HomeMy WebLinkAboutCERTIFICATE OF OCCUPANCYCERTIFICATE, 'F OCCUPANCY
This Certificate is issued pursuant to the requirei
time of issuance this structure was in compliance
regulating building construction or use. For the f
; of the Florida Building Code certifying that at the
the various ordinances of St. Lucie County
I Building Permit No.1 - 0510-0102 1
Parcel/Folio Nbr:
1428-702-1492-000/4
Lot #
I Block: 64
Subdivision:
San Lucie,Plaza S/D Unit I
Oc cupancy:
Factory Industrial - low hazard
Building Address:
3200 ST LUCIE BLVD PHASI
Legal Description:
Permit Job
NEW CONSTRUCTION - 24�5
Description
STOREFRONT - PHASE I - 241
ALSO REF PARCEL 1428-702
Permit Finaled: 12/26/2007
1
19 SF INDUSTRIAL WAREHOUSE W/
,509 SF
1537-000/2 BLK 65
I
Contractor ROBERT BRYAN GOING TRIM�RAFT INC (561) 718-8756
1335 NEPTUNE DR BOYNTON BEACH, FL 33426
Christopher Lestrange
Building Official
NOTE:
This Certificate of Occupancy is issued to the above named, for I
the applicant will abide by and comply with all the conditions of
Lucie County pertaining to the erection, construction or remodeli
This also certifies that the electrical wiring and/or equipment, an(
this Certificate grants permission to occupy and use the property
require a new Certificate of Occupancy.
Wednesday, December 26, 2007
Date Printed
ilding at the above named location only upon the express provision that
te Zoning Ordinances and all Ordinances or Building Codes of Saint
g of buildings or structures.
be plumbing work have been inspected and approved. The issuance of
-scribed herein only for the use indicated. Any change in use will
POST IN A CON, SPICUOUS PLACE
A�,- 1. .- - 4� ; _
Code Compliance Division
2300 Virginia Avenue
Ft. Pierce, FIL 34982
Phone: (772) 462-1553 Fax: (772) 462-1148
http://stiucieco.gov/ce
INSPECTION CARD
Permit#: SLC- 0510-0102 Conf A 901 Type: Building Commercial
Issued 08/07/2006 Status: FIN Double Fee: No
Job Location 3200 ST LUCIE BLVD PHASE 1 City: FORT PIERCE
Jurisdiction: St. Lucie County Lot: 1 Block: 64
Parcel: 1428-702-1492-000/4 Subdiv: San L cie Plaza S/D Unit 1
Flood: X Elev: FloodMap: 1MF
JobDescription: NEW CONSTRUCTION m 24,509 SF NDUSTRIAL WAREHOUSE W/ STOREFRONT -PHASE I -
24,509 SF
ALSO REF PARCEL 1428-702-1537-000/2 BLK 65
Setbacks Left: 98.00 Right 176.00 Front Rear: 60.00
Inspection Notes: PRIVATE PROVIDER STATES THAT THE BUILDING FINAL (180) IS A PASS..
Contractor
ROBERT BRYAN GOING
TRIMCRAFT INC (561) 718-8756
1335 NEPTUNE DR
BOYNTON BEACH, FL 33426
Property Owner
Runaway's End LLC
(561) 718-8753
29 NE 4th Ave
Delray Beach, FL 33483
UB-PERMITS
Permit #
Status PT Cert # DBA
Owner I Builder Job Description
0510-0102-01
FIN
EP 18609 MAURICE ELECTRIC
INC
0510-0102-02
FIN
PP 8352 MEEKS PLUM
BING INC
0510-0102-03
FIN
ME 10363 NISAIR AIR CONDITIONING
0510-0102-04
FIN
RP 20108 J A TAYLOR 11
OOFING INC
change roof from 16911 to 20108
INSPECTIONS -
Permit # Code Description Priori Date �
0510-0102 106 Engineers Report 0 05/30,
**5130/07 Recieved engineer report dated May 23,2007 reg
(147) , gave to Ken Arnold to review (boones)***
0510-0102 108 Engineer Letter 0
PER ENGINEER ELECTRICAL INSPECTION DATED 10/1
ELECTRIC SERVICE POWER RELEASE INSPECTION. S
OK TO RELEASE POWER ELECTRIC CONTRACTOR TO
0510-0102 147 Drywall 0 05/29,
FIREWALL WEST SIDE OF WALL (2ND LAYER OF DRY\/
0510-0102 147 Drywall 0 05/3R
0510-0102 147 Drywall 0 06/11,
PER ENGINEER INSPECTION REPORT DATED 5/24/07 F
APPROVED BY JAMES PARKER BN4597
0510-0102 147 Drywall 0 05/2R
APPROVED AS NOTED BULD NO. 1 DRYWALL SCREW.
0510-0102 147 Drywall 0 07/11,
DRYWALL SCREW INSPECTION FOR OFFICE 1 STAND
APPROVED////JAMES PARKER BN4597
0510-0102 147 Drywall 0 07/16,
PER ENGINEER INSPECTION REPORT DATED 7/16/07 F
0510-0102 147 Drywall 0 07/17,
Requests, Call: (772) 462-1261
J. Res Description Inspecto Date Insp.
50 Engineer Approval Acc Ken Arnold 05/30/2007
the insulation (141) window/door attachment (148) and drywall screw
50 Engineer Approval Acc Ken Arnold 10/19/2007
ICE, METERS, PANELS, AND ELEVATOR EQUIP. OK.
qTROL CIRCUIT ENERGIZING SCHEDULE.
7 50 Engineer Approval Acc Ken Arnold 05/29/2007
.) AS APPROVED.
7 50 Engineer Approval Acc Ken Arnold 05/30/2007
7 50 Engineer Approval Acc Ken Arnold 06/11/2007
FIREWALL WEST SIDE OF WALL (2ND LAYER OF DRYWALL) AS
50 Engineer Approval Acc Ken Arnold 05/29/2007
)7 50 Engineer Approval Acc Ken Arnold 07/11/2007
D FLOOR ONLY/ WAREHOUSE NOT READY/////PARTIAL
7 50 Engineer Approval Acc Ken Arnold 07/16/2007
PHASE 1 1 ST LAYER DRYWALL COMPLETED AS A PASS.
7 50 Engineer Approval Acc Ken Arnold 07/17/2007
I Permit Nun 10510-0102
PERIENGINEER WSPECTIC;N REPOR� TED 7/17/07 FOF
0510-0102 147 Drywall ' 0 07/30/201
PER ENGINEER LETTER DATED 7/17/07 FOR PHASE 1 DR'
0510-0102 161 Utilities 0
PER DAVE MILLARD WITH FPUA.
0510-0102 170 Fire Penetrations 0 07/06/201
PER ENGINEER INSPECTION REPORT DATED 6/20/07 FOF
0510-0102 103 Eufer Ground 1 10/27/201
null
Scheduled: Tue Oct 24 16:42:22 EDT 2006 with value: null
Scheduled: Thu Oct 26 11:25:48 EDT 2006 with value: Fri Oct
NOVEMBER 27,2006 PERTAINING TO INSPECTIONS DONI
FOOTER STEEL PHASE 1 (NORTH BUILDING) WITH A RES
0510-0102 103 Eufer Ground 1 10/27/201
0510-0102 104 Compaction Test 1 10/1
0510-0102 106 Engineers Report 1 02/12/2
PER ENGINEERS TILT -UP WALL PANEL INSPECTION DA'
PANEL CONNECTION. FOR A REPORT OF STRUCTURAL
GIRDER/BEAM TO PERIMETER WALL, BAR JOIST TO BE)
PERIMETER DECK ANGLE.
0510-0102 106 Engineers Report 1 10127/2
0510-0102 106 Engineers Report 1 11/0
0510-0102 106 Engineers Report 1 11
0510-0102 106 Engineers Report 1 11/1
same REPORT AS 10/27/06
0510-0102 106 Engineers Report 1 11/1
0510-0102 106 Engineers Report 1 12/08/21
RECEIVED ENGINEERS REPORT NO. 3, DATED NOVEME
ELEVATOR PIT WALLS TO BOTTOM OF THICKENED SLAI
0510-0102 106 Engineers Report 1 12/08/21
RECEIVED ENGINEERS REPORT NO. 4 DATED NOVEMBE
FLOOR BATHROOMS (4) TOTAL (2) ON GRID LINE C AND
0510-0102 106 Engineers Report 1 01/08/21
ACCEPTED SUMMARY OF INSPECTIONS/STATUS OF WC
PANELS 2 THRU 28. K.ARNOLD
0510-0102 106 Engineers Report 1 01/23/21
FOR INSPECTIONS DONE ON 12/29/2006 AND 01/08/2007
26,27,28,59,2,3,4,5,6,7,8,9,10,30,31,11,12,13,14,16,17,18,1 G
BOX OUTS AT BOTTOM OF PANEL. (01/08/2007) --- PASS f
PHASE 1 DRYWALL COMPLE1, ASS)
7 50 Engineer Approval Acc Ken Arnold 07/30/2007
VVALL COMPLETE.
92 Accepted As Noted. Ken Arnold 12/26/2007
7 50 Engineer Approval Acc Ken Arnold 07/06/2007
OFFICE LOCATION I ST FLOOR APPROVED AS NOTED.
3 90 Approved Scott Attey 10/27/2006
27 00:00:00 EDT 2006 RECEIVED ENGINEERS REPORT NO. 2 DATED
ON 10/24/2006 REFERENCING 3/0 CU CONNECTED TO BUILDING
JLT OF PASS.
90 Approved Private Provider 10/27/2006
90 Approved Karen Neal 10/17/2006
50 Engineer Approval Acc Ken Arnold 02/12/2007
2/12/07 FOR NORTH BUILDING PHASE 1 AS A PASS FOR PANEL TO
EL INSPECTION ALSO A PASS FOR BEAM TO COLUMNS,
DIST GIRDER, BAR JOIST TO WALL, BRIDGING & BRACING,
90 Approved BillLogsdon 10/27/2006
90 Approved BillLogsdon 11/01/2006
90 Approved BillLogsdon 11/20/2006
90 Approved 11/14/2006
)6 90 Approved BillLogsdon 11/14/2006
)6 92 Accepted As Noted Private Provider 12/08/2006
:R 27,2006 PERTAINING TO INSPECTION DONE 10/31/2006 FOR
WITH A RESULT OF PASS.
)6 92 Accepted As Noted Private Provider 12/08/2006
R 27,2006 PERTAINING TO INSPECTION DONE ON 11/17/2006 FOR IST
2) ON GRID LINE E. WITH A RESULT OF PASS (PARTIAL)
)7 50 Engineer Approval Acc Ken Arnold 01/08/2007
ZK (PASS) RECEIVED IN OUR OFFICE 01/08/2007 PERTAINING TO
)7 50 Engineer Approval Acc Ken Arnold 01/23/2007
(12/28/2006) ---- PASS 25,
!0,21,22,23,24 AND 15. PASS ALL EXCEPT PANEL 15. THERE ARE 7
\NEL 15.
0510-0102 106 Engineers Report 1 02/01/2007 50 Engineer Approval Acc Ken Arnold 02/01/2007
ACCEPTED ENGINEER APPROVAL LETTER DATED JANUrIRY 23,2007 FOR PASS INSPECTIONS FOR VERTICAL LEG PANELS 34,
35, 38, 41, 44, 47, 48 AND 5 1.
0510-0102 106 Engineers Report 1 02/05/2007 50 Engineer Approval Acc Ken Arnold 02/05/2007
1
PER ENGINEERS LETTER DATED 2/2/07 FOR EXTERIOR 7ALL PANELS ANGLE ATTACHMENTS WELDED TO PANEL EMBEDDED
PLATES AND BOLTED TO FOOTERS. (PASS)
0510-0102 106 Engineers Report 1 02/05/2007 50 Engineer Approval Acc Ken Arnold 02/05/2007
PER ENGINEERS LETTER DAT31D 1/15/07 FOR VERTICAL�LEG PANEL 34, 35, 38,41, 44,47,48 AND 51. (PASS)
0510-0102 106 Engineers Report 1 02/16/2007 50 Engineer Approval Acc Ken Arnold 02/16/2007
ACCEPTED ENGINEERS REPORT FOR A PASS ON THE ROOF DECKING INSTALLATION DATED 2/15/07
1
0510-0102 106 Engineers Report 1 02/19/2907 50 Engineer Approval Acc Ken Arnold 02/19/2007
PER ENGINEER REPORT FOR TILT -UP WALL PANEL INSPECTION FOR LOADING DOCK PANELS 54,55,56,57,56 AND
DUMPSTER CONTAINMENT WALLS PANELS 1, 2,3,4 ANF 5 AS A PASS DATED 2/16/07.
0510-0102 106 Engineers Report 1 02/22/21007 50 Engineer Approval Acc Ken Arnold 02/22/2007
PER TILT -UP WALL PANEL INSPECTION DATED 2/2/07 FOR EXTERIOR WALL PANELS ANGLE ATTACHMENTS WELDED TO
PANEL EMBEDDED PLATES AND BOLTED TO FOOTERS �S A "PASS".
0510-0102 106 Engineers Report 1 02/22/2P07 50 Engineer Approval Acc Ken Arnold 02/22/2007
PER REPORT OF CAST IN PLACE CONCRETE AND REINFORCED MASONRY INSPECTION DATED 2/20/07 FOR LOADING RAMP
AND DUMPSTER WALL FOOTERS WF-24 ASA "PASS". �
0510-0102 106 Engineers Report 1 03/05/2,007 50 Engineer Approval Acc Ken Arnold 03/05/2007
PER TILT UP WALL PANEL INSPECTION DATED 3/5/07. LOADING RAMP AND DUMPSTER CONTAINMENT WALLS (PASS).
REPORT OF METAL FRAMING AND EXTERIOR SHEATHAG INSPECTION REPORT DATED 3/5/07 FOR METAL FRAMING. 18 GU.
GALV. STUD FRAMING AT (3) ROOF TOWER ENCLOSUR�S AND 20 GA FRAMING ABOVE MECHANICAL ROOM (PASS)
0510-0102 106 Engineers Report 1 03/05/gOO7 50 Engineer Approval Acc Ken Arnold 03/05/2007
lPermit Nun 10510-0102
PERIENGINEER STRUCTU14AL STEEL"_ _J?ECTION DATED 2/28/07 FOR REINSPECT MEZj JE BARJOIST INSTALLATION AND
COMPLETE COLUMN BASE PLATE ATTACHMENTS. (PASS) FOR INSPECTION THAT FAILED 2/27/07
0510-0102 106 Engineers Report 1 03/05/20017 50 Engineer Approval Acc Ken Arnold 03/05/2007
PER ENGINEER REPORTS DATED 2/7/07,2/12/07,2/15/07 AN, D 2/16/07.
0510-0102 106 Engineers Report 1 03/07/2001� 50 Engineer Approval Acc Ken Arnold 03/07/2007
PER ENGINEER INSPECTION REPORT DATED 3/6/07 FOR [DECK PREPARATION, W.W.M OK TO POUR MEZZANINES. PER
REPORT FOR STRUCTURAL ' STEEL INSPECTION MEZZANI�ES METAL DECK INSTALLATION (PASS)
0510-0102 106 Engineers Report 1 03/12/200 1 7 50 Engineer Approval Acc Ken Arnold 03/12/2007
PER ENGINEERS INSPECTION REPORT DATED 3/9/07 FOF TOWER WALL SHEATHING AND IN PROGRESS INSPECTION OF
BUILT-UP ROOF INSTALLATION. (APPROVED)
0510-0102 106 Engineers Report 1 03/22/20(7 92 Accepted As Noted Ken Arnold 03/22/2007
3/22/07 recieved private provider report jorwarded token arno d RECEIVED ENGINEERS REPORT FOR EXTERIOR SHEATHING
INSPECTION WHICH FAILED CONCERNING THE RED IRO� ANGLES WELDED TO TOWER ROOF BEAM FOR TRUSS TIE DOWN.1)
WELDING NOT COMPLETED PER DETAIL. 2) DETAILS TO E E SIGNED AND SEALED BY ENGINEER OF RECORD.
0510-0102 106 Engineers Report 1 03/22/200 1 7 50 Engineer Approval Acc Ken Arnold 03/22/2007
PER ENGINEERS REPORT DATED 3/5/07 FOR LOADING RAMP AND DUMPSTER CONTAINMENT WALLS. (PASS). REPORT DATED
3/5/07 FOR METAL FRAMING OF 18 GA. GALV.STUD FRAMING AT (3) ROOF TOWER ENCLOSURES AND 20 GA FRAMING ABOVE
MECHANICAL ROOM.(PASS)3/6/07 FOR METAL DECK --- MEZZANINES METAL DECK INSTALLATION (PASS).3/6/07 FOR ELEVATED
SLAB DECK PREPARATION, W.W.M OK TO POUR MEZZANINES. (PASS)3/9/07 FOR WALL SHEATHING AND ROOF IN
PROGRESS --TOWER WALL SHEATHING AND IN PROGRESS INSPECTION OF BUILT-UP ROOF INSTALLATION OK.
1
0510-0102 106 Engineers Report 1 04/27/2007 50 Engineer Approval Acc Ken Arnold 04/27/2007
PER ENGINEER REPORT DATED 4/10/07 FOR ROLL -UP DO I ORS. DEFICIENCIES OBSERVED.
1
0510-0102 106 Engineers Report 1 04/27/2007 50 Engineer Approval Acc Ken Amold 04127/2007
1
PER ENGINEER REPORT DATED 4/18/07 FOR WINDOW & DOOR INSTALLATION WITH A PARTIAL PASS.
1
0510-0102 106 Engineers Report 1 04/27120�7 50 Engineer Approval Acc Ken Arnold 04/27/2007
PER ENGINEER REPORT DATED 4/19/07 FOR ROOF SHEA�HING FOR SOUTH AND MIDDLE TOWER.
0510-0102 106 Engineers Report 1 05/08/2007 50 Engineer Approval Acc Ken Arnold 05/08/2007
PER ENGINEER EXTERIOR SHEATHING INSPECTION REP�RT DATED 4/23/2007 FOR ROOF SHEATHING COMPLETE PHASE 1.
0510-0102 106 Engineers Report 1 05/29/2097 50 Engineer Approval Acc Ken Arnold 05/29/2007
PER ENGINEER INSPECTION REPORT DATED 5/11/07 FOR BUILDING 1 FIVE WALL ELECTRIC OUTLETS ROUGH -IN. DRYWALL
SCREW INSPECTION EAST SIDE OF FIREWALL I ST LAYER OF 5/8 GYPSUM BOARD AS A PASS.
1
0510-0102 106 Engineers Report 1 04/27/2007 50 Engineer Approval Acc Ken Arnold 04/27/2007
1
PER ENGINEER REPORTS DATED 4/5/07 FOR WORK IN PROGRESS FON THE WINDOWS AND TRUSS TO TRUSS
1
0510-0102 106 Engineers Report 1 04/27/2007 50 Engineer Approval Acc Ken Arnold 04/27/2007
1
PER ENGINEER REPORT DATED 4/10/07 FOR ALL TRUSSES EXCEPT WEST END.
0510-0102 106 Engineers Report 1 06/20/20�7 50 Engineer Approval Acc Ken Arnold 06/20/2007
PER ENGINEER ELECTRICAL INSPECTION REPORT DATE,b6/18/2007 FROM INSPECTOR BILL DAVISON BN 1366 FOR EXTERIOR
ENTRYWAY CEILINGS HI HAT LIGHTS AND FIVE SPRINKLERS OK TO COVER. CEILINGS OVER PERSONNEL ENTRIES. (PASS)
1
0510-0102 106 Engineers Report 1 uU/z1/zuuf 50 Engineer Approval Acc Ken Arnold 06/21/2007
PER ENGINEER ELECTRICAL INSPECTION REPORT DATE I P 6/20/2007 FOR ELECTRIC ROUGH WEST END TENANT BUILD OUT
ONLY AS A PASS, PANEL NOT MADE UP. NEED AS BUILT REVISED DRAWINGS PER BILL DENISON BN1366
0510-0102 106 Engineers Report 1 06/21/2007 50 Engineer Approval Acc Ken Arnold 06/21/2007
1
PER ENGINEERS REPORT DATED 6/20/2007 FOR FRAMING AND FIRE PENETRATIONS IN OFFICE LOCATION 1ST FLOOR. AS
APPROVED AS NOTED .... PROVIDE UL FOR METAL DECK JOIST ASSEMBLY.
0510-0102 106 Engineers Report 1 07/24/2097 50 Engineer Approval Acc Ken Arnold 07/2412007
RECEIVED ENGINEER REPORTS DATED 7/9/0717/10/0717/il6/07 AND 7/17/07.
0510-0102 106 Engineers Report 1 50 Engineer Approval Acc Ken Arnold 10111/2007
PER ENGINEER ELECLRICAL INSPECTION REPORT DATED OCT. 11, 2007 FOR ELECTRIC SERVICE POWER RELEASE
INSPECTION. SERVICE, METER, PANELS AND ELEVATOR�EQUIP. OK. PER BILL DENISON BN1366.
0510-0102 110 Footer/Foundation 1 16 92 Accepted As Noted BillLogsdon 10/27/2006
PHASE 1 NORTH BLD FOOTER AN COLUMN PADS ELEVATOR PIT
1
0510-0102 110 Footer/Foundation 1 10/27/2006 90 Approved Scott Attey 10/27/2006
null
Scheduled: Thu Oct 26 11:23:36 EDT 2006 with value: Fri Oc 27 00:00:00 EDT 2006 RECEIVED ENGINEER REPORT I DATED
NOVEMBER 27,2006 PERTAINING TO INSPECTIONS DON�' ON 10/24/2006. PHASE 1 (NORTH BUILDING) CONTINUOUS
PERIMETER FOOTER, INTERIOR COLUMN FOOTERS AND'ELEVATOR PIT FLOOR. RESULTS (PASS) WITH NOTES: 1) PROVIDE
CLARIFICATION FROM ARCH. OR ENGINEER FOR F-84 D�SIGNATED AT GRID LINES (F,4).
0510-0102 115 Slab 1 11/30/20 1 06 50 Engineer Approval Acc Ken Arnold 11/30/2006
1
GROUNS SLAB COMPLETE FOR PHASE I (NORTH BUILDING) PER INSPECTOR LOUNSBERRY. (PRIVATE PROVIDER) RECEIVED
SECOND NOTICE DATED 12/20/2006 FOR INSPECTION D�NE ON 11/30/2005 STATING GROUND SLAB COMPLETE FOR PHASE 1
(NORTH BUILDING). K.ARNOLD 12/20/2006.
0510-0102 119 Stem wall 1 11/01/2C
ELEVATOR PIT WALLS
0510-0102 420 Plumbing Rough I 11/22/2C
90 Approved Private Provider 11/01/2006
50 Engineer Approval Acc Ken Arnold 11122/2006
jPermit Nun F0510-0-102 I
ACCEPTED ENGINEERS R&ORT TO - IPLETE UNDER(
RESULTS OF INSPECTION: PASS. DATED 11/21/2006. RE(
COMPLETE UNDERGROUND PLUMBING ROUGH FOR PH)
0510-0102 420 Plumbing Rough 1 11/14/20
0510-0102 420 Plumbing Rough 1 07/10/20
NORTH BUILDING PHASE 1 2ND ROUH PLUMBING ... /////P,
AT EXTERIOR FOR FINAL. 2) RE-ROUTE WATER SUPPLY
APPLIANCE OR INSTALL PAN PIPED TO DRAIN FOR FINAI.
0510-0102 427 Temp.Toilet/Temp Culvert 1 11/14/20
0510-0102 104 Compaction Test 2
0510-0102 105 Form Board Survey 2 12/0
0510-0102 106 Engineers Report 2 04/12/2C
4/12/07 recieved engineers report dated 4/4/07 forwarded to I
INSPECTION. PROVIDE PRODUCT APPROVAL FOR WIND
OF CENTER LINE 3.5" AND 2" O.C.
0510-0102 106 Engineers Report 2 03/12/2C
PER ENGINEERS REPORT NO. 13 FOR BAR JOISTS FOR I
AND (2) BAR JOIST RED IRON SUPPORT ANGLE AT SW C
REPORT (2/28/07) REINSPECT MEZZANINE BAR JOIST IN, -
(PASS). PARTIAL INSPECTION ON ROOF IN PROGRESS (,
INSPECTION DATED 3/1/07 PHASE 1 --- CONDUCT PREINS
PER AISC 13TH EDITION, 16.2-43.
0510-0102 106 Engineers Report 2 03/09/2C
PER ENGINEER LETTER DATED MARCH 1, 2007 FOR INSI
WALL FOOTERS WF-2Y, (12) INTERIOR 8'X8'COLUMNS B,
0510-0102 108 Engineer Letter 2 02/13/2C
PER ENGINEER LETTER FOR TILT -UP WALL PANEL INSP
32 AND 61. PASS ALL EXCEPT PANEL 61. 2 BOX OUTS IN
0510-0102 115 Slab 2 04/27/2C
THIS SLAB INSPECTION IS FOR TILT WALL///////PER ENGIr
SLAB AND LOADING RAMP.
0510-0102 121 Termite Spray 2 12/01/2C
0510-0102 148 Window/Door Attachment 2 04/04/2C
null
Scheduled: Mon Mar 26 15:30:55 EDT 2007 with value: null
Scheduled: Mon Mar 26 15:33:46 EDT 2007 with value: null
APPROVAL FOR WINDOWS. 12 TAPCONS IN SILL 3 EACH
0510-0102 148 Window/Door Attachment 2 04/27/2C
PER ENGINEER REPORT DATED 4/10/07 FOR ALL WINDO
0510-0102 413 Pipe Test 2 11/20/2C
barhroom 2 on grid c and to 2on grid e I ST FLOOR
0510-0102 413 Pipe Test 2 04/27/20
Re -inspection I PER ENGINEER REPORT DATED 11/21/06
FOR PHASE I (NORTH BUILDING). PASS BY DAVID LOUN�
(2) ON GRIDLINE E..
0510-0102 116 2nd Floor Slab 4 04/27/201
INSPECTION FOR MEZZINE FLOOR PER ENGINEER REP,
MEZZANINES PER DAVID LOUNSBURY.
Scheduled: Wed Mar 7 10:15:26 EST 2007 with value: null
0510-0102 133 Window/Door Bucks 5 12/17/201
0510-0102 135 Wall Sheathing 5 07/02/2
PER ENGINEER INSPECTION REPORT DATED 6/28/07 FC
A PASS.
0510-0102 135 Wall Sheathing 5 07/10/2
PER ENGINEER INSPECTION REPORT DATED 6/28/07 FC
A PASS...
0510-0102 136 Roof Dry-inrrin Tab 5 07/06/2
0510-0102 140 Construction Rough Frami 5 07/0
PER ENGINEER INSPECTION REPORT DATED 6/18/07
0510-0102 141 Insulation 5 05/3
OUND PLUMBING ROUGH FC - _-iASE I (NORTH BUILDING).
IVED DUPLICATE INSPECTION REPORT WITH A "PASS" TO
E 1 (NORTH BUILDING) 12/20/2006. KARNOLD
90 Approved Private Provider 11/14/2006
50 Engineer Approval Acc Ken Arnold 07/10/2007
S//// 1) PROVIDE ACCESSIBLE MAIN SHUT-OFF FOR SUPPLY WATER
3OVE CEILING HUNG A/C UNIT NO WATER PIPING ABOVE ELECTRIC
92 Accepted As Noted BillLogsdon 11/14/2006
90 Approved Karen Neal 12/06/2006
90 Approved Diane Flanigen
50 Engineer Approval Acc 04/12/2007
Arnold PER ENGINEER REPORT DATED APRIL 4,2007 FOR SILL
S. 12 TAPCONS IN SILL, 3 EACH END 4.5" AT 2"O.C., 3 EACH SIDE
7 50 Engineer Approval Acc 03/12/2007
EZZANINES.(FAIL) 1) REMOVE SLAG FROM WELDS FOR INSPECTION
,RNER LOCATION NOT WELDED COMPLETE. (2/27/07) NEXT
FALLATION AND COMPLETE COLUMN BASE PLAATE ATTACHMENTS.
28/07) AND ROOF IN PROGRESS (2/29/07) AS APPROVED.
ki-LATION VERIFICATION OF BOLTS AND INSTALLATION METHODS
50 Engineer Approval Acc Ken Arnold 03/09/2007
'TION DONE ON 2/20/07 FOR LOADING RAMP AND DUMPSTER
E PLATES GROUTED. (PASS)
50 Engineer Approval Acc Ken Arnold 02/13/2007
TION DATED 1/11/07 FOR PANEL 34, 35, 38, 41, 47, 48, 51, 53, 60, 62,
)LUMN. EOR TO ADVISE.
50 Engineer Approval Acc Ken Arnold 04/27/2007
:_7R REPORT DATED 4/10/07 FOR SLAB ON GRADE FOR DUMPSTER
90 Approved Ken Arnold 12/01/2006
50 Engineer Approval Acc Ken Arnold 04/04/2007
=_R ENGINEER REPORT DATED 3/27/07 ---- PROVIDE PRODUCT
ND 4.5" IN AND TO.C., 3 EACH SIDE OF CENTERLINE 3.5'AND 2-O.C.
1 50 Engineer Approval Acc Ken Arnold 04/27/2007
S ARE COMPLETE FASTERNERS AS REQUIRED.
91 Partial Approval Private Provider 11/20/2006
50 Engineer Approval Acc Ken Arnold 04/27/2007
D 11/17/06 TO COMPLETE UNDERGROUND PLUMBING ROUGH
:RRY IIST FLOOR BATHROOMS (4) TOTAL (2) ON GRID LINE C AND
50 Engineer Approval Acc Ken Arnold 04/27/2007
DATED 3/6/07 FOR DECK PREPARATION, W.W.M OK TO POUR
93 Not Required Private Provider 12/17/2007
7 50 Engineer Approval Acc Ken Arnold 07/02/2007
CEILINGS/SOFFIT SHEATHING AT EXTERIOR ENTRY LOCATIONS AS
7 50 Engineer Approval Acc Ken Arnold 07/10/2007
CEILINGS/SOFFIT SHEATHING AT EXTERIOR ENTRY LOCATIONS. AS
50 Engineer Approval Acc Ken Arnold 07/06/2007
7 50 Engineer Approval Acc Ken Arnold 07/06/2007
CEILING FRAMING ABOVE ENTRY DOORS APPROVED AS NOTED.
7 50 Engineer Approval Acc Ken Arnold 05/30/2007
IlPermit Nun 10510-0102 1
PER tNGINEER INSPECTION REPOR'.-,-.,,rED 5/17/2007 FC
U.L. ASSEMBLY WP1522 ASA PASS.
NORTH BUILDING PHASE 1 ', WALL INSULATION PER RATED
0510-0102 148 Window/Door Attachment 5 05/29/200? 50 Engineer Approval Acc Ken Arnold 05/29/2007
APPROVED AS NOTED BUILDING NO. 1 OVEERHEAD DOOR ATTACHMENT. PROVIDE REVISED ENG. LETTER FOR'L'ANGLE
ATTACHMENT TO WALL. 1
0510-0102 167 Roof Final 5 1 119,200 50 Engineer Approval Acc Ken Arnold 11/19/2007
PER ENGINEER'S INSPECTION REPORT DATED 11;1312007 FOR NORTH BLDG PHASE 1 FINAL ROOF INSPECTION AS A PASS
APPROVED BY DAVID LOUNSBUERY BN3026Re-inspection �l
0510-0102 167 Roof Final 5 11/2112007 50 Engineer Approval Acc Ken Arnold 11/21/2007
PER ENGINEER INSPECTION REPORT DATED 11/13/07 AS A PASS
NORTH BLDG PHASE 1 FINAL ROOF INSPECTION.
0510-0102 179 Firewall 5 05/22/200T 50 Engineer Approval Acc Ken Arnold 05/29/2007
PER INSPECTION REPORT DATED 5/17/2007 FOR NORTH BUILDING PHASE I FIRE WALL INSULATION PER RATED U.L.
ASSEMBLY WP1522 AS A PASS.
0510-0102 238 Electric Rough 5 05/14/200, 50 Engineer Approval Acc Ken Arnold 05/14/2007
PER ENGINEER INSPECTION REPORT DATED 5/11/07 FOR BUILDING 1 FIRE WALL ELECTRIC OUTLETS ROUGH -IN. DRYWALL
SCREW INSPECTION EAST SIDE OF FIRE WALL IST LAYE OF5/8 GYPSUM BOARDASAPASS.
0510-0102 238 Electric Rough 5 50 Engineer Approval Acc Ken Arnold 10/08/2007
PER ELECTRICAL INSPECTION REPORT DATED 9/27/07 FOR BUILDING 1 OFFICES CEILING ROUGH AS A PASS PER BILL
DENISON BN1366
0510-0102 238 Electric Rough 5 50 Engineer Approval Acc Ken Arnold 09/28/2007
PER ENGINEER REPORT DATED 9/27/07 FOR BULDING I OFFICES CEILING ROUGH AS A PASS BY INSPECTOR BILL DENISON
BN1366
0510-0102 238 Electric Rough 5 07106120017 50 Engineer Approval Acc Ken Arnold 07/06/2007
PER ENGINEER INSPECTION REPORT DATED 6/18/07 FOR EXTERIOR ENTRYWAY CEILINGS HIHAT LIGHTS AND FIRE
SPRINKLERS OK TO COVER. CEILINGS OVER PERSONNE�' ENTRIES AS A PASS.//////]NSPECTION REPORT DATED 6/20/07
0510-0102 260 30 Day for Testing 5 10/17/2007 90 Approved Van Whitaker 10/17/2007
10/16107 window schedule with bob/ contr.bac
0510-0102 280 Electric Final 5 12/10/2007 50 Engineer Approval Acc Ken Arnold 12/10/2007
PER ENGINEER REPORT OF ELECTRICAL INSPECTION: DATED 12/10/07 FOR PHASE 1 FINAL ELECTRIC AS A PASS.
INSPECTOR BILL DENISON BN#1366
0510-0102 351 Mechanical Rough-In(duct 5 07/06/200 50 Engineer Approval Acc Ken Arnold 07/06/2007
PER ENGINEER INSPECTION REPORT DATED 6/21/07 FOR NORTH BUILDING PHASE I MECH ROUGH NOT READY FAIL.
0510-0102 351 Mechanical Rough-In(ducl 5 07/31/200 81 Disapproved Private Provider
NORTH BLDG PHASE I DUCT ROUGH ..... ////FAIIU//// 1) PRO IDE APPROVED AS-BUILTS BY MECH ENG. 2) FINISH INTAKE AIR TO
UNIT (5) 3) PROVIDE R/H OR TRANSFER AIR TO 2ND FLOO OFFICES 4) DATA/COMMUN [CATION ROOMS S/A & r/A?
0510-0102 351 Mechanical Rough-In(duct 5 50 Engineer Approval Acc Ken Arnold 09/28/2007
PER ENGINEER REPORT DATED 9/27/07 FOR A PARTIAL FINAL MECH FOR ABOVE CEILING FLEX DUCT CONNECTIONS AS A
PARTIAL PASS 1) PROVIDE APPROVED AS-BUILTS BY INS ECTIOR LOUNSBERRY BN3026
0510-0102 351 Mechanical Rough-ln(duct 5 81 Disapproved Private Provider 08/08/2007
Re -inspection 2////PER ENGINEER MECHANICAL INSPECTIO I N REPORT DATED 7/31/07 FOR NORTH BLDG PHASE 1 DUCT
ROUGHA) PROVIDE APPROVED AS-BUILTS BY MECH ENd. 2) FINISH INTAKE AIR TO UNIT (5) 3) PROVIDE R/A OR TRANSFER
AIR TO 2ND FLOOR OFFICES 4) DATAICOMMUNICATION �OOMS S/A & R/A.. INSPECTION RESULTS IS A FAIL.
0510-0102 351 Mechanical Rough-In(ducl 5 50 Engineer Approval Acc Ken Arnold 09/11/2007
Re -inspection 3NPER ENGINEER INSPECTION REPORT DATED 9/7/07 FOR PHASE I MECHANICAL ROUGH INSPECTION AS A
PASS. DAVID LOUNSBERRY BN3026
0510-0102 351 Mechanical Rough-In(duct 5 50 Engineer Approval Acc Ken Arnold 09/14/2007
RECEIVED FINAL MECHANICAL ROUGH INSPECTION AS A PASS. DATED 9/13/2007 FROM DAVID LOUNSBERRY BN3026
0510-0102 351 Mechanical Rough-In(ducl 5 50 Engineer Approval Acc Ken Arnold 09/21/2007
0510-0102 351 Mechanical Rough-In(ducl 5
PHASE 1 MECHANICAL ROUGH INSPECTION ----- PASS----
1) PROVIDE SIGNED & SEALED, REVIEWED AS-BUILTS FO
0510-0102 380 Mechanical Final 5 12/13/20C
PER ENGINEER REPORT DATED 12/12/2007 FOR FINAL ME
LOUNSBURY BN 3026Re-inspection 1
0510-0102 380 Mechanical Final 5
PARTIAL FINAL MECH. FOR ABOVE CEILING FLEX DUCT C
9/27/2007 FROM DAVID LOUNSBERRY BN3026
50 Engineer Approval Acc Ken Arnold 09/21/2007
FINAL MECHANICAL INSPECTION
50 Engineer Approval Acc Ken Arnold 12/13/2007
HANICAL INSPECTION PHASE 1 AS A PASS BY INSPECTIOR DAVID
91 Partial Approval Private Provider 10/08/2007
NECTIONS PER MECHANICAL INSPECTION REPORT DATED
0510-0102 423 Plumbing Top Out 5 07/02/20017 50 Engineer Approval Acc Ken Arnold 07/02/2007
PER ENGINEER INSPECTION REPORT DATED 6/28/.07 FOR, NORTH BUILDING PHASE 1 2ND ROUGH PLUMBING AS A PASS 1)
PROVIDE ACCESSIBLE MAIN SHIUT-OFF FOR SUPPLY WATIER AT EXTERIOR FOR FINAL. 2) RE-ROUTE WATER SUPPLY ABOVE
CEILING HUNG A/C UNIT NO WATER PIPING ABOVE ELEC�RICAL APPLIANCE OR INSTAL PAN PIPED TO DRAIN FOR FINAL
0510-0102 423 Plumbing Top Out 5 50 Engineer Approval Acc Ken Arnold 10/08/2007
Re -inspection 3
jPernnit Nun 10510-0102
0510-6102 423 Pitimbing T�p Out
5 07/06/200? 50 Engineer Approval Ken Arnold 07/06/2007
PEER ENGINEER INSPECTION REPORT DATED 6/21/07 FOR NORTH BUILDING PHASE I 2ND ROUGH PLUMB NOT READY FAIL
0510-0102 423 Plumbing Top Out 5 81 Disapproved Private Provider 09/28/2007
PHASE I NORTH BUILDING FINAL PLUMBING AS A FAIL �
1)NEED TO COMPLETE INSTALLATION OF FIXTURES AND T OILET ROOM PARTITIONS TO VERIFY REQUIRED CLEARANCES.
0510-0102 480 Plumbing Final 5 12/13/200� 50 Engineer Approval Acc Ken Arnold 12/1312007
PER ENGINEER REPORT DATED 12/12/2007 FOR, INSPECTION PHASE 1 AS A PASS BY INSPECTOR DAVID
LOUNSBURY. BN 3026Re-inspection 1
0510-0102 480 Plumbing Final 5 81 Disapproved Private Provider 10/08/2007
PER PLUMBING INSPECTION REPORT DATED 9/27/07 AS A FAIL
1) NEED TO COMPLETE INSTALLATION OF FIXTURES AND TOILET ROOM PARTITIONS TO VERIFY REQUIRED CLEARANCES.
PER DAVID LOUNSBERRY BN3026
0510-0102 500 Smoke Draft Stop 5 12/17/2007 50 Engineer Approval Acc Ken Arnold 12/17/2007
PER ENGINEER REPORT
0510-0102 259 Power Release Form 7 92 Accepted As Noted Barbara Counsello 10/11/2007
sub contr hold needs to contact contr lic dept. recvd faxed power release form.1 0/11/07 bac
0510-0102 800 Address Final 7 12117/200 1 7 50 Engineer Approval Acc Ken Arnold 12/17/2007
PER ENGINEER INSPECTION REPORT DATED 12/14/2007 �AVID LOUNSBURY BN3026
0510-0102 165 Handicap Restrooms 8 12/18/200 1 7 81 Disapproved Scoff Attey 12/18/2007
i
THE DOOR CLOSERS MUST MEET ADA REQIERMENTS [ SWEEPS FROM 70 DEGREES WILL TAKE #3 SECONDS TO MOVE WITH
IN #3 INCHES OF THE LATCH.,AND THE OPENING FORCEO�UST NOT BE GREATER THAN 5 LBS.
0510-0102 165 Handicap Restrooms 8 12/20/20 90 Approved Scott Attey 12/20/2007
Re -inspection 1
Resulted: Thu Dec 20 13:54:12 EST 2007
0510-0102 172 Hurricane Panels (shutterc 8 7 93 Not Required Private Provider 12/17/2007
PER ENGINEER INSPECTION REPORT DATED 12/14/2007. �URRICANE PANELS NOT NEEDED AS WINDOWS ARE IMPACT
RESISTANT. DAVID LOUNSBURY BN3026
0510-0102 180 Building Final 8 12/18/2007 81 Disapproved Scott Attey 12/18/2007
ALL DOOR CLOSERS REQUIRED FOR ADA EXTERIOR DCIORS MUST MEET THE CODE, SWEEPS FROM 70 DEGREES WILL
TAKE #3 SECONDS TO MOVE WITH IN #3 INCHES OF THE �ATCH AND HAVE AN OPENING FORCE NOT GREATER THAN 8.5 LBS.
ALL EXIT DOORS WITH CRASH BARS MUST BE OPERATIONAL.
0510-0102 180 Building Final 8 1/_/zu/zuVf 90 Approved Scott Attey 12/20/2007
Re -inspection 1
0510-0102 261 30 Day Expired 8 12126120 7 90 Approved Ken Arnold 12/26/2007
0510-0102 700 Fire Department Final 8 12/18/2007 90 Approved Mike Matthy 12/26/2007
1
0510-0102 801 Paving and Drainage Certi 8 1 Z/ I b/zUVI f 91 Partial Approval Michael Halter 12/18/2007
12/18/07 partial pending as built engineering- per mike halter. 6ac
1
0510-0102 801 Paving and Drainage Certi 8 1z/191zuu1 90 Approved Michael Halter 12/1912007
Re -inspection 1 1
0510-0102 803
Parking/Handicap Sign &,' 8 12/18/20?7
90
Approved
Scott Attey
12/18/2007
0510-0102 808
Land scaping/Trees 8 12/18/2007
91
Partial Approval
Brian Pauley
12/19/2007
PARTIAL APPROVED WITH CONDITION THAT SHOCKING
5HOMAND OAKS BE REPLACED WITH
HEALTHY APPROPRIATE
SPECIES (IE LIVE
OAKS WITHIN 60 DAYS 12/19/2007.
0510-0102 808
Landscaping/Trees 8
92
Accepted As Noted
Amy Mott
12/2612007
Re -inspection 2
0510-0102 996
Final Termite Treatment 8 12/1812007
90
Approved
Scott Attey
12/18/2007
0510-0102 999
Final Inspection 8
12/26/2007
per engineer letter dated December 18, 2007 from ClhristophJ,
S Throop
BN4338 and Michael J. O'Connor
PE 44082
0510-0102 808
Landscaping/Trees 9
1
81
Disapproved
Private Provider
09/21/2007
FINAL ROOF INSPECTION -----FAIL ----- I
1) PROVIDE PRODUCT APPROVAL FOR ROOF SrULIUM I t- AND TO BE SHUTTERED FOR NON -IMPACT GLAZED OPENING
2) NEED TO COMPLETE SECURING GALVINIZED CAPS Tb, CURBS NOT BEING UTILIZED FOR EQUIPMENT.
3) NORTH BUILDING OVLFLOW SCUPPER AT EAST REGION IS OBSTRUCTED WITH MODIFIED FLASHING.
JlPermitNu 10510-0102