Loading...
HomeMy WebLinkAboutCERTIFICATE OF CODE COMPLIANCE2645 Executive Pad* Drive, Ste. 157 Weston, Florida 33331 Tel.: (954) 3494249 Fax (954) 349.4251 Rower Generation & Distribution n www.pgdengineers.com April 12th, 201Q' SGANNEW 086 Z� Q� Mr. J. (Van) Whitaker �G Building Code Inspector St l 'O PAIR* St. Lucie County Public Works Department 2300 Virginia Avenue Fort Pierce, Florida 34982 Subject: Certificate of Code ompliance — UL Field Evaluation Electrical Power Distgbution System Project 23 kV Rectifier Trans ormers Assemblies "A" and "B" Project Address: Allied New Technolo iies Plant 9545 Rangeline Road, Fort Pierce, Florida, 33987 Inspector Name: Carlos Alberto V Profgssional License: 53809 Contractor: Dolphin Electrical I, the undersigned, as a duly registered Pr( authorized to observe full time the constr Distribution System at the new Allied New knowledge and belief, exercising due care installation of the 23 kV SPECIALTR.AFO R St. Lucie County permitted drawings E-6, E-7 compliance with applicable Codes' and intent supporting documents and design criteria. P.E. Inc. ssional Engineer in the State of Florida, having been lion, installation and testing of the Electrical Power echnologies Plant hereby state that; to the best of my i diligence in the observation of the construction tamer Transformers Assemblies A and B as described id E-11; the constructionwasobserved to be built witliiii`. . the permit, the approved plans, specifications, and other' . I hereby certify that the 23 KV Rectifier Tran formers and Control Panels listed below, Manufactured by SPECIALTRAFO S.p.A. Milano Italy, have been field evaluated by Underwriters Laboratory, Inc: (UL), a qualified testing laboratory, .for comp4an e with the latest Ul, Standard on safety for applicable Medium Voltage standards and "Industrial Control Panels", Standard UL 508A. A Field Evaluated Product UL label was affixed on each Rectiflei Transformer and:Control panel indicating full compliance. 1. 23 KV'RECTIFIER TRANSFORMER ASSEMBLY "A" a. Rectifier Transformer S/N 357 6 (ED-TR-OOIA) b. Control Panel SN 6601 c. OLTC Control Panel (Oil Loa Tap Changer) S/N 6603 d. Overvoltage Protection Panel /N 6605 2. 23 KV RECTIFIER TRANSFORMER ASSEMBLY `B" a. Rectifier Transformer S/N 35797 (ED=T 001B, ,) b. Control Panel S/N 6600 s!; c. OLTC Controi�Panel (Oil Load Tap.Chariger) S/N 6602 d. Overvoltage Y'r6tection Panel /N;6,6.04 "SERVING THE POWER INDUSTRY WITH EXCELLENCE" Power Generation & 2645 Executive Park Drive, Ste. 157 Weston, Florida 33331 Tel.: (954) 3494249 Fax: (954) 3494251 www.pgdengineers.com The following documents are enclosed for Sty Lucie County Building Official recordkeeping: 1. Rectifier Transformer Steel ColumnPase Plate Analysis and Anchoring Details dated 3/19/2010, signed and sealed by Mr. Adolfo J. onzalez, E.E. #58620. 2. Oil Confinement Area Calculations on drawing sheet # S1-10a dated 3/19/2010, signed and sealed by Mr. Adolfo J. Gonzalez, E. E. #58620. 3. Field Test Report Issued by North American Substation Services for Rectifier Transformers S/N 35796 and S/N 35797, dated 2/11/200. 4. FRIEM S.p.A. SpecialTrafo (Typical). 5. FRIEM S.p.A. Rectifier (Typical) 6. 23 kV SPECIALTRAFO Rectifier A complete set of Rectifier Transformer be submitted to St. Lucie County Bt inspection and certification documents. Therefore, I respectfully request St. Lucie above mentioned 23 KV Rectifier Tr= purposes. Carlos Alberto Vargas,.P.E. Engineer-of-Record/Irispector CC: Allied New Technologies, Dolphin Diagram and Rating Plate S/N 36796 dated 12/11/07 Assembly Layout Drawing No. 85450 sheet 4 dated 5/11/07 Assemblies A and B pictures (Typical) )lies construction and installation "as -built" drawings will Code Inspector along with the final electrical project Building Code Inspector the approval to energize the and control Panels for testing and commissioning ic, CONVE & AVS, File "SERVING THE INDUSTRY WITH EXCELLENCE"