HomeMy WebLinkAboutPILE INSTALLATION CERTIFICATION3931 SW 47 Ave.# 104
Davie, Fl. 33314
Tel: 954-584-6115
Lod P Ift, E-mail: rcolefto@soilprobe.net
April 16,2019
American Foundation, Inc.
10780 NW 13 8th St. #D6
I-Ealeah Gardens, FL 3 3 0
RE: Pile InstaHation Certification
Proposed Residence
Lot #2
4416 N Hwy. AlA
Fort Pierce, FL
. 7RECEIVED
JUN 2019
. S u P
T., Lucie county, Permitting
Soilprobe Engineering & Testing, Inc. has completed field observation of auger cast piles
installation for the above referenced pr8ject. Piling operation was conducted by American
Foundation corresponding to the date of �April 16, 17, 18, 19, and 23, 2019 and installation
witnessed by a representative of this offic6. The purpose of this site inspections was to observe
and document pile installation operation oD I �Y.
A total number of sixty two (62) piles wer6 placed at locations staked in the field by the owner's
representative and to depths as indicated in the attached field inspection logs. Pile installation
data for each pile are presented in the attac4ed field installation logs.
Following our observation of pile
knowledge of project documents we
for achieving an allowable bearing
respectively.
Sincerely,
& Testing, Inc.
Enc. Pile instaRation -logs
Location sketcfi
ition operation at the scheduled time, and our
that the referenced piles were adequately installed
ty of 40 tons compression and 12 tons tension
SOILPROBE ENGINEERING AND TESTING5 INC.
1611 Auger Cast Pfle Log
PROPOSED TWO-STORY RESIDENCE & lContractor: SION HOMES Grout Spec's.
PROJECT: Load Bearing (tons)
POOL ILogged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410,4416,4422 N Hwy AIA Misc. Info: 1- 2- t, e..n-s i ori,
Engineers Sign and Seal: I
CITY: Fort Pierce, FL
Field Notes:
SteelSpec's: (6) #6 full length bars with#3 ties @4" O.C. @top of pile and @10" O.C. @balance
Pile I D
_7 I-MIM-
Auger
Ime
T11
Depth
(feet)
Theorical
Grout Arn't
-C-.Y-.-
Pump
Strokes
Actual
Grout Amt.
Grout
Factor
Kips
Date: April 16,2019
otes
-C-.Y.-
-
comp tension
1
1
2:20
30
1.50
50
2.05
1.36
80
24
Start 7:33 Arrived 7:30
2
2
2:00
30
1.50
50
2.05
1.36
80
24
ADONEL #4416 9 Cy
3
3
1:59
30.
1.50
51
2.09
1.39
80
24
4
4
2:32
30
1.50
50
2.05
1.36
80
24
Stop 8:20
5
5
1:48
30
1.60
48
1.96
1.31
80
24
Start 8:24 Arrived 8:18
6
6
2:12
30
1.50
50
2.05
1.36
80
24
ADONEL #4009 9,cy
7
7
2:23
30
1.50
49
2.00
1.34
80
24
8
8
2:00
30
1.50
48
1.96
1.31
80
24
9
9
2:00
1 30
1.50
59
2.41
1.61
80
24
Stop 9:25 Start 9:25
10
10
2:40
30
1.50
64
2.62
1.75
80
24
IADONEL #7004 Arrived 9:15
11
11
2:16
30
1.50
50
2.05
1.36
80
24
9 Cy
12
12
1:45
30-
1.50
53
2.17
1.45
80
24
Stop 10:15 Start 10:15
13
13
1:47
30
1.50
50
2.05
1.36
80
24
ADONEL #7012 Arrived 10:00
14
14
2:33
30
1.50
50
2.05
1.36
80
24
9 Cy
15
15
2:15
30
1.50
55
2.25
1.50
80
24
16
16
2:29
30
1.50
56
2.29
1.53
80
24
Stop 11:00 Start 11:00
17
17
2:18
30
1.50
51
2.09
1.39
80
24
ADONEL #7016 Arrived 10:37
18
18
2:22
30
1.50
51
2.09
1.39
so
24
Testtaken 9 Gy
19
19
2:16
30
1.50
5,2
2.13
1.42
80
24
20
1:53
30
1.50
52
2.13
1 1.42
80
24
Pag.: 1/12
SOILPROBE ENGINEERING AND TESTING, INC.
16" Auger Cast Pile Log
PROJECT: PROPOSED TWO-STORY RESIDENCE & lContractor: SION HOMES Grout Spec's Load Bearing (tons)
POOL ILogged BY: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC ADDRESS: 4410,4416,4422 N Hwy AlA Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
SteelSpec's: (6) #6 full length bars with#3 ties@ 4" O.C. @top of pile and @10" O.C. @balance
Pile I.D.
Auger
Time
-MIN-.
Depth
(feet)
--
Theorical
Grout Arn't
Pump
Strokes
Actual
Grout Amt.
Grout
Factor
Kips
Date: April 16,2019
Notes
-C-.Y.-
comp tension
1
21
2:07
30
1.50
53
2.17
1.45
80
24 .
Stop 11:28 Start 11:29
2
22
2:17
30
1.50
54
2.21
1.47
80
24
ADONEL #4009 Arrived 11:00
3
23
3:00
30
1.50
50
2.05
1.36
80
24
9 cy
4
24
2:16
30
1.50
52
2.13
1.42
80
24
5
25
2:32
30
1.50
50
2.05
1.36
8o
24
Stop 1:04 Start 1:04
6
26
2:42
30
1.50
52
2.13
1.42
80
24
IADONEL #8001 Arrived 12:29
7
27
2:26
30
1.50
50
2.05
1.36
80
24
9 cy
8
28
2:31
30
1.50
55
2.25
1.50
80
.24
9
29
3:04
30
1.50
50
2.05
1.36
80
24
10
30
2:11
30
1.50
52
2.13
1.42
80
1 24
Stop 1:50 Start 1:50
11
31
1:59
30
1.50
50
2.05
1.36
80
24
ADONEL #7012 Arrived 1:00
12
32
1:56
30
1.50
50
2.05
1.36
80
24
Testtaken 9 cy
13
33
2:23
30
1.50
48
1.96
1.31
80
24
14
34
2:13
30
1.50
56
2.29
1.53
80
24
Stop 2:25
15
35
2:00
30
1.50
52
2.13
1.42
80
24
Start 2:31 Arrived 1:40
16
36
1:56
30-
1.50
60
2.45
1.64
80
24
ADONEL #7016 9 cy
17
37
2:07
30
1.50
60
2.45
1.64
80
24
18
38
2:19
30
1.50
53
2.17
1 1.45
80
24
19
39
2:49
30
1.50
54
2.21
1.47
So
24
Stop 3:07 Start 3:07
20
40
1 2:13
30
1.50
1 52
2.13
1.42
1 80
24
fADONEL #7004 Arrived 2:38
Pag.: 2/12
SOILPROBE ENGINEERING AND TESTING, INC.
16" Auger Cast Pfle Log
PROJECT: PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's Load Bearing (tons)
POOL ILogged BY: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410,4416,4422 N Hwy AIA Misc. Info:
Engineers Sign and Sea[: 12 tension
CITY: Fort Pierce, FL
Field Notes:
SteelSpec's: (6)#6 full Iengthbarswith#3 ties @4" O.C. @top of pile and @10" O.C. @bal ance
Pile I.D.
__
Auger
Time
_MIN�
Depth
(feet)
--
Theorical
Grout Am't
—CvY-.--
Pump
Strokes
— ___
Actual
Grout Amt.
--C-.Y—.-
Grout
Factor
- — --
Kips
Date: April 16,2019
Notes--
--co-m—pt-en—sion
1
41
2:14
30
1.50
52
2.13
1.42
80
24
9 Cy
2
42
2:34
30
1.50
52
2.13
1.42
80
24
3
43
2:39
30
1.50
59
2.41
1.61
80
24
Stop 3:47 Start 3:47
4
44
2:39
30
1.50
50
2.05
1.36
80
24
ADONEL #4009 Arrived 3:15
5
45
2:05
30
1.50
58
2.37
1.58
80
24
9 Cy
6
46
2:20
30
1.50
55
2.25
1.50
80
24
7
47
2:26
30
1.50
60
2.45
1.64
80
24
Stop 4:22 Start 4:22
8
48
2:13
30
1.50
53
2.17
1.45
80
24
ADONEL #8001 Arrived 4:04
9
49
2:15
30
1.50
50
2.05
1.36
80
24
9 Cy
10
50
2:51
30
1.50
52
2.13
1.42
80
24
Stop 5:00
11
12
13
14
15
16
17
18
19
20
Pag.: 3/12
SOILPROBE ENGINEERING AND TESTING, INC.
16" Auger Cast Pfle Log
PROPOSED TWO-STORY'RESIDENCE & lContractor: SION HOMES Grout Spec's
PROJECT: Load Bearing (tons)
POOL ILogged BY: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410, 4416, 4422 N Hwy AlA Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
SteelSpec's: (6) #6 fall length bars with #3 ties @4" o.c. at top of pile and @10" o.c. at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Arn't
C.Y.
Pump
Strokes.
-
Actual
Grout Amt.
-C.Y-
Grout
Factor
-
Kips
-comp-tension-
Date: April 17,2019
Notes
1
51.
2:24
30
1.50
50
2.08
1.38
80
24
Start 7:30 Arrived 7:20
2
52
1 2:39
30
1.50
51
2.12
1.41
80
24
ADONEL #7016 9 cy
3
53
2:36
30
1.50
50
2.08
1.38
80
24
4
54
2:43
30
1.50
50
2.08
1.38
80
24
Stop 8:19
5
55
2:56
30
1.50
52
2.16
1.44
80
24
Start 8:24 Arrived 8:08
6 1
56
2:34
30
1.50 1
49
2.03
1.36
80
24-
IADONEL #8001 Testtaken 9 Cy
7
57
3:14
30
1.50
48
1.99
1.33
80
24
8
58
3:10
30
1.50
51
2.12
1.41
80
24
9
59
2:55
30
1.50
50
2.08
1.38
80
24
Stop 9:13 Start 9:13
10
60
2:15
30
1.50
55
2.28
1.52
80
24
ADONEL #7010 Arrived 9:07
11
61
2:28
30
1.50
50
2.08
1.38
80
24
9 cy
12
62
2:52
30
1.50
55
2.28
1.52
80
24
13
63
205
30
1.50
53
2.20
1.47
80
24
Stop 10:04 Start 10:04
14
64
2:41
30
1.50
49
2.03
1.36
80
24
ADONEL #4001 Arrived 9:57
15
65
2:27
30
1.50
50
2.08
1.38
80
24
9 cy
16
66
1:58
30
1.50
48
1.99
1.33
80
24
17
67
2:38
30
1.50
55
2.28
1.52
80
24
18
68
2:21
30
1.50
49
2.03
1 1.36
80
24
S top 10:55 Start 10:55
19
69
�.34
30
.50
51
2.12
1.41
80
24
IADONEL #7016 Arrived 10:35
20
70
2:12
30
1.50
52
2.16
1.44
1 80
24
1 9 cy
Pag.: 4/12
SOILPROBE ENGINEERING AND TESTING, INC.
16" Auger Cast Pfle Log
PROJECT: PROPOSED TWO-STORY RESIDENCE & lContractor: SION HOMES Grout Spec's Load Bearing (tons)
POOL ILogged BY: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410,4416,4422 N Hwy AlA Misc. Info: 12 tension
Engineers Sign and Seal:
CITY: Fort Pierce, FL
Field Notes:
SteelSpec's: (6) #6 full length bars with #3 ties @4" o.c. at top of pile and @10" o.c. at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
__Q_Y_
PUMP
Strokes
___
Actual
Grout Amt.
_C.Y�
Grout
Factor
-
Kips
-cornly--re-nsion-
Date: April 17,2019
-otes- ---
1
71
3:05
30
1.50
50
2.08
1.38
80
24
2 1
72
2:42
30
1.50
47 1
1.95
1.30
80
24 Istop
11:35
3
73
2:20
30
1.50
50
2.08
1.38
80
24
Start 11:42 Arrived 11:22
4
74
3:35
30
1.50
50
2.08
1.38�
80
24
ADONEL #8001 Testtaken 9 cy
5
75
2:51
30
1.50
51
2.12
1.41
80
24
6
76
2:27
30
1.50-
48
1.99
1.33
80
24
7
71
2:40
30
1.50
51
2.12
1.41
80
24
Stop 12:23 Start 12:23
8
78
2:45
30
1.50
52
2.16
1.44
80'
24
ADONEL #7010 Arrived 12:00
9
79
2:42
30'
1.50
53
2.20
1.47
80
24
9 cy
10
80
2:30
30
1.50
50
2.08
1.38
80
24
11
81
2:22
30
1.50
52
2.16
1.44
80
24
Stop 1:37 Start 1:37
12
82
1:59
30
1.50
51
2.12
1.41
80
24
ADONEL #7003 Arrived 1:26
13
83
2:45
30
1.50
52
2.16
1.44
80
24-
9 cy
14
84
2:23
30
1.50
51
2.12
1.41
80
24
15
85
2:18
30
1.50
52
2.16
1.44
80
24
16
86
2:14
30
1.50
55
2.28
1.52
80
24
Stop 2:24 Start 2:24
17
87
2:37
30
1.50
53
1.47
80
24
ADONEL #4001 Arrived 1:41
18
88
3:02
30'
1.50
50
2.08
1.38
80
24
9 cy
19
89
2:30
30
1.50
50
1 2.08
1.38
80
24
1
20
90
2:25
30
1.50
50
1 2.08
1.38
80
24
IStop 2:55 Start 2:55
Pag.: 5/12
SOILPROBE ENGINEERING AND TESTING5 INC.
16" Auger Cast Pfle Log
PROJECT: PROPOSED TWO-STORY RESIDENCE & lContractor: SION HOMES Grout Spec's Load Bearing (tons)
POOL ILogged BY: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410,4416,4422 N Hwy AIA Misc. Info: 12 tension
Engineers Sign and Seal:
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @4' ox. at top of pile and @ 10" o.c. at balance'
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Arn't
C.Y.
Pump
Strokes
-
Actual
GroutAmt.
-C.Y.-
2.32
Grout
Factor
-
Kips
-comp-tension-
80 24
Date: April 17,2019
Notes- . ---
1
91
2:53
30
1.50
56
1.55
ADONEL #8001 Arrived 2:20
2
92
2:27
30
1.50
52
2.16
1.44
80
24
Cy
3
93
2:27
30
1.50
51
2.12
1.41
80
24
4
94
2:39
30
1.50
48
1.99
1.33
80
24
Stop 4:03 Start 4:03
5
95
2:21
30
1.50
50
2.08
1.38
80
24
ADONEL #7010 Arrived 3:10
6
96
2:38
30
1.50
50
2.08
1.38
80
24
1 9 Cy
7
97
2:56
30
1.50
50
2.08
1.38
80
24
Stop 5:20
8
98
2:40
30
1.50
52
2.16
1.44
80
24
Start Arrived 5:18
9
99
1:52
30
1.50
47
1.95
1.30
80
24
ADONEL #4010 9 Cy
10
100
2:11
30
1.50
53
2.20
1.47
80
24
11
101
2:37
30
1.50
50
2.08
1.38
80
24
Stop 6:00
12
13
14
15
16
17
18
20
1
Pag.: 6/12
SOILPROBE ENGINEERING AND TESTING, INC.
16" Auger Cast Pile Log
PROPOSED TWO-STORY RESIDENCE & lContractor: SION HOMES Grout Spec's
PROJECT: 5000 psi Load Bearing (tons)
POOL ILogged BY: AO
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410,4416,4422 N Hwy AIA Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
SteelSpec's: (6) #6 full length bars with #3 ties, @4" o.c. at top of pile and @10" o.c.at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Arn't
C.Y.
PUMP
Strokes
-
Actual
Grout Amt.
Y.-
Grout
Factor
-
Kips
-comp-tens;iio-n
Date: April 18,2019
otes-- -
-1
-1 02--_
3-0-0
30
1.50
50
2.01
1.34
80
24
Start 8:12 Arrived 7:43
2
103
2:34
30
1.50
50
2.01
1.34
80
24
ADONEL #7010 9 Cy
3
104
2:55
30
1.50
55
2.21
1.47
80
24
4
105
3:19
30
1.50
50
2.01
1.34
80
24
Stop 8:50
5
106
3:50
30
1.50
50
2.01
1.34
8o
24
Start 8:57 Arrived 8:42
6
ib7
2:14
30
1.50
50
2.01
1.34
80
24
ADONEL #7009 Testtaken 9 cy
7
108
2:57
30
1.50
48
1.93
1.29
80
24
8
109
2:31
30
1.50
51
2.05
1.37
80
24
9
110
2:35
30
1.50
48
1.93
1.29
80
24
Stop 10:07 Start 10:07
'10
ill
3:00
30
1.50
52
2.09
1.39
80
24
ADONEL #7014 Arrived 9:56
11
1 112
3:00
'30
1.50
48
1.93
1.29
-80
24
9 cy
12
113
2:40
30
1.50
51
2.05
1.37
80
24
13
114
3:15
30
1.50
52
2.09
1.39
80
24
14
115
2:55
30
1.50
53
2.13
1.42
80
24
Stop 10:55 Start 10:55
15
116
2:25
30
1.50
52
2.09
1.39
80
24
ADONEL #7016 Arrived 10:27
16
117
2:11
30
1.50
50
2.01
1.34
80
24
9 cy
17
118
2:40
30
1.50
51
2.05
1.37
80
24
18
119
2:05
30
1.50
52
2.09
1.39
1 80
24
jStop 11:49 Start 11:49
19
120
2:53
30
1.50
53
2.13
1.42
1 80
24
JADONEL #7009 Arrived 11:45
F20
121
2:23
30
1.50
54
2.17
1.45
1 80
1 24
1 9 cy
Pag.: 7/12
SOILPROBE ENGINEERING AND TESTING, INC.
16" Auger Cast Pile Log
PROPOSED TWO-STORY RESIDENCE & lContractor: SION HOMES Grout Spec's
PROJECT: ------ 5000 psi Load Bearing (tons)
POOL ILogged BY: AO
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410,4416,4422 N Hwy AIA Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
SteelSpecls: (6) #6 full length bars with #3 ties @4" o.c. at top of pile and @10" o.c.at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Arn't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
Yips
-comp-tension-
Date: April 18,2019
-1-
-1-22-
Z33
3-0
1.50
53
2.13
1.42
80
24
2
123
2:41
30
1.50
49
1.97
1.31
so
24
Stop 1:17 Start 1:17
3
124
2:26
30
1.50
52
2.09
1.39
80
24
ADONEL #7014 Arrived 12:50
4
125
2:57
30
1.50
51
2.05
1.37
80
24
9 Cy
5
126
3:09
30
1.50
50
2.01
1.34
80
24
6
127
3:28
30
1.50
50
2.01
1.34
80
24
7
128
3:00
30
1.50
53
2.13
1.42
80
24
Stop 2:15 Start 2:15
8
129
2:37
30
1.50
51
2.05
1.37
80
24
ADONEL #7010 Arrived 1:35
9
130
2:49
30
1.50
52
2.09
1.39
80
1 24
9 cy
10
131
2:48
30
1.50
52
2.09
1.39
80
24
11
132
2:49
30
1.50
53
2.13
1.42
80
24
Stop 3:14 Start 3:14
12
133
2:32
30
1.50
51
2.05
1.37
80
24
ADONEL #4005 Arrived 2:24
13
134
2:04
30
1.50
51
2.05
1.37
80
24
Testtaken 9 cy
14
135
2:00
30
1.50
54
2.17
1.45
80
24
1
15
136
2:14
30
1.50
55
2.21
1.47
80
24
16
137
2:07
30
1.50
irg
2.13
1.42
80
24
Stop 4:20 Start 4:20
17
138
2:23
30
1.50
50
2.01
1.34
80
24
ADONEL #7009 Arrived 2:52
18
139,
2:00
30
1,50
52
2.09
1.39
80
1 24
9 cy
19
140
2:33
30
1.50
54
2.17
1.45
80
24
IStop 5:30
20
1
1 1
Pag.: 8/12
SOILPROBE ENGINEERING AND TESTING, INC.
16" Auger Cast Pile Log
PROJECT: PROPOSED TWO-STORY RESIDENCE & lContractor: SION HOMES Grout Spec's Load Bearing (tons)
POOL ILogged BY: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410,4416,4422 N Hwy AIA Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
SteeISpec's: (6) #6 full length bars with #3 ties @4" at top of pile and @10" at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Arn't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.-
Grout
Factor
Kips
-comp-tension-
Date: April 19,2019
otes----___
-1-
-141--
-2-57-_
_36--
1.50
48
2.16
1.44
go
24
Start 7:53 Arrived 7:34
-2
142
2:16
30
1.50
50
2.25
1.50
80
24
ADONEL #7016 Testtaken 9 cy
3
143
2:21
30
1.50
50
2.25
1.50
80
24
4
144
2:21
30
1.50
49
2.21
1.47
80
24
5
145
2:38
30
1.50
50
2.25
1.50
80
24
Stop 8:39 Start 8:39
6
146
3:00
30
1.50
50
2.25
1.50
80
1 24
ADONEL #8001 Arrived 8:02
7
147
2:17
30
1.50
51
2.30
1.53
80
24
9 cy
8
148
2:27
30
1.50
48
2.16
1.44
80
24
9
149
2:22
30
1.50
55
2.48
1.65
80
24
Stop 9:35 Start 9:35
10
150
2:24
30
1.50
1 50
2.25
1.50
80
24
ADONEL #7014 Arrived 8:54
11
151
3:22
30
1.50
5o
2.25
1.50
80
1 24
9 cy
12
152
2:30
30
1.50
53
2.39
1.59
80
24
13
153
2:36
30
1.50
48
2.16
1.44
80
24
Stop 10:39 Start 10:39
14
154
2:51
30
1.50
50
2.25
1.50
80
24
ADONEL #7004 Arrived 9:39
15
155
2:44
30
1.50
52
2.34
1.56
80
24
9 cy
16
156
2:14
30
1-.50
51
2.30
1.53
80
24
17
157
2:32
30
1.50
53
2.39
1.59
80
24
Stop 11:32 Start 11:32
158
2:35
30
1.50
55
2.48
1 1.65
80
24
ADONEL #4009 Arrived 10:23
L18
19
159
1 2:27
30
1.50
55
2.48
1.65
80
24
9 cy
20
160
1 1:59
30
1.50
1 50
2.25
1.50
80
24
Pag.: 9/12
SOILPROBE ENGINEERING AND TESTING, INC.
16" Auger Cast Pffe Log
PROJECT: PROPOSED TWO-STORY RESIDENCE & lContractor: SION HOMES Grout Spec's Load Bearing (tons)
POOL ILogged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410,4416,4422NHwyA1A Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
SteelSpec's: (6) #6 fall length bars witlf 6 ties @4" at top of pile and @10" at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
TheoricaI
Grout Am t
C.Y.
Pump
Strokes
Actual
Grout Amt..
C.Y.
Grout
Factor
Kips
—comp—tension-
Date: April 19,2019
Notes ------
1
—2-.'50--
—.--30—
—f.50
52
2.34
1.56
80
24
Stop 12:22 Start 12:22
2
162
2:15
30
1.50
55
2.48
1.65
80
24
ADONEL #7016 Arrived 11:42
3
-
9 cy
4
Stop 1:30
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Pag.: 10/12
SOILPROBE ENGINEERING AND TESTING, INC.
,1611 Auger Cast Pile Log
PROPOSED TWO-STORY RESIDENCE & lContractor: SION HOMES Grout Spec's
PROJECT: Load Bearing (tons)
POOL ILogged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTTNG, INC. ADDRESS: 4410,4416,4422 N Hwy AlA Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
SteelSpec's: Auger Cast Pile with (6) #6 full length bars with #3 ties @4" at top of pile and @10" at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Arn't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
_
Icips
-comp-tension-
Date: April 23, 2019
motes- -- --- ----
I
-1-63_
-2--.34---1---
30--_
1-50
50
2.13
1.42
80
24
Start 9:50 Arrived 9:34
2
164
3:01
30
1.50
49
2.08
1.39
80
24 -ADONEL
#7007 Test taken 9 cy
3
165
2:35
30
1.50
55
2.34
1.56
80
24
4
166
2:22
30
1.50
50
2.13
1.42
80
24
Stop 10:39
5
167
2:14
30
1.50
52
2.21
1.47
80
24
Start 10:40 Arrived 10:15
6
168
2:41
1 30
1.50
54
2.30
1.53
80
24
ADONEL #7016 9 cy
7
169
2:09
30
1.50
54
2.30
1.53
80
24
8
170
2:19
30
1.50
52
2.21
1.47
80
24
9
171
2:40
30
1.50
51
2.17
1.45
80
24
Stop 11:20 Start 11:20
10
172
2:44
30
1.50
50
2.13
1.42
80
24
IADONEL #4009 Arrived 10:49
11
173
2:58
30
1.50
52
2.21
1.47
80
24
9 cy
12
174
2:27
30
1.50
50
2.13
1.42
80
24
13
175
2:16
30
1.50
50
2.13
1.42
80
24
Stop 12:18 Start 12:18
14
176
2:25
30
1.50
54
2.30
1.53
80
1. 24
ADONEL #7015 Arrived 11:51
15
177
2:00
30
1.50
52
2.21
1.47
80
24
9 cy
16,
178
3:33
30
1.50
54
2.30
i.53
80
24
17
179
2:22
30
1.50
52
2.21
1.47
80
24
Stop 1:12
18
180
2:17
30
1.50
50
2.13
1.42
80
24
Start 1:25 - Arrived 12:40
19
181
2:29
30
1.50
53
2.25
1.50
1 80
1 24
IADONEL #8001 9 cy
20
1 182
2:26
30
1.50
55
2.34
1.56
1 80
1 24
1 - I
Pag.: 11/12
SOILPROBE ENGINEERING AND TESTING, INC.
16" Auger Cast Pile Log
PROJECT: PROPOSED TWO-STORY RESIDENCE & lContractor: SION HOMES Grout Spec's Load Bearing (tons)
POOL ILogged BY: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410,4416,4422 N Hwy AIA Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
SteelSpecls: Auger Cast Pile with (6) #6 full length bars with #3 ties @4" at top of pile and @10" at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Arn't
C.Y.
Pump
Strokes-
Actual
Grout Amt.
____C.Y._
Grout
Factor
—
Kips
—cornp—tension-
Date: April 23, 2019
--Notes— ---
--l--183—
2-10
30
1.50
55
2.34
1.56
80
24
Stop 1:57
2
1184
1 2:34
30
1.50
56
2.38
1.59
80
24
Start 2:06 Arrived 1:00
3
185
2:28
30
1.50
55
2.34
1.56
80
24
ADONEL #7000 Testtaken 9 Cy
4
186
2�50
30
1.50
56
2.38
1.59
80
24
5
187
2:44
30
1.50
55
2.34
1.56
80
24
Stop 2:41
6
188
2:25
30
1.50
48
2.04
1.36
80
24
Start 2:58 Arrived 2:36
7
189
1 2:05
30
1.50
54
2.30
1.53
80
24
ADONEL #7016 9 cy
8
190
2:22
30
1.50
55
2.34
1.56
80
24
Stop 3:30
9
10
11
12
13
14
15
16
17
18
19
20
Pag.: 12/12
W.up 'T'Iga
I % I
-'. 8 A
-9-3 nrnal-184
0
L
J=i 1" - -
1-62
W-1
.461 159
-88
163
Van-
1:g4
1.
83
85
flit r I
10
ISO
wi 86 177
.176.
1 78
.1 C gn
go, r
145
7
........ ..... 40 A-
70.
f 76
L1%—+ XIR- . ... . .....
r'-*�' g pp t w
ilg- !6! i�
Ell
-=z :72
- 1� Y� 73
MIPM ZIA=-
. .........
SOILPROBE ENGINEERING AND Pile Location Sketch
TESTING American Foundation Lot #2
3931 SW 471 Ave. #104 4416 N Hwy AIA
Davie, FL 33314 Fort Pierce, FL
Tel. (954) 584-6115