Loading...
HomeMy WebLinkAboutINSPECTION CARDCode Compliance Division INSPECTION CARD 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-2172 Fax: (772) 462-6443 http://www.stiucleco.org/public works/permitting.ht http://airs.slcfl.vetrol.com/AI RSweb.p hp Permit #: SLC- 0802-0116 Confirmation #: 763 Issued: 01/14/2009 Type: Building Commercial Job Location: 9549 RANGELINE RD City: PORT ST LUCIE Jurisdiction: St. Lucie County Parcel: 4201-111-0001-000/7 Subdiv: Lot: Block: Flood: Elev: Flood Map: Setbacks Left: 36.00 Right: Front: 50.00 Rear: Job Description: TCO ISSUED 3/31/2010 FOR TESTING k MANUFACTURING BLEACH OPERATION ONLY ---NO OCCUPANCY--KA NEW CONSTRUCTION OF A COMMERC L WAREHOUSE (MAIN BUILDING). THIS PERMIT EXCLUDES THE CLOSED LOOP RECYCLE SYSTEM COMA INED WITHIN THE COOLING TOWERS, ASSOCIATED SUMPS, CONTAINMENT AND PIPING PER FDEP LETTER DATED 11/21/2008 UNTIL A COPY OF THE FDEP INUSTRIAL WASTEWATER PERMIT HAS BEEN REVIEWED AND APPROVED BY THE BUILDING OFFICIAL. 8/18/09 COOLING TOWER ADDED TO S F OPE OF WORK. REVISION AND LETTERS ON FILE. Contractor JOSE R. VEGA VM CONSTRUCTION, INC (305) 220-6557 8370 WEST FLAGLER ST SUI E # 206 MIAMI, FL 33144 Property Owner CHEM-TEX SUPPLY CORP (786) 348-7592 3901 NW 115TH AWE MIAMI, FL 33178-1859 SUB -PERMITS Permit # Status PT Cert # DBA' I Owner / Builder Job Description 0802-0116-01 ISS EP 24302 DOLPHIN ELE TRICAL CONT 3-25-2009 CHANGE OF ELECTRICAL SUB FORM JAVIER ROJAS 25258 TO JOHN TAYLOR 24302- PER LETTER FROM CONTRACTOR- A HUMPHREY 0802-0116-02 ISS PP 17488 ART STOVER P UMBING INC 0802-0116-03 ISS ME 18627 ALBERT KUEBLTR HEATING 0802-0116-04 ISS RP 10533 TOTAL ROOFING SYSTEMS II Inspection Notes: TCO issued 3/31/2010 for testing & manufacturing bleach operation only.//KA NO CO UNTIL CONSTRUCTION OF RIGHT AND LEFT TURN LANES AT THE PROJECT ENTRANCE ARE PROVIDED.KA (SEE LINDA IN GROWTH MANAGEMENT WITH ANY QUESTIONS). _ NO CO UNTIL COUNTY COMMISSIONERS HAVE ADOPTED A RESOLUTION APPROVING THE LANDSCAPING AGREEMENT UNDER RESOLUTION 08-095. L.GALBRAITH (SEE SITE PLAN FOLDER). landscape agreement approved 5/6/08. stee copy in title. cml For the automated inspection system call (772)462-1261. To schedule an inspection online go to http://airs.slcfl.vetrol.com/AIRSweb.php. All inspections requested prior to 9:00 PM will be.scheduled for the next business day. Inspection requests between 9:00 PM Friday and 9:00 PM Monday will be scheduled for the following Tuesday. If you require any assistance, please contact the Building Department at (772) 462-2172. Permit # Type Code Description Priority Date Sched 0802-0116 115 Slab 0 03/10/2009 null Scheduled: Mon Mar 9 10:07:08 EDT 2009 with value: null Resulted: Tue Mar 10 10:02:51 EDT 2009 0802-0116 115 Slab 0 03/27/2009 Res Description Inspector Date Insp. 91 Partial Approval Greg Smyth 03/10/2009 91 Partial Approval Greg Smyth 03/27/2009 Permit Nunj 10802-0116 Code Compliance Division 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-2172 Fax: (772) 462-6443 http://www.stiucieco.org/public—works/permiffin hftp://airs.slcfl.vetrol.com/AIRSweb.php NORTH HALF OF RAMPMARKED ON PLAN.Re-inspectio 1 Scheduled: Thu Mar 26 16:58:47 EDT 2009 with value: Fri M 0802-0116 115 Slab 0 04/012( areas circled on plan.Re-inspection 2 Scheduled: Tue Mar 31 15:40:00 EDT 2009 with value: We Resulted: Wed Apr 1 13:57:26 EDT 2009 0802-0116 115 Slab 0 04/08/ Re -inspection 3 CIRCLED AND INITAILED ON PLANS Scheduled: Tue Apr 7 14:28:24 EDT 2009 with value: null 0802-0116 115 Slab 0 04/16/ sections on plan that are circle and dated and initialed by gr Scheduled: Wed Apr 15 08:18:15 EDT 2009 with value: Thu Resulted: Thu Apr 16 14:38:01 EDT 2009 0802-0116 115 Slab 0 04/21/�( peding revisions for piers and secondary slabs on top of alrq Scheduled: Mon Apr 20 09:56:11 EDT 2009 with value: null Resulted: Tue Apr 21 13:35:06 EDT 2009 0802-0116 115 Slab 0 04/27/2( Re -inspection 6 Resulted: Mon Apr 27 14:36:22 EDT 2009 0802-0116 115 Slab 0 04/30/2( Re -inspection 7 Scheduled: Wed Apr 29 14:29:56 EDT 2009 with value: Thu Resulted: Thu Apr 30 13:14:59 EDT 2009 0802-0116 115 Slab 0 05/05/21 Re -inspection 8 SECOND FLOOR SLAB FOR ELECTRIC RC Scheduled: Mon May 4 09:51:08 EDT 2009 with value: Tue h 0802-0116 115 Slab 0 05/14/21 area circled on plan with this date. Re -inspection 11 Scheduled: Wed May 13 15:29:43 EDT 2009 with value: Thu Resulted: Thu May 14 14:31:20 EDT 2009 0802-0116 115 Slab 0 05/18/21 AREAS CIRCLED AND DATED ON PANRe-inspection 12 Resulted: Mon May 18 14:24:18 EDT 2009 0802-0116 115 Slab 0 05/21/21 area dated on plan. Re -inspection 13 Scheduled: Wed May 20 12:48:51 EDT 2009 with value: Thu Resulted: Thu May 21 13:54:21 EDT 2009 0802-0116 115 Slab 0 05/26/21 areas circled on plansRe-inspection 14 Scheduled: Fri May 22 08:48:03 EDT 2009 with value: Tue N Resulted: Tue May 26 14:02:07 EDT 2009 INSPECTION CARD 27 00:00:00 EDT 2009 3 91 Partial Approval Apr 1 00:00:00 EDT 2009 91 Partial Approval Greg Smyth 04/01/2009 Dave Johnson 04/08/2009 )9 91 Partial Approval Greg Smyth 04/16/2009 .Re -inspection 4 pr 16 00:00:00 EDT 2009 )9 91 Partial Approval Greg Smyth 04/21/2009 iy poured slabs. contractor to take pictures of both. Re -inspection 5 91 Partial_Approval 91 Partial Approval 30 00:00:00 EDT 2009 Greg Smyth 04/27/2009 Greg Smyth 04/30/2009 91 Partial Approval Dave Johnson 05/05/2009 1 AND CONTAINMENT SLAB BOTH CIRCLED AND INITIALED ON PLANS 5 00:00:00 EDT 2009 91 Partial Approval Greg Smyth 05/14/2009 14 00:00:00 EDT 2009 91 Partial Approval 91 Partial Approval 21 00:00:00 EDT 2009 91 Partial Approval 00:00:00 EDT 2009 0802-0116 115 Slab 0 05/11/2009 91 Partial Approval SLAB AROUND COLUMNS CIRCLED ON LAN.Re-inspection ) Scheduled: Fri May 8 10:52:11 EDT 2009 with value: Mon May 11 00:00:00 EDT 2009 Resulted: Mon May 11 14:05:48 EDT 2009 0802-0116 115 Slab 0 05/13/2009 91 Partial Approval Re -inspection 10 Scheduled: Tue May 12 12:04:29 EDT 2009 with value: Wed May 13 00:00:00 EDT 2009 Resulted: Wed May 13 14:34:55 EDT 2009 0802-0116 115 Slab 0 06/01/2009 91 Partial Approval Re -inspection 15 Scheduled: Fri May 29 11:35:05 EDT 2009 with value: Mon Jun 1 00:00:00 EDT 2009 Resulted: Mon Jun 1 14:49:47 EDT 2009 0802-0116 115 Slab 0 06/10/2009 91 Partial Approval Re -inspection 16 Scheduled: Tue Jun 9 09:58:31 EDT 2009 with value: Wed Jun 10 00.00:00 EDT 2009 Resulted: Wed Jun 10 14:14:29 EDT 2009 0802-0116 115 Slab 0 06/19/2009 91 Partial Approval Greg Smyth 05/18/2009 Greg Smyth 05/21/2009 Greg Smyth 05/26/2009 Greg Smyth 05/11/2009 Greg Smyth 05/13/2009 Greg Smyth 06/01/2009 Greg Smyth 06/10/2009 Greg Smyth 06/18/2009 Permit Nun 0802-0116 Code Compliance Division 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-2172 Fax: (772) 462-6443 http://www.stiucieco.org/public—works/pormiffin hftp://airs.slcfl.vetrol.com/AIRSweb.php INSPECTION CARD null Resulted: Thu Jun 18 14:41:15 EDT 2009 0802-0116 115 Slab 0 06/22 2009 91 Partial Approval Re -inspection 19 Scheduled: Fri Jun 19 12:43:19 EDT 2009 with value: Mon Jun 22 00:00:00 EDT 2009 Resulted: Mon Jun 22 14:22:17 EDT 2009 0802-0116 115 Slab 0 07/07. 009 91 Partial Approval Re -inspection 20 Scheduled: Mon Jul 6 13:52:13 EDT 2009 with value: Tue ul 7 00:00:00 EDT 2009 Resulted: Tue Jul 7 13:46:16 EDT 2009 0802-0116 115 Slab 0 07/12009 91 Partial Approval Re -inspection 21 Scheduled: Mon Jul 13 12:46:29 EDT 2009 with value: Tue ul 14 00:00:00 EDT 2009 Resulted: Tue Jul 14 14:19:21 EDT 2009 0802-0116 115 Slab 0 07/201 009 91 Partial Approval Re -inspection 22 Scheduled: Fri Jul 17 10:33:43 EDT 2009 with value: Mon J 120 00:00:00 EDT 2009 Resulted: Mon Jul 20 14:32:30 EDT 2009 0802-0116 115 Slab 0 08/31/2 09 90 Approved Re -inspection 23This Inspection Was For The Cooling Tower Slab Per Greg Smyth. Scheduled: Fri Aug 28 11:07:13 EDT 2009 with value: Mon Aug 31 00:00:00 EDT 2009 0802-0116 118 Column 0 12/14/2009 92 Accepted As Noted Re -inspection 6 0802-0116 118 Column 0 09/16/2009 91 Partial Approval Re -inspection 5 Scheduled: Tue Sep 15 15:12:39 EDT 2009 with value: Wed Lp 16 00:00:00 EDT 2009 COOLING TOWER INTERIOR COLUMNS ALL EXCEPT FOL. R. 0802-0116 118 Column 0 04/17/2009 91 Partial Approval Re -inspection 4 Scheduled: Thu Apr 16 14:46:08 EDT 2009 with value: Fri Ap 17 00:00:00 EDT 2009 Resulted: Fri Apr 17 14:15:03 EDT 2009 0802-0116 118 Column 0 02/20/20 9 91 Partial Approval Re -inspection 1 4 COLUMNS 2 UP TO 12' HT AND 2 TO 8' H 0802-0116 118 Column • 0 02/25/2 1 9 91 Partial Approval partial 1 st lift no tie beams. Re -inspection 2 Scheduled: Tue Feb 24 13:58:13 EST 2009 with value: Wed FL 25 00:00:00 EST 2009 Resulted: Wed Feb 25 14:36:01 EST 2009 0802-0116 118 Column 0 03/16/200 91 Partial Approval Re -inspection 3 NEED PROPER REVISIONS FOR ALL CHAN ES. Scheduled: Fri Mar 13 09:21:53 EDT 2009 with value: Mon Mar 16 00:00:00 EDT 2009 Resulted: Mon Mar 16 14:34:26 EDT 2009 0802-0116 118 Column 0 02/19/200t circled 3 columns and initialed areas on revision plans.null Scheduled: Wed Feb 18 08:52:20 EST 2009 with value: null Resulted: Thu Feb 19 10:35:54 EST 2009 0802-0116 125 Tie Beam 0 03/10/20M null Resulted: Tue Mar 10 10:02:39 EDT 2009 0802-0116 125 Tie Beam 0 05/21/2= bottom floor and 2nd floor Scheduled: Wed May 20 12:49:25 EDT 2009 with value: Thu K Resulted: Thu May 21 13:54:40 EDT 2009 0802-0116 125 Tie Beam 0 05/26/2005 areas circled on plans. Re -inspection 2 Scheduled: Fri May 22 08:49:02 EDT 2009 with value: Tue May Resulted: Tue May 26 14:02:29 EDT 2009 Greg Smyth 06/22/2009 Greg Smyth 07/07/2009 Greg Smyth 07/14/2009 Greg Smyth 07/20/2009 Greg Smyth 08/31/2009 Greg Smyth 12/14/2009 Posted 09/16/2009 Greg Smyth 04/17/2009 Dave Johnson 02/20/2009 Greg Smyth 02/25/2009 Greg Smyth 03/16/2009 91 Partial Approval Greg Smyth 02/19/2009 91 Partial Approval Greg Smyth 03/10/2009 75 Cancelled by Customei Greg Smyth 05/21/2009 21 00:00:00 EDT 2009 91 Partial Approval Greg Smyth 05/26/2009 00:00:00 EDT 2009 Permit Nun 0802-0116 Code Compliance Division INSPECTION CARD 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-2172 Fax: (772) 462-6443 http://www.stiucieco.org/public_works/permitting.h m http://airs.slcfl.vetrol.com/AIRSweb.php 0802-0116 125 Tie Beam 0 12/12009 92 Accepted As Noted Greg Smyth 12/14/2009 Re -inspection 3 12-11-09----- 238--bldg elec rgh for DOLP IN ELEC is complete ------- 238 elec rgh for CONVEY is still pending (DC elec) -------------- —------------------- 280 elec final ---all interior Work for DOLPHIN ELEC is complete -----outside site lighting (bridge) and cable tray covers still pending ----- -------------- 280 elec final for CO�IVEY--all DC work pending Resulted: Mon Dec 14 14:19:40 EST 2009 0802-0116 164 Poured Concrete Wall 0 12114 z009 92 Accepted As Noted Greg Smyth 12/14/2009 Re -inspection 3 0802-0116 164 Poured Concrete Wall 0 09/10/2009 91 Partial Approval Greg Smyth 09/10/2009 This Inspection Is For Cooling Tower Slab. Re -inspection 2 0802-0116 164 Poured Concrete Wall 0 04/16/ 009 91 Partial Approval Greg Smyth 04/16/2009 sections on plan that are circled with this date and my initial I�IRe-inspection 1 0802-0116 164 Poured Concrete Wall 0 03/24/2009 91 Partial Approval Greg Smyth 03/24/2009 0802-0116 232 Eliectric - Underground 0 04/16/ I009 90 Approved Van Whitaker 04/16/2009 ELECTRICIANS ON SITE TO MEET WITH INSPECTOR 0802-0116 238 Electric Rough 0 09/11/2009 91 Partial Approval Van Whitaker 09/11/2009 [Call John @529-2828 (Dolphin Electric)] In office area. en Resulted: Fri Sep 11 14:09:28 EDT 2009 9-11-09---- 238 --- partial, office, r. rms, break area only 0802-0116 238 Electric Rough 0 12/11/2 , 09 91 Partial Approval Van Whitaker 12/11/2009 Re -inspection 1 0802-0116 238 Electric Rough 0 03/26/2 10 90 Approved Van Whitaker 03/26/2010 Re -inspection 2 0802-0116 260 30 Day for Testing 0 03/26/2 10 90 Approved Van Whitaker 03/26/2010 0802-0116 280 Electric Final 0 12/11/20I 9 91 Partial Approval Van Whitaker 12/11/2009 null Scheduled: Thu Dec 10 11:42:22 EST 2009 with value: null Resulted: Fri Dec 11 14:11:28 EST 2009 0802-0116 280 Electric Final 0 03/26/20 0 90 Approved Van Whitaker 03/26/2010 Re -inspection 1 0802-0116 351 Mechanical Rough-In(d 0 08/26/20 9 90 Approved Gary Scheigner 08/26/2009 0802-0116 425 Sewer Connect 0 10/16/2009 92 Accepted As Noted Greg Smyth 10/16/2009 5 FEET FROM BLD CONNECTION TO SITE RAN UTILITY LI$1E ONLY. 0802-0116 429 Grinder Pump 0 03/30/201 92 Accepted As Noted Greg Smyth 03/30/2010 grinder pump is actually a lift station pumping to an elevated dr. infield. 0802-0116 480 Plumbing Final 0 03/30/2017 90 Approved Greg Smyth 03/30/2010 0802-0116 821 Solid Waste 0 03/30/2010 93 Not Required Ken Arnold 03/30/2010 0802-0116 104 Compaction Test 1 05/04/200� 90 Approved Ken Arnold 05/04/2009 0802-0116 104 Compaction Test 1 03/30/2009 90 Approved Eileen Norton 03/30/2009 PER AFFIDAVIT SUBMITTED. EN 0802-0116 104 Compaction Test 1 05/13/2009 PER AFFIDAVIT RECEIVED 05/13/09 DATED 05/12/19.EN 0802-0116 106 Engineers Report 1 GROUND GRID, AREA 1, REPORT DATE 4/2/2009 0802-0116 106 Engineers Report 1 GROUND GRID, AREA 3, REPORT DATE 4/2/2009 0802-0116 106 Engineers Report 1 GROUND GRID, MAIN BUILDING, REPORT DATE 3/6/2009 0802-0116 106 Engineers Report 1 02/17/2010 PER ENGINEERS REPORT DATED DECEMBER 28, 2009 (REI Peter to provide engineers report to inspector FINAL ENGINEERS REPORT REQUIRED 0802-0116 110 Footer/Foundation 1 02/04/2009 90 Approved Eileen Norton 05/13/2009 92 Accepted As Noted Ed DeGenaro 06/03/2009 92 Accepted As Noted Ed DeGenaro 06/03/2009 92 Accepted As Noted Ed DeGenaro 06/03/2009 92 Accepted As Noted Ken Arnold 03/10/2010 O W. GRITZ PE66989) 91 Partial Approval Dave Johnson 02/04/2009 Permit Nun 0802-0116 Code Compliance Division INSPECTION CARD 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-2172 Fax: (772) 462-6443 http://www.stiucieco.org/public—works/permitting.h� m http:/lairs.slcfl.vetrol.com/AIRSweb.php Re -inspection 1 highlighted and signed on plans Scheduled: Tue Feb 3 07:57:07 EST 2009 with value: We Feb 4 00:00:00 EST 2009 0802-0116 110 Footer/Foundation 1 02/09 2009 91 Partial Approval Greg Smyth 02/09/2009 PENDING REVISION FOR 2 CENTER PADS CICLED O PLANS PADS ARE BEING CONECTED WITH ANOTHER SECTION OF CONCRETE AND STEEL.Re-inspection 2 Resulted: Mon Feb 9 14:15:14 EST 2009 0802-0116 110 Footer/Foundation 1 12/14 2009 92 Accepted As Noted Greg Smyth 12/14/2009 Re -inspection 3 0802-0116 110 Footer/Foundation 1 01/28/ 009 91 Partial Approval null north end of building signed on hilighted area of foundat on plans. Scheduled' Tue Jan 27 09:49:02 EST 2009 with value: We Jan 28 00:00:00 EST 2009 0802-0116 140 Construction Rough Fr. 1 09/23/ 009 91 Partial Approval METAL BUILDING FRAMINGTHIS INSPECTION WAS FO CONTROL ROOM FRAMING ONLY. 0802-0116 140 Construction Rough Fr. 1 12/14/ 009 92 Accepted As Noted Re -inspection 2 Dave Johnson 01/28/2009 Greg Smyth 09/23/2009 Greg Smyth 12/14/2009 0802-0116 141 Insulation 1 12/14709 92 Accepted As Noted Greg Smyth 12/14/2009 Re -inspection 1 0802-0116 149 Progress inspection 1 08/14/2009 90 Approved Van Whitaker 08/14/2009 ROUGH DUCT INSPECTION. EN Resulted: Fri Aug 14 14:25:27 EDT 2009 0802-0116 159 Isolated Footing 1 02/11/2 09 91 Partial Approval Greg Smyth 02/11/2009 STILL PENDING REVISION.null Scheduled: Tue Feb 10 13:53:06 EST 2009 with value: Wed 11 00-00:00 EST 2009 Feb Resulted: Wed Feb 11 14:40:32 EST 2009 0802-0116 159 Isolated Footing 1 02/16/2009 81 Disapproved Greg Smyth 02/16/2009 Re -inspection 1 Scheduled: Fri Feb 13 09:13:02 EST 2009 with value: Mon Fe 16 00:00:00 EST 2009 Resulted: Mon Feb 16 08:54:13 EST 2009 0802-0116 159 Isolated Footing 1 02/17/20 9 91 Partial Approval Greg Smyth 02/17/2009 Re -inspection 2 Scheduled: Mon Feb 16 09:30:19 EST 2009 with value: Tue F b 17 00:00:00 EST 2009 Resulted: Tue Feb 17 14:44:41 EST 2009 0802-0116 159 Isolated Footing 1 04/08/2009 91 Partial Approval Dave Johnson 04/08/2009 Re -inspection 3 CIRCLED AND INITIALED ON PLANS, REFEfTO REVISIONS. 0802-0116 159 Isolated Footing 1 12114/200I 90 Approved Greg Smyth 12/14/2009 Re -inspection 4 0802-0116 165 Handicap Restrooms 1 01/07/2010 81 Disapproved Greg Smyth 01/07/2010 null Scheduled: Mon Dec 14 10:00:53 EST 2009 with value: null Scheduled: Wed Jan 6 13:29:35 EST 2010 with value: null Resulted: Thu Jan 7 14:29:28 EST 2010 0802-0116 165 Handicap Restrooms 1 03/30/2010 Re -inspection 1 0802-0116 167 Roof Final 1 12/17/2009 null Scheduled: Wed Dec 16 14:01:12 EST 2009 with value: null Resulted: Thu Dec 17 14:32:42 EST 2009 0802-0116 259 Power Release Form 1 09/16/2009 0802-0116 380 Mechanical Final 1 12/11/2009 MUST INSPECT FLOAT SWITCHES ON AHUs Resulted: Fri Dec 11 14:11:48 EST 2009 0802-0116 420 Plumbing Rough 1 04/24/2009 two systems same building.en Resulted: Fri Apr 24 14:09:36 EDT 2009 4-24-09----- 421 0802-0116 420 Plumbing Rough 1 04/30/2009 Re -inspection 1 Resulted: Thu Apr 30 13:15:13 EDT 2009 90 Approved Greg Smyth 03/30/2010 92 Accepted As Noted Greg Smyth 12/17/2009 90 Approved Ken Arnold 09/16/2009 90 Approved Van Whitaker 12/11/2009 91 Partial Approval Van Whitaker 04/24/2009 rtial, see plan page 1.01-A for area completed 91 Partial Approval Greg Smyth 04/30/2009 Permit Nun 0802-0116 Code Compliance Division 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-2172 Fax: (772) 462-6443 http://www.stlucleco.org/public—works/permittin http:/iairs.slcfl.vetrol.com/AIRSweb.php 0802-0116 420 Plumbing Rough 1 121141,2 Re -inspection 2 0802-0116 423 Plumbing Top Out 1 09/15/ PARTIAL PLUMBING FOR CONTROL ROOM ONLY DRIN NEED TO BE EXTENDED THRU ROOF. 0802-0116 423 Plumbing Top Out 1 02/04/ Re -inspection 5 Scheduled: Wed Feb 3 08:42:26 EST 2010 with value: null Resulted: Thu Feb 4 14:34:46 EST 2010 0802-0116 423 Plumbing Top Out 1 01/29/ pending the rest of the ck valves on hose connections.Re-in, 0802-0116 423 Plumbing Top Out 1 10/1612I PENDING EYEWASHES AND HOSEBIBBS.Re-inspection 1 0802-0116 423 Plumbing Top Out 1 11/19/2 outside storm and condensate.Re-inspection 2 Scheduled: Wed Nov 18 14:59:08 EST 2009 with value: Thu 0802-0116 423 Plumbing Top Out 1 12/15/2 need letter from engineer stating that the hosebibbs and hose CONDITION MAY HAPPEN WITHOUT THEM. ALSO NEED FROM SAME PIPING THAT THE COOLING TOWER IS BEII BIBBS.ALSO NEED ENGINEER TO VERIFY IN WRITING TI SUPPLY AND POTABLE WATER SUPPLY FEEDING REST Scheduled: Mon Dec 14 10:00:15 EST 2009 with value: Tue Resulted: Tue Dec 15 14:45:38 EST 2009 0802-0116 700 Fire Department Final 1 03/11/2 0802-0116 809 Consultation 1 07/02/2 REQUESTING 9:30 APPT WITH VAN. EN Resulted: Thu Jul 2 15:06:56 EDT 2009 7-2-09----- met with imported ----main swt gear is from mexico and will have a UL acceptable testing agency 0802-0116 900 Plan Revision 1 NEW SHEET #S1 034a, PIERS, DOWLS, REBAR FOR T 0802-0116 900 Plan Revision 1 CHANGE BEAMS, COLUMNS, ROOF INSPECTION CARD 92 Accepted As Noted Greg Smyth 12/14/2009 109 91 Partial Approval Greg Smyth 09/15/2009 NG FOUNTAIN WATERLINE NEEDS TO BE STRAPPED TO WALL VENTS 10 90 Approved Greg Smyth 02/04/2010 10 91 Partial Approval Greg Smyth 01/29/2010 )ection 4 09 91 Partial Approval Greg Smyth 10/16/2009 09 91 Partial Approval Greg Smyth 11/19/2009 19 00:00:00 EST 2009 )9 81 Disapproved Greg Smyth 12/15/2009 connections do notNEED VACUMBREAKERS POSSIBLE CONTAMINATION NG. LETTER ADDRESSING THE WAY THE EYEWASHES ARE SUPPLIED G FED FROM. ALSO NEED SEPERATE SHUTOFF VALVES FOR HOSE %T THERE IS BACKFLOW PROTECTION FOM COOLING TOWER WATER ;OOMS .ETC. EYEWASHES AND EMERGENCY SHOWERS.Re-inspection 3 ec 15 00:00:00 EST 2009 0 90 Approved Debbie Knupp 03/10/2010 9 90 Approved Van Whitaker 07/02/2009 g--- rectifiers, surge protectors, xformers, and main swt gear are icker----- other equip not UL labeled will have to have a letter from bldg code 92 Accepted As Noted Ed DeGenaro 05/04/2009 i SECTIONS F, B, H, K & G 92 Accepted As Noted Ed DeGenaro 05/26/2009 0802-0116 900 Plan Revision 1 COLUMN SUPPORT CELLS, SOS REDESIGN, DELETE TROU REVISION SHEET & DRAWINGS 0802-0116 900 Plan Revision 1 REBAR AND UTILITY PAD 0802-0116 900 Plan Revision 1 METAL BUILDING MANUFACTURERS' DRAWINGS, AMERICA 0802-0116 900 Plan Revision 1 PRECAST CHANGED TO POURED IN PLACE, ENGINEER INE TWIN TEE SHOP DRAWINGS PROVIDED 0802-0116 105 Form Board Survey 2 NEED FINAL SURVEY. L.GALBRAITH 0802-0116 121 Termite Spray 2 92 Accepted As Noted Ed DeGenaro 04/07/2009 EXTEND CELL TO 2ND FLOOR AC, LIGHTING, PANELS, SEE 92 Accepted As Noted Ed DeGenaro 04/07/2009 92 Accepted As Noted Ed DeGenaro 02/05/2009 BUILDING COMPANY 92 Accepted As Noted Ed DeGenaro 02/05/2009 :CTION REPORT REQUIRED FOR SHORING, BY CONTRACTOR AND 92 Accepted As Noted Lydia Galbraith 92 Accepted As Noted Greg Smyth 12/14/2009 Permit Nunj 10802-0116 Code Compliance Division INSPECTION CARD 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-2172 Fax: (772) 462-6443 http://www.stiucleco.org/public—works/permitting.htm http://airs.slcfl.vetrol.com/AIRSweb.php null Resulted: Mon Dec 14 14:20:20 EST 2009 0802-0116 900 Plan Revision 2 92 Accepted As Noted Ed DeGenaro 07/30/2009 23 PAGE REVISION, MOVE DOOR, REMOVABLE RAIL & CHAIN, HARMONICS FILTER SUPPORT, ROOF DETAILS, DUCTWORK CHANGE, LIGHT LOCATIONS, RECEPTICLES, PLUMBING WASTE AND ROOF DRAINS 0802-0116 900 Plan Revision 2 08/19 2009 90 Approved Chris LeStrange 08/19/2009 COOLING TOWER ADDED TO SCOPE OF WORK. 0802-0116 192 Deck Steel 3 92 Accepted As Noted Greg Smyth 12/14/2009 null Scheduled: Mon May 4 09:51:43 EDT 2009 with value: null Resulted: Mon Dec 14 14:20:41 EST 2009 0802-0116 146 Deck 4 92 Accepted As Noted Greg Smyth 12/14/2009 CONCRETE Resulted: Mon Dec 14 14:20:59 EST 2009 0802-0116 140 Construction Rough Fr 5 92 Accepted As Noted Greg Smyth 12/14/2009 INTERIOR WALLS Resulted: Mon Dec 14 14:21:25 EST 2009 0802-0116 141 Insulation 5 91 Partial Approval Greg Smyth 09/23/2009 THIS INSPECTION WAS FOR CONTROL ROOM ONLY.n II Scheduled: Mon Sep 21 09:50:14 EDT 2009 with value: nu 1 0802-0116 148 Window/Door Attachmt 5 92 Accepted As Noted Greg Smyth 12/14/2009 null Scheduled: Thu Nov 5 12:34:17 EST 2009 with value: null Resulted: Mon Dec 14 14:21:47 EST 2009 0802-0116 600 Product Certification 5 92 Accepted As Noted Greg Smyth 12/14/2009 null Resulted: Mon Dec 14 14:22:19 EST 2009 0802-0116 106 Engineers Report 6 50 Engineer Approval Ace Greg Smyth 01/06/2010 ENGINNERS REPORT FOR ---SNUGNESS OF THR BOLT CONNECTIONS FOR THE BLDING FRAMING, VISUAL INSPECTING THE WELDED CONNECTIONS FOR THE ROLLUP OVERHEAD DOORS, AND INSPECTING THE WALL AND ROOF SHEATHING FASTENERS. SEE REPORT IN FILE 01/06/2010 0802-0116 179 Firewall 7 92 Accepted As Noted Greg Smyth 12/14/2009 null Resulted: Mon Dec 14 14:22:42 EST 2009 0802-0116 823 Test & Balance Report 7 0802-0116 900 Plan Revision 7 92 Accepted As Noted Ed DeGenaro 04/02/2010 TRANSFORMER WALL PENETRATIONS 0802-0116 184 Final Survey 8 0802-0116 808 Landscaping/Trees 8 0802-0116 810 Health Dept - Septic 8 0802-0116 820 Driveway/Culvert 8 0802-0116 801 Paving and Drainage C 9 0802-0116 999 Final Inspection 9 Permit Nun 0802-0116