HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASER V/
Datv.
Project Addrew:
ilf S s
ic
-49
`C dd"' 61
e 14, P
-2. ..nia, A,;�R.. 0 04
7-72-40-2-'1'1-"',65 Fax 772-:462-6443
ReqUe:.4t'foe
0
'T-..e,M06ra-ry'POWer-ItL;il--6ase
\0 ok� .�
Parm"t kilmher. \ C� TA\,�
THE UNDERSIGNED HEREBY ' UEST RELEAISE OF ELECTRICAL POWER TO THE A13OVE DESCRI13ED
REQ
PROPERTYt FOP, A PBUOD NOT -TO EAC EED 'tHIRTY (30) PAY-S, FQR THE PURPOSE 05TESTING SYSTEMS
AND EQUIPMENT IN PREPARATION FOP, AFI�AL INSPECUON. IN CONMERATION OF APPROVAL OF THE
REQUES17 WE HERM ACK'00WLENX AN b ;��kE'E A� FdLLOWS:
1. This tenprary pomr rel�ase is. requ
Occupancy of any typ�!, 00er ftn th
2. PS withess by o6r �jqpbWms, we- h0n
inclodmg Bta ding NvWon Pblicy, wh'h
3. All Conditions and requiremepts rl�ted
Power for Testingff h�ve`been fulfilled
4- AX r6quests for an ektemion, beyRrja
the re&5on'fbr the reqg.est PqWe�r ME
the finaftn�PeWon . has nut been . app
the Stop Work Order.
ted fOr th8 above stated Purpose only, and ihem Wifl be no
Xtx'mitted by MnstrucUon during thlis time period.
v agr�e tb ablde by all fArms and conditions of tMs agreement,
is jnc0*rat(5d hi�r�ih by reference.
i the aMthed document enti5ed "Requirements for 30 Day
ad the premise is ready fbr-compliance inspecUon.
days must be.made in wntihg to the suilding offidal -st�ting
be remWecf ftim the s1te aridlor a Stop Work. . Order issued if
ved Wthin 30,days. A fee df $100.00'will be required to lift
W15 HEREBY RELEASE AND AGREE TO HOLD HARMLES�, Sr LUCIE COUNTY, AND THETR EMPLOYEE9 FROM
ALL LTABIL171"IES AND -CLAIMS OF ANY TYPE 0# MTURE WHICH MAY A.RISE NOW OR IN THE FUTURE OUT
OF THIS-TRANSACTION,INCLUDING ANY 'DAMfi(3�E'w 141-C?j." '
-MAY BE INCUR
RED PUE TO THE
D15C6NNEd10N':0F ELECT PJaL PO'W'Eklffilff &VT OF WOLAITON OF THIS AGREEM T.
N�
-s-V�
L�vv I DATE I
1
�99_j 9000/t000d 608-1 9��U3L�36LL
_Wod� U:tL K1_90_3L