Loading...
HomeMy WebLinkAboutKSM SOIL COMPACTION REPORT/qua6ug As To P, CP lk 9 (PhINV59 AIL LJ) M KELLER, SCHLEICHER & MacWILL/IAM ENGIN E*ERING AND TESTING, INC. MARTIN (772) 337-7755 P.O. BOX 78-1377, /SEBASTIAN, FL 32978-1377 SEBASTIAN (772) 589-0712 PALM BEACH (561) 845-7445 www.ksmengineering.net MELBOURNE (321) 768-8488 FAX (561) 845-8876 E-Mail: KSM'6KSMENGINEERING.NET ST. LUCIE (772) 229-9093 C.A.: 5693 FAX (772) 589-6469 SOIL COMPACTION REPORT ASTM D" 1567 and ASTM D 2922 DATE TESTED June 11, 2018 KSM JOB#: 181899-1 d/MH/jt PERMIT # 1804-0750 RECEIVED CONTRACTOR Wynne Development JOB LOCATION 168 Camino Del / Rio JUN 19 2018 Spanish Lakes '� Permitting Department Port St. Lucie,Florida St. Lucie county ITEM TESTED Compacted Foundation Fill TEST LOCATION DEPTH PEN DRY MAX. DRY PERCENT OF SAMPLE READ DENSITY PROCTOR VALUE COMPACTION 1. S.W. 011- 50 104.4 109.1 95.7 2. N.W. I / 50 105.9 11 97.1 3. Center 1: 50 106.0 97.2 4. S. E. 50 105.0 96.2 5. N. E. 50- 104.7 96.0 Soil Description: Brown Sand 110.0 - W In Place Moisture: E 8.3 Percent G 109.0 Optimum Moisture: H I 12.0 Percent T I I Max. Dry Density: 109.1 P.C.F. P 108.0 @ Test Locations The C Density & Penetrometer IF Readings Indicate the 107.0 Me Degree,,p0C ""' btiqn ets MW Min IN I D if 146��a R -Pen.-Aeadi e%,to haturall Grade. y 106.0 .. . ... 9 10 11 12 13 14 15 _pw Moisture - % of Dry Weight Pre- lx� M* biltucie County Building Department F i Email to: dotty@spanishlakes.com Ronald G. Keller, P.E.: 37293 / SI Lic. No.: 860 / Julie E. Keller, P.E.: 68366 0�/12/2018 11:33 7725896469- KSM ENGINEERING PAGE 02/02 OWN aL L-3 J M L NG, INC. �77 SE13MMAN (772) 569-0712 KELLER, SCHLEIC.IHER & MaCWILLIAM ENGINEFF31NG AND TESTI MARTIN (T72) 337-7755 p.O. BOX 78-1377, S,E13ASTIAN, FL 32978-13 M91-BOURNE (321) 768-8488 PALM BEACH (561) 845-7445 www-ksmenginearing.net ST. LUCIE (772) 229-9093 FAX (561) 845-8876 E.Mail; K$M@kSM5NGINEF-AING.NET FAX (772) 589-6469 C.A.. 5693 SOIL cOMPACTION REPORT ASTM D 11�57 and ASTM D 2922 KSM JOB 181899-1 d/MH/jt DATE TESTED June 11, 2018 PERMIT # 1804-0750 - RECEIVED CONTRACTOR Wynne Development JOB LOCATION 168 Camino Del Riol JUN Spanish Lakes I Permitting 0epartment St. Lbcle countv Port St. Lucie, Flodda ITEM TESTED Compacted Found6tion Fill — I PERCENT TEST LOCATION *PEN DRY MAX.DRY DEPTH I FNSITY PROCTOR VALUE COMPACTION OF SAMPLE READ D . 1 95.7 50 104.4 .109.1 1. S.W. 0 105.9 97.1 2, N.W. ti .97.2 3. Center It 50 106.0.- 96.2 4. LS. E. 50 105-'0 96.0 5. N, E. 104,7 Soil Description: Brown $and 110.0 W in Place Moisture,. E 6.3 Piercent G 109-0 Optimum Moisture: H- 12.0 Percent T max. Dry Density: P \4- 108,0 109.1 P.C.F. @ Test Locations The Density & Penetrometer F Readings lndifi4jqsj�p, 107.0 f#& to I - I Degree,0tqePK#RZ M Oets I Ap Miniq for n tiff R I y pin. i ta.Natiral Grade. 106,0 ft ' 0 1" 9 12 13 14 15 Rej q IT 10 11 1p 00 0 Moisture - % of Dry Weight JU I' - I& . side I-j, Building Department IV. je un Email to.: d0tty@spanishIakes.cdrn Flonald G. Keller,1 P.F-.-- 372931 Sl Lic. No.., 860 t Julie E. Keller, RE.: W66