Loading...
HomeMy WebLinkAboutBUUILDING PLAN'Q, Gulf Coast Suppig and MFG Sv Crimp Metal roofing rL #11451.12 26 ga. 6v crimp metal roofing attached to p1gwood dock using #9 x LB" wood screws with self scaling washer at 12" o.c. max spacing over ASTM 0 (tgpe 2) 30 lb felt underlagment installed with min. 4' side laps and 6' end laps fastened with corrosion resistant tin caps and with 1.25" ring shank malls =ed 4" o.c �..all laps and two staggered . rows 12' o.c. in field. Attach L. t� + ....2 �� A.# .. -. #I... k..# tinished stucco bands KIC.;HT I 1UN lay ST LUCIE co-UNTY 1. ... 11 .­ - � - - . RE 114� OR NO INSPECTION WILL BE MADN C CON�,EALEO FAB "IENERS OR ATTACHMENTS AAE THE RESPONSIBILITY OF THE CONTRA.CT0.0 O.F RENRO 12 THW PLANS AND AU. PROPOUD WORK ARE "JUL) 'VTTO RE CiO)TT X N OLD !,,MGP�C TOP, STN AT (IN ORD F.P, TO iJA'-' L r COMPLTWIT�,' A�LA-A'XiCiIXE MES, 12 4 15LOPE SCALE. 114' = 1'-0* Gulf Coast SuppIV and MFG 5v Crimp Metal roofing FIL #11 51.12 24 ga. 5v crimp metal roofing attached to plgwood deck It #9 x 1.5" wood' screws with self sealing washer at 12" o.c. max spacing ver ASTM D (tgpe 2) 30 lb felt underlagmerit installed with min. 4 side reps and V end laps fastened with corrosion resistant tin caps and with 1.25" ring shank mail$ %ned 6' o.c. at all laps and two stalgered . rows 12" o.c. in field. Attach k to trusses using attachment detail on this sheet coral 110of ELEVATION NOTES: Gulf Coast 5uppig and MFG 5v Crimp Metal roofing FL #11651.12 26 ga. Sv crimp metal roofing attached to plgwood deck using #9 x 1.5' woo screws with self sealing washer at 12" o.c. max spacing over ASTM D (tgpe 2) 30 lb felt underlagment installed with min. 4" side laps and V end laps fastened with corrosion resistant tin cap& and with 1.25" ring shank nails Ta aced V o.c. at all laps and two staggered . rows 12" o.c. in field. Attach Ick to trussas usinci attachment detail on this sheet /8" thick X 8"w cut )ral finished stucco bands �, W � . *1.u6(_V virl "�JP16clk 6VT1,_lW6W fin I sh e d Stu c c� bands block construction REAR ELEVATION — Overhangs at I'-01' unless otherwise noted on Roof Flan Roof pitch at 4:12 unless otherwise noted — An� changes to this plan shall be submitted to the architect for approval in writing prior to starting construction. — Return ALL Stucco Bands into Window or Door. X 8"w cut 5/81, thick X 811w cut ed stucco 6-a—nds coral finished stucco bands 5/8" thick light textured stucco on tgpical concrete block construction - Pinis ad Floor — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — LEFT ELEVATION SCALE. 1/4' = 1'-0' SCALE: 114' = 1'-0' Gulf Coast SuppIg and MFG 5v Crimp Metal rooting K #11651.12 24 Ia. 5v crimp metal roofing attached to plgwood deck using #9 x 1.5" wooJ screp with self scaling washer at 12" *.q. max spacing over ASTM 0 (tope 2) 30 lb felt underlagment installed with min- -4' side laps and 44 end laps fastened with corrosion resistant tin caps and with 1.25* ring shank nails Taced Ln O.C. at all laps and twocistaggered . rows 12" o�c. in field. Attach cc.k to trusses using attachment etai on this sheet 1/8" Thick cut coral stucco over paper backed wire lath nailed to substrate through one lager of 15 lb felt using Sd nails. Substrate to be 19/32" CDX Plilwood mailed at 6" o.c. in field and edges with 10d ring shank galvanized nails into truss webbing. 12 4 SLOPPE 12 12" D.H. ),H, 04 5/8" thick X 8"w cut coral finished stucco bands TO 11= .F. 5/8" thick light textured Finish Columns with stucco on tgpical concrete 5/8" thick cut coral block construction finished stucco bands FRONT ELEVATION SCALE: 1/4' = 1'-00 2" x 4" top platel 11 '1/2" drgwall ceiling on truss bottom cord 1/2" drgwall on 2" x 4' studs at 16" o.c. ALL CONTRACTOR WARRANTIES BEGIN WHEN THE CLOSING OCCURS BETWEEN THE BUYER AND WYNNE BUILDING CORP. AND WILL CONTINUE FOR ONE YEAR FROM THAT DATE PERMITTING INFORMATION (FORM 100) Florida Building Code Residential: Lth Edition and ASCE 1-10 for Wind Loading Btxldimq Design is: Enclosed Risk Categorg: 11 Wind VallocitV. 145 mph ultimate Mean Roof Height. ll'-p" Roof Pitch: -4.12 Internal Pressure Coefficient: ±OIR Subjectabilit4 to damage from: Weathering. Negligible Termitea.Veru Heavu Width of Rod End Zone: 3'-4* Wind Speed: 165 mph ultimate Wind Exposure Classification: C Adjustment factor for Exposure Height. 1.21 x O.L = 0.12L ASD design Load Combination. ASCIE 1-10 Section 2.4 DL+LL; DL+0.6WL; 0.6DL+O.6WL Components t Cladding Wind Pressure (NET) Roof Zone: 1. +20.11 pat Roof Zone: 2. +20.4/-5-1.0 pat Roof Zone: 3. +20.L/-84.0 Pat Components t Cladding Wall End Zone Width: 3'-4" Components t Cladding Wind Pressure (NET) Wall Zone. 4.+35.8/-38.1 pat Roof Zone I Wall Zone: S. +35.8/-41.8 pet Walls Zone 4 Components t Cladding Wind Pressure (NET) on Garage Door: +32.0/-,40.3 Pat Sheet Walls Considered for Structure? yes ga - Roof Zone 2 Continuous Load Path Provided? yes — Walls Zone 5 Are Component* an Cladding Dot-a-fis Provided?Yes END ZONE base -board 2" x 4" F.T. bottom plate Mininsim Sixt Bearing Presaure:2SOOpsi, Presumptive: X Bg Test: pal This Building Shall Have the Following: w ; Corner Zones APPROVED SHUTTERS: X IMPACT r.LASS; BOTH: NEITHER: oof Zone 3 4" concrete slab with fibermesh OR 0XV 410/10 111 on 4 mil Via ueen over clean compacted termite treat � fill nterior Non -Bearing Partition n ROOF LIVE LOAD: 31 pef Roof: DEAD LOAD. 10 pat JOB ADDRESS: C_,Q6� I FLOOR CRASH POST DETAIL TYPICAL NOTES: SCALE 114'1 11-01, high b N.T.S. 4" diameter 1. Contractor to verify ALL notes and dimensions prior to �ge e post. Floor Flange with 4 - 3/8" proceeding With Work. ernsion bolts into 2. Contractor to STRICTLY enforce ALL OSHA Requirements. sla (3/8"t 50 kal steel plate) 3. ALL Lumber to be used as Beam, Rafters, etc... to have 6. a minimum 1,400 F.B.I. fiber stress. IQ 4. No dissimilar metals to touch. S. ALL Concrete used for slabs shall be min. 2,600 FBI concrete. �24 ALL Concrete used for vertical filled cells, cont. tie beams etc.. to ON 2 shall be 3,000 F.B.I. concrete and/or -4,000 F.B.I. grout mix 6. Drywall, at cei n h 11 be leveled and attached to bottom chord of trusses with icre a per FBC R102.3.5. 1. ALL wood in contact with concrete shall be pressure treated. 8. ALL wall dimensions are nominal and not finished Wall or stud dimensions. 9. ALL plumbing fixtures to be low flow. 10. Contractor to Provide Drain at water heater in accordance with the current edition of the Florida Plumbing Code. 11, Contractor to Provide a 2'-B" wide door at one bathroom for 2 �2" 2'A' V2" handicap accessibility requirements. 12. Lowest finished floor to be -set by Governing Building Department surveyor to set in field. 13. Separation between residence and garage shall be per FBC R302.� 1-4. Door between garage and residence shall be 1-3/4"t 20 min. rated door Water Heater 15. Wall and Ceiling shall have a flame -spread classification of not greater than 200 per FBC R302.9.1 14. Wall and ceiling finishes shall have a smoke -developed index of not greater than 450 per FBC R302.9.2 11. All exposed attic insulation materials installed on attic floors shall have a critical radiant I" x V PIT, Buck flux not less than 0.12 watt per -square centimeter. Exposed foam plastic insulation block with case her materials exposed on the underside of the roof deck or on the attic walls shall comply prior to door attac with F.B.C. R31� - see permit info box of code edition C 18. G losum board material shall conform to ASTM C36, C19, C4_15, C514, C630, 931 C4�0, CIOO2, CIO,4J,CII11, CII-18, C1218, C1395, or C1394 and shall be installed according to the followina: (FBC R102.3.5) FLAN Orgivall Thickness Location Orientation Framing Member Max. spacing of fasteners Nail si7ing options for Installation of drilwall into 8 Mpacing aximum wood framing members 2" x min. thickness Ceiling Perpendicular 24" -71, 12" 13ga 1 3/8R long with 19/L4' head OR 0.098" diameter x 1 I/f lon s� annular -ringed or Sid cooler n 1 OR 0.080' die. x 1 5/8" long with 16/44" head Walls Either 161, 8" 16M Direction OR Gjpsuim.�c,a d nail 0.080 die. x 5 u h Ceiling Perpendicular 24" .1. 12" 13ga 1 5/8" long with 19/L4" head OR 0.098" diameter x 1 3/8" lonp annular -ringed or 6d cooler nai OR . V.V,7.L Qla. x 1 1/8" long with Walls Either 10 8H 140 Direction 114" head OR Gi,*u,,,board nail 0.0915' die. x 1/ .," head. with 19/1 Install SGD thru buck into block with 31111" tap -con with 1 1/2" penetration at 0 o.c. max. from each corner and 20." o.c. max thereafter at head per product approval Use 3/16" tap -con with 1 1/2" penetration at to" O.C. max� from each corner and 20" o.c. max thereafter at sill per product appirc 19. ALL ceramic tile surfaces installed shall conform to ASTM A108.1 thru A108.4. A108.1, A118.1, A118.3, A136.1 and A131.1 accordance with ASTM 20. Cement, fiber -cement or glass mat �gpsum backers in C1288, C1325, OR C1118 and installe I.A.W. manufacturers recommendations shall be used as backer for the Wall tile in tub areas and Wall panels in shower areas. 21. Insulation including facings such as retarders or vapor permeable members installed within floor -ceiling assemblies, roof -ceiling assemblies, wall, crawl spaces and attics shall have a flame spread index not to exceed 25 with an accompangtn� smoke developed index not to exceed 450 when tested in accordance wit STM E 8-4 Insulation shall comply with F.B.C. R31L. Gulf Coast Suppig and MFG Sv Crimp Metal roofing FL #11451.12 24 ga. Sv crimp metal roofing attached to plitwood deck using #9 x 1.5" woo screws with self scaling washer at 12" o.c. max spacing over ASTM D (tilpe 2) 30 lb felt umderlagment Installed with min. If side laps and A" end laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails raced Vro.c. at all laps and two staggered rows 12" o.c. in field. Attach lack to It usses using attachment detail on this sheet simpson HETA 20 or equal hurricane anchor at each truss 12 with (10) od x 1 1/2" nails ENGINEEREO TRUSSES F R IE_ 24' o.c.) sup orting Max. 4F at 244o.c. TYPICAL Islollbs. apti't (shop drawings bg manufacturer) Aluminum Drip R-30 blown fiberglass in bottom chord of trusses Edge t Fascia —1/2' dr,wall with smooth 'Irish 2" x 4" Sub -Fascia Two rows of beam block filled with concrete (1) #5 bar cont. in each row. Substitute Kalican full a vent vinul adfit Installed —and recast lintel filled with concrete and (1) US tar cont. for bottom row over openings using 1/6' die shank x 1.5" long galv. nails with 3/8' die. head per approval - sea chart sheet #1 1/2" druwall over I" x fur,,np,_fo,I strips at 14" o.c. with R4.1 c*--insulation on tUpIcal Sill Block walls Z All drUwall to be Installed per FB C R-102.3.1 5/8" thick light textured T and shall meet all pertaining ASTIM codes. stucco on tlipical concrete �o Mortar to be Tliplis "MR onl )riortioned per FBC R401.1 block construction and Mortar jonts shall comp1g;wIt FBC R401,21 Provide Dur-O-Rock at all wet areas (ex. showers, tube etc...) US bar vert. w/ 30' overlap Fill cell with concrete and at each filled #5 bar vert. (topical), shall not exceed n Wood us mu.crig .48 otherwise noted see foundation plan notes for Base spacing at openings J 4' concrete slab with fibermash OR j;lux1.6 #10/10 WWM on 6 mil Visqueen over . . / clean compacted termite treated Fill Grade 14" x MR Concrete footin with (2) #5 bars 60rIt- am US transverse bars at 48m o1c. TYFICAL SECTION Scale : 1/2" = 1'-0" to Masonrg Beam nails 011I.0 Head fixed door sliding door 7-,—,/2-T AREA CALCULATIONS Living A/C = 14,46 sq. ft. Front Porch = 1,41 sq. ft- Rear Porch = 200 sq. ft, Garage = 321 sq. ft. Total Under Roof= 2108 sq, f t. Total Cubic Ft = 11,568 24 VTR 21" VTR III I Masterr Bath I 2' 2. 2" V711t W.C. 2' Shar. Kit. Sink Itchign 2- W.C. Bath #2 Shar. kc. 0 0 Septic PLUMBING RISER I" x 6" P.T. Buck nailed to block with case hardened nails prior to door attachment \ Masonrg Walt 12" OPTIONAL PATIO/SLAB z _Lmv LL-1 U T ILO 121-81, MA37ER c BEDROOM �8--O" A F F let C��j LL C4 Rod il"I'lile Is Ile 9 0 ILI ILI 00 ATH Rod Qs heir I RWI KITCHE� Veni Drijer through wall L N 1-Ilikv-O'l A.F.F. lk-' Flat Ceiling Upper cabinets to ex n over Xef. 12" x 12" Concrete column III/ block filled with concrete and (2) #1 bars vert. tied into lintels above Covered Porch J48'-0- to,9' - 8" A.F.F. vaulteld Ceiling AT M x 6' knee -wall to 9'-8" A,r-,F. glow counter top IV Vaulted Ceiling DINING ROOM Vanjtg to be 34 112 " high (41") cl �tl' zir- 03/4', I I L 111�11 711!d.1 . .. T 31 8" OD 2M .. .... - ------ IIIIIIIIIIII;Tgpical Flooring (NI 2" filter - Bottom Track Install SGID thru buck into Sill block with 3/14" top -con with 'All 1/2" penetration at L' o.c. max. c ac Sliding D loor Detail 'From a h corner and 20." o.c. max (�U.H. thereafter at jambe per product approval R-11 Batt Jamb A/C �47175tcel Ballard cr At Masonrg Wall NITS S d I .0it- I - #1 iri .N / T 2, x 54- Pro tic # if vide auto ��oth light J 1 701 closer UJ I r I U ULU is.) C., 11 a U Meter - - 150 Pi L — — — — — - 19 Amp nel GARAGE 22" < Jk8'-0" A,r.F-- Flat Ceiling lark size Rough Open. Window Description PRESSURE ZONE 54ke"x 4svl" Single Hung ZON E .4 I- t ®RGGRFF- N Y 55 1, SECOND BEDROOM 2. 6'- 2 Ye" x 5'-S &3 Vill 15" x t Single Hung ZONE 4 - 11 A 3. .2'-2" x V-2 1/2" A 1/2 X .2 0 /0 Wrigiliff Milling N 'iIIIIIIII.,J Flat Ceiling ELI MTII IC -DE uj /","I% 0- -4. 4'-24- 154ks"x 54VI Single Hung ZONE 4 E A � I ALL Windows to be aluminum windows wl tint and mullions per elevations. C-1 ALL windows t withstand pressures in permit info box on sheet r ----------------- 1 ALL windows in bathrooms to be tempered I Block wall in All rough op!�I�n_q dimensions to be verified by contractor to be block EGRESS WIlLn Manul dc U s Specs prio, to cons I uc w i COVERED PORCH 6' -2" 12" x with concrete 12" concrete and (2) into lintals 111-611 Door Schedule Ile _T 1 Install windows thru buck into block with 3/14" top con with 1 1/20 penetration at 1.4 oc. max. from each corner and 20.' o.c. max thereafter at ambs and 20' o.c. max. Exterior face at head and aid per product approval of wall Buck to be I" V I I"x4" P-T. if I sm - dr�� x 4' PIT Buck mailed to A 1 rA INSTALL ^11,1 All 1 I r-oiir-oii In* 5'-4" 34'-Oo VULKEM BLOCK SEALANTI IAMM UFADER AND 3'-4" Exterior race Of wall lark Size Rough Opening I Door Description PRESSURE ZONE A 41-00 X 14-0101 108* X 84" Overhead Garage Door ZONE 4 B, 31-On X C-ak 41 �4"x 83�i` Fiberglass Panel - Inswing ZONE 4 C LI-09 X 61-81, 148 X al �211 .70111 b"I"' 1..." Sliding Glass Door ZONE 4 D 2'-0" X V-8'0! - Solid Care - Wood - L-Panell -51-Fold Finished 24' x 81'/2" E 2 X 41-80 Solid Core - Wood - L-Pariel F 51-09 X 61-811 Solid Care - Wood - 6-Panall - Bi-Fold 21-8# x L'-Su k I N' Solid Core Wood, Steel, or Masonite Door H 2`811 X V-Sul Solid Core - Wood 4-Panel i 21-6m X 61_811� Solid Core - Wood L-Famel - Bi-Fold K 21-81' X C-Sul Solid Core - Wood &-Panel - 51-Fold ALL Exterior .." doors to withstand pressures stated in permit info box on sheet #1 GARAGE DOORSPECIFIED IN PRODUCT APPROVAL FORM AND SHALL WITHSTAND THE PRESSURES STATED IN PERMIT INFO BOX ON SHEET Ul 4'- 2 " < n bloc bars v�ert"tqtdo 91-61, 5'­4" 2 114 CIIII Ln Attach buck to block wall with 1/4" die. Elco conc screws with min. 1 114" penetration at 12" o.c. max and 4" max from each corner thru 2" x 4" PT Buck lock, with case nardene nai a I .4 + k Ii-^nt rnt-t nr nQt All At illIrldows prior to window attachment SILL BLOCK PRIOR TO BUCK Detail at Door All rougn Operliq imensions o e ell :1 ,,with manufa.cturer s specs prior to construction NTS INSTALLATION Braden it Braden AIA, FA WLItine Budding Q rp, Date Drawn 3-21-18 Revisions Architects 411 - Planners 5.E. Coconut Avenue The Grand Carltor GARAGE LEFT Drawn bq: Tel : (112) 281-8268 C:. C:. U. Fax : (112) 281-8283 Spariish Lakes Checked by: E mail: bradenaiascomcast. net St. Lucie County Florida I I Stuart- FL 1,4994 UAAC000032 M 48 Wood screws thru jamb imto buck at each hinge and 15' o.c. max and prior to door attachment NTS Sheet 2. OF 5 Comm # 12-2� STRUCTURAL NOTES- 4_0" i 14'-0" %_ 201-Off ALL FOOTING ARE DESIGNED FOR A MINIMUM OF 2,500 PSF SOIL 8. SLOPE ALL PORCH SLABS, COVERED WALK, FTC. AWAY 101-01, BEARING CAPACITY. IF ANY SUB -SOIL, MUCK OR NON -UNIFORM FROM HOUSE TO DRAINS (IF PROVIDED) PER PLANS PATIO/SLAB F- CONDITIONS EXIST, REPORT TO ARCHITECT AND OBTAIN AM F, PROPER ENGINEERING DATA FOR DESIGN. — 2. ALL SLABS AND FOOTINGS TO BE A MINIMUM 2,500 PSI AT 28 DAYS 9. DESIGN LOADS ARE AS FOLLOWS: ROOF (DL+LL) = 41 PsF D9 I 131EI-i i-i-11 ---- iJE10 I M.1i - - - - - - - - - - - t Ova T-d J ALL COLUMNS, FILLED CELLS, AND BEAMS SHALL BE MIN. 3000 PSI BE SOOO PSI OR -4,000 PSI DAYS WIND VELOCITY = PER PERMIT INFO BOX ON SHEET 41 - GROUT MIX AT 26 EXPOSURE ="C" Filled cell under 3- POISON SOIL AND COVER W/ 6 MIL. VISQUEEN WITHIN 2"! HOURS. NO girder above SOIL POISONING TO BE ACCOMPLISHED OUTSIDE OF FOUNDATION. 10. ALL REINFORCING STEEL SHALL BE GRADE 40, MEETING ASTM A-14, t 2,4' -4 GROUND FLOOR SLAB TO BE A MINIMUM 4" THICK W/ 6X6 10/10 A-35 SPECIFICATIONS, ALL ANCHOR TO BE A - 30-1 STEEL. Rear Patio/Stab r- WELDED WIRE MESH REINFORCING ON 4 MIL. POLYETHYLENE VAPOR _J to be poured separate__'�_" 0 from the house slab. -0 BARRIER ON TERMITE TREATED, CLEAN MACHINE COMPACTED FILL 11- ALL DOWELS, SLEEVES, CONDUITS, INSERTS, BLOCKOUTS, ANCHOR M (MINIMUM 95% DENSITY). LAP POLYETHYLENE 12" MINIMUM, FIBERMESH BOLTS AND FRAMES SHALL BE IN PLACE PRIOR TO POURING CONCRETE. MIX MAY BE SUBSTITUTED FOR WELDED WIRE MESH. FOR OPENINGS AND SPECIAL FEATURES OMITTED ON THESE PLANS, —M SEE ARCHITECTURAL OR MECHANICAL PLANS WHERE APPLICABLE. Thicken footing to 5- LOT TO BE CLEARED OF ALL SMALL PLANT GROWTH AND DEBRIS 24% x 14"d x 24' under filled cell if BEFORE FILL 15 BROUGHT IN. FILL MATERIAL SHALL CONSIST OF 12. —18 under girder bearing. 4 IE H) CLEAN GRANULAR SAND CONTAINING LESS THAN 10% MATERIAL MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS: LE I — — — — — — — — — — — PASSING THE US STANDARD NO. 200 MESH SIEVE. PLACE FOOTING: 3" 01 1 4� STRUCTURAL FILL IN LOOSE LAYERS OF 12" IN THICKNESS AND BEAMS: 1-1/2" — Rear Patio/slab//to COMPACT EACH LIFT TO AT LEAST 95% OF ITS MODIFIED DRY _E W L) — I be flush with bottom of U PROCTOR VALUE. 13. LAP ALL REINFORCING STEEL A MINIMUM OF -48 BAR DIAMETERS. CID a-0 U I sliding door recess. 4- GENERAL CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND 14. USE STRUCTURAL GRADE WOOD WITH A MINIMUM Fb OF 1600 PSI u_ Slope 1/2' DIMENSIONS. BRING ANY DISCREPANCIES OR OMISSIONS TO THE ATTENTION OF THE ARCHITECT. IS. ALL STANDARD LUMBER SHALL BE SYP WITH A MINIMUM Fb OF 1000 PSI OF NO.2 SOUTHERN PINE, UNLESS NOTED OTHERWISE. GARAGE FLOORS TO BE SMOOTH TROWEL FINISH (SLOPPED PER FOUNDATION PLAN). PROVIDE 1-1/2" RECESS FOR OVERHEAD DOOR 1(6. ALL LUMBER IN CONTACT WITH ANY CONCRETE OR MASONRY SHALL BE PRESSURE TREATED. FASTENERS TO HAVE MIN. G185 RATING. FOUNDATION FL/4N I - 1. Ang changes to plans must be submitted to the architect SCALE: 114" = 1'-0" H.B. for 14 10 approval before proceeding with construction. 2. Contractor shall be responsible for verification of all Termite Protection for New +-- 1 concrete Slab with fibernesh OR I"xl" 410/10 WWM on (P mil Vsqueen over notation and dimensions before starting construction. Construction. clean compacted termite treated fill 3. Soil conditions assumed to be 2500 psf. Should ang other conditions be encountered, the architect Shall be notified in writing for revision Sorl treatment used for subterranean termite prevention inside the foundation perimeter shall be done after all .4. Ver[fg all recess thickness at showers, tile, etc.... excavation, backfilling and compaction is complete. 5. Contractor to filled concrete and 1 45 bar vert. at -48" provide cell with If soil area is disturbed after initial chemical soil treatment o.c. max. Provide (1) filled cell on each side of opening to 5'-Il" wide. area shall be re -treated with a chemical soil treatment /� It 1-1111 including spaces boxed or framed. Provide (2) filled cells on each side of openings from ra —� to 9 and Provide (3) filled cells on each side of openings from 10'-0" and up Treatment must be in accordance with the rules and laws M Contractor to see plans for ang other condition used. Foundation walls established bg the Florida Department of Agriculture and shall have filled cells at 2-4" o.c. unless otherwise noted (see section) consumer services. L Contractor to provide for Form Board Surveg — Form Board Surveq Protective sleeves around metallic piping penetrating be Truss Compang to truss floors be to provided to prior construction concrete slab on grade shall not of cellulose 1. Contractor to provide for soil test prior to construction and provide containing materials and shall receive application of a coog of soil test to architect for review prior to construction termicide in annular space between sleeve and pipe. 8, ALL Reinforcing be �0, meeting ASTM A-1� and steel shall grade A-35 specifications. ALL Anchors to be A-301 steel. DL 9. Provide a minimum of 3" concrete protection at footings and 1-1/2 concrete protection at beams for ALL reinforcing bars. 6 A/C 4'40 Steel Ballard 7�Q filled wl ConcreteO US bar vert. wl Thicken e to 8"x8" (y SEE TYPICAL ondge 30" overlap with c crete and 4" concrete slab with fibermesh OR at each filled cell ECTIONS one #5 bar continuous VxL' #10/10 WWM on 10 mil Visqueen over r__0 nr_� clean compacted termite treated fill Q% 42 0-'U I 4' concrete slab with fibermesh OR GRADE,,� F50 5 Eno 2. taoxv nio/io wwm on io mii visqu*en over clean compacted termite treated fill Et! Grade\ E I L =3 Pill- N�1111 R C B EDGE DETAIL 0�3 U -1 14% x 14"d concrete monolithic footing with (2) its bars cont. SCALE 1/2" 1'-0" 0 9) LL cli "OE U 0 C;Z� U 0 (N #5 bar vert. wl TYPICAL FOOTING DETAIL 30' overlap U<) C: s E E # q) W v-= -6 0 -010 at each filled ce111111 SCALE 1/2" 1 '�SEE TYPICAL a IL ECTIONS 4 concrete 51ab with fibermeah OR Adjust curb height zr� Filled Cell Masonrg Column With One Ux LU -1 (L ( 11 x4" 3*10/10 WWM on 10 mil Visqueen over based on gar. floor 4" concrete slab with fibermesh OR #5 From Footing To Tie Beam tf) Q Ln clean compacted termite treated fill slope, 4"x4" #10/10 WWM on lo mil Visqueon over Conc. Fill To Be 3000 PSI clean com rmite treated fill pacted te Recess for 17—17— L ts bar 45 bar in curb See Floor Plan For Location L —ir-- V EEI cont. 0'-0" F.F. Garage Door On E C ffD f1d Step per foundation plan Grade Ila J F T .9C 12" concrete column block filled ck fil]led -4 L -1 T17— — -m__ SincIle Filled Cell )Iumn .. t , �x vert ti with concrete and (2) $91 hars vert. ti into lintels above 101, (2) #5 bars cont. bottom steel How x 14"d concrete monolithic NTS rooting with (2) #5 bars cont. L)&- 1 lL A I AM/AGt-- 'D 1 tzt- UUJN SCALE 1/2" = I'-U7; 12' x 12' concrete column block filled with concrete and 12) 30 bar& vert. tied into lintel* above Top of footer - 14" below finished N Em Verifll house slab height in field I GARAGE CURB DETAIL 2' x 4' FT wood sec-ured with 3/8"dia. x 4" anchor bolt at 18" o.c. overhead door track secured to wood jamb per manufacturer's product approval araL le Door Jamb Detail 1- -1 GARAGE DOOR TO WITHSTAND PRESSURES STATED LUMN FOOTING DETAIL IN PERMIT INFO BOX ON SHEET 41. SEE PRODUCT NTS SCALE 1/2 1,-07,' APPROVAL FORM FOR MANUFACTURER MAKE AND MODEL. t-illed L;ell Masonrg L;olumn With C)ne US From Footing To Beam Each. Conc. Fill To Be 3000 PSI See Floor Plan For Location Double Filled Cell Column NTS Braden it Braden AIA, FA Architects — Planners 411 S.E. Coconut Avenue Tel : (112) 281-8258 Pax : (112) 281-8283 E mail: bradenaia9comcast. net Wanne Building Corp. The Grdrd CdrItOr Spanish Lakes St. Lucie Countq Florida FOOTING SCHEDULE Mark stzv Description pi 145W X 14"D MONOLITHIC FOOTING WITH 2 #5 BARS CONTINUOUS F 12OW X l2mD MONOLITHIC FOOTING WITH (2) US BARS CONTINUOUS F 300 x 300 x l4nD COLUMN FOOTING WITH (4) #5 BARS EACH WAY 4 r 18,111 X 8"D THICKEN SLAB EDGE WITH I US BAR CONTINUOUS F 14*W With X 14"D Curb at Garage MONOLITHIC FOOTING I WITH 2 #5 BAR$ CONTINUOUS - CURB 0'-0' GARAGE LEFT Date Drawn 3-21-18 Drawn 69: C. C. U. Checked bU. ID. R. B. Revisions : sheet I Comm # 3. 112 - 2 � oIF 5 ROOF SHEETING ATTACHMENT DETAIL 8d ring shank (min. 2.5" long) 1. Minimum Nail Size, 2- Minimum Screw S ze = 48 x 2" 3. Minimum Sheathing Thickness 19/32" ClDX Pkiwood 4. Use nails or screws bagdson presspre for ropT stated in permit info box on t e e plans Tor zone 3 K Area Edge Field Fastener Max. Pressure nZone 1 4 01 L Bid ring shank 45 par Zone 2 4 11 11 L 8d ring shank '1(. par Zone 3 4 of 4 It 8d ring shank 81 psf Zone 3a 4" Ci 48 wood screw 112.5 psf Use nails or screws based on resture for roof stated in permit inFo box on these plgns or zone 3 Concrete Lintel Column is, Verifq with Plan 2"x 12" Umn Block Provide #5 bar& with min. 48 bar diameters overlap into beam. Tic filled call steel into continuous beam block steel. 1� Provide Cast -Crete SUS-OB/OT set lintel set in mortar-. Kim. an Bearing Provide 45 bar set in pre -cost lintel into beam where length of the opening calls ror it. I- �L Provide FIT Buck r;,, attached per jamb details into filled ce 4" Pre -cast Sill A 7T,�f �Poured Filled Cell "-!*--:?."-'* ? - 1 1. ­: -6L: ETAIL AT WINDOW OPEN CBS WALL Sca SINGLE Provide 95 bars with min. 48 bar 01ameters overlap in filled call. Tie filled cell steel into continuous foot* steel. Concrete Footing (we foot or schedule for exact sizes) ING IN 1/ 2 0 REAR GIRDER TRUSS Nail 2' x 4"' blocking to vert. leg of truss with 10d x 1.5' mad& at 4" oc. Install into u 7 into wall usim rod act min. (22) 10d nails into truss Rdbar R e b7a r .48 Bar Dia- > Min. Overlap TRUSS 13LOC<ING DETAIL AT GIRDER 37RAPPING to Lintel Attdchmert AT CENTER BEARING POINT NTS 1/8' thick light textured stucco installed per ASTM C 924 over ASTM 0 tgpe 2 paper backed wire lath mailed to substrate through one lager of ASTM D T �jilpo 2 felt paper using ad nails. Substrate--�, to be 19/3 CDX Plgw6od nailed at 4" o.c. in field and edges with 10d ring shank nails into studs. Gulf Coast SuppIg and MFG 5v Crimp Metal roofing FL, 911451.12 26 go. 5v crimp metal roofing attached to plywood deck using #9 x 1.5" woocT screws with self sealing washer at 12m o.c. max spacing over ASTM D (tgpe 2) 30 Ib felt underlagment installed with min. 4" side laps and 4' and laps fastened with corrosion resistant tin caps and with 1.25" ring shank nails !Paced Cro.c. at all laps and two staggered rows 12" ox. in field. Attach sick on this sheet to t usses, using attachment detai ddit onal Precast Lin el _�z CLE R Lintel Length Bar Length Clear Span "A" Bars tj 13 1$ Bars it, "I V, 1 1 2'-10" 2'-B" 11-41, 2,43 none 31-0 31-411 2'-2" 2,#5 none 811118-015AT BPS-IB/IT SPS-IS/2T 41-01, 31-101, 7-811 2,#� none _ZT X-1— 85 bar& CLEAR _411 3'-2" 2.#3 none no Raw of 'H' Block Above 51-41, 5'-2" 4'-0" 2.43 none 5`10" -a" +-4" 2,44 none Precast Lintel 21#4 none Additi 1 5 on bar@ is, 11-41, -01, 6'-2" 2,#5 none 81216-115/1'r OF16-11 2T 8'-4- -01, 2,45 none NOTES: ALL reinforcing steel Is grade W. 1. min, coverage of steel=1.5" 2. min. bearing required 9 ca. end=S' 3. standard Tor reinf. steei=ASTM A415 TYPICAL LINTEL SECTION PRECAST CONCRETE LINTEL SCHEDULE Mark or U Unit W1 Lintel Size Cast -Crete apecification Rowe or "H' Block A (B�oy xILI) Bottom Steel am a Tf:el Size Max Gravitil Load (PLF) Max upwt Lied IPLF) Max, Lateral Land (PLF) L22 7-20 V-48 BIFS-OBAT 1 #5 3044 160 1024 L31 T-44 4'-0' 8Fa-OB/IT 1 #6 2541 130 163 L45 4'-S- W-10" SIRS-OBAT 1 #5 1106 41041 331`1 LSO 15'-Op BIRS-015AT 1 #5 1238 835 121 L60 4--a- i,-tv or-e-oa/tT 1 #5 1011 121 534 LBO a, -on ior-siv or-1111-115/2'r 1 #5 1 2 #6 152 691 $12 L90 T-O- 10'-&# SIRS-113/2'r 1 #5 2 #5 443 630 401 L90B 9'-0' 10'-e 111FIL-18/2'r ONE 1 85 2 #5 1533 1183 401 LIO 0 101-ON 1 111-44 OFS-6/2'r 1 #5 2 1 #5 582 494 452 LIOOB 10 '-O-J ll'-4 alft -IB/2T ONE 1 #5 2 #5 131.9 1028 452 TD20 12'-On 13'-4' BIFS-119/2'r #9 2 #5 411 428 324 L-1205 121-04 13'-4* SPIA-15/2T ONE 1 #5 2 #5 1015 110 1 324 L140 W-00 15'-4" SPII.-IB/2T ONE 1 #5 2 #r, 1250 1 1011 259 LI&O 16'-0' 11'-4' , 1111241-115/2'r 1 #5 2— #5 300 1 192 114 LWO W-00 IT-4" 1 asm-is/2'r 1 #5 2 0 5OO__J 194 - ALL LINTELS SHALL BE MADE BY CAST-CRETP. - LINTELS SHALL BE FILLED SOLID WITH 3000 PSI CONCRETE - REFER TO CAST-CRETE CATALOG FOR ALL INFORMATION REGARDING LINTEL CONSTRUCTION, HANDLING INFORMATION, AND SAFE LOAD REQ_ REQUIREMENTS - LINTELS OVER 1,4'-0" LONG ARE TO BE PRESTRESSED. =HETA 20 or equal 6 anchor at each true& with (10) 10d x 1 1/2" nails 24' o.c.) sup rting Max. r, fol 1810lbs. upift Aluminum Drip Edge t Fascia 12u 2* X 6" Kagcon full a vent vinlill soffit installed using 1/0' dia shank x 1.5' long galy. roofing nails with 3/0' dia. head per product approval - see chart sheet #1 12' x 12" concrete column block filled with concrete and (2) #1 bar& vert. tm into lintials above thicken edge to a'xa" With concrete and one 95 bar continuous BEYOND Top of f coter It." below finished floor 12 Aluminum Drip Edge i Fascia f lash Flash and Counter Nail ledger to gable and truss with (2) 10d I at each web hi -rib lath vertical wood to provide Into rat! 3/4% penetration 5/80 thick light textured stucco on typical concrete block construction Varier - see plan #5 bar vert. wl 30�' overlap at each filled cell Rear Patio/Slab to be flush with bottom of sliding door recess. Step per foundation plan Slope per foundation plan 111 IEE�I I I F111111 I I 1�11111�1 I _71 11 1�111111 I I 1�11111�1 I I 1�11111�1 I I I ��71 11 1= TUWCdI Poured Ca ccwicretv b Feared Concreti concrete plack Concrete i Manufacture Section Flush Mounted Shutter Detai[ dunanint Panel ims per Sao 7ww;gl Stud Detail I/Sw x 3/32' Wing Nut u.1 appropriate washer and spacing par manufacturer's Datmis Stud Detail TTS Stud w/ Ow Cost Zinc Nickel Fisted Wing Nut nts Brace Gable or with 2" x 4" SYP #2 Sft back nailed to bottom of top chords using (2) IOd nails at each truss RE-ENGINEERf-:D WOOD TRUSSES 24"o.c. TYPICAL shop drawings bg manufacturer C4 LU x 110 Y_ C14 13 C nL LL CIL UJ L_ to u) LLq) E r a OD = — t5 to I- C4 < 1 LUU El Bruce Gable and with 2" x 1' SYP #2 min. aft back nailed to bottom — of top chords using (2) 10d nails at each truss \R-30 blown fiberglass in bottom chord of trusses -1/2" druwall with smooth finish Two rows of beam block filled with concrete -and (1) #5 bar cont. in each row. Substitute �recast lintel filled with concrete and (1) #5 ar cont. for bottom row over openings 1/2" dr arall.over I" x furrinp, strips IL o.c. with R,4.1 i-foil -insulation on typical 8' Block walls All drgwall to be installed per FBC R102.3.1 and shall meet all pertaining ASTM codes. Mortar to be Tgpe "M" 'I roportionedoer P15C R6011 and Mortar joints shall com��v'with OBC R401,2.1. Provide Our-O-Rock at al wet areas (ex. showers. tubs eta... Iu U Strap truss to wall using Simpson MGT with Simpson HETA 20 5/8" die. threaded rod with min 12' embedment hurricane anchor at each truss into beam (22) 10d either wet act or in epoxy with nails into truss. Add blocking to of ( 24 o.c.) 'ET supporting Max. truss leg per detail on this sheet C—H A �2 0 1810 lbs. uplift 110014 kii M I 11A WNA WA WO 11 —AA, WAIN FAR MAIN ad ArAfft A NA FIRAIS 11 11111ill 4g� Eli amp. �m I lmoft`�M 1. MAN la in WUSE M win iFe n I r- I I I Z I I ! Fill cell with concrete and fl) #5 bar vert. (typical). - ROOF FLAN C4 so C14 9) < 4J cL U] ii- 4M U C C: to EL OD E r_ U) Qu Z: C14 Max. spacing shall not exceed a erwise noted see foundation plan notes for - OVERHANGS AT 1'-0" UNLESS OTHERWISE NOTED ON THIS SHEET spacing at openings 1' concrete slab with fibermash OR - ROOF PITCH AT -4:12 UNLESS OTHERWISE NOTED ON THIS SHEET VxV 410/10 WWM on 4 md Visqueen over - TRUSS SHOP DRAWINGS TO BE PROVIDED BY MANUFACTURER clean compacted termite treated fill — ANY CHANGES TO THIS PLAN SHALL BE SUBMITTED TO THE ARCHITECT FOR APPROVAL IN WRITING PRIOR TO STARTING CONSTRUCTION. UH ALL TRUSS TO TRUSS CONNECTIONS BY 1111 TRUSS MANUFACTURER 1 P ARCHITECT TO REVIEW TRUSS SHOP DRAWINGS PRIOR 8 TO CONSTRUCTION FOR LAYOUT AND UPLIFT VERIFICATION dt Front Forch CONTRACTOR TO PROVIDE FOR FORM BOARD SURVEY AND TO PROVIDE FORM BOARD SURVEY TO TRUSS COMPANY PRIOR TO TRUSS CONSTRUCTION OPTIONAL PANEL "A" Poles BR Load Wire Description dire# cfrc# Description Wire Load BR Poles 2 40 1.0 kw #8 A/C camp 1 2 AHU #10 3.5 kw 30 2 3 4 2 30 4.5 kw #10 40 gal. water HTR 5 L Range #4 12.o kw 50 2 1 20 1 1.0 kw 1 #12 Pump 9 1 10 1 Draer #10 6.0 kw 30 2 11 12 1 20 1.5 kw #12 13 14 Dishwasher #12 1.2 kw 20 1 1 20 1.5 kw 312 Microwave Is 16 Refrigerator #12 1.2 kw 20 1 1 20 1.5 Its #12 Kitchen S.A.C. 11 is Recopts #12 - 20 1 1 20 1.5 kw Kitchen S.A.C. 19 20 Recepts #12 - 20 1 1 20 1 1.2 kw -*12 #12 Clothes Washer 21 1 22 1 Recepts #12 -1 20 1 1 20 0.01 Its #12 Garage Door Opener 23 24 Recapts #12 - 20 1 1 20 1.4 Its 812 25 26 Recepts #12 - 20 1 1 20 1.112 kw $12 21 2S Recepts #12 1 1 20 812 General Lighting 211 30 Recepts #12 - 20 1 - 1 20 $12 General Lighting 31 32 Racepts #12 - 20 1 - 1 120 $12 General Lighting 33 1 34 1 Exterior GFCI #12 - 20 1 1 - 1 20 #12 General Lighting 35 36 Bathroom OF[ #12 - 20 1 1 20 #12 Smoke Detectors 31 38 General Lighting #12 - 20 1 - 1 20 #12 Bathroom GF1 99 40 General Lighting #12 - 20 1 - sbare 41 42 store PANEL "A" LOAD CALCULATION SHEET Load Description Qtq. Watts -[Total(Watts) ft.) .. ...... ...... .Sm;!I.App!iance Circuitils) j4nge ........................... .............. Microwave ............ .. .... 0 ............................................ Dish Washer ....................... ........ .......... � 0 ................................... .q19tb?A.Pruqr ............... .................... ........... .W.ate.r..H.eater ................................................. .pprage - Poor. Opener .......... ........... - 1135 3 5,206 2 1,500 [12,000 3,000 1 12,000 1 1,200 1,200 1 1 1,500 1,500 1 1.200 1,200 11,200 1 5,000 5,000 1-4,500 4,500 1 1.800 1,800 1 810 810 Total Watts 3-1,415 First 10000 Watts 9100% 1 10,000 10.000 Remainder 2-1,415 940% 1 0 10,146 Electric Heat or A/C 10,000 Vi 1 10,000 10.000 Calculated Load Watts 30.946_ Voltage 2.40 Calculated Wattage Divided bli Voltage = Total Amps 129.03 - Pam@[ Size Required 150 Ampal Electriclal S�mbol Legerd 5 Single Pole Switch Recessed Can Light % Double Pole Switch Elieball Recessed J- FB Rush Button Switch Exhaust Pan =9 Duplex Outlet Ceiling Mounted Light Special Receptacle 0- 1 Wall Mounted Light p- Grc Waterproof ground fault circuit interru ter I ON Light with Pull Chain (attic) 8 Floor Duplex Outlet @ Computer Connection Jack Fc-m-1 Carbon Monoxide Detector 4& Flood Light (2) Thermostat c= Electrical Panel Central Vac E5 Electrical Meter Smoke Detector Ceiling fan Television Jack Telephone Jack ACD,sc A/C Disconnect 0�1 I x 4 Florescent Light 2 x 4 Florescent Light Speaker Hook -Up Pritercom 163 CFM IOXIOXL PATIO/SLAB MASTE BEDR001 GR AT RO M 11.3 CPM IOXIOXL 12x12x9 B/A F-1 Center Registers 4\ 169 cr-�M�ori calling fan IL9 CPM loxiok, I IOxIox1 12x12x9 B/A CLOSE'k H.S. I C 0M 8x4x4 qC14 H.1 1201 + 3 PM DINING Soffit ATH ROOM Exhaust Duct Thru Soffit L- - - - - - - 63 CPM LL 12)d2xl H.S. 20 CP 1 FM ru 8x4x,4 r Vent th "Al is LqJ17i I Soffit 4" Exhaust 0 -�w ATH Duct Thru Q 0 20lx2O Wall WF GF Install culetA I- I UJ 10 under disc. or r 22' x 54 not shown 0 > claritg Attic Access - Et 232 CPM '4 UxLx-1 111;2-j [ EA/I C Meter� k150 Amp Panel GARAGE I JUNCTION BOX TO SUPPORT A FAN THERMOSTAT LOCATION �IEC��ANICAL L �"�OUT B/A BALANCED AIR SCALE: 1/�-4" I 1'-0" Electric Notes: 1. 2. Use copper wire onl no aluminum. Provide and wire aill, required smoke detectors. I'l. It is not the intent of these plans to show everg minor detail 3. Contractor to verifg location of electrical of construction. The contractor shall furnish and install all items for a complete electrical System and provide all 4. service and provider. ALL taddle fans shall be on a rheostat. the requirements necessarg for the equipment to be placed in proper working order. S. ALL ath and kitchen receptacles to be GF1 rotected. 18. All work shall be done in accordance with the N.E.C.1 and 4. '71. ALL exterior outlets to be WP/GFI protecteT shall compIg with all local codes and ordinances, and shall a Recessed cans to be installed per NFPA requirements. meet all standard requirements of the local electric utilitg 8. AFCi receptacles are required in all rooms except and telephone compang. Kitchen, Bathrooms, and Garage. 9. A/C Return Air Balance Must complg w/ FBC RMIL02 10. A/C Refri er3rit lines that are run thru Slabs must be 19. The electrical sgstem shall be completelg and effectivel sleeved in AV grounded as required bg the latest edition of the N.E. 11. ALL A/C Equipment shall compIg with energg calculation 20. All material shall be new and shall bear underwriters' 12. All work shall be performed bg a licensed electrical labels where applicable. contractor, the completed agstem shall be fully operative. 13. Contractor shall pag for all fees, permits, testin and 3 21. All equipment and panel sizes shall be verified before inspections including blower testing wher ' ordering. The contractor shall provide circuit routings to 1,4. All work shall be coordinated with other traaes to avoid suit the job conditions. interference with the progress of construction. 15. All required insurance shall be provided for protection 22. Furnish and install all fixtures as called for on the plans against the public liabilitg and propertg damage for the or as selected bg others. duration of the work. 16. Contractor shall uarantee all materials and workmanship ?or 23. All racewags and pipes placed in or through ang concrete free of defects a period of not less than two gears from slab shall be spaced a minimum of three diameters of the the date of acceptance or certificate of occupancg, or one largest conduit or pipe from ang other service, gear from closing sale of house. Correction of defects shall be completed without additional 24. All exposed wire below 9'-1" shall be installed in metal EMT charge and shall include replacements or repair of ang conduit. other phase of installation that mag have been damaged. 25. Dryer Vents to be installed per FBC RMIS02 SECOND BEDROOM ILI 12xl2xS S/A COVERED PORCH A/C disc. LF--I 150 #2/0 Aluminum feed AMP MC13 1%'Condurt PANEL 21, PVC ( 2" rigid service FPL Bar:,", 't?',% 'wr I in, I r to com . r or slab ELECTRICAL RISER - Contractor shall use AL-CLI Landing lugs. INTS - Contractor shall t 0 rqued lugs I . A.W. manufacturers recommen ations which shall be verified prior to construction Braden t Braden AIIA, FA Architects - Planners 411 S.E. Coconut Avenue Tel : (112) 281-8268 Fax : (112) 281-8283 B E mail, bradenaiascomcast. net Stuart. FL 34996 UAAC000032 Meter 14 �' MASTER BEDROOM OPTIONAL T1 SLAB .,.,Covered Poi -All\ WP Gro [I ITVI 0-j arbon G etector R 0 M F `1 DINING i . 1.1\\ ROOM I FC GrCl MFM K=n 0 KITCHEN L - -$Dokff -L Carb.2111 Monoxide Detector /24" 3'-2" Combo V-2- _I C IONCCFM F F N GF Fct 42� GrI F -2-2*-x -54'- > Attic Access "ente, I with light L 150 AMR Opticnal Panel panel location Full chain light in attic 9= 1211, GFc1 GARAGE Garage Door Opener r ----------------- i -,-17 I I CLOSiE ELECTRIC,,4L FL/4N Attic Ventinci Calculations FBC 230' Total Attic Space = 212-4 sq. ft. Venting Ratio 1/150 = 14.1� sq. f t. required Provide A Continuous Vented Soffit W nne Building Corp. The Grand Carlton Spanish Lakes St. Lucie Countg Florida N // -.4 BgDROOM WF COVERE,1!� F1 � F-ORC H SCALE: 1/4" = I'-011 Post Light lwth"Vo7c --I Photo Coll Date Drawn Revisions 3-21-18 GARAGE Drawn bq: LEFT C. C. U. Checked bg. ID. R. 15. 41-31, H.B. Exhaust Duct Thru Soffit Wire For Front Post Light Sheet Comm # E-1 12-2� OF 5 A=LIFE SAFETY WARNING This symbol identifies Life Safety Warnings that should be read given special attention by all persons installing trusses. --5PAGING NOTE AILL TRUSSES ARE TO 13E SET AT 2'-0: ON CENTER EXCEPT AS NOTED MULTIPLE PLY TRUSSES MUST BE zASQTENED TOGETHER PER ENGINEERINC BEFORE SETTING. REFER TO ENGINEERING DRAWING TO DETERMINE Ak IF MULTIPLE PLY. A& F19 DON'T LIFT TRUSSES WITH SPANS LONGER THAN 30'BY THE PEAK. I CONSULT BCSI I 30'S less A 30' to 60' Span A P; 6 0 degrees Sprea r Ba or less I — �? - .4— 112 0 1 ,g Line 3pan cpprox. REFER `0 E3CS1 be set ths �a, f crc�e used. I y��, tr��, e, n�t nn.t�h. J c,,,,e �p,rato, �ets t,�ss th,s cy. — Approx 2/3 to .. le, La % 4 1/2 of Span REFER TO BCSI iss must be set this way if crone used. This is an example, truss may not match. Insist crone operator sets truss this way. All load bearing walls, headers, beams & lintels must be in place at indicated height before trusses AL are installed. AL I Fz:;'-b " 4n%, " F=30 1 F= F=Qb " 4C::> -T- IF= UNLESS NOTED ELSEWHERE ON THIS LAYOUT, THESE TRUSSES ARE NOT DESIGNED FOR AIR HANDLERS IN THE ROOF OR FOR ANY OTHER A/C REQUIREMENTS. THIS MAY BE IN CONFLICT WITH BUILDING CODE AND A/C DESIGN REQUIREMENTS. CONSULT WITH BUILDING DEPARTMENT AND A/C CONTRACTOR. U REPRESENTS A MANGER For Truss to Truss Connections see hanger/connector schedule in engineering package. Carrying Girder Nails mu as = tabs 0 shown. G!u de Dome angle nails. Truss SEAT PLATES BY CHAMBERS �X INDICATES LOAD BEARING WALL REQUIRED BY TRUSSES SUPPLIED BY BUILDER AT A HEIGHT OF 8'-1 ABOVE FINISHED FLOOR 12 4.00 F_ upset=11/4" heel=3 15/16" PLUMB CUT END 2 x 4 Top Chord WALL HEIGHT V-11" TYPICAL END DETAIL 12 4-00 F__ ---j­ 2.00 08'-lw 12 2 upset=1/4" heel=3 15/16" PLUMB CUT END 2 x 4 Top Chord WALL HEIGHT 8'-1" END DETAIL: A ARRANGE WITH CRANE OPERATOR IN ADVANCE FOR A SPREADER BAR OF Do not stand on trusses until they are braced per BCSI & properly nailed to straps & GARAGE LEFT The Architect's or Architect's representative's shop drawing approval is NOT a "double check" of the contractor. 17'- 23'IN LENGTH The contractor shall remain responsible hangers for checking field measurements and other construction criteria. Architect's approval covers general root shape, review of truss strapping, and loading on structure from gravitv Ind uplift loads and their re%n.Aih/( Braden & Braden AA.A.1�.A. FABRICAT110N AGREEMENT* TMWWCAM40TOESTAMWUWMTMAGREbOMMOMM&M'MMM [ MOW be 111151211111111 hc made In WU socordance %fth Oft buss placiernew dognum layoul. 1-. posess "be aliftu ft sole willioilty, lor delaimining-successlul bWwft of ft lnx� 2.,M dicianslom h Oft layout have been verified by, ft undersigod. & Unless %vftn nudoe Is wovided W c~ mail to Chambies Truss w" Wn (1CI) dayi 9f "Very an unclersIgned aprees that re badcoliarlift %41 be allowed. -In the WON uxh wow notice In Anishad Charnbars Tnw " be" ft" CO bution days in %ftch bo be* fo;k" F11011111d, " W subseula COW Vueses, at Chamblee OPUL 4. TlW INAIIING111100d S* I J recalpt ur V= 14)3w swnnwy~ by TPI & V/Mk 5. DWKwY' is to job 2Z It 'IS#, Wyft- resporalbillity 11 maim to jb ft suitable for dellimy. awrobars Thm No do sole suftrity to dstwn*w so sullididir of In Job sft cir a poition of ibe)ob aft for delimy. Charnben Truss will be respoialble for dump deliverY Wily. The boyar, to responsible for additional dellmy expenses N Mail Thm has to radefteir because job site, be not pWWW for domy at buye, in not pmpened Ilor d*jwy of 1rususs. puyW is responsible to Chambeft Tnm for WwbV ODW due b ON owiddom & plion am shown Iq pw@Wvph 7 below Is subject to chanos If NIY dM9" am. Made 111) liftleyout. A $50 per has fag for rawlsom may to clunisped by CharnbersTruss. ' 7-Tbls- is a PURCHAW ORDER to Chombers.Truss oil In mum speed bN or if nit iapsesesnif a resecriable Pica. Irmics will be made an d*my and POW v4ft ISIMS Of MI 6n'ddmy. imi" msy� be made at scheduled daw, ut ddvoY I buyer ciamol Of was The undersigned agnsal lo be for wascibria in amt of payment not ft* dwille be added for all some W paidwithlin famu;. & or kilads anywhem on Vile shad ccemIllubis agreement ID @4 bem havelm qvin of Chambers Truss vdardq asO for this fuslarall ft unclansiWied when da of am wid all Indebledims owed tD ChindeaS Tives by -my antity , and ihe turdwolvad agness bD Pay such indebtedness kw=!Uft 100116 ill debea in payment for malarial be me& by ft M=6 ev"t of IsM, pigepri owicarinkilil tft do kams Lindshed hereunder c,psymenignsis, lDhK*KftpwGno"tW=-o,,*IkvwmtorwrimxhacknwM be SaInit Lbeb CKNV, POWL On 1i Demp responsiboss am par-Hadonal Stiffidard And lilbacestwided Guldebset For CaMucdon UOV Maud Plane Connected Wood Trusaw ANSVrpVWTrA4-200r* DATP� UuWe ply tualias must be feaftned together per engineering beftm OW am s4 flallum to do so can millikin roof coillailiqla. TempmrY and permanent bmaft am required and can am We and property and is the roisponslitift of Ithe bitaul; erector. i gui contelift of the informartion pad* linduded on delivery before saillifing llruaill;W - j6plipent"AdimUL ...Tiumearrustbeedialid Trilm"s muirt be ad plumb and silillipm Do notiast bunks oraftok of plirliflood, roofing materI1011 oranY Mhai loaft on tuaveN6 thb can own COUOP" DaNOTSET TRUSSES USING THIS LA- -USELAyoUT DELjvEjPMWffH TRUSSES TO SEfTIRUSSE3 CHAMBEIMSTRUSS INC 310 oleander kienue Fort'Plerd% Fidirldin U982-8423 800-551-5932 Fort F%me 77Z.45-M12 Fax ft46W11 Pe&utih 712.M2.2012 stillad 7Y2-286-33M 0 92-0/93.2 MITEX 4.2 DESIGN CRITERIA County SAINT LUCIE Building Department SAINT LUCIE COUNTY Wind Design Criteria ASCE 7-2010 Wind Design Method MWFRSIC-C hybrid Wind ASCE 7-10 Roofing Material Shingle or Shake 0— Loading in PSF Roof R.D.L. >% — s Top Chord Live 20 M Top Chord Dead 7 4.2 ca 0 Bottom Chord Live 10 Non -Concurrent E Cil's Bottom Chord Dead 10 3 TOTAL Load 37 7.2 10 Duration Factor 1.25 cd M; Wind Speed 165mph 2 0 >0 T Top Chord C.B. Sheeting by builder. 0 Bottom Chord C.B. Sheeting by builder. I I j.7 Highest Mean Height 114'-04 0 Vq Building Type ENCLOSED Building Category II:Non Restirlictive Exposure Category C Barrier Island No Conforms to FBC 2017 W W Follow U) 173, A GARAGE RIGHT 13 TRUSS DRAWINGS ARE ATTACHED TO LAYOUT Verlify DESIGN CRITERIA shown above with the building department and your engineer. Design Criteria is the responsibility of the Chambers Truss Inc. Drawing Nam: Mi 13M Scale: 1/4 = 1' 72 total trusses, 13 different trusses. MI 4: SAE ACAD: SAE Reviewed By-_ Date: 04124/12 Revised: 0=1/18 FOR WYNNE BUILDING CORP. DESCRIPTION: 62"GRAND CARLTON III PAGE 1 of 1 CUSTOMER INITIALS EACH PAGE M 11323 75/31