Loading...
HomeMy WebLinkAboutREVISION (2)OFFICE USE ONLY: &GANNOD DATE FILED: a_IV REVISION FEE: St Ludp, to PERMrr It / TO / -' . RECEEPT # PLANNING & DEVIELOPMENT SERVICES BUILDING & COPE REGULATION DIVISION 2300 VIRGINIA AVENUE FORT PIERCE, FL 34982-5652 (772) 462-1553 RENV10% APPLICATION F R BUILDING PERMIT REVISIONS PRn.IF:rT mprIRMATinm LOCATION/SITE 1A ADDRESS: ACQUAVIST LOT 2 4416 N. HIGHWAY Al A DETAILED DESCRIPTION OF PROJECT REVISIONS: REVISED LOCATION OF FLOOD VENTS WITH UPDATED CALCULIATIONS CONTRACTOR INFORMATION: STATE of FL REG./CERT. #: CGC 1527445 ST. LUCIE CO CERT. #: 31143 BUSINESS NAME: ARTAR CONSTRUCTION LLC QUALIFIERS NAME- ARMANDO REYES TOLEDO ADDRESS: 13360 SW 40 STREET CITY: MIAMI STATE: FL ZIP: 33175 PHONE (DAYTIME). 786-344-3855 FAX: OWNER/BUILDERINFORMATION: NAME: VENETIAN ADMINISTRATION LLC ADDRESS: 7400 W. FLAGLER STREET CITY: MIAMI STATE: FL ZIP: 33144 FAX: PHONE (DAYTIME- 786-512-4484 NAME: DAVID S. KNIGHT, P.E. ADDRESS: 234514th AVENUE, SUITE 3 CITY: VERO BEACH PHONE (DAYTIME): 772-569-5505 SWCC: 9123109 Revised 06130117 STATE: FL FAX: NA ZIP: 329620 f FLOOD VENT CALCLILATIOWI�-- a"46" ENGINEERED FLOOD VENTS THAT PROVIDE 250 SF OF FLOOD COVERAGE GARAGE 1520 SF/250 - 6.1 - 7 VENTS 9 VENTS PROVIDED LOBBY/STORAGE AREAS 1265 SF/250 = 5.1 = 6 VENTS 5 VENTS PROVIDED + I PASS T14RU BELOW POOL DECK AREA 1105 SF/250 - 4.4 = 5 VENTS (+I VW FOR LOBBY/STORAGE PASS THRU - 6 VENTS) 7 VENTS PROVIDED THE DESIGN OF THE FLOOD VENT OPENINGS WILL PROVIDE FOR EQUALIZATION OF HYDROSTATIC FLOOD FORCES ON EXTERIOR WALLS BY ALLOWING FOR THE AUTOMATIC ENTRY AND EX1T OF FLOODWATERS AS SPEOFIED IN SECTION 2.7.2.2 OF ASCE 24. PER FBC. R322.2.2 FOOT NOTE 2.1 THE BOTTOM OF EACH OPENING SHALL HE NOT MORE THAN I FOOT ABOVE THE HIGHER OF THE FINAL INTERIOR FLOOR AND THE FINISHED EXTERIOR GRADE IMMEDIATELY BELOW THE OPENING, .j CL LU mc w- LLI Q 0 0 >1 Uj LU 0 (.) Cc ut:blljN by H OSK N T MGIMEER. WHETHER THE PROJECT FOR 4 THE . GS ARE THE POM OF DRAWN BY PMP THEY ARE MADE IS OCECUrED OR Nor. OR Structural Concerns US� FOR OTHER PRO,=TS IS PMnU ONLY 7. WALE BY WRITTEN CONTRACT VMH THE ENGINI L AS NOTED Exhibit UNAMORIZED USE IMLL BE PROSECUTED ............. L S. KJM DATE 12-27-2021 PURSUANT TO 7W COPYRZHII AW I iml ICC-ES Evaluation Repo E5R-4;332 "REVISION Reissued March 2020 This report is subject to renewal March 2022. wwwAcc-es.org 1 (800) 423-6587 1 (662) 699-05431 A Subsidiary of the Intemational Code CounciN DIVISION: 08 00 00--OPENINGS Section: 08 96 43—Vents I Foundation Flood Vents REPORT HOLDER: SMART PRODUCT INNOVATIONS, INC. EVALUATION SUBJECT: FREEDOM FLOOD VENTTm AUTOMATIC FOUNDATION FLOOD VENT: MODEL FFV-1608 1.0 EVALUATION SCOPE Compliance with the follovAng codes: a 2018, 2015, 2012, 2009 and 2006 Internaflonal Building CodeO (IBC) n 2018, 2015, 2012, 2009 and 2006 International Residential Code@ (IRC) Properties evaluated: • Physical operation • Water flow • Weathering 2.0 USES The model FFV-1608 Freedom Flood Vent� is used to equalize hydrostatic pressure on walls of enclosures subject to rising or falling floodwaters. With the cover removed, the model FFV-1608 also provides natural air ventilation. 3.0 DESCRIPTION 3A General: The model FFV-1608 Freedom Flood Vent� is an engineered mechanically operated in -wall flood vent (FV) that automatically allows floodwater to enter an enclosed area and exit. The FV is comprised of a polycarbonate frame with mounting flange and a polycarbonate horizontally pivoting door. When subjected to rising water, the model FFV-1608 Freedom Flood VentT" door is activated and pivots to allow water and debris to flow in either direction to equalize hydrostatic pressure from one side of the enclosure to the other. The FV features a removable polycarbonate cover. The FV door will activate and pivot when subjected to rising water with or without the polycarbonate cover installed. 3.2 Engineered Opening: The FV complies with the design principle noted in Section 2.7.2.2 and Section 2.7.3 of ASCE/ SEI 24-14 (2018 and 2015 IBC and IRC) [Section 2.6.2.2 of ASCE/ SEI 24-05 (2012, 2009, 2006 IBC and IRC)] for a maximum rate of rise and fall of 5.0 feet per hour ). In order to comply with the (0.423 m opening requirement of ASCE/ SEI 24, Freedom Flood Vent� FVs must be installed in accordance with Section 4.0 below. See Table 1 for vent size and maximum allowable area coverage for a single vent. 4.0 DESIGN AND INSTALLATION The model FFV-1608 Freedom Flood VeW is designed to be installed into walls or overhead doors of existing or new construction. Installation of the vent must be in accordance with the manufacturer's instructions, the applicable code, and this report. In order to comply with the engineered opening design principle noted in Sections 2.7.2.2 and 2.7.3 of ASCE/ SEI 24-14 (2018 and 2015 IBC and IRC) [Section 2.6.2.2 of ASCE/ SEI 24-05 (2012, 2009, 2006 IBC and IRC)], the Freedom Flood VeW must be installed as follows: N With a minimum of two openings on different sides of each enclosed area. • With a minimum of one FV for every 250 square feet (23.2 m2) of ena—os—eZ—aTUa. '-' • Below the base flood elevation. 0 With the bottom of the vent located a maximum of 12 inches (305.4 mm) above the higher of the final interior grade or floor and the finished exterior grade immediately under each opening. 6.0 CONDITIONS OF USE The Freedom Flood Vent- described in this report complies with, or is a suitable alternative to what is specified in, those codes listed in Section 1.0 of this report, subject to the following conditions: 5.1 The model FFV-1608 Freedom Flood Vent� unit must be installed in accordance with this report, the applicable code and the manufacturers published installation instructions. In the event of a conflict, the instructions in this report shall govern. 6.2 The model FFV-1608 Freedom Flood Vent� unit must not be used in place of "breakaway walls" in coastal high hazard areas, but are permitted for use in conjunction with breakaway walls in other areas. I ICC-ES Evaluation Reports are not to be construed asrepresenting aesthetics or any other, attributes not specifically addressed, nor are they to be construed as an endorsem ent ofthe subject ofthe report or a recomm endation for its use. There is no, warranty by ICC Evaluation Service, LLC, express or implied, as a man to anyfinding or other matter in this report, or as to any product covered by the report. Copyright @ 2020 ICC Evaluation Servioe, LLC. All rights reserved. Page I of 4 ESR-4332 I Most Widely Accepted and Trusted 5 . 3 Use of the Freedom Flood Vent as under -floor space ventilation is outside the scope of this report. 6.0 EVIDENCE SUBMITTED Data in accordance with the ICC-ES Acceptance Criteria for Mechanically Operated Flood Vents (AC364), dated August 2015 (editorially revised October 2017). 7.0 IDENTIFICATION 7.1 The Freedom Flood Vent� model recognized in this report must be identified by a label bearing the manufacturers name (Smart Product Innovations, Inc.) and the evaluation report number (ESR-4332.). TABLE 2 of 4 7.2 The report holders contact information is the following: SMART PRODUCT INNOVATIONS, INC. 430 ANDBRO DRIVE, UNIT I PITMAN, NEW JERSEY 08071 (800) 607-1627 www.freedomfloodvent.com infoD-freedomfloodvent.com FLOOD VENTm ALO MODELNAME MODELNUMBER MODEL SIZE COVERAGE (sq. ft.) Freedom Flood VentTm FFV-1 608 153/4"X 81/16" 250 For SI: I inch = 25.4 mm I I - FIGURE I —MODEL FFV-1608 FREEDOM VENT': SHOWN WITH COVER REMOVED FIGURE 2—MODEL FFV-1608 FREEDOM FLOOD VENTTm: SHOWN WITH FLOOD DOOR PIVOTED OPEN IMES Evaluation Report R-4332 CBC and CRC Supplement Reissued March 2020 This report is subject to renewal March 2022. wwwAcc-es.org 1 (800) 423-6587 1 (562) 699-0543 1 A Subsidiary of the International Code Cound/8 DIVISION: 08 00 00--OPENINGS Section: 08 96 43—Vents I Foundation Flood Vents REPORT HOLDER: SMART PRODUCT INNOVATIONS, INC. EVALUATION SUBJECT: FREEDOM FLOOD VENTTm AUTOMATIC FOUNDATION 1.0 REPORT PURPOSE AND SCOPE Purpose: The purpose of this evaluation report supplement is to Vent: Model FFV-1608, recognized in ICC-ES master 4 with codes noted below. Applicable code edition(s): 0 2016 Calffibmia Building Code (C13C) N 2016 California Residential Code (CRC) 2.0 CONCLUSIONS 2.1 CBC: The Freedom Flood Vent.. Automatic Foundation Flood Vent: master evaluation report ESR-4332, complies with CBC Chapt accordance with the 2015 Intemational Building CodeO (2015 requirements of 12, 16, and 16A, as applicable. r VENT: MODEL FFV-1608 that the Freedom Flood Vent- Automatic Foundation Flood i report ESR-4332, has also been evaluated for compliance Aodel FFV-1608, described in Sections 2.0 through 7.0 of the .rs 12, 16 and 16A, provided the design and installation are in 113C) provisions noted in the master report and the additional The product recognized in this supplement has not been ev�luated under CBC Chapter 7A for use in the exterior design and construction of new buildings located in any Fire Hazal rd Severity Zone within State Responsibility Areas or any Wldland-Urban Interface Fire Area. I 2.2 CRC: The Freedom Flood VeW Automatic Foundation Flood Vent: Model FFV-1608, described in Sections 2.0 through 7.0 of the master evaluation report ESR-4332, complies with the 2016 CRC, provided the design and installation are in accordance with the 2015 International Residential CodeO (2015 IRC) provis.'ions noted in the master report. The product recognized in this supplement has not been ev design and construction of new buildings located in any Fire Wildland-Urban Interface Fire Area. The product recognized in this supplement has not been Interface CodeO. i under 2016 CRC Chapter R337, for use in the exterior I Severity Zone within State Responsibility Areas or any for compliance with the International Wildland-Urban This supplement expires concurrently with the evaluation report, reissued March 2020. I ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not specifically addressed nor are they to be construed as an endorsement ofthe subject ofthe report or a recommendationfor its use. There is no,'warramy bylCCEvatuation Service, LLC, express or implied as 111111, to aryfinding or other matter in this report, or as to any product covered by the report. -- Copyright Q 2020 ICC Evaluation Service, LLC. All rights reserved. Page 3 of 4 IMES Evaluation FBC Supplement Reissued March 2020 This report is subject to renewal March 2022. wwwAcc-es.org 1 (800) 423-6587 1 (562) 699-0543 � A Subsidiary of the Internationai Code CouncilO DIVISION: 08 00 00—OPENINGS Section: 08 95 43—Vents I Foundation Flood Vents REPORT HOLDER: SMART PRODUCT INNOVATIONS, INC. EVALUATION SUBJECT: FREEDOM FLOOD VENTrm AUTOMATIC FOUNDATION 1.0 REPORT PURPOSE AND SCOPE Purpose: The purpose of this evaluation report supplement is to indic Model FFV-1608, recognized in ICC-ES master evaluation the codes noted below. Applicable code editions: * 2017 Florida Building Code —Building * 2017 Florida Building Code —Residential 2.0 CONCLUSIONS The Freedom Flood VentTm Automatic Foundation Flood Veni master evaluation report ESR-4332, complies with the Flot Residential, provided the design and installation are in a= noted in the master report. Use of the Freedom Flood Vent� Automatic Foundation compliance with the High -Velocity Hurricane Zone provisions Code —Residential. VENT: MODEL FFV-1608 that Freedom Flood Vent� Automatic Foundation Flood Vent: port ESR-4332, has also been evaluated for compliance with Model FFV-1608, described in Sections 2.0 through 7.0 of the Ja Building Code —Building and the Florida Building Code — 'dance with the International Building CodeO (IBC) provisions :)od Vent: Model FFV-1608 has also been found to be in the Florida Building Code —Building and the Florida Building For products failing under Florida Rule 9N-3, verification tha� the report holders quality assurance program is audited by a quality assurance entity approved by the Florida Building Co I mmission for the type of inspections being conducted is the responsibility of an approved validation entity (or the code official, when the report holder does not possess an approval by the Commission). I This supplement expires concurrently with the evaluation report, reissued March 2020. ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other as an endorsement ofthe subject ofthe report or a recommendationfor its use. There is no to anyfinding or other matter in this report, or as to anyproduct covered by the report. Copyright @ 2020 ICC Evaluation Servioe, LLC. All rights reserved. not specifically addressed, nor are they to be construed by ICC Evaluation Service, LLC, express or implied, as MIT= Page 4 of 4