HomeMy WebLinkAboutINSPECTION CARDDec 19 07 02:13p
Code Compliance Division
2300 Virginia Avenue
Ft. Flerae, ft 34"2
Phwe; (772) 452-1653 Fax; (772) 462-1143
httP.-Ifstlucieco.gOVICS
Pernrit N SLC- 0510-0102 Conf# I
Issued 08107/2005 Insp Area
Job Lacatior 3200 ST LUCIE BLVD PHASE I
Jurisdiction. St. Lucie County
Parael: 1428-702-1492-00014 Subdiv, Son
owner Runaways End LLG
Project:
JobDescrWoo NEW CONSTRUCTION-24,509 S
24,509 SF
ALSO REF PARCEL 1428-702-15.r
p.2
rlk*= 01fuz
4109FEUTION CARD
TV": Building Commercial
Mnsftr Nbr.;
City FORT PIERCE
Lot I Black 64 Double Foe No
ucle Plaza S/D Unft 1
-load X Elev., Pl%oa4mav: 176F
INDUSTRIAL WAREHOUSE W1 STOREFROW. PHASE I -
BLK 65
Cararactal ROBERT BRYAN GOING TRIMCRAFT INC (561) 718-8756
1335 NEPTUNE DFI BOYNTON BEACH, FL 33426
Property Owne Runaway's End LLC (56 T) 71 "753
29 NE 4th AVS Delray Beach, FL, 3M3 - - ---
SetbauM Lefl 96.00 Right 176.00
inspection Notes! PRIVATE PROVIDER STATES 11
FINALS FOR OUR INSPECTORS
Front Rear 60.00
T THE BUILDING FWAL (180) IS A PASS. KEN SET UP
Perrrdt
Cart I
ODA
()MMgr/ Builde job Deserlip-t
0510-0102-01
ISS
EIP
18609
MAURICE ELECTRIC
INC
OBID-DID2-02
IS$
PP
8362
MEEKS PLUMBING
INC
Oslo-01102-03
Iss
ME
10363
NISAIR AIR CONDITIONING
DSID-0102-04
ISS
RP
20108
J A TAYLOR ROOFINIS
INC chark9efoollimm T6911 W20109
INSPECTIPNS - Par
Permit Reg P9JgtWi:1-3r- —Pr Pa" so
0510-0102 Sol Paving and DralwileCertif 8 12MBM07
0510-M02 W3 ParkhofflandicapW&S 8 121711007
0510-OID2 GDS Final Termhe Tr9alment 8 112n8M007
wALOSID-0102 aG5 Landwapingfriaes a
1211M007
OSID-0102 165 Handtap Rastrimms; e
1211wom
051"102 700 Fire Department FhW a
1211&2007
051 Ml D2 180 BiAlding F:Inal 8
12dlaW07
OSI"ID2 201 30 Day EVired 6
12JI712007
051D�3102 am Adt"w Final 7
12M7=07
PEFI ENGINEER INSPECTION REPORT DATCO
12114=07 DA
OW-0102 500 SmakeDmftftp 5
1211712007
PER ENGINEER REPORT
0510-DI02 133 VYirdow/D0orBud* 6
12117/RD07
0610-0102 172 HuMcane - Panels (srsatum) e
121117/21707
PER ENGINEER INSPECTION REPORT DATED
1 W 4MD07. HI
RESISTANT. DAVID LOUNSOURY SN3026
0510-0102 MM Machanicil][Fmal S
121=007
PER ENGINEER REPORT DATED 12112=07 FOR FINAL MEC
LOUNSBURY NN 3026ft-Inspaufto 1
0510-0102 480 PlumbIngFinal, 5
12113MOO7
PER ENGINEER FILFORT CIATED 121124W FOR PINAL PLUI
LOUNSSURY. Re-impection I
cc"
up.sts, Call; (M) 4G2-12
Flee Desorlyfie I Date Inap
0 , i;,Omgv
0 Pending
0 Pendikigj 17
0 Pending .4#q
0 Pending_ 7-7
0 Pending r. b
a Peryding - J-7
0 Pending
90 Engineer AFpfeval Accepted 28 12AW2007
LOUNSSURY EN3026
80 Engheer Appr" Amapted 28 1121172M7
03 Not RequirW 1ZJI7/N07
83 NotRaquired CP,1 '1211712007
ICANEPANEL.9 NOT NEEDED ASWNDOW5 Aft IMPACT
50 EnonserAppro%oal "led 28 12113007
IICAL INSPWTION PHASE I AS A PASS SY INSPECTiCIR DAVID,
5o Engineer Apprayal Accepted 28 12M�120(37
ia INSPECTION PHASE I AS A PASS BY IWECTOR OAVID
e-
I
Code Compliance Division
2300 Virginia Avenue
Ft. Pierce, FL 34982
Phone: (772) 462-1553 Fax: (772) 462-1148
http://stiucleco.gov/ce
Permit#: SLC- 0510-0102 Conf #: 904
Issued 08/07/2006 Status: FIN
Job Location 3200 ST LUCIE BLVD PHASE 1
Jurisdiction: St. Lucie County
Parcel: 1428-702-1492-000/4 Subdiv: San Lu(
Flood: X Elev: Flood Map: 176
Job Description: NEW CONSTRUCTION - 24,509 SF IN
24,509 SF
ALSO REF PARCEL 1428-702-1537-0
Setbacks Left: 98.00 Right 176.00
INSPECTION CARD
Type: Building Commercial
Double Fee: No
City: FORT PIERCE
Lot: 1 Block: 64
Plaza S/D Unit 1
USTRIAL WAREHOUSE W/ STOREFRONT - PHASE I -
BLIK 65
Front
Inspection Notes: PRIVATE PROVIDER STATES THAT THE BUILDING FINAL (180) IS A PASS..
Rear: 60.00
Contractor ROBERT BRYAN GOING TRIMCRAFT INC (561) 718-8756
1335 NEPTUNE DR BOYNTON BEACH, FL 33426
Property Owner Runaway's End LLC (561) 718-8753
29 NE 4th Ave Delray Beach, FL 33483
SUBLPERMITS
Permit # Status PT Cert # DBA Owner/ Builder Job Description
0510-0102-01 FIN EP 18609 MAURICE ELECTL INC
0510-0102-02 FIN PP 8352 MEEKS PLUMBIN INC
0510-0102-03 FIN ME 10363 NISAIR AIR COND TIONING
0510-0102-04 FIN RP 20108 1 A TAYLOR ROOI�ING INC change roof from 16911 to 20108
INSPECTIONS - For Requests, Call: (772) 462-1261
Permit # Code Description Priority Date Sched.1 Res Description Inspecto Date Insp.
0510-0102 106 Engineers Report 0- 05/30/2007 50 Engineer Approval Acc Ken Arnold 05/30/2007
**5/30/07 Recieved engineer report dated May 23,2007 regarding he insulation (141) window/door attachment (148) and drywall screw
(147) , gave to Ken Arnold to review (boones)***
0510-0102 108 Engineer Letter 0 50 Engineer Approval Acc Ken Arnold 10/19/2007
PER ENGINEER ELECTRICAL INSPECTION DATED 10/11/07
ELECTRIC SERVICE POWER RELEASE INSPECTION. SERVICE, METERS, PANELS, AND ELEVATOR EQUIP. OK.
OK TO RELEASE POWER ELECTRIC CONTRACTOR TO CONTI�01- CIRCUIT ENERGIZING SCHEDULE.
0510-0102 147 Drywall 0 05/29/2007 50 Engineer Approval Acc Ken Arnold 05/29/2007
FIREWALL WEST SIDE OF WALL (2ND LAYER OF DRYWALL) AS APPROVED.
0510-0102 147 Drywall 0 05/30/2007 50 Engineer Approval Acc Ken Arnold 05/30/2007
0510-0102 147 Drywall 0 06/11/2007 50 Engineer Approval Acc Ken Arnold 06/11/2007
PER ENGINEER INSPECTION REPORT DATED 5/24/07 FOR FIR WALL WEST SIDE OF WALL (2ND LAYER OF DRYWALL) AS
APPROVED BY JAMES PARKER BN4597
0510-0102 147 Drywall 0 05/29/2007 50 Engineer Approval Acc Ken Arnold 05/29/2007
APPROVED AS NOTED BULD NO. 1 DRYWALL SCREW.
0510-0102 147 Drywall 0 07/11/2007 50 Engineer Approval Acc Ken Arnold 07/11/2007
DRYWALL SCREW INSPECTION FOR OFFICE 1 ST AND 2ND FLOOR ONLY/ WAREHOUSE NOT READY/////PARTIAL
APPROVED////JAMES PARKER BN4597
0510-0102 147 Drywall 0 07/16/2007 � 50 Engineer Approval Acc Ken Arnold 07/16/2007
PER ENGINEER INSPECTION REPORT DATED 7/16/07 FOR PHASE 1 1 ST LAYER DRYWALL COMPLETED AS A PASS.
0510-0102 147 Drywall 0 07/17/2007 � 50 Engineer Approval Acc Ken Arnold 07/1712007
I Permit Nun] 10510-0102
PER ENGINEER INSPECTION REPORI�,, JED 7/117/07 FOR P�HASE 1 DRYWALL COMPLETE SS)
0510-0102 147 Drywall 0 07/30/200 1 50 Engineer Approval Acc Ken Arnold 07/30/2007
PER tNGINEER LETTER DATED 7/17/07 FOR PHASE 1 DRYWALL COMPLETE.
0510-0102 161 Utilities 0 92 Accepted As Noted Ken Arnold 12/2612007
* PER DAVE MILLARD WITH FPUA.
0510-0102 170 Fire Penetrations 0 07/06/20071 50 Engineer Approval Acc Ken Arnold 07/0612007
PER ENGINEER INSPECTION REPORT DATED 6/20/07 FOR OFFICE LOCATION 1ST FLOOR APPROVED AS NOTED.
0510-0102 103 Eufer Ground 1 10/27;20061 90 Approved Scott Aftey 10/27/2006
null
Scheduled: Tue Oct 24 16:42:22 EDT 2006 with value: null -
Scheduled: Thu Oct 26 11:25:48 EDT 2006 with value: Fri Oct 27 00:00:00 EDT 2006 RECEIVED ENGINEERS REPORT NO. 2 DATED
NOVEMBER 27,2006 PERTAINING TO INSPECTIONS DONE ON 10/24/2006 REFERENCING 3/0 CU CONNECTED TO BUILDING
FOOTER STEEL PHASE 1 (NORTH BUILDING) WITH A RESU LIT OF PASS.
0510-0102 103 Eufer Ground 1 10/27/20061 90 Approved Private Provider 10/27/2006
0510-0102 104 Compaction Test 1 10/1
0510-0102 106 Engineers Report 1 02/12/20071
PER ENGINEERS TILT -UP WALL PANEL INSPECTION DATED,
PANEL CONNECTION. FOR A REPORT OF STRUCTURAL STE
GIRIDER/BEAM TO PERIMETER WALL, BAR JOIST TO BEAM/,'
PERIMETER DECK ANGLE.
0510-0102 106 Engineers Report 1 10/27/2006�
0510-0102 106 Engineers Report 1 11/01/2006
0510-0102 106 Engineers Report 1 11/20/2006
0510-0102 106 Engineers Report 1 11/13/2006
same REPORT AS 10/27/06
0510-0102 106 Engineers Report 1 11/14/2006
0510-0102 106 Engineers Report 1 12/08/2006
RECEIVED ENGINEERS REPORT NO. 3, DATED NOVEMBER
ELEVATOR PIT WALLS TO BOTTOM OF THICKENED SLAB W
0510-0102 106 Engineers Report 1 12/08/2006
RECEIVED ENGINEERS REPORT NO. 4 DATED NOVEMBER
FLOOR BATHROOMS (4) TOTAL (2) ON GRID LINE C AND (2)
0510-0102 106 Engineers Report 1 01/08/2007
ACCEPTED SUMMARY OF INSPECTIONS/STATL
PANELS 2 THRU 28. K.ARNOLD
0510-0102 106 Engineers Report 1 01/23/2007
FOR INSPECTIONS DONE ON 12/29/2006 AND 01/08/2007. (1
26,27,28,59,2,3,4,5,6,7,8,9,10,30,31,11,12,13,14,16,17,18,19,20,
BOX OUTS AT BOTTOM OF PANEL. (01/0812007) --- PASS PAN
90 Approved Karen Neal 10/17/2006
50 Engineer Approval Acc Ken Arnold 02/12/2007
2/12/07 FOR NORTH BUILDING PHASE I AS A PASS FOR PANEL TO
EL INSPECTION ALSO A PASS FOR BEAM TO COLUMNS,
DIST GIRDER, BAR JOIST TO WALL, BRIDGING & BRACING,
90 Approved Bill Logsdon 10/27/2006
90 Approved BillLogsdon 11/01/2006
90 Approved BillLogsdon 11/20/2006
90 Approved 11/14/2006
90 Approved BillLogsdon 11/14/2006
92 Accepted As Noted Private Provider 12/08/2006
27,2006 PERTAINING TO INSPECTION DONE 10/31/2006 FOR
TH A RESULT OF PASS.
92 Accepted As Noted Private Provider 12/08/2006
7,2006 PERTAINING TO INSPECTION DONE ON 11/17/2006 FOR IST
PN GRID LINE E. WITH A RESULT OF PASS (PARTIAL) -
1 50 Engineer Approval Acc Ken Arnold 01/08/2007
(PASS) RECEIVED IN OUR OFFICE 01/08/2007 PERTAINING TO
0510-0102 106 Engineers Report 1 02/01/2007
ACCEPTED ENGINEER APPROVAL LETTER DATED JANUARN
35, 38, 41, 44, 47, 48 AND 5 1.
0510-0102 106 Engineers Report 1 02/05/2007
PER ENGINEERS LETTER DATED 2/2/07 FOR EXTERIOR WA
PLATES AND BOLTED TO FOOTERS. (PASS)
0510-0102 106 Engineers Report 1 02/05/2007
PER ENGINEERS LETTER DAT3D 1/15/07 FOR VERTICAL LE
0510-0102 106 Engineers Report 1 02/16/2007
ACCEPTED ENGINEERS REPORT FOR A PASS ON THE ROOF
0510-0102 106 Engineers Report 1 02/19/2007
PER ENGINEER REPORT FOR TILT -UP WALL PANEL INSPECI
DUMPSTER CONTAINMENT WALLS PANELS 1, 2,3,4 AND 5,4
0510-0102 106 Engineers Report 1 02/22/2007
PER TILT -UP WALL PANEL INSPECTION DATED 2/2/07 FOR E,
PANEL EMBEDDED PLATES AND BOLTED TO FOOTERS AS A
0510-0102 106 Engineers Report 1 02/22/2007
PER REPORT OF CAST IN PLACE CONCRETE AND REINFOR(
AND DUMPSTER WALL FOOTERS WF-24 AS A "PASS".
0510-0102 106 Engineers Report 1 03/05/2007
PER TILT UP WALL PANEL INSPECTION DATED 3/5/07. LOAD]
REPORT OF METAL FRAMING AND EXTERIOR SHEATHING IN
GALV. STUD FRAMING AT (3) ROOF TOWER ENCLOSURES Al
0510-0102 106 Engineers Report 1 03/05/2007
50 Engineer Approval Acc Ken Arnold 01/23/2007
'28/2006) ---- PASS 25,
1,22,23,24 AND 15. PASS ALL EXCEPT PANEL 15. THERE ARE 7
L 15.
50 Engineer Approval Acc Ken Arnold 02/01/2007
23,2007 FOR PASS INSPECTIONS FOR VERTICAL LEG PANELS 34,
50 Engineer Approval Acc Ken Arnold 02/05/2007
PANELS ANGLE ATTACHMENTS WELDED TO PANEL EMBEDDED
50 Engineer Approval Acc Ken Arnold 02/05/2007
PANEL 34,35, 38, 41,44,47, 48 AND 51. (PASS)
50 Engineer Approval Acc Ken Arnold 02/16/2007
DECKING INSTALLATION DATED 2/15/07
50 Engineer Approval Acc Ken Arnold 02/19/2007
']ON FOR LOADING DOCK PANELS 54,55,56,57,58 AND
S A PASS DATED 2/16/07.
50 Engineer Approval Acc Ken Arnold 02/2212007
'TERIOR WALL PANELS ANGLE ATTACHMENTS WELDED TO
"PASS".
50 Engineer Approval Acc Ken Arnold 02/22/2007
�ED MASONRY INSPECTION DATED 2/20/07 FOR LOADING RAMP
50 Engineer Approval Acc Ken Arnold 03/05/2007
G RAMP AND DUMPSTER CONTAINMENT WALLS (PASS).
;PECTION REPORT DATED 3/5/07 FOR METAL FRAMING. 18 GU.
D 20 GA FRAMING ABOVE MECHANICAL ROOM (PASS)
50 Engineer Approval Acc Ken Arnold 03/05/2007
I Permit Nunj 10510-0102
PER ENGINEER STRUCTURAL STEEL"t, _,�'ECTION DATED 2/28/07 FOR REINSPECT MEZ2_ .'E BARJOIST INSTALLATION AND
COMPLETE COLUMN BASE PLATE ATTACHMENTS. (PASS) FOR INSPECTION THAT FAILED 2/27/07
0510-6102 106 Engineers Report 1 03/05/2007 50 Engineer Approval Acc Ken Arnold 03/05/2007
PER ENGINEER REPORTS DATED 2/7/07,2/12/07,2/15/07 A�D 2/16/07.
'0510-0102 106 Engineers Report 1 03/07/2007 50 Engineer Approval Acc Ken Arnold 03/07/2007
PER ENGINEER INSPECTION REPORT DATED 3/6/07 FOR D I ECK PREPARATION, W.W.M OK TO POUR MEZZANINES. PER
REPORT FOR STRUCTURAL STEEL INSPECTION MEZZANINI ES METAL DECK INSTALLATION (PASS)
1
0510-0102 106 Engineers Report I U.J/1zlzuut 50 Engineer Approval Acc Ken Arnold 03/12/2007
PER ENGINEERS INSPECTION REPORT DATED 3/9/07 FOR �OWER WALL SHEATHING AND IN PROGRESS INSPECTION OF
BUILT-UP ROOF INSTALLATION. (APPROVED)
0510-0102 106 Engineers Report 1 03/22/2007 92 Accepted As Noted Ken Arnold 03/2212007
3/22/07 recieved private provider report jorwarded to ken arnol� RECEIVED ENGINEERS REPORT FOR EXTERIOR SHEATHING
INSPECTION WHICH FAILED CONCERNING THE RED IRON ANGLES WELDED TO TOWER ROOF BEAM FOR TRUSS TIE DOWN.1)
WELDING NOT COMPLETED PER DETAIL. 2) DETAILS TO BE SIGNED AND SEALED BY ENGINEER OF RECORD.
0510-0102 106 Engineers Report 1 03/22/2004,1 50 Engineer Approval Acc Ken Arnold 03/22/2007
PER ENGINEERS REPORT DATED 3/5/07 FOR LOADING RAMP AND DUMPSTER CONTAINMENT WALLS. (PASS). REPORT DATED
3/5/07 FOR METAL FRAMING OF 18 GA. GALV.STUD FRAMI�G AT (3) ROOF TOWER ENCLOSURES AND 20 GA FRAMING ABOVE
MECHANICAL ROOM.(PASS)3/6/07 FOR METAL DECK --- MEZZANINES METAL DECK INSTALLATION (PASS).3/6/07 FOR ELEVATED
SLAB DECK PREPARATION, W.W.M OK TO POUR MEZZANIOES. (PASS)3/g/07 FOR WALL SHEATHING AND ROOF IN
PROGRESS --TOWER WALL SHEATHING AND IN PROGRESS INSPECTION OF BUILT-UP ROOF INSTALLATION OK.
0510-0102 106 Engineers Report 1 04/27/200�i 50 E ineer Approval Acc Ken Arnold 04/27/2007
O� ng
PER ENGINEER REPORT DATED 4/10/07 FOR ROLL -UP D RS. DEFICIENCIES OBSERVED.
0510-0102 106 Engineers Report 1 04/27/20071 50 Engineer Approval Acc Ken Arnold 04/27/2007
PER ENGINEER REPORT DATED 4/18/07 FOR WINDOW & DOOR INSTALLATION WITH A PARTIAL PASS.
0510-0102 106 Engineers Report 1 04/27/20071 50 Engineer Approval Acc Ken Arnold 04/27/2007
PER ENGINEER REPORT DATED 4/19/07 FOR ROOF SHEATHING FOR SOUTH AND MIDDLE TOWER.
0510-0102 106 Engineers Report 1 05/08/2007� 50 Engineer Approval Acc Ken Arnold 05/08/2007
PER ENGINEER EXTERIOR SHEATHING INSPECTION REPO T DATED 4/23/2007 FOR ROOF SHEATHING COMPLETE PHASE 1.
0510-0102 106 Engineers Report 1 05/29/2007� 50 Engineer Approval Acc Ken Arnold 05/29/2007
PER ENGINEER INSPECTION REPORT DATED 6/11/07 FOR UILDING 1 FIVE WALL ELECTRIC OUTLETS ROUGH -IN. DRYWALL
SCREW INSPECTION EAST SIDE OF FIREWALL 1 ST LAYER OF 5/8 GYPSUM BOARD AS A PASS.
0510-0102 106 Engineers Report 1 04/27/2007
PER ENGINEER REPORTS DATED 4/5/07 FOR WORK IN PRC
0510-0102 106 Engineers Report 1 04/27/2007
PER ENGINEER REPORT DATED 4/10/07 FOR ALL TRUSSES
50 Engineer Approval Acc Ken Arnold 04/27/2007
SS FON THE WINDOWS AND TRUSS TO TRUSS
50 Engineer Approval Acc Ken Arnold 04/27/2007
EPT WEST END.
0510-0102 106 Engineers Report 1 06/20120071 50 Engineer Approval Acc Ken Arnold 06/20/2007
PER ENGINEER ELECTRICAL INSPECTION REPORT DATED /18/2007 FROM INSPECTOR BILL DAVISON BN 1366 FOR EXTERIOR
ENTRYWAY CEILINGS HI HAT LIGHTS AND FIVE SPRINKLER OKTO COVER. CEILINGS OVER PERSONNEL ENTRIES. (PASS)
0510-0102 106 Engineers Report 1 06/21/20071 50 Engineer Approval Acc Ken Arnold 06/21/2007
PER ENGINEER ELECTRICAL INSPECTION REPORT DATED P/20/2007 FOR ELECTRIC ROUGH WEST END TENANT BUILD OUT
ONLY AS A PASS, PANEL NOT MADE UP. NEED AS BUILT REVISED DRAWINGS PER BILL DENISON BN1366
0510-0102 106 Engineers Report 1 06/21/2007 1 50 Engineer Approval Acc Ken Arnold 06/21/2007
PER ENGINEERS REPORT DATED 6/20/2007 FOR FRAMING A, ND FIRE PENETRATIONS IN OFFICE LOCATION I ST FLOOR. AS
APPROVED AS NOTED .... PROVIDE UL FOR METAL DECK & JOIST ASSEMBLY.
0510-0102 106 Engineers Report 1 07/24/2007 1 1 50 Engineer Approval Acc Ken Arnold 07/24/2007
RECEIVED ENGINEER REPORTS DATED 7/9107, 7/10/07, 7/16107 AND 7/17/07.
0510-0102 106 Engineers Report 1 1 50 Engineer Approval Acc Ken Arnold 10/11/2007
PER ENGINEER ELECLRICAL INSPECTION REPORT DATED OCT. 11, 2007 FOR ELECTRIC SERVICE POWER RELEASE
INSPECTION. SERVICE, METER, PANELS AND ELEVATOR E�UIP. OK. PER BILL DENISON BN1366.
0610-0102 110 Footer/Foundation 1 10/27/2006
PHASE 1 NORTH BLD FOOTER AN COLUMN PADS ELEVATC
0510-0102 110 Footer/Foundation 1 10/27/2006
null
Scheduled: Thu Oct 26 11:23:36 EDT 2006 with value: Fri Oct 27
NOVEMBER 27,2006 PERTAINING TO INSPECTIONS DONE 0
PERIMETER FOOTER, INTERIOR COLUMN FOOTERS AND EL
CLARIFICATION FROM ARCH. OR ENGINEER FOR F-84 DESIC
0510-0102 115 Slab 1 11/30/2006
GROUNS SLAB COMPLETE FOR PHASE 1 (NORTH BUILDING:
SECOND NOTICE DATED 12/20/2006 FOR INSPECTION DONE
(NORTH BUILDING). K.ARNOLD 12/20/2006.
0510-0102 119 Sternwall 1 11/01/2006
ELEVATOR PIT WALLS
0510-0102 420 Plumbing Rough 1 11/22/2006
92 Accepted As Noted BillLogsdon 10/27/2006
PIT
90 Approved Scott Attey 10/27/2006
00:00:00 EDT 2006 RECEIVED ENGINEER REPORT 1 DATED
N 10/24/2006. PHASE 1 (NORTH BUILDING) CONTINUOUS
EVATOR PIT FLOOR. RESULTS (PASS) WITH NOTES: 1) PROVIDE
'NATED AT GRID LINES (FA).
50 Engineer Approval Acc Ken Arnold 11/30/2006
PER INSPECTOR LOUNSBERRY. (PRIVATE PROVIDER) RECEIVED
ON 11/30/2005 STATING GROUND SLAB COMPLETE FOR PHASE 1
90 Approved Private Provider 11/01/2006
50 Engineer Approval Acc Ken Arnold 11/22/2006
lPermit Nun 10510-0102
PER ENGINEER INSPECTION REPORT _,'ED 5/17/2007 FO�
NORTH BUILDING PHASE 1 1 NALL INSULATION PER RATED
U.L. ASSEMBLY WP1 522 AS A PASS.
0510-6102 148 Window/Door Attachment 5 05/29/2007
50 Engineer Approval Acc Ken Arnold 05/29/2007
APPROVED AS NOTED BUILDING NO. 1 OVEERHEAD DOOJ
ATTACHMENT. PROVIDE REVISED ENG. LETTER FOR'L'ANGLE
ATTACHMENT TO WALL.
0510-0102 167 Roof Final 5 11/19/2007
50 Engineer Approval Acc Ken Arnold 11119/2007
PER ENGINEER'S INSPECTION REPORT DATED 11/13/2007
OR NORTH BLDG PHASE 1 FINAL ROOF INSPECTION ASA PASS
APPROVED BY DAVID LOUNSBUERY BN3026Re-inspection 1
0510-0102 167 Roof Final 5 11/21/2007
50 Engineer Approval Acc Ken Arnold 11/2112007
PER ENGINEER INSPECTION REPORT DATED 11/13/07AS
PASS
NORTH BLDG PHASE 1 FINAL ROOF INSPECTION. .
0510-0102 179 Firewall 5 05/22/200
50 Engineer Approval Acc Ken Arnold 05/29/2007
PER INSPECTION REPORT DATED 5/17/2007 FOR NORTH BUILDING
PHASE 1 FIRE WALL INSULATION PER RATED U.L.
ASSEMBLY WP1 522 AS A PASS.
0510-0102 238 Electric Rough 5 051 1412_001�
50 Engineer Approval Acc Ken Arnold 05/14/2007
PER ENGINEER INSPECTION REPORT DATED 5111/07 FOR
UILDING 1 FIRE WALL ELECTRIC OUTLETS ROUGH -IN. DRYWALL
SCREW INSPECTION EAST SIDE OF FIRE WALL I ST LAYERI
OF 5/8 GYPSUM BOARD AS A PASS.
0510-0102 238 Electric Rough 5
PER ELECTRICAL INSPECTION REPORT DATED 9/27/071
DENISON BN1366
0510-0102 238 Electric Rough 5
PER ENGINEER REPORT DATED 9/27/07 FOR BULDING I
BN1366
50 Engineer Approval Acc Ken Arnold 10/08/2007
BUILDING 1 OFFICES CEILING ROUGH AS A PASS PER BILL
50 Engineer Approval Acc Ken Arnold 09/28/2007
S CEILING ROUGH AS A PASS BY INSPECTOR BILL DENISON
0510-0102 238 Electric Rough 5 07/06/2007'1 50 Engineer Approval Acc Ken Arnold 07106/2007
PER ENGINEER INSPECTION REPORT DATED 6/18/07 FOR EXTERIOR ENTRYWAY CEILINGS HIHAT LIGHTS AND FIRE
SPRINKLERS OK TO COVER. CEILINGS OVER PERSONNELI ENTRIES AS A PASS.//////INSPECTION REPORT DATED 6/20/07
0510-0102 260 30 Day for Testing 5 10/17/200
10/16/07 window schedule with bob/ contr.bac
0510-0102 280 Electric Final 5 12/10/200
PER ENGINEER REPORT OF ELECTRICAL INSPECTION: D
INSPECTOR BILL DENISON BN#1366
0510-0102 351 Mechanical Rough-In(ducl 5 07/06/200
PER ENGINEER INSPECTION REPORT DATED 6/21/07 FOR
90 Approved Van Whitaker 10/17/2007
50 Engineer Approval Acc Ken Arnold 12/10/2007
12/10107 FOR PHASE I FINAL ELECTRIC AS A PASS.
50 Engineer Approval Acc Ken Arnold 07/06/2007
'H BUILDING PHASE 1 MECH ROUGH NOT READY FAIL.
0510-0102 351 Mechanical Rough-In(ducl 5 07/' 1/2'071 81 Disapproved Private Provider
NORTH BLDG PHASE I DUCT ROUGH ..... /NFAIL/h / 1 �3 PROVI E APPROVED AS-BUILTS BY MECH ENG. 2) FINISH INTAKE AIR TO
UNIT (5) 3) PROVIDE R/H OR TRANSFER AIR TO 2ND FLOO OFFICES 4) DATA/COMMUNICATION ROOMS S/A & r/A?
0510-0102 351 Mechanical Rough-In(ducl 5 50 Engineer Approval Acc Ken Arnold 09/28/2007
PER ENGINEER REPORT DATED 9/27/07 FOR A PARTIAL FI AL MECH FOR ABOVE CEILING FLEX DUCT CONNECTIONS AS A
PARTIAL PASS 1) PROVIDE APPROVED AS-BUILTS BY INSP CTIOR LOUNSBERRY BN3026
0510-0102 351 Mechanical Rough-In(ducl 5 08/08/2007 81 Disapproved Private Provider 08/08/2007
Re -inspection 2////PER ENGINEER MECHANICAL INSPECTION, REPORT DATED 7/31/07 FOR NORTH BLDG PHASE 1 DUCT
ROUGHA) PROVIDE APPROVED AS-BUILTS BY MECH ENG. 2) FINISH INTAKE AIR TO UNIT (5) 3) PROVIDE R/A OR TRANSFER
AIR TO 2ND FLOOR OFFICES 4) DATA/COMMUN [CATION RdOMS S/A & R/A.. INSPECTION RESULTS IS A FAIL.
0510-0102 351 Mechanical Rough-In(ducl 5 1 60 Engineer Approval Acc Ken Arnold 09/11/2007
Re -inspection 3NPER ENGINEER INSPECTION REPUK I UA I tU 9/7/07 FOR PHASE I MECHANICAL ROUGH INSPECTION AS A
PASS. DAVID LOUNSBERRY BN3026 I
0510-0102 351 Mechanical Rough-In(ducl 5 'TION AS A P
RECEIVED FINAL MECHANICAL ROUGH INSPEC
0510-0102 351 Mechanical Rough-In(ducl 5
0510-0102 351 Mechanical Rough-In(ducl 5
PHASE I MECHANICAL ROUGH INSPECTION ----- PASS----
1) PROVIDE SIGNED & SEALED, REVIEWED AS-BUILTS FOR
0510-0102 380 Mechanical Final 5 12/13/2007
PER ENGINEER REPORT DATED 12/12/2007 FOR FINAL MEC
LOUNSBURY BN 3026Re-inspection 1
0510-0102 380 Mechanical Final 5
PARTIAL FINAL MECH. FOR ABOVE CEILING FLEX DUCT COf
9/27/2007 FROM DAVID LOUNSBERRY BN3026
50 Engineer Approval Acc Ken Arnold 09/14/2007
. DATED 9/13/2007 FROM DAVID LOUNSBERRY BN3026
50 Engineer Approval Acc Ken Arnold 09/21/2007
50 Engineer Approval Acc Ken Arnold 09/21/2007
MECHANICAL INSPECTION
50 Engineer Approval Acc Ken Arnold 12/13/2007
ICAL INSPECTION PHASE 1 AS A PASS BY INSPECTIOR DAVID
91 Partial Approval Private Provider 10/08/2007
'TIONS PER MECHANICAL INSPECTION REPORT DATED
0510-0102 423 Plumbing Top Out 5 07/02/2007 1 50 Engineer Approval Acc Ken Arnold 07/02/2007
PER ENGINEER INSPECTION REPORT DATED 6/28/.07 FOR NORTH BUILDING PHASE 1 2ND ROUGH PLUMBING AS A PASS 1)
PROVIDE ACCESSIBLE MAIN SHIUT-OFF FOR SUPPLY WATER AT EXTERIOR FOR FINAL. 2) RE-ROUTE WATER SUPPLY ABOVE
CEILING HUNG A/C UNIT NO WATER PIPING ABOVE ELECTRICAL APPLIANCE OR INSTAL PAN PIPED TO DRAIN FOR FINAL
0510-0102 423 Plumbing Top Out
Re -inspection 3
50 Engineer Approval Acc Ken Arnold 10/08/2007
jPermit Nun 10510-0102
ACCEPTED ENGINEERS REPORT TO !PLETE LINDE
RESULTS OF INSPECTION: PASS. DATED 11/21/2006. R
COM.PLETE UNDERGROUND PLUMBING ROUGH FOR P
0510-0102 420 Plumbing Rough 1 11/14/:
U510-0102 420 Plumbing Rough 1 07/10/200
NORTH BUILDING PHASE 1 2ND ROUH PLUMBING ... /////PA
AT EXTERIOR FOR FINAL. 2) RE-ROUTE WATER SUPPLY/
APPLIANCE OR INSTALL PAN PIPED TO DRAIN FOR FINAL.
0610-0102 427 Temp.Toilet/Temp Culvert 1 11/14/200
0510-0102 104 Compaction Test 2 12/OE
0510-0102 105 Form Board Survey 2 12/01
OOND PLUMBING ROUGH F0 ASE 1 (NORTH BUILDING).
IVED DUPLICATE INSPECTION REPORT WITH A "PASS" TO
E 1 (NORTH BUILDING) 12/20/2006. KARNOLD
90 Approved Private Provider 11/14/2006
0510-0102 106 Engineers Report 2 04/12/20071
4/12/07 recieved engineers report dated 4/4/07 forwarded to Ke�
INSPECTION. PROVIDE PRODUCT APPROVAL FOR WINDO
OF CENTER LINE 3.5" AND 2" O.C.
0510-0102 106 Engineers Report 2 03/12/20011
PER ENGINEERS REPORT NO. 13 FOR BAR JOISTS FOR ME2
AND (2) BAR JOIST RED IRON SUPPORT ANGLE AT SW COR�
REPORT (2/28/07) REINSPECT MEZZANINE BARJOIST INST�
(PASS). PARTIAL INSPECTION ON ROOF IN PROGRESS (2/28
INSPECTION DATED 3/1/07 PHASE I --- CONDUCT PREINSTAL
PER AISC 13TH EDITION, 16.2-43.
0510-0102 106 Engineers Report 2 03/09/2007
PER ENGINEER LETTER DATED MARCH 1, 2007 FOR INSPEC
WALL FOOTERS WF-2Y, (12) INTERIOR 8'X8'COLUMNS BASE
0510-0102 108 Engineer Letter 2 02/13/2007
PER ENGINEER LETTER FOR TILT -UP WALL PANEL INSPECI
32 AND 61. PASS ALL EXCEPT PANEL 61. 2 BOX OUTS IN CC
0510-0102 115 Slab 2 04/2712007
THIS SLAB INSPECTION IS FOR TILT WALL///////PER ENGINEE
SLAB AND LOADING RAMP.
0510-0102 121 Termite Spray 2 12/01/2006
0510-0102 148 Window/Door Attachment 2 04/04/2007
null
Scheduled: Mon Mar 26 15:30:55 EDT 2007 with value: null
Scheduled: Mon Mar 26 15:33:46 EDT 2007 with value: null PEI
APPROVAL FOR WINDOWS. 12 TAPCONS IN SILL 3 EACH EN
0510-0102 148 Window/Door Attachment 2 04/27/2007
PER ENGINEER REPORT DATED 4/10/07 FOR ALL WINDOWS
0510-0102 413 Pipe Test 2 11/20/2006
barhroom 2 on grid c and to 2on grid e 1ST FLOOR
50 Engineer Approval Acc Ken Arnold 07/10/2007
1) PROVIDE ACCESSIBLE MAIN SHUT-OFF FOR SUPPLY WATER
: CEILING HUNG A/C UNIT NO WATER PIPING ABOVE ELECTRIC
92 Accepted As Noted BillLogsdon 11/14/2006
90 Approved Karen Neal 12/06/2006
90 Approved Diane Flanigen
50 Engineer Approval Acc 04/12/2007
Arnold PER ENGINEER REPORT DATED APRIL 4,2007 FOR SILL
S. 12 TAPCONS IN SILL, 3 EACH END 4.5" AT 2"O.C., 3 EACH SIDE
0510-0102 413 Pipe Test 2 04/27/2007
Re-inspectionl PER ENGINEER REPORT DATED 11/21/06ANE
FOR PHASE I (NORTH BUILDING). PASS BY DAVID LOUNSBE
(2) ON GRIDLINE E..
0510-0102 116 2nd Floor Slab 4 04/27/2007
INSPECTION FOR MEZZINE FLOOR PER ENGINEER REPORT
MEZZANINES PER DAVID LOUNSBURY.
Scheduled: Wed Mar 7 10:15:26 EST 2007 with value: null
0510-0102 133 Window/Door Bucks 5 12/17/2007
0510-0102 135 Wall Sheathing 5 07/02/2007
PER ENGINEER INSPECTION REPORT DATED 6/28/07 FOR C
A PASS.
0510-0102 135 Wall Sheathing 5 07/10/2007
PER ENGINEER INSPECTION REPORT DATED 6/28/07 FOR C
A PASS...
0510-0102 136 Roof Dry-in/Tin Tab 5 07/06/2007
0510-0102 140 Construction Rough Frami 5 07/06/2007
PER ENGINEER INSPECTION REPORT DATED 6/18/07 FOR
0510-0102 141 Insulation 5 05/30/2007
50 Engineer Approval Acc 03/12/2007
4INES.(FAIL) 1) REMOVE SLAG FROM WELDS FOR INSPECTION
t LOCATION NOT WELDED COMPLETE. (2/27/07) NEXT
TION AND COMPLETE COLUMN BASE PLAATE ATTACHMENTS.
AND ROOF IN PROGRESS (2/29/07) AS APPROVED.
'ION VERIFICATION OF BOLTS AND INSTALLATION METHODS
50 Engineer Approval Acc Ken Arnold 03/09/2007
riON DONE ON 2/20/07 FOR LOADING RAMP AND DUMPSTER
PLATES GROUTED. (PASS)
50 Engineer Approval Acc Ken Arnold 02/13/2007
ON DATED 1/11/07 FOR PANEL 34, 35, 38, 41, 47, 48, 51, 53, 60, 62,
.UMN. EOR TO ADVISE.
50 Engineer Approval Acc Ken Arnold 04/27/2007
Z REPORT DATED 4/10/07 FOR SLAB ON GRADE FOR DUMPSTER
90 Approved Ken Arnold 12/01/2006
50 Engineer Approval Acc Ken Arnold 04/04/2007
ENGINEER REPORT DATED 3/27/07 ---- PROVIDE PRODUCT
4.5" IN AND TO.C., 3 EACH SIDE OF CENTERLINE 3.5'AND 2'O.C.
50 Engineer Approval Acc Ken Arnold 04/27/2007
,RE COMPLETE FASTERNERS AS REQUIRED.
91 Partial Approval Private Provider 11/20/2006
50 Engineer Approval Acc Ken Arnold 04/27/2007
11/17/06 TO COMPLETE UNDERGROUND PLUMBING ROUGH
RY 1ST FLOOR BATHROOMS (4) TOTAL (2) ON GRID LINE C AND
50 Engineer Approval Acc Ken Arnold 04/27/2007
�TED 3/6/07 FOR DECK PREPARATION, W.W.M OK TO POUR
93 Not Required Private Provider 12/17/2007
50 Engineer Approval Acc Ken Arnold 07102/2007
qGS/SOFFIT SHEATHING AT EXTERIOR ENTRY LOCATIONS AS
50 Engineer Approval Acc Ken Arnold 07/10/2007
qGS/SOFFIT SHEATHING AT EXTERIOR ENTRY LOCATIONS. AS
50 Engineer Approval Acc Ken Arnold 07/06/2007
50 Engineer Approval Acc Ken Arnold 07/06/2007
qG FRAMING ABOVE ENTRY DOORS APPROVED AS NOTED.
50 Engineer Approval Acc Ken Arnold 05/30/2007
Permit Nu 10510-0102
0510-0102 423 Plumbing Top Out 5 07/06/2007, ' 50 Engineer Approval Ken Arnold 07/06/2007
PEER ENGINEER INSPECTION REPORT DATED 6/21/07 FOR NORTH BUILDING PHASE 1 2ND ROUGH PLUMB NOT READY FAIL
0510-0102 423 Plumbing Top Out 5 81 Disapproved Private Provider 09/28/2007
FOASE I NORTH BUILDING FINAL PLUMBING AS A FAIL
1)NEED TO COMPLETE INSTALLATION OF FIXTURES AND TOILET ROOM PARTITIONS TO VERIFY REQUIRED CLEARANCES.
0510-0102 480 Plumbing Final 5 12/13/200 50 Engineer Approval Acc Ken Arnold 12/13/2007
PER ENGINEER REPORT DATED 12/12/2007 FOR FINAL PLL MBING INSPECTION PHASE 1 AS A PASS BY INSPECTOR DAVID
LOUNSBURY. BN 3026Re-inspection 1
0510-0102 480 Plumbing Final 5 81 Disapproved Private Provider 10/08/2007
PER PLUMBING INSPECTION REPORT DATED 9/27/07 AS A FAIL
1) NEED TO COMPLETE INSTALLATION OF FIXTURES AND TOILET ROOM PARTITIONS TO VERIFY REQUIRED CLEARANCES.
PER DAVID LOUNSBERRY BN3026
0510-0102 500 Smoke Draft Stop 5 50 Engineer Approval Acc Ken Arnold 12117/2007
PER ENGINEER REPORT 92 Accepted As Noted Barbara Counsello 10/11/2007
0510-0102 259 Power Release Form 7
sub contr hold needs to contact contr lic dept. recvd faxed power, release form.1 0/11/07 bac
0510-0102 800 Address Final 7 12/17/2007 50 Engineer Approval Acc Ken Arnold 12/17/2007
PER ENGINEER INSPECTION REPORT DATED 121/14/2007 D�VID LOUNSBURY BN3026
1
0510-0102 165 Handicap Restrooms 8 12/18/2001 81 Disapproved Scott Attey 12/18/2007
THE DOOR CLOSERS MUST MEET ADA REQIERMENTS f SVYEEPS FROM 70 DEGREES WILL TAKE #3 SECONDS TO MOVE WITH
IN #3 INCHES OF THE LATCH.,AND THE OPENING FORCE USTNOTBE GREATER THAN 5 LBS.
0510-0102 165 Handicap Restrooms 8 12/20/200 90 Approved Scott Attey 12/20/2007
Re -inspection I
Resulted: Thu Dee 20 13:54:12 EST 2007
0510-0102 172 Hurricane Panels (shutterf 8 12/17/200 93 Not Required Private Provider 12/17/2007
PER ENGINEER INSPECTION REPORT DATED 12/14/2007 ' HURRICANE PANELS NOT NEEDED AS WINDOWS ARE IMPACT
RESISTANT. DAVID LOUNSBURY BN3026
0510-0102 180 Building Final 8 12/18/20JI 81 Disapproved Scott Attey 12/18/2007
ALL DOOR CLOSERS REQUIRED FOR ADA EXTERIOR DOORS MUST MEET THE CODE, SWEEPS FROM 70 DEGREES WILL
TAKE #3 SECONDS TO MOVE WITH IN #3 INCHES OF THE LATCH AND HAVE AN OPENING FORCE NOT GREATER THAN 8.5 LBS.
*ALL EXIT DOORS WITH CRASH BARS MUST BE OPERATIC NAL.
0510-0102 180 Building Final 8 12/20/2007 90 Approved Scott Attey 12/20/2007
Re -inspection 1
0510-0102 261 30 Day Expired 8 12/26/2007 90 Approved Ken Arnold 12126/2007
0510-0102 700 ITAM—De-plo 2jM 90 Approved
.MW�� 8 4,2/,I�W_20 ' Mike Matthy 12/26/2007
0510-0102 801 Paving and Drainage Certi 8 12/18/2(
12/18/07 partial pending as built engineering- per mike halter.
0510-0102 801 Paving and Drainage Certi 8 12/19/2(
Re -inspection 1
0510-0102 803 Parking/Handicap Sign &,' 8 12/1
0510-0102 808 Landscaping[Trees 8 12/18/2(
PARTIAL APPROVED WITH CONDITION THAT SHOCKING
SPECIES (IE LIVE OAKS WITHIN 60 DAYS 12/19/2007.
0510-0102 808 Landscaping/Trees 8
Re -inspection 2
0510-0102 996 Final Termite Treatment 8 12/18/2(
0510-0102 999 Final Inspection 8
per engineer letter dated December 18, 2007 from Christopher
0510-0102 808 Landscaping/Trees 9
FINAL ROOF INSPECTION ----- FAIL -----
1) PROVIDE PRODUCT APPROVAL FOR ROOF SKYLIGHTS
2) NEED TO COMPLETE SECURING GALVINIZED CAPS TO
3) NORTH BUILDING OVEFLOW SCUPPER AT EAST REGIC
91 Partial Approval Michael Halter 12/18/2007
90 Approved Michael Halter 12/19/2007
90 Approved Scott Attey 12/18/2007
91 Partial Approval Brian Pauley 12/19/2007
,ND OAKS BE REPLACED WITH HEALTHY APPROPRIATE
92 Accepted As Noted Amy Mott 12/26/2007
90 Approved Scott Attey 12/18/2007
12/26/2007
Throop BN4338 and Michael J. O'Connor PE 44082
81 Disapproved Private Provider 09/21/2007
�D TO BE SHUTTERED FOR NON -IMPACT GLAZED OPENING.
JRBS NOT BEING UTILIZED FOR EQUIPMENT.
IS OBSTRUCTED WITH MODIFIED FLASHING.
I Permit Nu 10510-0102 1