HomeMy WebLinkAboutREVISION (2)OFFICE USE ONLY:
&GANNOD
DATE FILED: a_IV
REVISION FEE: St Ludp, to
PERMrr It / TO / -' .
RECEEPT #
PLANNING & DEVIELOPMENT SERVICES
BUILDING & COPE REGULATION DIVISION
2300 VIRGINIA AVENUE
FORT PIERCE, FL 34982-5652
(772) 462-1553
RENV10% APPLICATION F R BUILDING PERMIT REVISIONS
PRn.IF:rT mprIRMATinm
LOCATION/SITE
1A
ADDRESS:
ACQUAVIST LOT 2
4416 N. HIGHWAY Al A
DETAILED DESCRIPTION OF PROJECT
REVISIONS:
REVISED LOCATION OF FLOOD VENTS WITH UPDATED CALCULIATIONS
CONTRACTOR INFORMATION:
STATE of FL REG./CERT. #: CGC 1527445
ST. LUCIE CO CERT. #: 31143
BUSINESS NAME: ARTAR CONSTRUCTION LLC
QUALIFIERS NAME- ARMANDO REYES TOLEDO
ADDRESS: 13360 SW 40 STREET
CITY: MIAMI STATE:
FL ZIP: 33175
PHONE (DAYTIME). 786-344-3855
FAX:
OWNER/BUILDERINFORMATION:
NAME: VENETIAN ADMINISTRATION LLC
ADDRESS: 7400 W. FLAGLER STREET
CITY: MIAMI
STATE: FL ZIP: 33144
FAX:
PHONE (DAYTIME- 786-512-4484
NAME: DAVID S. KNIGHT, P.E.
ADDRESS: 234514th AVENUE, SUITE 3
CITY: VERO BEACH
PHONE (DAYTIME): 772-569-5505
SWCC: 9123109
Revised 06130117
STATE: FL
FAX: NA
ZIP: 329620
f
FLOOD VENT CALCLILATIOWI�--
a"46" ENGINEERED FLOOD VENTS THAT
PROVIDE 250 SF OF FLOOD COVERAGE
GARAGE 1520 SF/250 - 6.1 - 7 VENTS
9 VENTS PROVIDED
LOBBY/STORAGE AREAS 1265 SF/250 = 5.1 = 6 VENTS
5 VENTS PROVIDED + I PASS T14RU
BELOW POOL DECK AREA 1105 SF/250 - 4.4 = 5 VENTS
(+I VW FOR LOBBY/STORAGE PASS THRU - 6 VENTS)
7 VENTS PROVIDED
THE DESIGN OF THE FLOOD VENT OPENINGS WILL
PROVIDE FOR EQUALIZATION OF HYDROSTATIC FLOOD
FORCES ON EXTERIOR WALLS BY ALLOWING FOR THE
AUTOMATIC ENTRY AND EX1T OF FLOODWATERS AS
SPEOFIED IN SECTION 2.7.2.2 OF ASCE 24. PER FBC.
R322.2.2 FOOT NOTE 2.1
THE BOTTOM OF EACH OPENING SHALL HE NOT MORE
THAN I FOOT ABOVE THE HIGHER OF THE FINAL INTERIOR
FLOOR AND THE FINISHED EXTERIOR GRADE IMMEDIATELY
BELOW THE OPENING,
.j
CL
LU
mc
w-
LLI
Q
0
0
>1
Uj
LU
0
(.)
Cc
ut:blljN by H OSK N T
MGIMEER. WHETHER THE PROJECT FOR 4
THE . GS ARE THE POM OF
DRAWN BY PMP THEY ARE MADE IS OCECUrED OR Nor. OR
Structural Concerns US� FOR OTHER PRO,=TS IS PMnU ONLY 7.
WALE BY WRITTEN CONTRACT VMH THE ENGINI L
AS NOTED Exhibit UNAMORIZED USE IMLL BE PROSECUTED .............
L S. KJM
DATE 12-27-2021 PURSUANT TO 7W COPYRZHII AW I iml
ICC-ES Evaluation Repo E5R-4;332
"REVISION Reissued March 2020
This report is subject to renewal March 2022.
wwwAcc-es.org 1 (800) 423-6587 1 (662) 699-05431 A Subsidiary of the Intemational Code CounciN
DIVISION: 08 00 00--OPENINGS
Section: 08 96 43—Vents I Foundation Flood Vents
REPORT HOLDER:
SMART PRODUCT INNOVATIONS, INC.
EVALUATION SUBJECT:
FREEDOM FLOOD VENTTm AUTOMATIC FOUNDATION
FLOOD VENT: MODEL FFV-1608
1.0 EVALUATION SCOPE
Compliance with the follovAng codes:
a 2018, 2015, 2012, 2009 and 2006 Internaflonal Building
CodeO (IBC)
n 2018, 2015, 2012, 2009 and 2006 International
Residential Code@ (IRC)
Properties evaluated:
• Physical operation
• Water flow
• Weathering
2.0 USES
The model FFV-1608 Freedom Flood Vent� is used to
equalize hydrostatic pressure on walls of enclosures
subject to rising or falling floodwaters. With the cover
removed, the model FFV-1608 also provides natural air
ventilation.
3.0 DESCRIPTION
3A General:
The model FFV-1608 Freedom Flood Vent� is an
engineered mechanically operated in -wall flood vent (FV)
that automatically allows floodwater to enter an enclosed
area and exit. The FV is comprised of a polycarbonate
frame with mounting flange and a polycarbonate
horizontally pivoting door. When subjected to rising water,
the model FFV-1608 Freedom Flood VentT" door is
activated and pivots to allow water and debris to flow in
either direction to equalize hydrostatic pressure from one
side of the enclosure to the other. The FV features a
removable polycarbonate cover. The FV door will activate
and pivot when subjected to rising water with or without the
polycarbonate cover installed.
3.2 Engineered Opening:
The FV complies with the design principle noted in
Section 2.7.2.2 and Section 2.7.3 of ASCE/ SEI 24-14
(2018 and 2015 IBC and IRC) [Section 2.6.2.2 of ASCE/
SEI 24-05 (2012, 2009, 2006 IBC and IRC)] for a
maximum rate of rise and fall of 5.0 feet per hour
). In order to comply with the
(0.423 m
opening requirement of ASCE/ SEI 24, Freedom Flood
Vent� FVs must be installed in accordance with Section
4.0 below. See Table 1 for vent size and maximum
allowable area coverage for a single vent.
4.0 DESIGN AND INSTALLATION
The model FFV-1608 Freedom Flood VeW is designed to
be installed into walls or overhead doors of existing or new
construction. Installation of the vent must be in accordance
with the manufacturer's instructions, the applicable code,
and this report. In order to comply with the engineered
opening design principle noted in Sections 2.7.2.2 and
2.7.3 of ASCE/ SEI 24-14 (2018 and 2015 IBC and IRC)
[Section 2.6.2.2 of ASCE/ SEI 24-05 (2012, 2009, 2006
IBC and IRC)], the Freedom Flood VeW must be installed
as follows:
N With a minimum of two openings on different sides of
each enclosed area.
• With a minimum of one FV for every 250 square feet
(23.2 m2) of ena—os—eZ—aTUa. '-'
• Below the base flood elevation.
0 With the bottom of the vent located a maximum of
12 inches (305.4 mm) above the higher of the final
interior grade or floor and the finished exterior grade
immediately under each opening.
6.0 CONDITIONS OF USE
The Freedom Flood Vent- described in this report
complies with, or is a suitable alternative to what is
specified in, those codes listed in Section 1.0 of this report,
subject to the following conditions:
5.1 The model FFV-1608 Freedom Flood Vent� unit must
be installed in accordance with this report, the
applicable code and the manufacturers published
installation instructions. In the event of a conflict, the
instructions in this report shall govern.
6.2 The model FFV-1608 Freedom Flood Vent� unit must
not be used in place of "breakaway walls" in coastal
high hazard areas, but are permitted for use in
conjunction with breakaway walls in other areas.
I
ICC-ES Evaluation Reports are not to be construed asrepresenting aesthetics or any other, attributes not specifically addressed, nor are they to be construed
as an endorsem ent ofthe subject ofthe report or a recomm endation for its use. There is no, warranty by ICC Evaluation Service, LLC, express or implied, as a
man
to anyfinding or other matter in this report, or as to any product covered by the report.
Copyright @ 2020 ICC Evaluation Servioe, LLC. All rights reserved. Page I of 4
ESR-4332 I Most Widely Accepted and Trusted
5 . 3 Use of the Freedom Flood Vent as under -floor space
ventilation is outside the scope of this report.
6.0 EVIDENCE SUBMITTED
Data in accordance with the ICC-ES Acceptance Criteria
for Mechanically Operated Flood Vents (AC364), dated
August 2015 (editorially revised October 2017).
7.0 IDENTIFICATION
7.1 The Freedom Flood Vent� model recognized in this
report must be identified by a label bearing the
manufacturers name (Smart Product Innovations,
Inc.) and the evaluation report number (ESR-4332.).
TABLE
2 of 4
7.2 The report holders contact information is the
following:
SMART PRODUCT INNOVATIONS, INC.
430 ANDBRO DRIVE, UNIT I
PITMAN, NEW JERSEY 08071
(800) 607-1627
www.freedomfloodvent.com
infoD-freedomfloodvent.com
FLOOD VENTm
ALO
MODELNAME
MODELNUMBER
MODEL SIZE
COVERAGE (sq. ft.)
Freedom Flood VentTm
FFV-1 608
153/4"X 81/16"
250
For SI: I inch = 25.4 mm
I I -
FIGURE I —MODEL FFV-1608 FREEDOM
VENT': SHOWN WITH COVER REMOVED
FIGURE 2—MODEL FFV-1608 FREEDOM FLOOD VENTTm: SHOWN WITH FLOOD DOOR PIVOTED OPEN
IMES Evaluation Report
R-4332 CBC and CRC Supplement
Reissued March 2020
This report is subject to renewal March 2022.
wwwAcc-es.org 1 (800) 423-6587 1 (562) 699-0543 1 A Subsidiary of the International Code Cound/8
DIVISION: 08 00 00--OPENINGS
Section: 08 96 43—Vents I Foundation Flood Vents
REPORT HOLDER:
SMART PRODUCT INNOVATIONS, INC.
EVALUATION SUBJECT:
FREEDOM FLOOD VENTTm AUTOMATIC FOUNDATION
1.0 REPORT PURPOSE AND SCOPE
Purpose:
The purpose of this evaluation report supplement is to
Vent: Model FFV-1608, recognized in ICC-ES master 4
with codes noted below.
Applicable code edition(s):
0 2016 Calffibmia Building Code (C13C)
N 2016 California Residential Code (CRC)
2.0 CONCLUSIONS
2.1 CBC:
The Freedom Flood Vent.. Automatic Foundation Flood Vent:
master evaluation report ESR-4332, complies with CBC Chapt
accordance with the 2015 Intemational Building CodeO (2015
requirements of 12, 16, and 16A, as applicable.
r
VENT: MODEL FFV-1608
that the Freedom Flood Vent- Automatic Foundation Flood
i report ESR-4332, has also been evaluated for compliance
Aodel FFV-1608, described in Sections 2.0 through 7.0 of the
.rs 12, 16 and 16A, provided the design and installation are in
113C) provisions noted in the master report and the additional
The product recognized in this supplement has not been ev�luated under CBC Chapter 7A for use in the exterior design
and construction of new buildings located in any Fire Hazal rd Severity Zone within State Responsibility Areas or any
Wldland-Urban Interface Fire Area. I
2.2 CRC:
The Freedom Flood VeW Automatic Foundation Flood Vent: Model FFV-1608, described in Sections 2.0 through 7.0 of the
master evaluation report ESR-4332, complies with the 2016 CRC, provided the design and installation are in accordance
with the 2015 International Residential CodeO (2015 IRC) provis.'ions noted in the master report.
The product recognized in this supplement has not been ev
design and construction of new buildings located in any Fire
Wildland-Urban Interface Fire Area.
The product recognized in this supplement has not been
Interface CodeO.
i under 2016 CRC Chapter R337, for use in the exterior
I Severity Zone within State Responsibility Areas or any
for compliance with the International Wildland-Urban
This supplement expires concurrently with the evaluation report, reissued March 2020.
I
ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not specifically addressed nor are they to be construed
as an endorsement ofthe subject ofthe report or a recommendationfor its use. There is no,'warramy bylCCEvatuation Service, LLC, express or implied as 111111,
to aryfinding or other matter in this report, or as to any product covered by the report. --
Copyright Q 2020 ICC Evaluation Service, LLC. All rights reserved. Page 3 of 4
IMES Evaluation
FBC Supplement
Reissued March 2020
This report is subject to renewal March 2022.
wwwAcc-es.org 1 (800) 423-6587 1 (562) 699-0543 � A Subsidiary of the Internationai Code CouncilO
DIVISION: 08 00 00—OPENINGS
Section: 08 95 43—Vents I Foundation Flood Vents
REPORT HOLDER:
SMART PRODUCT INNOVATIONS, INC.
EVALUATION SUBJECT:
FREEDOM FLOOD VENTrm AUTOMATIC FOUNDATION
1.0 REPORT PURPOSE AND SCOPE
Purpose:
The purpose of this evaluation report supplement is to indic
Model FFV-1608, recognized in ICC-ES master evaluation
the codes noted below.
Applicable code editions:
* 2017 Florida Building Code —Building
* 2017 Florida Building Code —Residential
2.0 CONCLUSIONS
The Freedom Flood VentTm Automatic Foundation Flood Veni
master evaluation report ESR-4332, complies with the Flot
Residential, provided the design and installation are in a=
noted in the master report.
Use of the Freedom Flood Vent� Automatic Foundation
compliance with the High -Velocity Hurricane Zone provisions
Code —Residential.
VENT: MODEL FFV-1608
that Freedom Flood Vent� Automatic Foundation Flood Vent:
port ESR-4332, has also been evaluated for compliance with
Model FFV-1608, described in Sections 2.0 through 7.0 of the
Ja Building Code —Building and the Florida Building Code —
'dance with the International Building CodeO (IBC) provisions
:)od Vent: Model FFV-1608 has also been found to be in
the Florida Building Code —Building and the Florida Building
For products failing under Florida Rule 9N-3, verification tha� the report holders quality assurance program is audited by a
quality assurance entity approved by the Florida Building Co I mmission for the type of inspections being conducted is the
responsibility of an approved validation entity (or the code official, when the report holder does not possess an approval by
the Commission). I
This supplement expires concurrently with the evaluation report, reissued March 2020.
ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other
as an endorsement ofthe subject ofthe report or a recommendationfor its use. There is no
to anyfinding or other matter in this report, or as to anyproduct covered by the report.
Copyright @ 2020 ICC Evaluation Servioe, LLC. All rights reserved.
not specifically addressed, nor are they to be construed
by ICC Evaluation Service, LLC, express or implied, as
MIT=
Page 4 of 4