Loading...
HomeMy WebLinkAboutCHECK LIST (2)6161 MWIff""' F - Avl' Check Lis Applications for compliance with the Florida Building Code, Energy Conservation shall include: M, This Checklist An Input report generated from the software just after completing compliance calculatons without any ftther changes I I The fall compliance report generated by the software that contains the project summary, complaince summary, certifica6ns and detailed component compliance reports Boxes appropriately check . ed in the Miscellanous report generated by the software at the end of the compliance report . F FL D ITEC URE &to PLA LLC AA-260M 7- ED EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1 .0 4/17/2016 Da e: June 30 2015 Page I of 13 I hereby certify that the plans and Florida Energy Code Prepared By: Date: ons covered b, this calculation are in compliance with the ( tf ace—�We I t 7 Building OlEcial- Date: I certify that this building is in complia i ce with the FLorid Energy Efficiency Code Date: Owner Agent: ;tem design is in compliance with the Florida If Required by Florida law, I hereby c8rtify that the s, I Energy Efficiency Code Reg No: Architect: Reg No: Electrical Designer: Reg No: Lighting Designer: Mechanical Designer: Reg No: Reg No: Plumbing Designer: ed.design Signature is required where Florida Law requires esign to be performed by register professionals. Typed names and registration numbers may be used where all relevant infOFMation is contained on signed/sealed plans. EnergyGauge Summit@ Fla]Com-2014. TAM �014-1.0 Compliant Software. Effective Date: June 30, 2015 4/17/2016 Page 3 of 13 Project A-1 TRUSS CONTANY Title: A-1 TRUSS CONTANY Type: Office rW'P.A Filet DAYT Raild-Ing En� Uses 1) lProposed 2) Baseline Total ELECTRlC1;rY(Ml3tu/kWh 1$) AREA LIGHTS MISC EQUIPMT; PUMPS & MISC; SPACE COOL SPACE HEAT VENT FANS 358-00 485.70 $5,591 $7,584 358.00 485.7.0 104891 142281 $5,591 $7,584 26.10 105.6.0 7656 30935 $408 $1,649 137.80 137.80 40364 40364 $2,151 $2,15.1 0.20 0.20 46 51 $2 $3 114.60 117.90 3357Z 34543 $1,789 $1,841 3.00 6.50 890 1890 $47 $101 76.30 117.70 ZZ363 34498 $1,192 $1,839 Credits Applied: None Passing Criteria 6446 Design (including any credits) = 5591 Passing requires Proposed Buildi ' ft cost to be t most 85% of Baseline cost. This Proposed Bu�-djng is at 73. % ftw Ct EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant So are. Effe ive Date: June 30, 2015 4/17/2016 Page 4 of 13 External Lighting CompHance Description Category Tradable? Allowance Area or Length ELPA CLP i I(W/Unit) or No. of Units (W) (W) (Saft or ft) I FPoje,-t: A -I TRUSS CONTANY Title: A -I TRUSS CONTANY T�,pe: Office (WEA File: DAYTONA13FACIELTMY) Lighting Controls C1 ompliance Acronym Ashrae DescriDtiOn Area Design Min COMPH- ID (sq-ft) Cr CP ance PrOZolSpl 17 Office -Enclosed 4,715 2 2 PASSES PrOZo2Spl 17 Office - Enclosed 4,468 2 2 PASSES — PASSES EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant Software. EffeGtive Date: June 30, 2015 4/17/2016 Page 5 of 13 Project: A -I TRUSS COIVIPANY Title: A -I TRUSS CONTANY 3)rpe: Office ("A File: DAyToNABEACELTMY) System Report Compliance rosyl System I Constant Volume Packaged No. of Units system I Component Category Capacity Design Eff IEff Criteria Design IPLV Comp -I ITLV Criteria liance Cooling System Air Conditioners Air Cooled 129000 11.30 11.20 11.40 11.40 PASSES 65000 to 135000 Btu/h Cooling Capacity Heating System Electric Furnace 50000 1.00 1.00 PASSES Air Handling System Air Handler (Supply) - 4000 0.80 0.82 PASSES -Supply Constant Volume PrOSyZ System 2 Constant Volume No. of Units I Component Category Capacit� Design Eff Design IPLV Comp - Eff Criteria ITLV Criteria liance Cooling System Air Conditioners Air Cooled 1211 1 11.30 11.20 11.40 11.40 PASSES 65000 to 135000 Btu/h Cooling Capacity Heating System Electric Furnace 500 1 0 1.00 1.00 4000 0.80 0.82 PASSES PASSES Air Handling System Air Handler (Supply) - -supply Constant Volume F-PASSES Plant Co inpliance Description Installed Size Design Alin Design Alin Category Comp No Eff E I ff IPLV IPLV liance None EnergyGauge Summit@ FialCom-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 Page 6 of 13 4117/2016 Water Heater Compliance Category Design Min Design Description Typ e Eff Eff Loss Max Comp .e Loss liance None sv�sem -Com Piping Sys em Compliance Category Pipe Dia Is O�erating Ins Cond Ins Req Ins Compliance Cate gory [inches] Runout? �emp [Bta-in/hr Thick [in] Thick [in] MY] Fr: I None EnergyGauge Summit@ Fla[Com-2014. TAM 201 �-I .0 Compliant Software. Effective Date: June 30, 2015 4/17/2016 1 Page 7 of 13 I Fenestration C402.2.7 Envelope U-� ;ac�tor oJf O�paque doors associated with the building ermal envelope meets requirements. Insulation C402.2.1.1 Envelope High-altiedo roofs satisfy one of the following: 0 3-year-ag'ed solar reflectance — 0.55 and thermal emittanc6 — 0.75, 3-year-aged solar reflectance Wattage Wattage Wattage G405,6 C405.4 C4052.3 index—J64.0, inffialyearsolarr ectanGe>=U.iU and thermal emittaince — 0.75, or initial year solar Exterior Lighting Exterior 'grounds lighting over 100 W provides >60 0 [B111 ImM unless on motion sensor or fixture is exempt from sc?pe of code or from external LPD. Interior Ughting Exit Sig 11 s do not exceed 5 watts per face. 0 Interior Lighting Addroollal interior lighting power allowed for special [I B, cl HVAG C4032.6 Mechanical SYSTEM —SPECIFIC G4033A,C403.3.1.1 Mechanical SYSTEM —SPECIFIC C403.3.1,C403.4.1 Mechanical SYSTEM —SPECIFIC C403AAA Mechanical SYSTEM_SPECIFIC 0403.2.10.1 Mechanical SYSTEM —SPECIFIC C4032.102 Mechanical SYSTEM —SPECIFIC G404.2 Mechanical SYSTEM_SPECIFIC C403.2.3 Mechanical Air.Leakage 0402.4.7 Envelope Insulation C402.2.6 Envelope Plan Review 0103.2 Envelope functions per the approved Hgniing plans and is a utom I tically controlled and separated from L general lighting. Exhau�t air energy recovery On systems meeting 0 M'o Table C403.2.6 Air ecinomizers provided where required, meet the PAO requir ments; for design capacity, control signal, ventialon controls, high -limit shut-off, integrated 1 izer control, and provide a means to relieve econom exces� outside air during operation. I Water economizers provided where requir ed, meet ri the reqluirements for design GapaGl�(, maximum I pressure drop and integrated economizer control. I Economizer operation will not increase heating 0 [211�0 enerjy use during normal operation. I HVAC fan systems at design conditions do not I exceed allowable fan system motor nameplate hp or fa P, system bhp. HVAC fan motors not larger than allowable limits. Sele water heating equipment meets efficlenGy 0 L req irements. Ziifugal fan open-circult cooling towers having combined rated capacity — I 100 gpm meets minimum efficiency requirement, >=38.2 gpm[hp. Plan Review C1 03.2 Exterior Lighting EnergyGauge Summit@ Fla/Com-2014. TAM 4/17/2016 �Ubules are installed on all building entrances. i 6rs have self -closing devices. I Jib edge insulation depth/length. Slab insulation 13 D iending away from b1fli ding is covered by j vement or>= 16 inches of soil. ans and/or specifications provide all information th which compliance Gan be determined for the ilding envelope and document where exceptions the standard are claimed. ans, specifications, and/or calculations provide all 0 El 0 ormation with which GOmpriance can be �termined for the exterior lighting -and electrical 'stems and equipment and document where ,ceptions to the standard are claimed. Information ovided should include exterior lighting power 11culations, wattage of bulbs and ballasts, 3nsformers and control devices. 114-1.0 Compliant Software. Effective Date: June 30, 2015 Page 8 of 13 Wattage G405.6.2 Exterior Lighting Exterior lighting power is consistent with what is shown on thel approved lighting plans, U U U demonstrati Ing proposed watts are less than or equal to allo,i�ed watts. Plan Review C1 03.2 Interior Lighting Plans, specifications, andtor calculations provide all informationw."ith which compliance can be ri determined forthe interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations', wattage of bulbs and ballasts, C4032.5.1 trarisformer's and control devices. I rspaces; Mechanical Demand control ventilation provided to HVAG >500 ft2 an? d >26 peoplell 000 ft2 occupant density -and served by systems with air side economizer, auto modu,labrig outside air damper control, or HVAC C403.2.4.3 design airlow >3,000 Gfrn. Mechanical Each zone equipped with setback controls using alltOrrlaft [time clock or programmable control Plan Review C1 03.2 system. I Mechanical Plans, specifications, and/or calculations provide all 0 0 informatio� with which compliance can be determined for the mechanical systems and equipmeg I t and document where exceptions to the standard are claimed. Load calculations per aGGeptab e engineering standards and handbooks. Plan Review C1 03.2 Mechanical Plans, specifications, and/or calculations provide all 1:1 0 0 information with which compliance Gan be determine'd for the service water heating systems and equi p1ment and document where exceptions to the standard are claimed. Hot water system sized per rfianOcturers sizing guide. SYSTEM SPECIFIC C403.4.5 Mechanical Zone controls can limit simultaneous ieating and cooling and sequence heating and cooling to each 11 0 SYSTEM SPECIFIC C403.4.3.1 zone. I Mechanical Three -pipe hydronic systems using a common return ior hot and chilled water are not used. - 1:1 El 1:1 SYSTEM SPECIFIC C403.4.32 Mechanical TWO -Pip I e hydronic systems using a common 13 0 [1 distribution system have controls to allow a deadba�d >=-15 OF, allow operation in one mode for at 1 ast 4 hrs before changeover, and have rest .91 controls to limit heating and cooling supply SYSTEM 0403.4.3.3.1 temper'ature to --30 OF. led to a Mechanical HydroriiG heat pump systems Gonnec 01111 -SPECIFIC comm6n water loop meet heat rejection and heat addffio I req . nts. SYSTEM C4082.2.2 Mechanical HVAC hydromG heating and cooling coils have -SPECIFIC rneang to balance and have pressure test SYSTEM C403.42 conne6flons. , n motors —7.5 hp to be drtven by variable Mechanical VAV fal -SPECIFIC spee�' drive, have a vane-a)dal fan with variable pitch blades, or have controls to limit fan motor demai-id. SYSTEM SPECIFIC C403.4.2.1 Mechanical VAV tians have static pressure sensors positioned so sefpoint <=i 13 total design pressure. 0 El 0 SYSTEM C403.4.2.2 1 Mechanical Reset static pressure setpoint for DDC controlled -1 El 1:1 E -SPECIFIC VAV �oxes reporting to central controller based on I the z ones requiring the most pressure. SYSTEM C403.4.5.4 I Mechanical Multiple zone HVAG systems have supply air 0 0 0 -SPECIFIC temperature reset controls. SYSTEM SPECIFIC G403.4.3.4 Mechanical Hydr I onic systems greater than 300,000 Btuth desl�n.d for variable fluid flow. 1:1 El 0 SYSTEM C403.4.3.4 Mechanical Te4erature reset by representative building loads El El El -SPECIFIC in pu, mping systems for chiller and boiler systems SYSTEM G403.4.4 >300,000 Btu/h. Mechanical Fan1systems with motors —7.5 hp associated with -SPECIFIC heatrejection equipmeritto have c-apabilityto ope'rate at 2/3 of full-sp eed and auto speed con6ls to control the leaving fluid temperature or condensing temp/pressure of heat rejection device. EnergyGauge Summit@ Fla/Com-2014, TAM 2014-1 . 0 Compliant Software. Eff6ctive Date: June 30, 2015 Page 9 of 13 4/17/2016 E I jo 0 T 00ha I 91OZILTIV 9 �OZ'OC eunp :818(] 9A]PS-4-3 'Weffi4OS IMIdwoo o'!�-J7 �OZ WVL .V�OZ_Woojej.� (gl!wwnS 9f5nP_E)AbjeUg [3 E] ,sBuipllnq 1ju ut pall.e1sul 6U.4qbl 5u4q6n lovam .1 Buiplinq Ile -40 ),n4s 01 s1041100 OPLUOIJIV s1041100 rl Talit4sul Bu4q5ll Jouelxa IOJ s1041100 bu.40110412w, oinv 5u4qBj-j JOUSIX'=1 fz'900 S104U00 .41BUI i000e pelle1sul Sl U04PInsul ;I junDdilloo juaLualinbal sIL4 �jRW popuedsns Pa So dol uo pallp4sul aq joutlao s;uawaxnbaj 1. uo4p-lnsul uo gqnsui lool eL9 jGaLu ol papua;ui uo4ninsul ado[OAUEJ VZ70VO -uoqoadsuluo4RpunoA Buunp in000 ol peou AP-111 uo.qi?lnsut uoge punci I pasodxe jol uo4RoWaA -jelIGIBLU w4oajold 0 P Lilm ar)ewep wo4 pajoa4old si uo4 -Insui joua:�XB adol@Au:3 VVZOSO ilogainsul .B12p;u"?-1GJ E:1 F1 1:3 jaLljo pup anjm-�j BuiplAoid ajeogglao uopinsui jo anjeA-I!j Lgim palagal si tlograinsut adolgAUG Nipline adoIGAIJ3 Vzoto ilogeinsul El 1:1 El -suoqon4sui qujns�i lool s,lain-pialnueul led pelle;sul uoE . =1 adojam�j z*MO uo.4einsul El F1 1:1 -suopn.4sui sdai o nueui led paliqsui ilograInsui 1jum ap B I AO adolaA113 �COSO uo gaInsul E] F1 F1 jo )joap a o ia uo.4elnsui sloollojaAal aLg o; pa;e-Ins i I s 1�n�o j! 61 S GdOIGA113 VZ700 uo4BInsul luo -Z � ui t=> si adols jooj aLa a luo p I allalsul q, uo.4pinsul jig-asool painod jo Is -suo.4on4sui s,I9jr4oP_jnuPw led pellWui uo.4eins I u jjoo�j adoleAu2 Z'ZOCO uo4slnsul -uo .4oadsul Euiwejj Buunp in000 o; peau AP-w 110.�nLtUOA El El . Isw;al�A�suleoawosjoj-enleA-�:iloo-tI �udinba adojam�j VVVZOO uo guinsul -Sa4l.A40B 90uRua1u'P-w:P9 E] pUa BUIdBoSpUel 'PUVA lqj�siow 'i'qr)iiuns .1 . 'a6pulap 1sujPr)P paloaloid 11048�nsul 11 ou;lx3 adoloAU3 )'q*Z'9Ot,3TZTOi?O uo gBinsul 'suO.4OrL4su1 o4elnsut @6�9 qej sdair4oeinueul led pG1P;su! U, . 2 I adOjOAu3 Z*COSO uopainsul ri -suo.4ort4sui sIair4q ejnup-w led pallp4sui uo.4painsul 111am apejO-Molag . adojam�j Z'Uco uo .4slnsul I -paplAcid eoup-Lwojj;gd salso .Pao Jo slaqej gi Pao ale sio 01 sp PID41 �npoid uo4z.4sGuq=j * adoleAuEl V VEOZO uO.4B4SGu9=J 0 E] I 'Od=IN qWA aouepj000e ui pajej mnpoid uoqf4seugzl ado1GAu3 VSOSO Uo4eAsGuq=J -buisnoq amequInj pue qsluglouajui I uaGAqaq j,aeS,p@j@qPjpuP_pa1P3JOj9qpuP O.P-41 I :p.Luil ol adoleAue 1p-uuaLi; 111 saJIPulwnl P ssa3eU adolaAug -sloop oBim)loop r)ui P-ol 1ju uo palisisul sjuaslaL428AA adojaA113 911*zotlo 068NEQ-1 JIV qSPNPaj jle;Dzlwlulw 01 Inua;ew Buiddelm alqp-a ad-iodp-A air4qow T!m paddt?jm jo padd.L4s 1pq;qse5 1pa�jnso 'Paleas GIB 119dolama rl .181geam jP_wjaLg Bui I!nq OL4 U1 af5qpqj jip-;o sboinos 1 adOIGAU3 V VVZOVO q6qeq-j JIV ri ri BU4 quawaimbal @Bieval Ile Gaw so pelaqP-1 ela WOOP pun . uo[ .1 .jP_4s@u9j:ginq-fUojoP_� adolaA113 17*VZM'O'VZOVO 962N88-1 JIV 'JGUU8W pGAojddP up u, p9jeas ale suo4n4auad jawi?q jrV 'JauuPw paAoidds us ul POPO; 10 pa;on4suoo IOLDa 13 ri El pue jauup-Lu pamdas up, ul palaes s' 11IRL9 'Oweq iie snonu.4uoo 9 su'Bjuoo;DdOjGAUa 6�1iplinq'aLLL I' * adoleA113 Z'VZMTi7'ZOtO aftNiae-1 JIV qqftuns joeilp apnIOXG 0� PGUBISGP ssalun jueoled 06 < GnIRA aZBqjp@jnsP_9w IR GARq P_GI8 F)U.1POSjUo.pq.L4sipj PU2 'GIOIS lipjai lasnoqelum pa;W051401-uOu 6uijrqoi4nuiaw ma!Aa�f uUld GOVJeS 9A LUO)�12 '951MIS lao-wo U, 1 S4461IMS adoleAuA Z'Z*Vzoto El 0 .40 IU046 Gft�opd OUILUialop AouaiOL40ABJeugil3uO.cPPPseL4JOIP . aq upo aoumidwoo qolqm qPM U04BWJOJU.l 0. o IOGfOJd 90VO maiAGICI ueld F1 F1 rl ilpaplAoidsuo.4pinolmio1puP-'suO4e gi.oads'suEld EIJO IT 099,1 910MIlt, 9 �OZ 'Oe SUrIp :818C] eA1JO;DJ;9 ';9JBAk4OS lUe!ldwoo C) �-t7�OZ JNVJ't7�OZ-WOO/'aH WWwnS abnaE)AF)iqu�] jGL40 jo, �O 06 pus sLuoo.4saj c)ilqnd Ul SGU6;BARJ pus spun Buillamp jqj =1. o �].� sLUQI�As �641294 rl 13 jalem amles Uo P911RIS111 S104UGO Off4eJO&GI J1?31Ueq3@JN c'toto drDionq in 61L�o lapplaAo juudn000 inoti-z'Noolo Asp-L!0000).' --1.98 0 rl M . I PUP, (veaq) zi.gg 0� Noews :sio4uoo o4sloinv J?D1UP-q3Svq S'fz'soto OVAH E311 1:1 'suO.43PSOJ dep@AO JUIOC49S @APq S10.4uoo aiMel6dwej- JnO1UBLJOGV4 �t"ZZotlo OVAH 0 -pueqp..p j. 9 - -A-q sIO-41100 ORBIsOLUJOU I 1801up-40GIN z7v,Tsoiro OVAH 0 0 '10-41100 1RTsOLUl9LR s Aq pelic4uoo si;auoz Was 01 BU11000 PUP- BL420H I * 1B.OlUBLIDavi V-V*'CZOVO OVAH D11 .;B;Dq pqpw Auo asn palp-eq eje lmg saoBds Pasofouaun I Isolup-140aV4 WVC00 OVAH 11 El 'BUIOUP-1p JIB Jos 9 . SUPGLU 9ABq SSOLA-@p leululial auoz pus slagno xv 1polue-L109VI VZ7,800 OVAH -Uo4sool pup, ai I nssaid ri o �wnuald pus s;onCl .4s;s uo poslaq pale-aE I JeO1UEqO@vq LZEOV-O OVAH =< uo.qslnsui GABq slaued PU4PG4 OVAH 0 F1 alqlsues;o saoujins; laupd eApagaui fqlP-uuaq-L .uo.4oadsu[ JW1ueqOaJN 977CO190 uo Buunp in000 ol psau AELU uO'[mWJ8A .qepunoj 'qp-ls e japun jo ui palle4surale swhuald jo I OVAH 0 slonp aj;)qAr, -pallaInsui suinuald pup slonp OVAH RO!UP-WaW ,(,ole 'puiWainislow 'uns ol onp) aBRLU'2P W04 pajoaloid si jaLgeam 01 pasodb(a uo glaInsul Buldicl JP31UPqoqvq V977SOro OVAH -Pamolle aj�qm sl�adwep I A1ABj6:i3qqO -selej efinNeal wnLuDcaLu leaw PUP, asn ul ;ou uaum 4nqs,%ao.48Uio1ni 1p-LI; siadwep boOP;nO GbeNna-1 JIV rl F1 pezuo;ow aABq swalsAs IsnBqxa pus JIS adoleAug -esolo Alleogetnolm;eig ijaduip-p I pazUo;OW aA94 SJUGA:48qS J041BAGJa PUS J114S adolmug V91,701ko aft-Nea-1 Jfv El 0 m 'P9gUOA AOUG10[4a juawdinb� 8 OVAH I [POlup-qoavq OVAH 0 -s1O4uOO ol uo.4o@uuoo ein" jol slosuas . "10 az" Lualsf's Bug 'd law GOVMOUS PUB U040 aei=l JeOlUU438VI 9YZ'Soto OVAH .s4pm pamolip- ol lanb, j, LR ml UaJU, aie s4i?Ak pasodoid Bu.4u4suowap IsuB d Bu.qqkil P@Aoiddp, aLg uo Umoqs si 1BLvA Lg!m #a1s,1SUOD G5141sm rl rl sl jamod r)u4qbll ampaj pup- dwul palle1sul joualu[ 'P�l�iA 6UNBrI JOU91ul Z79,90-vo 1114u,21 I aq 11e4s (palunow ooelins io jup-pual a6pa olarapa 1001 � U1441M eje jo (pa4unow ss-aoaj ji) jejuaO o1jqUGO jagj 0 � Lgm gle ;PLR suo. sjn54Uoo dwel palaqwnu ppo ulLfli . m salieuiwn1;ueos@jon1=1 Eu4qbll lopOlul S1041100 0 -susid BU.qqBll POAOjddp- jar P91121sul sesn agloade joj samap lo.4uoo Bu.4qBq alejadaS S104U00 Bu.44611 louGlul VZ*900 -W-4�00 Bu.gqBll paimbei qWA paddinba alp- sloguoui do)jooi pup - .1 pm saoRd pasolou�j slqbi sjepunP-ajP1'461Aepq_ I joualul s1O-4uOO Bu.4qOr e,z,z7goto El slo.4uoo 6u4q6!1 pej!nbei qm paddinba alp seeie PaILIBilap'lis fjp-wPd 6u4qB!-1 JO"Glul C'ZZGO170 s1O4uOO 0 El - saouds pajinbei ui pallelsu I sjosuas loupdn000 qf�rl iop I Z77z*goto s10-41100 buq 91U -saloelde0al PJq3WAS PUR 0 El rl sexeuilUnI paim sJo4uoO ;1341 loop k4da Ll 112W GLR 1 is qqms Jelseul GUO ;Snel 113 GASq spun 6iiidealS " slo-quoo Bu.qqBl joualul S,z7goiro -1 . -61J414511 0 salp- IslaueB jo juaptiodepup4qBJ L4 1041100 I.Lg f;1.4uoo panpv4pul qVm PaPtAo�d sau oz 1qB!JA2C1 Bu44511 lOualul VZ!Z*9M S1041100 I ,%Oq Aq bu.44BIl E] Iseal Is peol aLR aonpaj AlLwollun ol palle1sul s1O4U,1 00 6u4qBn s1041100 f3u.4146rl 'OuG'ul Z' VZ'900 -sjuedn000 ol alqism PUB sIqlsse0os 4PPal W-41100 lunuBLU 11; �ue susid Bu.4qft p9Aoiddp- jad pallqsui sio-4uco 6114411 46puadapul SIOAU00 . I joualul V Vz!goto 6u.4L15r SYSTEM —SPECIFIC G404.4 Mechanical SYSTEM —SPECIFIC C404-2 Mechanical SYSTEM —SPECIFIC C403.2.3 MeGharfical SYSTEM —SPECIFIC C403.4.2 Mechanical SYSTEM_SPECIFIC C4032.8 Mechanical SYSTEM_SPECIFIC C403.2.7.i .3 Mechanical sy,STEM—SPECIFIC C403.4.3.5 Mechanical SYSTEM —SPECIFIC G403-4.3.3.3 Mechanical SYSTEM —SPECIFIC C403.4.6 Mechanical SYSTEM —SPECIFIC 0403.4.7 Mechanical sysTEM__�SPECIFIC C403.2.42 Mechanical SYSTEIVI—SPECIFIG C403.2.4.3.3 Mechanical SYSTEM—sPECIFIC C403.2.4.1.1 Mechanical SYSTEM —SPECIFIC 0404.3 Mechanical SYSTEM —SPECIFIC C404.5 Mechanical SYSTEM —SPECIFIC C404-5 Mechanical SYSTEM —SPECIFIC G404.5 Mechanical SYSTEM —SPECIFIC C404.6 Mechanical SYSTEM--: SPECIFIC C404.7.1 Mechanical SYSTEM —SPECIFIC C404.7.3 Mechanical SYSTEM SPECIFIC C404-7.2 Mechanical Testing C4082-32 Mechanical Mandatory Additional E C406 Project Insulation C402.2.8 Project Auton'tatidtirne SWR hes installed to automatically El Li sWitGh off recirculating hot-water system or heat trace. Heat traps installed on non -circulating storage 0 0 water tanks. I PTAO and PTHP with sleeves 16 in. by 4211n. labeled for replacement only as per Footnote b to Table C403.2.3(3). %fAV fan >1 = 7.5 hp are driven by mechanical or 0 El 11 electrical �arlable speed drive, or driven by blades, or operate Vane -all with variable speed with motol r demand —30% design kW at 50% design flo' w - calculations required HVAC plp'ing Insulation thickness. Where piping is 0 El installed in or under a slab, verification may need to occur du I ring Foundation Inspection. requires DuGtwork operating >3 in. water column air leak�ge testing. IReducelf ow in pumping systems >1 0 hp to multiple 1:1 0 chillers or boilers when others are shut down. Two-polition automatic valve interlocked to shut off 0 I water flow when hydronic heat pump with pumping System �1 0 hp is off. Conde�ser heat recovery system that can he -at water t� 85 IF or provide 60% of peak heat rejectlo� 'is installed for preheating of service hot in, 2417 facility, water cooled systems reject water >6 MMBtu SHW load —I MMBtu. Hot ga's b;,Is limited to: � � — 5000 4 211'113� 240:t! —2� I He ing to each zone is controlled by a at " cool thermostat control. Minimum one humidity control devic� I per installed humidifiGation/dehumidification system. Systems include optimum start controls. 0 0 Heat pump controls prevent supplemental electric 0 resis nce heat from coming on when not needed. PubI7 lavatory faucet water temperature --110* F Al piping in circulating system insulated 0 First 8 ft of oubet piping is insulated El 1 All heat traced or externally heated piping insulated 1:1 0 0 ConLs are installed that limit the operation of -a 0 recirculation pump installed to maintain tem plerature of a storage tank. Poo� heaters are equipped with ontoff switch and 11 El 11 no continuously burning pilot light. Vap�r retardant pool covers are provided for 0 he �ted pools and permanently Installed spas. T 1 ime switches are installed on all pool heaters and 0 pum, ps. HV�G control systems have been tested to ensure proper operation, calibration and adjustment of coritrols. Efficient HVAC performance, efficient lighting 0 0 sys I tern or on -site supply of renewable energy c,�sist�nt wM what is shown the approved plans. surface of floor structures Incorporating 11 0 heating insulated to —R-3.5- I EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 4/17/2016 Pagge 12 of 13 a F post -c.ristructon post Construction Post construction post Construction Post Construction Post construction Post Construction post Construction post ConstruGtion Post Construction p ost c o rrtru ob o n post Construction C408.3 Exterior Lighting ti ystems Lighting syslems ave been tested to ensure adjustment, programming, and U U Li proper calibration, 04082.5.1 Interior Lighting operation. 1 Furnished -as-built drawings for electric power 30 days of system acceptance. systems w6in instru ctions; for systems and 0 C303.3,C4082.5.2 Interior Lighting Furnished O&M io the building owner or designated equipment C408.3 Interior Lighting representative. Lighting sykerns; have been tested to ensure adjustment, programming, and 0 pioper Gafil�ration, Mechanical operation. Furnished -NAC as-buift draiMngs submitted within 0 0 0 C408.2.5.1 90 days of system acceptance. C303.3,G408.2.5.2 Mechanical Fumished O&M manuals for HVAC systems within 0 0 90 days o� system acceptance. is 0408.2.5.3 Mechanical An air andfor hydronic system balancing report for HVAO systems. provided J commissioning developed by registered 0 0 C408.2.1 mechanical plan design professional or approved agency. C4082.4 Mechanical Prelimina commissioning report completed and certified by registered design professional or Mechanical approve� agency. Final corprnissioning report due to building owner C408.2.6.4 within 90 1 days of receipt of certificate of C4082.3.1 Mechanical occupancy. HVAG e I ulpment has been tested to ensure proper operaO. i have been tested to ensure proper 0 El C408.2.3.3 Mechanical Economizers EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1 . o Compliant Software. Effective Date: June 30, 2015 Page 13 of 13 4/17/2016