Loading...
HomeMy WebLinkAboutCERTIFICATE OF OCCUPANCYCERTIFICATE, 'F OCCUPANCY This Certificate is issued pursuant to the requirei time of issuance this structure was in compliance regulating building construction or use. For the f ; of the Florida Building Code certifying that at the the various ordinances of St. Lucie County I Building Permit No.1 - 0510-0102 1 Parcel/Folio Nbr: 1428-702-1492-000/4 Lot # I Block: 64 Subdivision: San Lucie,Plaza S/D Unit I Oc cupancy: Factory Industrial - low hazard Building Address: 3200 ST LUCIE BLVD PHASI Legal Description: Permit Job NEW CONSTRUCTION - 24�5 Description STOREFRONT - PHASE I - 241 ALSO REF PARCEL 1428-702 Permit Finaled: 12/26/2007 1 19 SF INDUSTRIAL WAREHOUSE W/ ,509 SF 1537-000/2 BLK 65 I Contractor ROBERT BRYAN GOING TRIM�RAFT INC (561) 718-8756 1335 NEPTUNE DR BOYNTON BEACH, FL 33426 Christopher Lestrange Building Official NOTE: This Certificate of Occupancy is issued to the above named, for I the applicant will abide by and comply with all the conditions of Lucie County pertaining to the erection, construction or remodeli This also certifies that the electrical wiring and/or equipment, an( this Certificate grants permission to occupy and use the property require a new Certificate of Occupancy. Wednesday, December 26, 2007 Date Printed ilding at the above named location only upon the express provision that te Zoning Ordinances and all Ordinances or Building Codes of Saint g of buildings or structures. be plumbing work have been inspected and approved. The issuance of -scribed herein only for the use indicated. Any change in use will POST IN A CON, SPICUOUS PLACE A�,- 1. ­.- - 4� ; _ Code Compliance Division 2300 Virginia Avenue Ft. Pierce, FIL 34982 Phone: (772) 462-1553 Fax: (772) 462-1148 http://stiucieco.gov/ce INSPECTION CARD Permit#: SLC- 0510-0102 Conf A 901 Type: Building Commercial Issued 08/07/2006 Status: FIN Double Fee: No Job Location 3200 ST LUCIE BLVD PHASE 1 City: FORT PIERCE Jurisdiction: St. Lucie County Lot: 1 Block: 64 Parcel: 1428-702-1492-000/4 Subdiv: San L cie Plaza S/D Unit 1 Flood: X Elev: FloodMap: 1MF JobDescription: NEW CONSTRUCTION m 24,509 SF NDUSTRIAL WAREHOUSE W/ STOREFRONT -PHASE I - 24,509 SF ALSO REF PARCEL 1428-702-1537-000/2 BLK 65 Setbacks Left: 98.00 Right 176.00 Front Rear: 60.00 Inspection Notes: PRIVATE PROVIDER STATES THAT THE BUILDING FINAL (180) IS A PASS.. Contractor ROBERT BRYAN GOING TRIMCRAFT INC (561) 718-8756 1335 NEPTUNE DR BOYNTON BEACH, FL 33426 Property Owner Runaway's End LLC (561) 718-8753 29 NE 4th Ave Delray Beach, FL 33483 UB-PERMITS Permit # Status PT Cert # DBA Owner I Builder Job Description 0510-0102-01 FIN EP 18609 MAURICE ELECTRIC INC 0510-0102-02 FIN PP 8352 MEEKS PLUM BING INC 0510-0102-03 FIN ME 10363 NISAIR AIR CONDITIONING 0510-0102-04 FIN RP 20108 J A TAYLOR 11 OOFING INC change roof from 16911 to 20108 INSPECTIONS - Permit # Code Description Priori Date � 0510-0102 106 Engineers Report 0 05/30, **5130/07 Recieved engineer report dated May 23,2007 reg (147) , gave to Ken Arnold to review (boones)*** 0510-0102 108 Engineer Letter 0 PER ENGINEER ELECTRICAL INSPECTION DATED 10/1 ELECTRIC SERVICE POWER RELEASE INSPECTION. S OK TO RELEASE POWER ELECTRIC CONTRACTOR TO 0510-0102 147 Drywall 0 05/29, FIREWALL WEST SIDE OF WALL (2ND LAYER OF DRY\/ 0510-0102 147 Drywall 0 05/3R 0510-0102 147 Drywall 0 06/11, PER ENGINEER INSPECTION REPORT DATED 5/24/07 F APPROVED BY JAMES PARKER BN4597 0510-0102 147 Drywall 0 05/2R APPROVED AS NOTED BULD NO. 1 DRYWALL SCREW. 0510-0102 147 Drywall 0 07/11, DRYWALL SCREW INSPECTION FOR OFFICE 1 STAND APPROVED////JAMES PARKER BN4597 0510-0102 147 Drywall 0 07/16, PER ENGINEER INSPECTION REPORT DATED 7/16/07 F 0510-0102 147 Drywall 0 07/17, Requests, Call: (772) 462-1261 J. Res Description Inspecto Date Insp. 50 Engineer Approval Acc Ken Arnold 05/30/2007 the insulation (141) window/door attachment (148) and drywall screw 50 Engineer Approval Acc Ken Arnold 10/19/2007 ICE, METERS, PANELS, AND ELEVATOR EQUIP. OK. qTROL CIRCUIT ENERGIZING SCHEDULE. 7 50 Engineer Approval Acc Ken Arnold 05/29/2007 .) AS APPROVED. 7 50 Engineer Approval Acc Ken Arnold 05/30/2007 7 50 Engineer Approval Acc Ken Arnold 06/11/2007 FIREWALL WEST SIDE OF WALL (2ND LAYER OF DRYWALL) AS 50 Engineer Approval Acc Ken Arnold 05/29/2007 )7 50 Engineer Approval Acc Ken Arnold 07/11/2007 D FLOOR ONLY/ WAREHOUSE NOT READY/////PARTIAL 7 50 Engineer Approval Acc Ken Arnold 07/16/2007 PHASE 1 1 ST LAYER DRYWALL COMPLETED AS A PASS. 7 50 Engineer Approval Acc Ken Arnold 07/17/2007 I Permit Nun 10510-0102 PERIENGINEER WSPECTIC;N REPOR� TED 7/17/07 FOF 0510-0102 147 Drywall ' 0 07/30/201 PER ENGINEER LETTER DATED 7/17/07 FOR PHASE 1 DR' 0510-0102 161 Utilities 0 PER DAVE MILLARD WITH FPUA. 0510-0102 170 Fire Penetrations 0 07/06/201 PER ENGINEER INSPECTION REPORT DATED 6/20/07 FOF 0510-0102 103 Eufer Ground 1 10/27/201 null Scheduled: Tue Oct 24 16:42:22 EDT 2006 with value: null Scheduled: Thu Oct 26 11:25:48 EDT 2006 with value: Fri Oct NOVEMBER 27,2006 PERTAINING TO INSPECTIONS DONI FOOTER STEEL PHASE 1 (NORTH BUILDING) WITH A RES 0510-0102 103 Eufer Ground 1 10/27/201 0510-0102 104 Compaction Test 1 10/1 0510-0102 106 Engineers Report 1 02/12/2 PER ENGINEERS TILT -UP WALL PANEL INSPECTION DA' PANEL CONNECTION. FOR A REPORT OF STRUCTURAL GIRDER/BEAM TO PERIMETER WALL, BAR JOIST TO BE) PERIMETER DECK ANGLE. 0510-0102 106 Engineers Report 1 10127/2 0510-0102 106 Engineers Report 1 11/0 0510-0102 106 Engineers Report 1 11 0510-0102 106 Engineers Report 1 11/1 same REPORT AS 10/27/06 0510-0102 106 Engineers Report 1 11/1 0510-0102 106 Engineers Report 1 12/08/21 RECEIVED ENGINEERS REPORT NO. 3, DATED NOVEME ELEVATOR PIT WALLS TO BOTTOM OF THICKENED SLAI 0510-0102 106 Engineers Report 1 12/08/21 RECEIVED ENGINEERS REPORT NO. 4 DATED NOVEMBE FLOOR BATHROOMS (4) TOTAL (2) ON GRID LINE C AND 0510-0102 106 Engineers Report 1 01/08/21 ACCEPTED SUMMARY OF INSPECTIONS/STATUS OF WC PANELS 2 THRU 28. K.ARNOLD 0510-0102 106 Engineers Report 1 01/23/21 FOR INSPECTIONS DONE ON 12/29/2006 AND 01/08/2007 26,27,28,59,2,3,4,5,6,7,8,9,10,30,31,11,12,13,14,16,17,18,1 G BOX OUTS AT BOTTOM OF PANEL. (01/08/2007) --- PASS f PHASE 1 DRYWALL COMPLE1, ASS) 7 50 Engineer Approval Acc Ken Arnold 07/30/2007 VVALL COMPLETE. 92 Accepted As Noted. Ken Arnold 12/26/2007 7 50 Engineer Approval Acc Ken Arnold 07/06/2007 OFFICE LOCATION I ST FLOOR APPROVED AS NOTED. 3 90 Approved Scott Attey 10/27/2006 27 00:00:00 EDT 2006 RECEIVED ENGINEERS REPORT NO. 2 DATED ON 10/24/2006 REFERENCING 3/0 CU CONNECTED TO BUILDING JLT OF PASS. 90 Approved Private Provider 10/27/2006 90 Approved Karen Neal 10/17/2006 50 Engineer Approval Acc Ken Arnold 02/12/2007 2/12/07 FOR NORTH BUILDING PHASE 1 AS A PASS FOR PANEL TO EL INSPECTION ALSO A PASS FOR BEAM TO COLUMNS, DIST GIRDER, BAR JOIST TO WALL, BRIDGING & BRACING, 90 Approved BillLogsdon 10/27/2006 90 Approved BillLogsdon 11/01/2006 90 Approved BillLogsdon 11/20/2006 90 Approved 11/14/2006 )6 90 Approved BillLogsdon 11/14/2006 )6 92 Accepted As Noted Private Provider 12/08/2006 :R 27,2006 PERTAINING TO INSPECTION DONE 10/31/2006 FOR WITH A RESULT OF PASS. )6 92 Accepted As Noted Private Provider 12/08/2006 R 27,2006 PERTAINING TO INSPECTION DONE ON 11/17/2006 FOR IST 2) ON GRID LINE E. WITH A RESULT OF PASS (PARTIAL) )7 50 Engineer Approval Acc Ken Arnold 01/08/2007 ZK (PASS) RECEIVED IN OUR OFFICE 01/08/2007 PERTAINING TO )7 50 Engineer Approval Acc Ken Arnold 01/23/2007 (12/28/2006) ---- PASS 25, !0,21,22,23,24 AND 15. PASS ALL EXCEPT PANEL 15. THERE ARE 7 \NEL 15. 0510-0102 106 Engineers Report 1 02/01/2007 50 Engineer Approval Acc Ken Arnold 02/01/2007 ACCEPTED ENGINEER APPROVAL LETTER DATED JANUrIRY 23,2007 FOR PASS INSPECTIONS FOR VERTICAL LEG PANELS 34, 35, 38, 41, 44, 47, 48 AND 5 1. 0510-0102 106 Engineers Report 1 02/05/2007 50 Engineer Approval Acc Ken Arnold 02/05/2007 1 PER ENGINEERS LETTER DATED 2/2/07 FOR EXTERIOR 7ALL PANELS ANGLE ATTACHMENTS WELDED TO PANEL EMBEDDED PLATES AND BOLTED TO FOOTERS. (PASS) 0510-0102 106 Engineers Report 1 02/05/2007 50 Engineer Approval Acc Ken Arnold 02/05/2007 PER ENGINEERS LETTER DAT31D 1/15/07 FOR VERTICAL�LEG PANEL 34, 35, 38,41, 44,47,48 AND 51. (PASS) 0510-0102 106 Engineers Report 1 02/16/2007 50 Engineer Approval Acc Ken Arnold 02/16/2007 ACCEPTED ENGINEERS REPORT FOR A PASS ON THE ROOF DECKING INSTALLATION DATED 2/15/07 1 0510-0102 106 Engineers Report 1 02/19/2907 50 Engineer Approval Acc Ken Arnold 02/19/2007 PER ENGINEER REPORT FOR TILT -UP WALL PANEL INSPECTION FOR LOADING DOCK PANELS 54,55,56,57,56 AND DUMPSTER CONTAINMENT WALLS PANELS 1, 2,3,4 ANF 5 AS A PASS DATED 2/16/07. 0510-0102 106 Engineers Report 1 02/22/21007 50 Engineer Approval Acc Ken Arnold 02/22/2007 PER TILT -UP WALL PANEL INSPECTION DATED 2/2/07 FOR EXTERIOR WALL PANELS ANGLE ATTACHMENTS WELDED TO PANEL EMBEDDED PLATES AND BOLTED TO FOOTERS �S A "PASS". 0510-0102 106 Engineers Report 1 02/22/2P07 50 Engineer Approval Acc Ken Arnold 02/22/2007 PER REPORT OF CAST IN PLACE CONCRETE AND REINFORCED MASONRY INSPECTION DATED 2/20/07 FOR LOADING RAMP AND DUMPSTER WALL FOOTERS WF-24 ASA "PASS". � 0510-0102 106 Engineers Report 1 03/05/2,007 50 Engineer Approval Acc Ken Arnold 03/05/2007 PER TILT UP WALL PANEL INSPECTION DATED 3/5/07. LOADING RAMP AND DUMPSTER CONTAINMENT WALLS (PASS). REPORT OF METAL FRAMING AND EXTERIOR SHEATHAG INSPECTION REPORT DATED 3/5/07 FOR METAL FRAMING. 18 GU. GALV. STUD FRAMING AT (3) ROOF TOWER ENCLOSUR�S AND 20 GA FRAMING ABOVE MECHANICAL ROOM (PASS) 0510-0102 106 Engineers Report 1 03/05/gOO7 50 Engineer Approval Acc Ken Arnold 03/05/2007 lPermit Nun 10510-0102 PERIENGINEER STRUCTU14AL STEEL"_ _J?ECTION DATED 2/28/07 FOR REINSPECT MEZj JE BARJOIST INSTALLATION AND COMPLETE COLUMN BASE PLATE ATTACHMENTS. (PASS) FOR INSPECTION THAT FAILED 2/27/07 0510-0102 106 Engineers Report 1 03/05/20017 50 Engineer Approval Acc Ken Arnold 03/05/2007 PER ENGINEER REPORTS DATED 2/7/07,2/12/07,2/15/07 AN, D 2/16/07. 0510-0102 106 Engineers Report 1 03/07/2001� 50 Engineer Approval Acc Ken Arnold 03/07/2007 PER ENGINEER INSPECTION REPORT DATED 3/6/07 FOR [DECK PREPARATION, W.W.M OK TO POUR MEZZANINES. PER REPORT FOR STRUCTURAL ' STEEL INSPECTION MEZZANI�ES METAL DECK INSTALLATION (PASS) 0510-0102 106 Engineers Report 1 03/12/200 1 7 50 Engineer Approval Acc Ken Arnold 03/12/2007 PER ENGINEERS INSPECTION REPORT DATED 3/9/07 FOF TOWER WALL SHEATHING AND IN PROGRESS INSPECTION OF BUILT-UP ROOF INSTALLATION. (APPROVED) 0510-0102 106 Engineers Report 1 03/22/20(7 92 Accepted As Noted Ken Arnold 03/22/2007 3/22/07 recieved private provider report jorwarded token arno d RECEIVED ENGINEERS REPORT FOR EXTERIOR SHEATHING INSPECTION WHICH FAILED CONCERNING THE RED IRO� ANGLES WELDED TO TOWER ROOF BEAM FOR TRUSS TIE DOWN.1) WELDING NOT COMPLETED PER DETAIL. 2) DETAILS TO E E SIGNED AND SEALED BY ENGINEER OF RECORD. 0510-0102 106 Engineers Report 1 03/22/200 1 7 50 Engineer Approval Acc Ken Arnold 03/22/2007 PER ENGINEERS REPORT DATED 3/5/07 FOR LOADING RAMP AND DUMPSTER CONTAINMENT WALLS. (PASS). REPORT DATED 3/5/07 FOR METAL FRAMING OF 18 GA. GALV.STUD FRAMING AT (3) ROOF TOWER ENCLOSURES AND 20 GA FRAMING ABOVE MECHANICAL ROOM.(PASS)3/6/07 FOR METAL DECK --- MEZZANINES METAL DECK INSTALLATION (PASS).3/6/07 FOR ELEVATED SLAB DECK PREPARATION, W.W.M OK TO POUR MEZZANINES. (PASS)3/9/07 FOR WALL SHEATHING AND ROOF IN PROGRESS --TOWER WALL SHEATHING AND IN PROGRESS INSPECTION OF BUILT-UP ROOF INSTALLATION OK. 1 0510-0102 106 Engineers Report 1 04/27/2007 50 Engineer Approval Acc Ken Arnold 04/27/2007 PER ENGINEER REPORT DATED 4/10/07 FOR ROLL -UP DO I ORS. DEFICIENCIES OBSERVED. 1 0510-0102 106 Engineers Report 1 04/27/2007 50 Engineer Approval Acc Ken Amold 04127/2007 1 PER ENGINEER REPORT DATED 4/18/07 FOR WINDOW & DOOR INSTALLATION WITH A PARTIAL PASS. 1 0510-0102 106 Engineers Report 1 04/27120�7 50 Engineer Approval Acc Ken Arnold 04/27/2007 PER ENGINEER REPORT DATED 4/19/07 FOR ROOF SHEA�HING FOR SOUTH AND MIDDLE TOWER. 0510-0102 106 Engineers Report 1 05/08/2007 50 Engineer Approval Acc Ken Arnold 05/08/2007 PER ENGINEER EXTERIOR SHEATHING INSPECTION REP�RT DATED 4/23/2007 FOR ROOF SHEATHING COMPLETE PHASE 1. 0510-0102 106 Engineers Report 1 05/29/2097 50 Engineer Approval Acc Ken Arnold 05/29/2007 PER ENGINEER INSPECTION REPORT DATED 5/11/07 FOR BUILDING 1 FIVE WALL ELECTRIC OUTLETS ROUGH -IN. DRYWALL SCREW INSPECTION EAST SIDE OF FIREWALL I ST LAYER OF 5/8 GYPSUM BOARD AS A PASS. 1 0510-0102 106 Engineers Report 1 04/27/2007 50 Engineer Approval Acc Ken Arnold 04/27/2007 1 PER ENGINEER REPORTS DATED 4/5/07 FOR WORK IN PROGRESS FON THE WINDOWS AND TRUSS TO TRUSS 1 0510-0102 106 Engineers Report 1 04/27/2007 50 Engineer Approval Acc Ken Arnold 04/27/2007 1 PER ENGINEER REPORT DATED 4/10/07 FOR ALL TRUSSES EXCEPT WEST END. 0510-0102 106 Engineers Report 1 06/20/20�7 50 Engineer Approval Acc Ken Arnold 06/20/2007 PER ENGINEER ELECTRICAL INSPECTION REPORT DATE,b6/18/2007 FROM INSPECTOR BILL DAVISON BN 1366 FOR EXTERIOR ENTRYWAY CEILINGS HI HAT LIGHTS AND FIVE SPRINKLERS OK TO COVER. CEILINGS OVER PERSONNEL ENTRIES. (PASS) 1 0510-0102 106 Engineers Report 1 uU/z1/zuuf 50 Engineer Approval Acc Ken Arnold 06/21/2007 PER ENGINEER ELECTRICAL INSPECTION REPORT DATE I P 6/20/2007 FOR ELECTRIC ROUGH WEST END TENANT BUILD OUT ONLY AS A PASS, PANEL NOT MADE UP. NEED AS BUILT REVISED DRAWINGS PER BILL DENISON BN1366 0510-0102 106 Engineers Report 1 06/21/2007 50 Engineer Approval Acc Ken Arnold 06/21/2007 1 PER ENGINEERS REPORT DATED 6/20/2007 FOR FRAMING AND FIRE PENETRATIONS IN OFFICE LOCATION 1ST FLOOR. AS APPROVED AS NOTED .... PROVIDE UL FOR METAL DECK JOIST ASSEMBLY. 0510-0102 106 Engineers Report 1 07/24/2097 50 Engineer Approval Acc Ken Arnold 07/2412007 RECEIVED ENGINEER REPORTS DATED 7/9/0717/10/0717/il6/07 AND 7/17/07. 0510-0102 106 Engineers Report 1 50 Engineer Approval Acc Ken Arnold 10111/2007 PER ENGINEER ELECLRICAL INSPECTION REPORT DATED OCT. 11, 2007 FOR ELECTRIC SERVICE POWER RELEASE INSPECTION. SERVICE, METER, PANELS AND ELEVATOR�EQUIP. OK. PER BILL DENISON BN1366. 0510-0102 110 Footer/Foundation 1 16 92 Accepted As Noted BillLogsdon 10/27/2006 PHASE 1 NORTH BLD FOOTER AN COLUMN PADS ELEVATOR PIT 1 0510-0102 110 Footer/Foundation 1 10/27/2006 90 Approved Scott Attey 10/27/2006 null Scheduled: Thu Oct 26 11:23:36 EDT 2006 with value: Fri Oc 27 00:00:00 EDT 2006 RECEIVED ENGINEER REPORT I DATED NOVEMBER 27,2006 PERTAINING TO INSPECTIONS DON�' ON 10/24/2006. PHASE 1 (NORTH BUILDING) CONTINUOUS PERIMETER FOOTER, INTERIOR COLUMN FOOTERS AND'ELEVATOR PIT FLOOR. RESULTS (PASS) WITH NOTES: 1) PROVIDE CLARIFICATION FROM ARCH. OR ENGINEER FOR F-84 D�SIGNATED AT GRID LINES (F,4). 0510-0102 115 Slab 1 11/30/20 1 06 50 Engineer Approval Acc Ken Arnold 11/30/2006 1 GROUNS SLAB COMPLETE FOR PHASE I (NORTH BUILDING) PER INSPECTOR LOUNSBERRY. (PRIVATE PROVIDER) RECEIVED SECOND NOTICE DATED 12/20/2006 FOR INSPECTION D�NE ON 11/30/2005 STATING GROUND SLAB COMPLETE FOR PHASE 1 (NORTH BUILDING). K.ARNOLD 12/20/2006. 0510-0102 119 Stem wall 1 11/01/2C ELEVATOR PIT WALLS 0510-0102 420 Plumbing Rough I 11/22/2C 90 Approved Private Provider 11/01/2006 50 Engineer Approval Acc Ken Arnold 11122/2006 jPermit Nun F0510-0-102 I ACCEPTED ENGINEERS R&ORT TO - IPLETE UNDER( RESULTS OF INSPECTION: PASS. DATED 11/21/2006. RE( COMPLETE UNDERGROUND PLUMBING ROUGH FOR PH) 0510-0102 420 Plumbing Rough 1 11/14/20 0510-0102 420 Plumbing Rough 1 07/10/20 NORTH BUILDING PHASE 1 2ND ROUH PLUMBING ... /////P, AT EXTERIOR FOR FINAL. 2) RE-ROUTE WATER SUPPLY APPLIANCE OR INSTALL PAN PIPED TO DRAIN FOR FINAI. 0510-0102 427 Temp.Toilet/Temp Culvert 1 11/14/20 0510-0102 104 Compaction Test 2 0510-0102 105 Form Board Survey 2 12/0 0510-0102 106 Engineers Report 2 04/12/2C 4/12/07 recieved engineers report dated 4/4/07 forwarded to I INSPECTION. PROVIDE PRODUCT APPROVAL FOR WIND OF CENTER LINE 3.5" AND 2" O.C. 0510-0102 106 Engineers Report 2 03/12/2C PER ENGINEERS REPORT NO. 13 FOR BAR JOISTS FOR I AND (2) BAR JOIST RED IRON SUPPORT ANGLE AT SW C REPORT (2/28/07) REINSPECT MEZZANINE BAR JOIST IN, - (PASS). PARTIAL INSPECTION ON ROOF IN PROGRESS (, INSPECTION DATED 3/1/07 PHASE 1 --- CONDUCT PREINS PER AISC 13TH EDITION, 16.2-43. 0510-0102 106 Engineers Report 2 03/09/2C PER ENGINEER LETTER DATED MARCH 1, 2007 FOR INSI WALL FOOTERS WF-2Y, (12) INTERIOR 8'X8'COLUMNS B, 0510-0102 108 Engineer Letter 2 02/13/2C PER ENGINEER LETTER FOR TILT -UP WALL PANEL INSP 32 AND 61. PASS ALL EXCEPT PANEL 61. 2 BOX OUTS IN 0510-0102 115 Slab 2 04/27/2C THIS SLAB INSPECTION IS FOR TILT WALL///////PER ENGIr SLAB AND LOADING RAMP. 0510-0102 121 Termite Spray 2 12/01/2C 0510-0102 148 Window/Door Attachment 2 04/04/2C null Scheduled: Mon Mar 26 15:30:55 EDT 2007 with value: null Scheduled: Mon Mar 26 15:33:46 EDT 2007 with value: null APPROVAL FOR WINDOWS. 12 TAPCONS IN SILL 3 EACH 0510-0102 148 Window/Door Attachment 2 04/27/2C PER ENGINEER REPORT DATED 4/10/07 FOR ALL WINDO 0510-0102 413 Pipe Test 2 11/20/2C barhroom 2 on grid c and to 2on grid e I ST FLOOR 0510-0102 413 Pipe Test 2 04/27/20 Re -inspection I PER ENGINEER REPORT DATED 11/21/06 FOR PHASE I (NORTH BUILDING). PASS BY DAVID LOUN� (2) ON GRIDLINE E.. 0510-0102 116 2nd Floor Slab 4 04/27/201 INSPECTION FOR MEZZINE FLOOR PER ENGINEER REP, MEZZANINES PER DAVID LOUNSBURY. Scheduled: Wed Mar 7 10:15:26 EST 2007 with value: null 0510-0102 133 Window/Door Bucks 5 12/17/201 0510-0102 135 Wall Sheathing 5 07/02/2 PER ENGINEER INSPECTION REPORT DATED 6/28/07 FC A PASS. 0510-0102 135 Wall Sheathing 5 07/10/2 PER ENGINEER INSPECTION REPORT DATED 6/28/07 FC A PASS... 0510-0102 136 Roof Dry-inrrin Tab 5 07/06/2 0510-0102 140 Construction Rough Frami 5 07/0 PER ENGINEER INSPECTION REPORT DATED 6/18/07 0510-0102 141 Insulation 5 05/3 OUND PLUMBING ROUGH FC - _-iASE I (NORTH BUILDING). IVED DUPLICATE INSPECTION REPORT WITH A "PASS" TO E 1 (NORTH BUILDING) 12/20/2006. KARNOLD 90 Approved Private Provider 11/14/2006 50 Engineer Approval Acc Ken Arnold 07/10/2007 S//// 1) PROVIDE ACCESSIBLE MAIN SHUT-OFF FOR SUPPLY WATER 3OVE CEILING HUNG A/C UNIT NO WATER PIPING ABOVE ELECTRIC 92 Accepted As Noted BillLogsdon 11/14/2006 90 Approved Karen Neal 12/06/2006 90 Approved Diane Flanigen 50 Engineer Approval Acc 04/12/2007 Arnold PER ENGINEER REPORT DATED APRIL 4,2007 FOR SILL S. 12 TAPCONS IN SILL, 3 EACH END 4.5" AT 2"O.C., 3 EACH SIDE 7 50 Engineer Approval Acc 03/12/2007 EZZANINES.(FAIL) 1) REMOVE SLAG FROM WELDS FOR INSPECTION ,RNER LOCATION NOT WELDED COMPLETE. (2/27/07) NEXT FALLATION AND COMPLETE COLUMN BASE PLAATE ATTACHMENTS. 28/07) AND ROOF IN PROGRESS (2/29/07) AS APPROVED. ki-LATION VERIFICATION OF BOLTS AND INSTALLATION METHODS 50 Engineer Approval Acc Ken Arnold 03/09/2007 'TION DONE ON 2/20/07 FOR LOADING RAMP AND DUMPSTER E PLATES GROUTED. (PASS) 50 Engineer Approval Acc Ken Arnold 02/13/2007 TION DATED 1/11/07 FOR PANEL 34, 35, 38, 41, 47, 48, 51, 53, 60, 62, )LUMN. EOR TO ADVISE. 50 Engineer Approval Acc Ken Arnold 04/27/2007 :_7R REPORT DATED 4/10/07 FOR SLAB ON GRADE FOR DUMPSTER 90 Approved Ken Arnold 12/01/2006 50 Engineer Approval Acc Ken Arnold 04/04/2007 =_R ENGINEER REPORT DATED 3/27/07 ---- PROVIDE PRODUCT ND 4.5" IN AND TO.C., 3 EACH SIDE OF CENTERLINE 3.5'AND 2-O.C. 1 50 Engineer Approval Acc Ken Arnold 04/27/2007 S ARE COMPLETE FASTERNERS AS REQUIRED. 91 Partial Approval Private Provider 11/20/2006 50 Engineer Approval Acc Ken Arnold 04/27/2007 D 11/17/06 TO COMPLETE UNDERGROUND PLUMBING ROUGH :RRY IIST FLOOR BATHROOMS (4) TOTAL (2) ON GRID LINE C AND 50 Engineer Approval Acc Ken Arnold 04/27/2007 DATED 3/6/07 FOR DECK PREPARATION, W.W.M OK TO POUR 93 Not Required Private Provider 12/17/2007 7 50 Engineer Approval Acc Ken Arnold 07/02/2007 CEILINGS/SOFFIT SHEATHING AT EXTERIOR ENTRY LOCATIONS AS 7 50 Engineer Approval Acc Ken Arnold 07/10/2007 CEILINGS/SOFFIT SHEATHING AT EXTERIOR ENTRY LOCATIONS. AS 50 Engineer Approval Acc Ken Arnold 07/06/2007 7 50 Engineer Approval Acc Ken Arnold 07/06/2007 CEILING FRAMING ABOVE ENTRY DOORS APPROVED AS NOTED. 7 50 Engineer Approval Acc Ken Arnold 05/30/2007 IlPermit Nun 10510-0102 1 PER tNGINEER INSPECTION REPOR'.-,-.,,rED 5/17/2007 FC U.L. ASSEMBLY WP1522 ASA PASS. NORTH BUILDING PHASE 1 ', WALL INSULATION PER RATED 0510-0102 148 Window/Door Attachment 5 05/29/200? 50 Engineer Approval Acc Ken Arnold 05/29/2007 APPROVED AS NOTED BUILDING NO. 1 OVEERHEAD DOOR ATTACHMENT. PROVIDE REVISED ENG. LETTER FOR'L'ANGLE ATTACHMENT TO WALL. 1 0510-0102 167 Roof Final 5 1 119,200 50 Engineer Approval Acc Ken Arnold 11/19/2007 PER ENGINEER'S INSPECTION REPORT DATED 11;1312007 FOR NORTH BLDG PHASE 1 FINAL ROOF INSPECTION AS A PASS APPROVED BY DAVID LOUNSBUERY BN3026Re-inspection �l 0510-0102 167 Roof Final 5 11/2112007 50 Engineer Approval Acc Ken Arnold 11/21/2007 PER ENGINEER INSPECTION REPORT DATED 11/13/07 AS A PASS NORTH BLDG PHASE 1 FINAL ROOF INSPECTION. 0510-0102 179 Firewall 5 05/22/200T 50 Engineer Approval Acc Ken Arnold 05/29/2007 PER INSPECTION REPORT DATED 5/17/2007 FOR NORTH BUILDING PHASE I FIRE WALL INSULATION PER RATED U.L. ASSEMBLY WP1522 AS A PASS. 0510-0102 238 Electric Rough 5 05/14/200, 50 Engineer Approval Acc Ken Arnold 05/14/2007 PER ENGINEER INSPECTION REPORT DATED 5/11/07 FOR BUILDING 1 FIRE WALL ELECTRIC OUTLETS ROUGH -IN. DRYWALL SCREW INSPECTION EAST SIDE OF FIRE WALL IST LAYE OF5/8 GYPSUM BOARDASAPASS. 0510-0102 238 Electric Rough 5 50 Engineer Approval Acc Ken Arnold 10/08/2007 PER ELECTRICAL INSPECTION REPORT DATED 9/27/07 FOR BUILDING 1 OFFICES CEILING ROUGH AS A PASS PER BILL DENISON BN1366 0510-0102 238 Electric Rough 5 50 Engineer Approval Acc Ken Arnold 09/28/2007 PER ENGINEER REPORT DATED 9/27/07 FOR BULDING I OFFICES CEILING ROUGH AS A PASS BY INSPECTOR BILL DENISON BN1366 0510-0102 238 Electric Rough 5 07106120017 50 Engineer Approval Acc Ken Arnold 07/06/2007 PER ENGINEER INSPECTION REPORT DATED 6/18/07 FOR EXTERIOR ENTRYWAY CEILINGS HIHAT LIGHTS AND FIRE SPRINKLERS OK TO COVER. CEILINGS OVER PERSONNE�' ENTRIES AS A PASS.//////]NSPECTION REPORT DATED 6/20/07 0510-0102 260 30 Day for Testing 5 10/17/2007 90 Approved Van Whitaker 10/17/2007 10/16107 window schedule with bob/ contr.bac 0510-0102 280 Electric Final 5 12/10/2007 50 Engineer Approval Acc Ken Arnold 12/10/2007 PER ENGINEER REPORT OF ELECTRICAL INSPECTION: DATED 12/10/07 FOR PHASE 1 FINAL ELECTRIC AS A PASS. INSPECTOR BILL DENISON BN#1366 0510-0102 351 Mechanical Rough-In(duct 5 07/06/200 50 Engineer Approval Acc Ken Arnold 07/06/2007 PER ENGINEER INSPECTION REPORT DATED 6/21/07 FOR NORTH BUILDING PHASE I MECH ROUGH NOT READY FAIL. 0510-0102 351 Mechanical Rough-In(ducl 5 07/31/200 81 Disapproved Private Provider NORTH BLDG PHASE I DUCT ROUGH ..... ////FAIIU//// 1) PRO IDE APPROVED AS-BUILTS BY MECH ENG. 2) FINISH INTAKE AIR TO UNIT (5) 3) PROVIDE R/H OR TRANSFER AIR TO 2ND FLOO OFFICES 4) DATA/COMMUN [CATION ROOMS S/A & r/A? 0510-0102 351 Mechanical Rough-In(duct 5 50 Engineer Approval Acc Ken Arnold 09/28/2007 PER ENGINEER REPORT DATED 9/27/07 FOR A PARTIAL FINAL MECH FOR ABOVE CEILING FLEX DUCT CONNECTIONS AS A PARTIAL PASS 1) PROVIDE APPROVED AS-BUILTS BY INS ECTIOR LOUNSBERRY BN3026 0510-0102 351 Mechanical Rough-ln(duct 5 81 Disapproved Private Provider 08/08/2007 Re -inspection 2////PER ENGINEER MECHANICAL INSPECTIO I N REPORT DATED 7/31/07 FOR NORTH BLDG PHASE 1 DUCT ROUGHA) PROVIDE APPROVED AS-BUILTS BY MECH ENd. 2) FINISH INTAKE AIR TO UNIT (5) 3) PROVIDE R/A OR TRANSFER AIR TO 2ND FLOOR OFFICES 4) DATAICOMMUNICATION �OOMS S/A & R/A.. INSPECTION RESULTS IS A FAIL. 0510-0102 351 Mechanical Rough-In(ducl 5 50 Engineer Approval Acc Ken Arnold 09/11/2007 Re -inspection 3NPER ENGINEER INSPECTION REPORT DATED 9/7/07 FOR PHASE I MECHANICAL ROUGH INSPECTION AS A PASS. DAVID LOUNSBERRY BN3026 0510-0102 351 Mechanical Rough-In(duct 5 50 Engineer Approval Acc Ken Arnold 09/14/2007 RECEIVED FINAL MECHANICAL ROUGH INSPECTION AS A PASS. DATED 9/13/2007 FROM DAVID LOUNSBERRY BN3026 0510-0102 351 Mechanical Rough-In(ducl 5 50 Engineer Approval Acc Ken Arnold 09/21/2007 0510-0102 351 Mechanical Rough-In(ducl 5 PHASE 1 MECHANICAL ROUGH INSPECTION ----- PASS---- 1) PROVIDE SIGNED & SEALED, REVIEWED AS-BUILTS FO 0510-0102 380 Mechanical Final 5 12/13/20C PER ENGINEER REPORT DATED 12/12/2007 FOR FINAL ME LOUNSBURY BN 3026Re-inspection 1 0510-0102 380 Mechanical Final 5 PARTIAL FINAL MECH. FOR ABOVE CEILING FLEX DUCT C 9/27/2007 FROM DAVID LOUNSBERRY BN3026 50 Engineer Approval Acc Ken Arnold 09/21/2007 FINAL MECHANICAL INSPECTION 50 Engineer Approval Acc Ken Arnold 12/13/2007 HANICAL INSPECTION PHASE 1 AS A PASS BY INSPECTIOR DAVID 91 Partial Approval Private Provider 10/08/2007 NECTIONS PER MECHANICAL INSPECTION REPORT DATED 0510-0102 423 Plumbing Top Out 5 07/02/20017 50 Engineer Approval Acc Ken Arnold 07/02/2007 PER ENGINEER INSPECTION REPORT DATED 6/28/.07 FOR, NORTH BUILDING PHASE 1 2ND ROUGH PLUMBING AS A PASS 1) PROVIDE ACCESSIBLE MAIN SHIUT-OFF FOR SUPPLY WATIER AT EXTERIOR FOR FINAL. 2) RE-ROUTE WATER SUPPLY ABOVE CEILING HUNG A/C UNIT NO WATER PIPING ABOVE ELEC�RICAL APPLIANCE OR INSTAL PAN PIPED TO DRAIN FOR FINAL 0510-0102 423 Plumbing Top Out 5 50 Engineer Approval Acc Ken Arnold 10/08/2007 Re -inspection 3 jPernnit Nun 10510-0102 0510-6102 423 Pitimbing T�p Out 5 07/06/200? 50 Engineer Approval Ken Arnold 07/06/2007 PEER ENGINEER INSPECTION REPORT DATED 6/21/07 FOR NORTH BUILDING PHASE I 2ND ROUGH PLUMB NOT READY FAIL 0510-0102 423 Plumbing Top Out 5 81 Disapproved Private Provider 09/28/2007 PHASE I NORTH BUILDING FINAL PLUMBING AS A FAIL � 1)NEED TO COMPLETE INSTALLATION OF FIXTURES AND T OILET ROOM PARTITIONS TO VERIFY REQUIRED CLEARANCES. 0510-0102 480 Plumbing Final 5 12/13/200� 50 Engineer Approval Acc Ken Arnold 12/1312007 PER ENGINEER REPORT DATED 12/12/2007 FOR, INSPECTION PHASE 1 AS A PASS BY INSPECTOR DAVID LOUNSBURY. BN 3026Re-inspection 1 0510-0102 480 Plumbing Final 5 81 Disapproved Private Provider 10/08/2007 PER PLUMBING INSPECTION REPORT DATED 9/27/07 AS A FAIL 1) NEED TO COMPLETE INSTALLATION OF FIXTURES AND TOILET ROOM PARTITIONS TO VERIFY REQUIRED CLEARANCES. PER DAVID LOUNSBERRY BN3026 0510-0102 500 Smoke Draft Stop 5 12/17/2007 50 Engineer Approval Acc Ken Arnold 12/17/2007 PER ENGINEER REPORT 0510-0102 259 Power Release Form 7 92 Accepted As Noted Barbara Counsello 10/11/2007 sub contr hold needs to contact contr lic dept. recvd faxed power release form.1 0/11/07 bac 0510-0102 800 Address Final 7 12117/200 1 7 50 Engineer Approval Acc Ken Arnold 12/17/2007 PER ENGINEER INSPECTION REPORT DATED 12/14/2007 �AVID LOUNSBURY BN3026 0510-0102 165 Handicap Restrooms 8 12/18/200 1 7 81 Disapproved Scoff Attey 12/18/2007 i THE DOOR CLOSERS MUST MEET ADA REQIERMENTS [ SWEEPS FROM 70 DEGREES WILL TAKE #3 SECONDS TO MOVE WITH IN #3 INCHES OF THE LATCH.,AND THE OPENING FORCEO�UST NOT BE GREATER THAN 5 LBS. 0510-0102 165 Handicap Restrooms 8 12/20/20 90 Approved Scott Attey 12/20/2007 Re -inspection 1 Resulted: Thu Dec 20 13:54:12 EST 2007 0510-0102 172 Hurricane Panels (shutterc 8 7 93 Not Required Private Provider 12/17/2007 PER ENGINEER INSPECTION REPORT DATED 12/14/2007. �URRICANE PANELS NOT NEEDED AS WINDOWS ARE IMPACT RESISTANT. DAVID LOUNSBURY BN3026 0510-0102 180 Building Final 8 12/18/2007 81 Disapproved Scott Attey 12/18/2007 ALL DOOR CLOSERS REQUIRED FOR ADA EXTERIOR DCIORS MUST MEET THE CODE, SWEEPS FROM 70 DEGREES WILL TAKE #3 SECONDS TO MOVE WITH IN #3 INCHES OF THE �ATCH AND HAVE AN OPENING FORCE NOT GREATER THAN 8.5 LBS. ALL EXIT DOORS WITH CRASH BARS MUST BE OPERATIONAL. 0510-0102 180 Building Final 8 1/_/zu/zuVf 90 Approved Scott Attey 12/20/2007 Re -inspection 1 0510-0102 261 30 Day Expired 8 12126120 7 90 Approved Ken Arnold 12/26/2007 0510-0102 700 Fire Department Final 8 12/18/2007 90 Approved Mike Matthy 12/26/2007 1 0510-0102 801 Paving and Drainage Certi 8 1 Z/ I b/zUVI f 91 Partial Approval Michael Halter 12/18/2007 12/18/07 partial pending as built engineering- per mike halter. 6ac 1 0510-0102 801 Paving and Drainage Certi 8 1z/191zuu1 90 Approved Michael Halter 12/1912007 Re -inspection 1 1 0510-0102 803 Parking/Handicap Sign &,' 8 12/18/20?7 90 Approved Scott Attey 12/18/2007 0510-0102 808 Land scaping/Trees 8 12/18/2007 91 Partial Approval Brian Pauley 12/19/2007 PARTIAL APPROVED WITH CONDITION THAT SHOCKING 5HOMAND OAKS BE REPLACED WITH HEALTHY APPROPRIATE SPECIES (IE LIVE OAKS WITHIN 60 DAYS 12/19/2007. 0510-0102 808 Landscaping/Trees 8 92 Accepted As Noted Amy Mott 12/2612007 Re -inspection 2 0510-0102 996 Final Termite Treatment 8 12/1812007 90 Approved Scott Attey 12/18/2007 0510-0102 999 Final Inspection 8 12/26/2007 per engineer letter dated December 18, 2007 from ClhristophJ, S Throop BN4338 and Michael J. O'Connor PE 44082 0510-0102 808 Landscaping/Trees 9 1 81 Disapproved Private Provider 09/21/2007 FINAL ROOF INSPECTION -----FAIL ----- I 1) PROVIDE PRODUCT APPROVAL FOR ROOF SrULIUM I t- AND TO BE SHUTTERED FOR NON -IMPACT GLAZED OPENING 2) NEED TO COMPLETE SECURING GALVINIZED CAPS Tb, CURBS NOT BEING UTILIZED FOR EQUIPMENT. 3) NORTH BUILDING OVLFLOW SCUPPER AT EAST REGION IS OBSTRUCTED WITH MODIFIED FLASHING. JlPermitNu 10510-0102