HomeMy WebLinkAboutTRUSSES DRAWINGSA =LIFE SAFETY WARNING
I
This symbol identifies Life Safety Warnings that
should be read and 'given special attention to all
persons �installing trusses.
SPACING NOTE
All trusses are to be set 2'-0" on
center except as noted.
MULTIPLE PLY TRUSSES MUST BE FASTENED
I
TOGETHER PER �ENGINEERING BEFORE
SETTING. REFER TO ENGINEERING DRAWING
TO DETERMINE IF MULTIPLE PLY.
1l A
WITH SPANS LONGER THAN
30',BY THE PEAK.
CONSULT BCSI
30' SDAn or less
60 degrees
or less
Tag Kne 112 span
appnxc
REFER TO BCSI
Truss must be set this way if crane is used.
Truss is an example, your truss may not match.,
Insist crane operator sets truss this way.
<---Approx 213 to
112 of Span.
REFER TO BCSI
Truss must be set this way if crane is used.
Truss is an example, your truss may not match.
Insist crane operator sets truss this way.
All load bearing walls, headers,
beams, & linte I Is must be in place
at indicated height before trusses
A are instaned. AN
0
AIR I
Unless noted elsewhere
designed for air handlE
requirements. This may be
Design requirements. Conc
0
I,NDLER NOTE
I this layout, these trusses are not
; in the roof or for any other A/C
I conflict with building code and A/C
It with Building Department and A/C
SCANNLU
By
/1\ 1 0
WARNING
The size of these trusses makes it necessary that they e set by a profeesional builder
familiar with and experienced in the problems and dangers of setting large span trusses.
The builder and erector should consult with an engineer licensed in Florida specializing
in wood roof trusses about the safe erection of these trusses. The engineer should be at
the job site when trusses are erected to provide supervision and advice.
I
SEAT PLATES BY CHAMBERS TRUSS
Hatch Legend
I
BRIG WALL @ 341
B RG WALL @ 221- 411
B RG WALL @ 241
BRIG WALL@ 111
I
J FMRE ! PRESENTS A HANGER
HANGER SCHEDULE �
USE HUS26 FOR 2X4, SUH46 FOR 4X2 EXCEPT AS SHOWN
CARRIED
TRUSS
CARRYING
TRUSS
14ANGER 10
FASTENER FOR
CARRIED TRUSS
FASTENER FOR
CARRYING TRUSS
I
*Please refer to Standard Engineering package for general instuction on installing hangers
10d=0.148"x3" I 16d=0.162" x 3 1/2"
ADo not stand on trusses unil:4 they are braced per BCSI & properly nailed to straps and hangers 1. 1.
METAL ROOFS S
U)
ry
0 U.J
LU _17
00-0
0
LL1 CO
0� 0
< UU
E) _J
U)
<
LL
_J U)
< 06
0-, C)
Z) Lu
1-- Z
L)
IMPERFECTIONS. SPECIAL INSTALLATION CARE MUST BE TAKEN.
GIRD 2-PLY
9
9
7-06-00
W
9
HIP CARRIER LOCATED AS DIMENSIONED ON LAYOUT V A
CORISIDER
ARE NOT E
24"O.C. THRU
CORNER JACKS
ONLY — I 2e
CORNER DETAIL
OVERHANGS NOT 8 '41 FOR CLARITY
5r—
PLUMB CUT END
2X4 TOP CHORD
WALL HEIGHT VARIES
END DETAIL: TYPICAL ROOF
r-
_U4-JU �g
W9
P-UMBZUT END
2X4 TOP CHORD
WALL HEIGHT 34'
END DETAIL: CANTILEVER
to
V)
I FABRICATION AGREEMENT
TRUSSES CANNOT BE STARTED UNTIL THIS AGREEMENT IS SIGNED & RETURNED
he undersigned acknowledges and agrees:
1. Trusses will be made in strict accordance with this truss placement diagram layout which is the sole authority foi
I etermining successful fabrication of the trusses.
,�2 2. All dimensions in this layout have been verified by the undersigned.
W
1� 3. Unless written notice is provided by certified mail to Chambers Truss within ten (10) days of delivery #w
17 W indersigned agrees that no backcharges will be allowed. In the event such written notice is furnished Chambers Truss
q W
0 Z hall have three (3) business days in which to begin repairs required, or to substitute other trusses, at Chambers option
0 Z
00 Wer 10 days of delivery remedy will be according to Florida statute 558.
4. The unders�necl acknowledges receipt of 'BCSI' summary sheet by TPI & WTCA.
5. Delivery is to job she. It is the buyers responsibility to make the job site suitable for delivery. Chambers Truss has
he sole authority to determine the suitability of the job site or a portion of the job site for delivery. Chambers Truss will
)a responsible for dump delivery only. The buyer is responsible for additional delivery expenses 9 Chambers Truss has
o redeliver because job site is not prepared for delivery or buyer is not prepared for delivery of trusses. Buyer is
assessav k esponsible to Chambers Truss for towfing costs due to site conditions.
Z. 6. Price as shown in paragraph 7 below is subject to change N any changes are made in this layout A $50 per hour
-1 Be for revisions may be charged by Chambers Truss.
iiiiiessia k 7. This is a PURCHASE ORDER to Chambers Truss of the sum agreed to, or if no agreement a reasonable price.
nvoice will be made on delivery and paid within terms of net on delivery. Invoice may be made at scheduled date of
efivery 9 buyer cannot accept delivery of fabricated trusses. The undersigned agrees to pay Chambers Truss
easonable attorneys fee for collections in event of payment not timely made. 1-1/2 % per month service charge will be
idded for all sums not paid within terms.
8. Signature or initials anywhere on this sheet constitutes agreement to all tens herein.
9. In consideration of Chambers Truss extending credit for this material the undersigned uncondifionalty guarantees
)ayment when due of any and all indebtedness owed to Chambers Truss by any entity receiving material and the
indersigned agrees to pay such indebtedness including attorneys fees, ff default in payment for material be made by the
ecipient
-1. n the event of any litigation concerning this agreement, the items furnished hereunder or payments referred to
Brain, the parties agree that the sole venue for any such action will be Saint Lucie County, Florida.
11. Design responsibilities are per .... National Standard And Recommended Guidelines On Responsibilities For
onstruction Using Metal Plate Connected Wood Trusses ANSIfrPIiWTCA 4 - 2002'"'
12. Warranty is per Chambers Truss Warranty attached.
TITLE
A spreader bar may be required per "BCSI" to prevent injury & damage.
.94hae.
Multiple ply trusses must be fastened together per engineering before they are
set, failure to do so can result in roof collapse.
Temporary and permanent bracing are required and can save life and property
and is the responsibility of the truss erector.
Study the contents of the information packet included on delivery before
setting trusses.
.011111111111h.
Trusses must be set and braced per design to prevent injury & damage.
,alghl
Trusses must be set plumb and square
Do not set bunks or stack of pry'wood, roofing material or any other
concentrated loads on trusses, this ran cause collapse.
DO NOT INSTALL TRUSSES USING THIS
USE PLAN DELIVERED WITH TRUSSES TO SET TRUSSES
CHAMBERS TRUSS INC
31 Orffle"an"Vrrvenue
Fort Pierce, Florida 34982-6423
800-551-5932
Fort Pierce 772-465-2012 Fax 772-465-8711
Vero Beach 772-569-2012 Stuart 772-286-3302
Web Site: CHAMBERSTRUSS.COM
Email: MAIL@CHAMBERSTRUSS.COM
LOADINGA)ESIGN CRITERIA REDUCIBLE
DESIGN CRITERIA
PER CODE SUCH AS SBC 16ose.1
County
Saint Lucie County
Building Department
Saint Lucie County
Wind Design Criteria
ASCE 2010
Wind Design Method
MWFRS(Directional)/C-C hybrid Wind ASCE 7-10
Roofing Material
Metal
Loading in PSF
Roof R.D.L.
Floor
Top Chord Live
20
40
Top Chord Dead
15 4.2
20
Bottom Chord Live
*1 O-Non Coriccurent
0
Bottom Chord Dead
10 3
5
Total Load
55 7.2
75
Duration Factor
1.25
1.00
Wind Speed
170mph
Top Chord C.B.
Sheathing by builder
Bottom Chord C.B.
Sheathing by builder
Highest Mean Height
33'
Building Type
Enclosed
Building Category
H: Non Restrictive
Exposure Category
D> Flat/ unobstructed/ exposed to wind over water...
Miles from Ocean
0
Conforms to Florida Building Code 2017
R.D.L.=Restraining Dead Load
C.B.=Continuous Bracing
Verify DESIGN CRITERIA shown above with the
building department and your engineer.
Design Criteria is the responsibility of the <
Building Designer and/or Engineer of Record
Chambers Truss Inc. Drawing Name: 75575
SCALE: 1/4" = V-011
303 total trusses, 76 unique designs
Designer: BLW Reviewed by:
Date: 11/09/18
FOR
Sion Homes
DESCRIPTION: Fill
� a idaF Py
ACQUAVISTA LOT #2 to �
Page 3 of 3 CUSTOMER INITIALS EACH PAGE
75575
7!
A=LIFE SAFETY WARNING
mbol iden�ifies Life Safety Warnings that
should be read and given special attention to all
persons installing trusses.
7 spAcING NOTE
AII trusses are to be set T-O" on
i
center except as noted.
MULTIPLE PLY TRUSSES MUST BE FASTENED
TOGETHER PER ENGINEERING BEFORE
SETTING, REFER TO ENGINEERING DRAWING
TO DETERMINE IF MULTIPLE PLY.
WITH SPANS LONGER
130' BY THE PEAK.
1 CONSULT BCSI
30'Spon or less
60 deg
or less
in span
approx.
<K— --Appmx 213 to
Tag Ina 1/2 of Span.
RE FER TO SCSI
T REFER TO SCSI
was must be set this way if crane is used,
Truss must be set this way if crane is used
Truss is an example, your truss may not mate
I
1.
Tr as Is an example, your truss may not malign.
u
I I
Insist cram operator sets bursa this way.
I
Insist crane operator asts truss this way,
All load bec--
beams, & lin
at indicated
'ing walls, headers,
a.Is must be in place
eight before trusses
k installed.
V I I mommomm�
AIR� HANDLER NOTE
Unless noted elsewhere on this layout, these trusses are not
designed for air hand, lers in the roof or for any other A/C
requirements. This may be in conflict with building code and A/C
Design requirements. Co' suit with Building Department and A/C
7 Contractor.
WARNING
The size of these trusses makes it necessary that they e set by a profew-Jonal builder
familiar with and experienced in the problems and dangers of setting large span trusses.
The builder and erector should consult with an engineer licensed in Florida specializing
in wood roof trusses about the safe erection of these trusses. The enginesr should be at
the job site when trusses are erected to provide supervision and advice.
I
SEAT PLATES BY CHAMBERS TRUSS
I -
F-1 Hatch Legend
FF77�BRG �WALL @ 341
BRG WALL @ 221- 411
BRG WALL @ 241
BRIG WALL@ 111
J 16REPRESENTS A HANGER
HANGER SCHEDULE �
I IRP Hl IS96 FOR 2X4. THD46 FOR 4X2 EXCEPT AS SHOWN
CARRIED
TRUSS
CARRYING
TRUSS
HANGERID
FASTENER FOR
CARRIED TRUSS
FASTENEP I OR
CARRYING I RUSS
*Please refer to Standard Engineering package for general instuction on instauirly llullyul�
lod=0.148" x T� 16d=0.162" x 3 1/2"
0 CONNECTIONS DESIGNED
AND SUPPLIED BY OTHERS
Recommended ST
Refer to information
(2) led nails G top & bottom of 2x4 vertl(u
2x6 (MIN) STRONGRACK restrained at each end.
I
,ONIGBACK for Floor Trusses
)n truss engineering dravvings.
block.
W/(3)16d nalls @ each vertical. Locate STRONGSACK 89 d
5TRONGBACKS are recommended to MINIMIZE VIBRATION
bottom cord as possible.
A Do not stand on tru
METAL
s until they are braced per BCS1 & properly nailed to straps and hangers
)FS SHOW IMPERFECTIONS. SPECIAL INSTALLATION CARE MUST BE TAKEN.
Do not set floor trusses upside down! Refer to engineering drawings.
ALL TRU S TO LEDGER CONNECTIONS DESIGNED & SUPPLIED BY OTHERS.
TOP OF ALL FLOOR TRUSS LEDGERS @ 23'- 9" THIS LEVEL.
BOTT0M OF ALL ROOF TRUSS LEDGERS @ 22'- 4" THIS LEVEL.
HIP CARRIER LOCATED AS DIM@NbIONED ON LAYOUT FJ
,!2
qk W
0 Z!;
% 6,
00
hi
24" 0
C RNC TH r
o ER JZUKS � 24-
ONLY
CORNER DETAIL
OVERHANGS NOT SHOWN I OR CLARITY
00
C5 &
90
C \1
0
5 r--
PLUMB CUT END
2X4 TOP CHORD
WALL HEIGHT VARIES
END DETAIL: TYPICAL ROOF
WhIld
SQUARE CUT END
4X2 TOP CHORD
LEDGER HEIGHT VARIES
END DETAIL: TYPICAL FL
SQUARE CUT END
4X2 TOP CHORD
LEDGER HEIGHT 23'- 9"
END DETAIL: RAISED CEILING
FABRICATION AGREEMENT
TRUSSES CANNOT BE STARTED UNTIL THIS AGREEMENT IS SIGNED & RETURNED
"he undersigned acknowledges and agrees:
1. Trusses will be made in strict accordance with this truss placement diagram layout which is the so
latermining successful fabrication of the trusses.
2. All dimensions in this layout have been verified by the undersigned.
3. Unless written notice is provided by certified mail to Chambers Truss within ten (10) days c
ridersigned agrees that no backcharges will be allowed. In the event such wriften notice is furnished Cl
hall have three (3) business days in which to begin repairs required, or to substitute other trusses, at Ch;
Iter 10 days of delivery remedy will be according to Florida statute 558.
4. The undersigned acknowfedges receipt of 'BCSI' summary sheet by TPI & WTCA.
5. Delivery is to job site. It is the buyer's responsibility to make the job site suitable for delivery. Chamt
is sole authority to determine the suitability of the job site or a portion of the job site for delivery. Cham
e responsible for dump delivery only. The buyer is responsible for additional delivery expenses it Charnt
) redeliver because job site is not prepared for delivery or buyer is not prepared for delivery of bu!
Bsponsible to Chambers Truss for towing costs due to site conditions.
6. Price as shown in paragraph 7 below is subject to change if any changes are made in this layout A
�e for revisions may be charged by Chambers Truss.
7. This is a PURCHASE ORDER to Chambers Truss of the sum agreed to, or if no agreement a rez
Tvoice will be made on delivery and paid within terms of net on delivery. Invoice may be made at schi
' silvery if buyer cannot accept delivery of fabricated trusses. The undersigned agrees to pay Ch
Z
a onable attomeys fee for collections in event of payment not thusly made. 1-1/2 % per month service
x1cled for all sums not paid within terms.
8. Signature or initials anywhere on this sheet constitutes agreement to all terms herein.
9. In consideration of Chambers Truss extending credit for this material the undersigned un0DndIfi0n2
)ayment when due of any and all indebtedness owed to Chambers Truss by any amity receiving InE
mclersigned agrees to pay such indebtedness including atforney's fees, If default in payment for material b
ecipient
10. In the event of any lifigation concerning this agreement, the hems furnished hereunder or payme
ierein, the parlies agree that the sole venue for any such action will be Saint Lucie County, Florida.
11. Design responsibilifies; are per '"'National Standard And Recommended Guidelines On ResIx
onstruction Using Metal Plate Connected Wood Trusses ANSIfTPI1WTCA 4 - 2002'"'
12. Warranty is per Chambers Truss Warranty attached.
TED
A spreader bar may be required per "BCSI" to prevent injury & dai
Multiple ply trusses must be fastened together per engineering before
set, failure to do so can result in roof collapse.
1011161111a.
Temporary and permanent bracing are required and can save life and
and is the responsibility of the truss erector.
.191111his.
Study the contents of the information packet included on delivery k
setting trusses.
.9111111111111a.
Trusses must be set and braced per design to prevent injury & da
Trusses must be set plumb and square
.99111111.
Do not set bunks or stack of plywood, roofing material or any ot
concentrated loads on trusses, this can cause collapse.
asses
DO NOT INSTALL TRUSSES USING THIS
USE PLAN DELIVERED WITH TRUSSES TO SET TRUSSES
CHAMBERS TRUSS IN
a1111110000
3105 Oleander Avenue
Fort Pierce, Florida 34982-6423
800-551-5932
Fort Pierce 772-465-2012 Fax 772-465-8711
Vero Beach 772-569-2012 Stuart 772-286-3302
Web Site: CHAMBERSTRUSS.COM
Email: MAIL@CHAMBERSTRUSS.COM
ar
LOADINGIDESIGN CRITERIA I
PER CODE SUCH AS SEC 164
DESIGN CRITERIA
County
Saint Lucie County
Building Department
Saint Lucie County
Wind Design Criteria
ASCE 2010
Wind Design Method
MWFRS(Directional)/C-C hybrid Wind ASCE 7-1
Roofing Material
Metal
Loading in PSF
Roof R.D.L.
Floor
Top Chord Live
20
40
Top Chord Dead
15 4.2
20
Bottom Chord Live
*10-Non Coriccurent
0
Bottom Chord Dead
to 3
5
Total Load
55 7.2
75
Duration Factor
1.25
1.00
Wind Speed
170mph
Top Chord C.B.
Sheathing by builder
Bottom Chord C.B.
Sheathing by builder
Highest Mean Height
33'
Building Type
Enclosed
Building Category
If: Non Restrictive
Exposure Category
D> Flat/ unobstructed/ exposed to wind over water
Miles from Ocean
0
Conforms to Florida Building Code 2017
R.D.L.=Restraining Dead Load
C.B.=Confinuous Bracing
C)
LU
Lif
C13)
Lo
Verify DESIGN CRITERIA shown above with the
building department and your engineer.
Design Criteria is the responsibility of the
Building Designer and/or Engineer of Record
Chambers Truss Inc. Drawing Name: 75575
Lu
Cc
SCALE: 1/4" = V-011
303 total trusses, 76 unique designs
Designer: BLW Reviewed by:
Date: 11/09/18
FOR
Sion Homes
DESCRIPTION:
ACQUAVISTA LOT #2
Page 2 of 3 CUSTOMER INITIALS EACH PAGE
75575
A =LIFE SAFETY WARNING
This symbol identifies Life Safety Warnings that
should be read and given special attention to all
persons installing trusses. I
I SPACING NOTE
All trusses are to be set 2'-0" on
center except as noted. I
MULTIPLE PLY TRUSSES MUST BE FASTENED
TOGETHER PER ENGINEERING BEFORE
SETTING. REFER TO !ENGINEERING DRAWING
A! TO DETERMIN E IF MULTIPLE PLY.
DON'T LIFT TRUSSES
WITH SPANS LONGER THAN
30' BY THE PEAK.
CONSULT BCSI
30' So6n or less
60 degrees
orless
Ta� 112 span Tagi
g line approx. I
REFER TO SCSI
Truss must be set this way if vane is used.
Truss is an example, your truss may not match.
Insist crane operator Sets truss this way.
Bar
��pprox W to
1/2 of Span.
REFER TO SCSI
Truss must be set this way if crane is used.
Truss is an example, your truss may not match.
Insist crane operator sets truss this way.
All load bearing walls, headers,
beams, & lintels must be in place
at indicated height before trusses
A are installed. A
0
AIR HANDLER NOTE
Unless noted elsewhere on this layout, these trusses are not
designed for air handlers in the roof or for any other A/C
requirements. This may be in 'conflict with building code and A/C
Design requirements. Consult� with Building Department and A/C
Contractor.
I
WAIRNING
The size of these trusses makes it necessary that they e set by a profeesional builder
familiar with and experienced in the problems and dangers of setting large span trusses.
The builder and erector should consult with an engineer licensed in Florida specializing
in wood roof trusses about the safe erection of these trusses. The engineer should be at
the job site when trusses are erected to provide supervision and advice.
Hatch Legend
BR I G WALL "--� 34'
GV
BR G WALL 22'- 4"
BR G WALL 24'
MBRG, WALL @ 11'
Recommended STRONGBACK for Floor Trusses
Refer to information on truss engineering drawings.
(2) led nails @ top & bottom of 2A
2x6 (MIN) STRONGBACK restrained at each end, Secure wi(3)16d nails @ each vertical. Locate STRONGBACK as
STRONGBACKS are recommended to MINIMIZE VIBRATION
a to bottom cord as possible.
A Do not stand on trusses
METAL ROOFS S
Do not
ALL TRUSS
till
they are braced per
BCS1 & properly
nailed to straps and hangers I.'.
W
IMPERFECTIONS. SPECIAL
INSTALLATION CARE
MUST BE TAKEN.
floor trusses upside down! Refer to engineering drawings.
LEDGER CONNECTIONS DESIGNED & SUPPLIED BY OTHERS.
6
CD M
C� 9
C, I ":,
SQUARE CUT END
4X2 TOP CHORD
LEDGER HEIGHT VARIES
END DETAIL: TYPICAL FLOOR
On
tz
FABRICATION AGREEMENT
TRUSSES CANNOT BE STARTED UNTIL THIS AGREEMENT IS SIGNED & RETURNED
"he undersigned acknowledges and agrees:
1. Trusses will be made in strict accordance with this truss placement diagram layout which is the sole authority for
letermining successful fabrication of the trusses.
2. All dimensions in this layout have been verified by the undersigned.
3. Unless written notice is provided by oertifiecl mail to Chambers Truss within ten (10) days of delivery the
indersigned agrees that no backGharges will be allowed. In the event Such written notice is furnished Chambers Truss
hall have three (3) business days in which to begin repairs required, or to substitute other trusses, at Chambers option.
er 10 days of delivery remedy will be according to Florida statute 558.
4. The undersigned acknowledges receipt of `BCSI' summary sheet by TPI & W-I-CA-
5. Delivery is to job site. It is the buyers responsibility to make the job site suitable for delivery. Chambers Truss has
he sole authority to determine the suitability of the job site or a portion of the job site for delivery. Chambers Truss will
)e responsible for dump delivery only. The buyer is responsible for additional delivery expenses 9 Chambers Truss has
o redeliver because job site 'is not prepared for delivery or buyer is not prepared for delivery of trusses. Buyer is
esponsible to Chambers Truss for towing costs due to site conditions.
6. Price as shown in paragraph 7 below is subject to change if any changes are made in this layout. A $50 per hour
ee for revisions may be charged by Chambers Truss.
7. This is a PURCHASE ORDER to Chambers Truss of the sum agreed to, or if w agreement a reasonable price.
nvoioe will be made on delivery and paid within terms of net on delivery. Invoice may be made at scheduled date of
elmy if buyer Cannot accept delivery of fabricated trusses. The undersl;Ined agrees to pay Chambers Tms
easonable attorneys fee for collections in event of payment not timely made. 1-1/2 % per month service charge will be
idded for all sums not paid within terms.
8. S�nature or initials anywhere on this sheet ofinstilukes agreement to all terms herein.
9. In Consideration of Chambers Truss extending credit for this material the undersiI;Ined unconditionally guarantees
xayment when due of any and all indebtedness owed to Chambers Truss by any entity receiving material and the
mdersigned agrees to pay such indebtedness including attorneys fees, if default in payment for material be made by the
ecipient.
10. In the event of any litigation Concerning this agreement, the gems furnished hereunder or payments referred to
erein, the parties agree that the sole venue for any such action will be Saint Lucie County, Florida.
11. Design responsibilities are per .... National Standard And Recommended Guidelines On Responsibilities For
onstruction Using Metal Plate Connected Wood Trusses ANSIfTPVWTCA 4 - 2002...
12. Warranty is per Chambers Truss Warranty attached.
)ATED
3IGNED
-OR TITLE
A spreader bar may be required per "BCSI" to prevent injury & damage.
,411111
Multiple ply trusses must be fastened together per engineering before they are
set, failure to do so can result in roof collapse.
.a.111101111k,
Temporary and permanent bracing are required and can save life and property
and is the responsibility of the truss erector.
Iddhk.
Study the contents of the information packet included on delivery before
setting trusses.
1911111hille.
Trusses must be set and braced per design to prevent injury & damage.
A1106.
Trusses must be set plumb and square
19111libli,,.
Do not set bunks or stack of plywood , roofing material or any other
concentrated loads on trusses, this can cause collapse.
DO NOT INSTALL TRUSSES USING THIS
USE PLAN DELIVERED WITH TRUSSES TO SET TRUSSES
CHAMBERS TRUSS INC
3105 Olean er venue
Fort Pierce, Florida 34982-6423
800-551-5932
Fort Pierce 772-465-2012 Fax 772465-8711
Vero Beach T72-569-2012 Stuart 772-286-3302
Web Site: CHAMBERSTRUSS.COM
Email: MAIL@CHAMBERSTRUSS.COM
1 .1 �..Vri 1.4A .61
LOADINGIDESIGN CRITERA REDUCIBLE
PER CODE SUCH AS Sac IN4.8.1
DESIGN CRITERIA
County Saint Lucie County
Building Department Saint Lucie County
Wind Design Criteria ASCE 2010
Wind Design Method MWFRS(Directional)/C-C hybrid Wind ASCE 7-10
Roofing Material Metal
Loading in PSF Roof R.D.L. Floor
Top Chord Live 20 40
Top Chord Dead 15 4.2 20
Bottom Chord Live *10-Non Conccurent 0
Bottom Chord Dead 10 3 5
Total Load 55 7.2 75
Duration Factor 1.25 1 �00
Wind Speed 170mph
Top Chord C.B. Sheathing by builder
Bottom Chord C.B. Sheathing by builder
Highest Mean Height 33'
Building Type Enclosed
Building Category IL Non Restrictive
Exposure Category D> Flat/ unobstructed/ exposed to wind over water...
Miles from Ocean 0
Conforms to Florida Building Code 2017
R.D.L.=Restraining Dead Load C.B.=Continuous Bracing
Verify DESIGN CRITERIA shown above with the
building department and your engineer.
Design Criteria is the responsibility of the
Building Designer and/or Engineer of Record
Chambers Truss Inc. Drawing Name: 75575
SCALE: 1/4" = V-101'"
303 total trusses, 76 unique designs
Designer: BLW Reviewed by:
Date: 11/09118
FOR
Sion Homes
DESCRIPTION:
ACQUAVISTA LOT #2
Page 1 of 3 CUSTOMER INITIALS EACH PAGE
75575