Loading...
HomeMy WebLinkAboutINSPECTION CARDDec 19 07 02:13p Code Compliance Division 2300 Virginia Avenue Ft. Flerae, ft 34"2 Phwe; (772) 452-1653 Fax; (772) 462-1143 httP.-Ifstlucieco.gOVICS Pernrit N SLC- 0510-0102 Conf# I Issued 08107/2005 Insp Area Job Lacatior 3200 ST LUCIE BLVD PHASE I Jurisdiction. St. Lucie County Parael: 1428-702-1492-00014 Subdiv, Son owner Runaways End LLG Project: JobDescrWoo NEW CONSTRUCTION-24,509 S 24,509 SF ALSO REF PARCEL 1428-702-15.r p.2 rlk*= 01fuz 4109FEUTION CARD TV": Building Commercial Mnsftr Nbr.; City FORT PIERCE Lot I Black 64 Double Foe No ucle Plaza S/D Unft 1 -load X Elev., Pl%oa4mav: 176F INDUSTRIAL WAREHOUSE W1 STOREFROW. PHASE I - BLK 65 Cararactal ROBERT BRYAN GOING TRIMCRAFT INC (561) 718-8756 1335 NEPTUNE DFI BOYNTON BEACH, FL 33426 Property Owne Runaway's End LLC (56 T) 71 "753 29 NE 4th AVS Delray Beach, FL, 3M3 - - --- SetbauM Lefl 96.00 Right 176.00 inspection Notes! PRIVATE PROVIDER STATES 11 FINALS FOR OUR INSPECTORS Front Rear 60.00 T THE BUILDING FWAL (180) IS A PASS. KEN SET UP Perrrdt Cart I ODA ()MMgr/ Builde job Deserlip-t 0510-0102-01 ISS EIP 18609 MAURICE ELECTRIC INC OBID-DID2-02 IS$ PP 8362 MEEKS PLUMBING INC Oslo-01102-03 Iss ME 10363 NISAIR AIR CONDITIONING DSID-0102-04 ISS RP 20108 J A TAYLOR ROOFINIS INC chark9efoollimm T6911 W20109 INSPECTIPNS - Par Permit Reg P9JgtWi:1-3r- —Pr Pa" so 0510-0102 Sol Paving and DralwileCertif 8 12MBM07 0510-M02 W3 ParkhofflandicapW&S 8 121711007 0510-OID2 GDS Final Termhe Tr9alment 8 112n8M007 wALOSID-0102 aG5 Landwapingfriaes a 1211M007 OSID-0102 165 Handtap Rastrimms; e 1211wom 051"102 700 Fire Department FhW a 1211&2007 051 Ml D2 180 BiAlding F:Inal 8 12dlaW07 OSI"ID2 201 30 Day EVired 6 12JI712007 051D�3102 am Adt"w Final 7 12M7=07 PEFI ENGINEER INSPECTION REPORT DATCO 12114=07 DA OW-0102 500 SmakeDmftftp 5 1211712007 PER ENGINEER REPORT 0510-DI02 133 VYirdow/D0orBud* 6 12117/RD07 0610-0102 172 HuMcane - Panels (srsatum) e 121117/21707 PER ENGINEER INSPECTION REPORT DATED 1 W 4MD07. HI RESISTANT. DAVID LOUNSOURY SN3026 0510-0102 MM Machanicil][Fmal S 121=007 PER ENGINEER REPORT DATED 12112=07 FOR FINAL MEC LOUNSBURY NN 3026ft-Inspaufto 1 0510-0102 480 PlumbIngFinal, 5 12113MOO7 PER ENGINEER FILFORT CIATED 121124W FOR PINAL PLUI LOUNSSURY. Re-impection I cc" up.sts, Call; (M) 4G2-12 Flee Desorlyfie I Date Inap 0 , i;,Omgv 0 Pending 0 Pendikigj 17 0 Pending .4#q 0 Pending_ 7-7 0 Pending r. b a Peryding - J-7 0 Pending 90 Engineer AFpfeval Accepted 28 12AW2007 LOUNSSURY EN3026 80 Engheer Appr" Amapted 28 1121172M7 03 Not RequirW 1ZJI7/N07 83 NotRaquired CP,1 '1211712007 ICANEPANEL.9 NOT NEEDED ASWNDOW5 Aft IMPACT 50 EnonserAppro%oal "led 28 12113007 IICAL INSPWTION PHASE I AS A PASS SY INSPECTiCIR DAVID, 5o Engineer Apprayal Accepted 28 12M�120(37 ia INSPECTION PHASE I AS A PASS BY IWECTOR OAVID e- I Code Compliance Division 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-1553 Fax: (772) 462-1148 http://stiucleco.gov/ce Permit#: SLC- 0510-0102 Conf #: 904 Issued 08/07/2006 Status: FIN Job Location 3200 ST LUCIE BLVD PHASE 1 Jurisdiction: St. Lucie County Parcel: 1428-702-1492-000/4 Subdiv: San Lu( Flood: X Elev: Flood Map: 176 Job Description: NEW CONSTRUCTION - 24,509 SF IN 24,509 SF ALSO REF PARCEL 1428-702-1537-0 Setbacks Left: 98.00 Right 176.00 INSPECTION CARD Type: Building Commercial Double Fee: No City: FORT PIERCE Lot: 1 Block: 64 Plaza S/D Unit 1 USTRIAL WAREHOUSE W/ STOREFRONT - PHASE I - BLIK 65 Front Inspection Notes: PRIVATE PROVIDER STATES THAT THE BUILDING FINAL (180) IS A PASS.. Rear: 60.00 Contractor ROBERT BRYAN GOING TRIMCRAFT INC (561) 718-8756 1335 NEPTUNE DR BOYNTON BEACH, FL 33426 Property Owner Runaway's End LLC (561) 718-8753 29 NE 4th Ave Delray Beach, FL 33483 SUBLPERMITS Permit # Status PT Cert # DBA Owner/ Builder Job Description 0510-0102-01 FIN EP 18609 MAURICE ELECTL INC 0510-0102-02 FIN PP 8352 MEEKS PLUMBIN INC 0510-0102-03 FIN ME 10363 NISAIR AIR COND TIONING 0510-0102-04 FIN RP 20108 1 A TAYLOR ROOI�ING INC change roof from 16911 to 20108 INSPECTIONS - For Requests, Call: (772) 462-1261 Permit # Code Description Priority Date Sched.1 Res Description Inspecto Date Insp. 0510-0102 106 Engineers Report 0- 05/30/2007 50 Engineer Approval Acc Ken Arnold 05/30/2007 **5/30/07 Recieved engineer report dated May 23,2007 regarding he insulation (141) window/door attachment (148) and drywall screw (147) , gave to Ken Arnold to review (boones)*** 0510-0102 108 Engineer Letter 0 50 Engineer Approval Acc Ken Arnold 10/19/2007 PER ENGINEER ELECTRICAL INSPECTION DATED 10/11/07 ELECTRIC SERVICE POWER RELEASE INSPECTION. SERVICE, METERS, PANELS, AND ELEVATOR EQUIP. OK. OK TO RELEASE POWER ELECTRIC CONTRACTOR TO CONTI�01- CIRCUIT ENERGIZING SCHEDULE. 0510-0102 147 Drywall 0 05/29/2007 50 Engineer Approval Acc Ken Arnold 05/29/2007 FIREWALL WEST SIDE OF WALL (2ND LAYER OF DRYWALL) AS APPROVED. 0510-0102 147 Drywall 0 05/30/2007 50 Engineer Approval Acc Ken Arnold 05/30/2007 0510-0102 147 Drywall 0 06/11/2007 50 Engineer Approval Acc Ken Arnold 06/11/2007 PER ENGINEER INSPECTION REPORT DATED 5/24/07 FOR FIR WALL WEST SIDE OF WALL (2ND LAYER OF DRYWALL) AS APPROVED BY JAMES PARKER BN4597 0510-0102 147 Drywall 0 05/29/2007 50 Engineer Approval Acc Ken Arnold 05/29/2007 APPROVED AS NOTED BULD NO. 1 DRYWALL SCREW. 0510-0102 147 Drywall 0 07/11/2007 50 Engineer Approval Acc Ken Arnold 07/11/2007 DRYWALL SCREW INSPECTION FOR OFFICE 1 ST AND 2ND FLOOR ONLY/ WAREHOUSE NOT READY/////PARTIAL APPROVED////JAMES PARKER BN4597 0510-0102 147 Drywall 0 07/16/2007 � 50 Engineer Approval Acc Ken Arnold 07/16/2007 PER ENGINEER INSPECTION REPORT DATED 7/16/07 FOR PHASE 1 1 ST LAYER DRYWALL COMPLETED AS A PASS. 0510-0102 147 Drywall 0 07/17/2007 � 50 Engineer Approval Acc Ken Arnold 07/1712007 I Permit Nun] 10510-0102 PER ENGINEER INSPECTION REPORI�,, JED 7/117/07 FOR P�HASE 1 DRYWALL COMPLETE SS) 0510-0102 147 Drywall 0 07/30/200 1 50 Engineer Approval Acc Ken Arnold 07/30/2007 PER tNGINEER LETTER DATED 7/17/07 FOR PHASE 1 DRYWALL COMPLETE. 0510-0102 161 Utilities 0 92 Accepted As Noted Ken Arnold 12/2612007 * PER DAVE MILLARD WITH FPUA. 0510-0102 170 Fire Penetrations 0 07/06/20071 50 Engineer Approval Acc Ken Arnold 07/0612007 PER ENGINEER INSPECTION REPORT DATED 6/20/07 FOR OFFICE LOCATION 1ST FLOOR APPROVED AS NOTED. 0510-0102 103 Eufer Ground 1 10/27;20061 90 Approved Scott Aftey 10/27/2006 null Scheduled: Tue Oct 24 16:42:22 EDT 2006 with value: null - Scheduled: Thu Oct 26 11:25:48 EDT 2006 with value: Fri Oct 27 00:00:00 EDT 2006 RECEIVED ENGINEERS REPORT NO. 2 DATED NOVEMBER 27,2006 PERTAINING TO INSPECTIONS DONE ON 10/24/2006 REFERENCING 3/0 CU CONNECTED TO BUILDING FOOTER STEEL PHASE 1 (NORTH BUILDING) WITH A RESU LIT OF PASS. 0510-0102 103 Eufer Ground 1 10/27/20061 90 Approved Private Provider 10/27/2006 0510-0102 104 Compaction Test 1 10/1 0510-0102 106 Engineers Report 1 02/12/20071 PER ENGINEERS TILT -UP WALL PANEL INSPECTION DATED, PANEL CONNECTION. FOR A REPORT OF STRUCTURAL STE GIRIDER/BEAM TO PERIMETER WALL, BAR JOIST TO BEAM/,' PERIMETER DECK ANGLE. 0510-0102 106 Engineers Report 1 10/27/2006� 0510-0102 106 Engineers Report 1 11/01/2006 0510-0102 106 Engineers Report 1 11/20/2006 0510-0102 106 Engineers Report 1 11/13/2006 same REPORT AS 10/27/06 0510-0102 106 Engineers Report 1 11/14/2006 0510-0102 106 Engineers Report 1 12/08/2006 RECEIVED ENGINEERS REPORT NO. 3, DATED NOVEMBER ELEVATOR PIT WALLS TO BOTTOM OF THICKENED SLAB W 0510-0102 106 Engineers Report 1 12/08/2006 RECEIVED ENGINEERS REPORT NO. 4 DATED NOVEMBER FLOOR BATHROOMS (4) TOTAL (2) ON GRID LINE C AND (2) 0510-0102 106 Engineers Report 1 01/08/2007 ACCEPTED SUMMARY OF INSPECTIONS/STATL PANELS 2 THRU 28. K.ARNOLD 0510-0102 106 Engineers Report 1 01/23/2007 FOR INSPECTIONS DONE ON 12/29/2006 AND 01/08/2007. (1 26,27,28,59,2,3,4,5,6,7,8,9,10,30,31,11,12,13,14,16,17,18,19,20, BOX OUTS AT BOTTOM OF PANEL. (01/0812007) --- PASS PAN 90 Approved Karen Neal 10/17/2006 50 Engineer Approval Acc Ken Arnold 02/12/2007 2/12/07 FOR NORTH BUILDING PHASE I AS A PASS FOR PANEL TO EL INSPECTION ALSO A PASS FOR BEAM TO COLUMNS, DIST GIRDER, BAR JOIST TO WALL, BRIDGING & BRACING, 90 Approved Bill Logsdon 10/27/2006 90 Approved BillLogsdon 11/01/2006 90 Approved BillLogsdon 11/20/2006 90 Approved 11/14/2006 90 Approved BillLogsdon 11/14/2006 92 Accepted As Noted Private Provider 12/08/2006 27,2006 PERTAINING TO INSPECTION DONE 10/31/2006 FOR TH A RESULT OF PASS. 92 Accepted As Noted Private Provider 12/08/2006 7,2006 PERTAINING TO INSPECTION DONE ON 11/17/2006 FOR IST PN GRID LINE E. WITH A RESULT OF PASS (PARTIAL) - 1 50 Engineer Approval Acc Ken Arnold 01/08/2007 (PASS) RECEIVED IN OUR OFFICE 01/08/2007 PERTAINING TO 0510-0102 106 Engineers Report 1 02/01/2007 ACCEPTED ENGINEER APPROVAL LETTER DATED JANUARN 35, 38, 41, 44, 47, 48 AND 5 1. 0510-0102 106 Engineers Report 1 02/05/2007 PER ENGINEERS LETTER DATED 2/2/07 FOR EXTERIOR WA PLATES AND BOLTED TO FOOTERS. (PASS) 0510-0102 106 Engineers Report 1 02/05/2007 PER ENGINEERS LETTER DAT3D 1/15/07 FOR VERTICAL LE 0510-0102 106 Engineers Report 1 02/16/2007 ACCEPTED ENGINEERS REPORT FOR A PASS ON THE ROOF 0510-0102 106 Engineers Report 1 02/19/2007 PER ENGINEER REPORT FOR TILT -UP WALL PANEL INSPECI DUMPSTER CONTAINMENT WALLS PANELS 1, 2,3,4 AND 5,4 0510-0102 106 Engineers Report 1 02/22/2007 PER TILT -UP WALL PANEL INSPECTION DATED 2/2/07 FOR E, PANEL EMBEDDED PLATES AND BOLTED TO FOOTERS AS A 0510-0102 106 Engineers Report 1 02/22/2007 PER REPORT OF CAST IN PLACE CONCRETE AND REINFOR( AND DUMPSTER WALL FOOTERS WF-24 AS A "PASS". 0510-0102 106 Engineers Report 1 03/05/2007 PER TILT UP WALL PANEL INSPECTION DATED 3/5/07. LOAD] REPORT OF METAL FRAMING AND EXTERIOR SHEATHING IN GALV. STUD FRAMING AT (3) ROOF TOWER ENCLOSURES Al 0510-0102 106 Engineers Report 1 03/05/2007 50 Engineer Approval Acc Ken Arnold 01/23/2007 '28/2006) ---- PASS 25, 1,22,23,24 AND 15. PASS ALL EXCEPT PANEL 15. THERE ARE 7 L 15. 50 Engineer Approval Acc Ken Arnold 02/01/2007 23,2007 FOR PASS INSPECTIONS FOR VERTICAL LEG PANELS 34, 50 Engineer Approval Acc Ken Arnold 02/05/2007 PANELS ANGLE ATTACHMENTS WELDED TO PANEL EMBEDDED 50 Engineer Approval Acc Ken Arnold 02/05/2007 PANEL 34,35, 38, 41,44,47, 48 AND 51. (PASS) 50 Engineer Approval Acc Ken Arnold 02/16/2007 DECKING INSTALLATION DATED 2/15/07 50 Engineer Approval Acc Ken Arnold 02/19/2007 ']ON FOR LOADING DOCK PANELS 54,55,56,57,58 AND S A PASS DATED 2/16/07. 50 Engineer Approval Acc Ken Arnold 02/2212007 'TERIOR WALL PANELS ANGLE ATTACHMENTS WELDED TO "PASS". 50 Engineer Approval Acc Ken Arnold 02/22/2007 �ED MASONRY INSPECTION DATED 2/20/07 FOR LOADING RAMP 50 Engineer Approval Acc Ken Arnold 03/05/2007 G RAMP AND DUMPSTER CONTAINMENT WALLS (PASS). ;PECTION REPORT DATED 3/5/07 FOR METAL FRAMING. 18 GU. D 20 GA FRAMING ABOVE MECHANICAL ROOM (PASS) 50 Engineer Approval Acc Ken Arnold 03/05/2007 I Permit Nunj 10510-0102 PER ENGINEER STRUCTURAL STEEL"t, _,�'ECTION DATED 2/28/07 FOR REINSPECT MEZ2_ .'E BARJOIST INSTALLATION AND COMPLETE COLUMN BASE PLATE ATTACHMENTS. (PASS) FOR INSPECTION THAT FAILED 2/27/07 0510-6102 106 Engineers Report 1 03/05/2007 50 Engineer Approval Acc Ken Arnold 03/05/2007 PER ENGINEER REPORTS DATED 2/7/07,2/12/07,2/15/07 A�D 2/16/07. '0510-0102 106 Engineers Report 1 03/07/2007 50 Engineer Approval Acc Ken Arnold 03/07/2007 PER ENGINEER INSPECTION REPORT DATED 3/6/07 FOR D I ECK PREPARATION, W.W.M OK TO POUR MEZZANINES. PER REPORT FOR STRUCTURAL STEEL INSPECTION MEZZANINI ES METAL DECK INSTALLATION (PASS) 1 0510-0102 106 Engineers Report I U.J/1zlzuut 50 Engineer Approval Acc Ken Arnold 03/12/2007 PER ENGINEERS INSPECTION REPORT DATED 3/9/07 FOR �OWER WALL SHEATHING AND IN PROGRESS INSPECTION OF BUILT-UP ROOF INSTALLATION. (APPROVED) 0510-0102 106 Engineers Report 1 03/22/2007 92 Accepted As Noted Ken Arnold 03/2212007 3/22/07 recieved private provider report jorwarded to ken arnol� RECEIVED ENGINEERS REPORT FOR EXTERIOR SHEATHING INSPECTION WHICH FAILED CONCERNING THE RED IRON ANGLES WELDED TO TOWER ROOF BEAM FOR TRUSS TIE DOWN.1) WELDING NOT COMPLETED PER DETAIL. 2) DETAILS TO BE SIGNED AND SEALED BY ENGINEER OF RECORD. 0510-0102 106 Engineers Report 1 03/22/2004,1 50 Engineer Approval Acc Ken Arnold 03/22/2007 PER ENGINEERS REPORT DATED 3/5/07 FOR LOADING RAMP AND DUMPSTER CONTAINMENT WALLS. (PASS). REPORT DATED 3/5/07 FOR METAL FRAMING OF 18 GA. GALV.STUD FRAMI�G AT (3) ROOF TOWER ENCLOSURES AND 20 GA FRAMING ABOVE MECHANICAL ROOM.(PASS)3/6/07 FOR METAL DECK --- MEZZANINES METAL DECK INSTALLATION (PASS).3/6/07 FOR ELEVATED SLAB DECK PREPARATION, W.W.M OK TO POUR MEZZANIOES. (PASS)3/g/07 FOR WALL SHEATHING AND ROOF IN PROGRESS --TOWER WALL SHEATHING AND IN PROGRESS INSPECTION OF BUILT-UP ROOF INSTALLATION OK. 0510-0102 106 Engineers Report 1 04/27/200�i 50 E ineer Approval Acc Ken Arnold 04/27/2007 O� ng PER ENGINEER REPORT DATED 4/10/07 FOR ROLL -UP D RS. DEFICIENCIES OBSERVED. 0510-0102 106 Engineers Report 1 04/27/20071 50 Engineer Approval Acc Ken Arnold 04/27/2007 PER ENGINEER REPORT DATED 4/18/07 FOR WINDOW & DOOR INSTALLATION WITH A PARTIAL PASS. 0510-0102 106 Engineers Report 1 04/27/20071 50 Engineer Approval Acc Ken Arnold 04/27/2007 PER ENGINEER REPORT DATED 4/19/07 FOR ROOF SHEATHING FOR SOUTH AND MIDDLE TOWER. 0510-0102 106 Engineers Report 1 05/08/2007� 50 Engineer Approval Acc Ken Arnold 05/08/2007 PER ENGINEER EXTERIOR SHEATHING INSPECTION REPO T DATED 4/23/2007 FOR ROOF SHEATHING COMPLETE PHASE 1. 0510-0102 106 Engineers Report 1 05/29/2007� 50 Engineer Approval Acc Ken Arnold 05/29/2007 PER ENGINEER INSPECTION REPORT DATED 6/11/07 FOR UILDING 1 FIVE WALL ELECTRIC OUTLETS ROUGH -IN. DRYWALL SCREW INSPECTION EAST SIDE OF FIREWALL 1 ST LAYER OF 5/8 GYPSUM BOARD AS A PASS. 0510-0102 106 Engineers Report 1 04/27/2007 PER ENGINEER REPORTS DATED 4/5/07 FOR WORK IN PRC 0510-0102 106 Engineers Report 1 04/27/2007 PER ENGINEER REPORT DATED 4/10/07 FOR ALL TRUSSES 50 Engineer Approval Acc Ken Arnold 04/27/2007 SS FON THE WINDOWS AND TRUSS TO TRUSS 50 Engineer Approval Acc Ken Arnold 04/27/2007 EPT WEST END. 0510-0102 106 Engineers Report 1 06/20120071 50 Engineer Approval Acc Ken Arnold 06/20/2007 PER ENGINEER ELECTRICAL INSPECTION REPORT DATED /18/2007 FROM INSPECTOR BILL DAVISON BN 1366 FOR EXTERIOR ENTRYWAY CEILINGS HI HAT LIGHTS AND FIVE SPRINKLER OKTO COVER. CEILINGS OVER PERSONNEL ENTRIES. (PASS) 0510-0102 106 Engineers Report 1 06/21/20071 50 Engineer Approval Acc Ken Arnold 06/21/2007 PER ENGINEER ELECTRICAL INSPECTION REPORT DATED P/20/2007 FOR ELECTRIC ROUGH WEST END TENANT BUILD OUT ONLY AS A PASS, PANEL NOT MADE UP. NEED AS BUILT REVISED DRAWINGS PER BILL DENISON BN1366 0510-0102 106 Engineers Report 1 06/21/2007 1 50 Engineer Approval Acc Ken Arnold 06/21/2007 PER ENGINEERS REPORT DATED 6/20/2007 FOR FRAMING A, ND FIRE PENETRATIONS IN OFFICE LOCATION I ST FLOOR. AS APPROVED AS NOTED .... PROVIDE UL FOR METAL DECK & JOIST ASSEMBLY. 0510-0102 106 Engineers Report 1 07/24/2007 1 1 50 Engineer Approval Acc Ken Arnold 07/24/2007 RECEIVED ENGINEER REPORTS DATED 7/9107, 7/10/07, 7/16107 AND 7/17/07. 0510-0102 106 Engineers Report 1 1 50 Engineer Approval Acc Ken Arnold 10/11/2007 PER ENGINEER ELECLRICAL INSPECTION REPORT DATED OCT. 11, 2007 FOR ELECTRIC SERVICE POWER RELEASE INSPECTION. SERVICE, METER, PANELS AND ELEVATOR E�UIP. OK. PER BILL DENISON BN1366. 0610-0102 110 Footer/Foundation 1 10/27/2006 PHASE 1 NORTH BLD FOOTER AN COLUMN PADS ELEVATC 0510-0102 110 Footer/Foundation 1 10/27/2006 null Scheduled: Thu Oct 26 11:23:36 EDT 2006 with value: Fri Oct 27 NOVEMBER 27,2006 PERTAINING TO INSPECTIONS DONE 0 PERIMETER FOOTER, INTERIOR COLUMN FOOTERS AND EL CLARIFICATION FROM ARCH. OR ENGINEER FOR F-84 DESIC 0510-0102 115 Slab 1 11/30/2006 GROUNS SLAB COMPLETE FOR PHASE 1 (NORTH BUILDING: SECOND NOTICE DATED 12/20/2006 FOR INSPECTION DONE (NORTH BUILDING). K.ARNOLD 12/20/2006. 0510-0102 119 Sternwall 1 11/01/2006 ELEVATOR PIT WALLS 0510-0102 420 Plumbing Rough 1 11/22/2006 92 Accepted As Noted BillLogsdon 10/27/2006 PIT 90 Approved Scott Attey 10/27/2006 00:00:00 EDT 2006 RECEIVED ENGINEER REPORT 1 DATED N 10/24/2006. PHASE 1 (NORTH BUILDING) CONTINUOUS EVATOR PIT FLOOR. RESULTS (PASS) WITH NOTES: 1) PROVIDE 'NATED AT GRID LINES (FA). 50 Engineer Approval Acc Ken Arnold 11/30/2006 PER INSPECTOR LOUNSBERRY. (PRIVATE PROVIDER) RECEIVED ON 11/30/2005 STATING GROUND SLAB COMPLETE FOR PHASE 1 90 Approved Private Provider 11/01/2006 50 Engineer Approval Acc Ken Arnold 11/22/2006 lPermit Nun 10510-0102 PER ENGINEER INSPECTION REPORT _,'ED 5/17/2007 FO� NORTH BUILDING PHASE 1 1 NALL INSULATION PER RATED U.L. ASSEMBLY WP1 522 AS A PASS. 0510-6102 148 Window/Door Attachment 5 05/29/2007 50 Engineer Approval Acc Ken Arnold 05/29/2007 APPROVED AS NOTED BUILDING NO. 1 OVEERHEAD DOOJ ATTACHMENT. PROVIDE REVISED ENG. LETTER FOR'L'ANGLE ATTACHMENT TO WALL. 0510-0102 167 Roof Final 5 11/19/2007 50 Engineer Approval Acc Ken Arnold 11119/2007 PER ENGINEER'S INSPECTION REPORT DATED 11/13/2007 OR NORTH BLDG PHASE 1 FINAL ROOF INSPECTION ASA PASS APPROVED BY DAVID LOUNSBUERY BN3026Re-inspection 1 0510-0102 167 Roof Final 5 11/21/2007 50 Engineer Approval Acc Ken Arnold 11/2112007 PER ENGINEER INSPECTION REPORT DATED 11/13/07AS PASS NORTH BLDG PHASE 1 FINAL ROOF INSPECTION. . 0510-0102 179 Firewall 5 05/22/200 50 Engineer Approval Acc Ken Arnold 05/29/2007 PER INSPECTION REPORT DATED 5/17/2007 FOR NORTH BUILDING PHASE 1 FIRE WALL INSULATION PER RATED U.L. ASSEMBLY WP1 522 AS A PASS. 0510-0102 238 Electric Rough 5 051 1412_001� 50 Engineer Approval Acc Ken Arnold 05/14/2007 PER ENGINEER INSPECTION REPORT DATED 5111/07 FOR UILDING 1 FIRE WALL ELECTRIC OUTLETS ROUGH -IN. DRYWALL SCREW INSPECTION EAST SIDE OF FIRE WALL I ST LAYERI OF 5/8 GYPSUM BOARD AS A PASS. 0510-0102 238 Electric Rough 5 PER ELECTRICAL INSPECTION REPORT DATED 9/27/071 DENISON BN1366 0510-0102 238 Electric Rough 5 PER ENGINEER REPORT DATED 9/27/07 FOR BULDING I BN1366 50 Engineer Approval Acc Ken Arnold 10/08/2007 BUILDING 1 OFFICES CEILING ROUGH AS A PASS PER BILL 50 Engineer Approval Acc Ken Arnold 09/28/2007 S CEILING ROUGH AS A PASS BY INSPECTOR BILL DENISON 0510-0102 238 Electric Rough 5 07/06/2007'1 50 Engineer Approval Acc Ken Arnold 07106/2007 PER ENGINEER INSPECTION REPORT DATED 6/18/07 FOR EXTERIOR ENTRYWAY CEILINGS HIHAT LIGHTS AND FIRE SPRINKLERS OK TO COVER. CEILINGS OVER PERSONNELI ENTRIES AS A PASS.//////INSPECTION REPORT DATED 6/20/07 0510-0102 260 30 Day for Testing 5 10/17/200 10/16/07 window schedule with bob/ contr.bac 0510-0102 280 Electric Final 5 12/10/200 PER ENGINEER REPORT OF ELECTRICAL INSPECTION: D INSPECTOR BILL DENISON BN#1366 0510-0102 351 Mechanical Rough-In(ducl 5 07/06/200 PER ENGINEER INSPECTION REPORT DATED 6/21/07 FOR 90 Approved Van Whitaker 10/17/2007 50 Engineer Approval Acc Ken Arnold 12/10/2007 12/10107 FOR PHASE I FINAL ELECTRIC AS A PASS. 50 Engineer Approval Acc Ken Arnold 07/06/2007 'H BUILDING PHASE 1 MECH ROUGH NOT READY FAIL. 0510-0102 351 Mechanical Rough-In(ducl 5 07/' 1/2'071 81 Disapproved Private Provider NORTH BLDG PHASE I DUCT ROUGH ..... /NFAIL/h / 1 �3 PROVI E APPROVED AS-BUILTS BY MECH ENG. 2) FINISH INTAKE AIR TO UNIT (5) 3) PROVIDE R/H OR TRANSFER AIR TO 2ND FLOO OFFICES 4) DATA/COMMUNICATION ROOMS S/A & r/A? 0510-0102 351 Mechanical Rough-In(ducl 5 50 Engineer Approval Acc Ken Arnold 09/28/2007 PER ENGINEER REPORT DATED 9/27/07 FOR A PARTIAL FI AL MECH FOR ABOVE CEILING FLEX DUCT CONNECTIONS AS A PARTIAL PASS 1) PROVIDE APPROVED AS-BUILTS BY INSP CTIOR LOUNSBERRY BN3026 0510-0102 351 Mechanical Rough-In(ducl 5 08/08/2007 81 Disapproved Private Provider 08/08/2007 Re -inspection 2////PER ENGINEER MECHANICAL INSPECTION, REPORT DATED 7/31/07 FOR NORTH BLDG PHASE 1 DUCT ROUGHA) PROVIDE APPROVED AS-BUILTS BY MECH ENG. 2) FINISH INTAKE AIR TO UNIT (5) 3) PROVIDE R/A OR TRANSFER AIR TO 2ND FLOOR OFFICES 4) DATA/COMMUN [CATION RdOMS S/A & R/A.. INSPECTION RESULTS IS A FAIL. 0510-0102 351 Mechanical Rough-In(ducl 5 1 60 Engineer Approval Acc Ken Arnold 09/11/2007 Re -inspection 3NPER ENGINEER INSPECTION REPUK I UA I tU 9/7/07 FOR PHASE I MECHANICAL ROUGH INSPECTION AS A PASS. DAVID LOUNSBERRY BN3026 I 0510-0102 351 Mechanical Rough-In(ducl 5 'TION AS A P RECEIVED FINAL MECHANICAL ROUGH INSPEC 0510-0102 351 Mechanical Rough-In(ducl 5 0510-0102 351 Mechanical Rough-In(ducl 5 PHASE I MECHANICAL ROUGH INSPECTION ----- PASS---- 1) PROVIDE SIGNED & SEALED, REVIEWED AS-BUILTS FOR 0510-0102 380 Mechanical Final 5 12/13/2007 PER ENGINEER REPORT DATED 12/12/2007 FOR FINAL MEC LOUNSBURY BN 3026Re-inspection 1 0510-0102 380 Mechanical Final 5 PARTIAL FINAL MECH. FOR ABOVE CEILING FLEX DUCT COf 9/27/2007 FROM DAVID LOUNSBERRY BN3026 50 Engineer Approval Acc Ken Arnold 09/14/2007 . DATED 9/13/2007 FROM DAVID LOUNSBERRY BN3026 50 Engineer Approval Acc Ken Arnold 09/21/2007 50 Engineer Approval Acc Ken Arnold 09/21/2007 MECHANICAL INSPECTION 50 Engineer Approval Acc Ken Arnold 12/13/2007 ICAL INSPECTION PHASE 1 AS A PASS BY INSPECTIOR DAVID 91 Partial Approval Private Provider 10/08/2007 'TIONS PER MECHANICAL INSPECTION REPORT DATED 0510-0102 423 Plumbing Top Out 5 07/02/2007 1 50 Engineer Approval Acc Ken Arnold 07/02/2007 PER ENGINEER INSPECTION REPORT DATED 6/28/.07 FOR NORTH BUILDING PHASE 1 2ND ROUGH PLUMBING AS A PASS 1) PROVIDE ACCESSIBLE MAIN SHIUT-OFF FOR SUPPLY WATER AT EXTERIOR FOR FINAL. 2) RE-ROUTE WATER SUPPLY ABOVE CEILING HUNG A/C UNIT NO WATER PIPING ABOVE ELECTRICAL APPLIANCE OR INSTAL PAN PIPED TO DRAIN FOR FINAL 0510-0102 423 Plumbing Top Out Re -inspection 3 50 Engineer Approval Acc Ken Arnold 10/08/2007 jPermit Nun 10510-0102 ACCEPTED ENGINEERS REPORT TO !PLETE LINDE RESULTS OF INSPECTION: PASS. DATED 11/21/2006. R COM.PLETE UNDERGROUND PLUMBING ROUGH FOR P 0510-0102 420 Plumbing Rough 1 11/14/: U510-0102 420 Plumbing Rough 1 07/10/200 NORTH BUILDING PHASE 1 2ND ROUH PLUMBING ... /////PA AT EXTERIOR FOR FINAL. 2) RE-ROUTE WATER SUPPLY/ APPLIANCE OR INSTALL PAN PIPED TO DRAIN FOR FINAL. 0610-0102 427 Temp.Toilet/Temp Culvert 1 11/14/200 0510-0102 104 Compaction Test 2 12/OE 0510-0102 105 Form Board Survey 2 12/01 OOND PLUMBING ROUGH F0 ASE 1 (NORTH BUILDING). IVED DUPLICATE INSPECTION REPORT WITH A "PASS" TO E 1 (NORTH BUILDING) 12/20/2006. KARNOLD 90 Approved Private Provider 11/14/2006 0510-0102 106 Engineers Report 2 04/12/20071 4/12/07 recieved engineers report dated 4/4/07 forwarded to Ke� INSPECTION. PROVIDE PRODUCT APPROVAL FOR WINDO OF CENTER LINE 3.5" AND 2" O.C. 0510-0102 106 Engineers Report 2 03/12/20011 PER ENGINEERS REPORT NO. 13 FOR BAR JOISTS FOR ME2 AND (2) BAR JOIST RED IRON SUPPORT ANGLE AT SW COR� REPORT (2/28/07) REINSPECT MEZZANINE BARJOIST INST� (PASS). PARTIAL INSPECTION ON ROOF IN PROGRESS (2/28 INSPECTION DATED 3/1/07 PHASE I --- CONDUCT PREINSTAL PER AISC 13TH EDITION, 16.2-43. 0510-0102 106 Engineers Report 2 03/09/2007 PER ENGINEER LETTER DATED MARCH 1, 2007 FOR INSPEC WALL FOOTERS WF-2Y, (12) INTERIOR 8'X8'COLUMNS BASE 0510-0102 108 Engineer Letter 2 02/13/2007 PER ENGINEER LETTER FOR TILT -UP WALL PANEL INSPECI 32 AND 61. PASS ALL EXCEPT PANEL 61. 2 BOX OUTS IN CC 0510-0102 115 Slab 2 04/2712007 THIS SLAB INSPECTION IS FOR TILT WALL///////PER ENGINEE SLAB AND LOADING RAMP. 0510-0102 121 Termite Spray 2 12/01/2006 0510-0102 148 Window/Door Attachment 2 04/04/2007 null Scheduled: Mon Mar 26 15:30:55 EDT 2007 with value: null Scheduled: Mon Mar 26 15:33:46 EDT 2007 with value: null PEI APPROVAL FOR WINDOWS. 12 TAPCONS IN SILL 3 EACH EN 0510-0102 148 Window/Door Attachment 2 04/27/2007 PER ENGINEER REPORT DATED 4/10/07 FOR ALL WINDOWS 0510-0102 413 Pipe Test 2 11/20/2006 barhroom 2 on grid c and to 2on grid e 1ST FLOOR 50 Engineer Approval Acc Ken Arnold 07/10/2007 1) PROVIDE ACCESSIBLE MAIN SHUT-OFF FOR SUPPLY WATER : CEILING HUNG A/C UNIT NO WATER PIPING ABOVE ELECTRIC 92 Accepted As Noted BillLogsdon 11/14/2006 90 Approved Karen Neal 12/06/2006 90 Approved Diane Flanigen 50 Engineer Approval Acc 04/12/2007 Arnold PER ENGINEER REPORT DATED APRIL 4,2007 FOR SILL S. 12 TAPCONS IN SILL, 3 EACH END 4.5" AT 2"O.C., 3 EACH SIDE 0510-0102 413 Pipe Test 2 04/27/2007 Re-inspectionl PER ENGINEER REPORT DATED 11/21/06ANE FOR PHASE I (NORTH BUILDING). PASS BY DAVID LOUNSBE (2) ON GRIDLINE E.. 0510-0102 116 2nd Floor Slab 4 04/27/2007 INSPECTION FOR MEZZINE FLOOR PER ENGINEER REPORT MEZZANINES PER DAVID LOUNSBURY. Scheduled: Wed Mar 7 10:15:26 EST 2007 with value: null 0510-0102 133 Window/Door Bucks 5 12/17/2007 0510-0102 135 Wall Sheathing 5 07/02/2007 PER ENGINEER INSPECTION REPORT DATED 6/28/07 FOR C A PASS. 0510-0102 135 Wall Sheathing 5 07/10/2007 PER ENGINEER INSPECTION REPORT DATED 6/28/07 FOR C A PASS... 0510-0102 136 Roof Dry-in/Tin Tab 5 07/06/2007 0510-0102 140 Construction Rough Frami 5 07/06/2007 PER ENGINEER INSPECTION REPORT DATED 6/18/07 FOR 0510-0102 141 Insulation 5 05/30/2007 50 Engineer Approval Acc 03/12/2007 4INES.(FAIL) 1) REMOVE SLAG FROM WELDS FOR INSPECTION t LOCATION NOT WELDED COMPLETE. (2/27/07) NEXT TION AND COMPLETE COLUMN BASE PLAATE ATTACHMENTS. AND ROOF IN PROGRESS (2/29/07) AS APPROVED. 'ION VERIFICATION OF BOLTS AND INSTALLATION METHODS 50 Engineer Approval Acc Ken Arnold 03/09/2007 riON DONE ON 2/20/07 FOR LOADING RAMP AND DUMPSTER PLATES GROUTED. (PASS) 50 Engineer Approval Acc Ken Arnold 02/13/2007 ON DATED 1/11/07 FOR PANEL 34, 35, 38, 41, 47, 48, 51, 53, 60, 62, .UMN. EOR TO ADVISE. 50 Engineer Approval Acc Ken Arnold 04/27/2007 Z REPORT DATED 4/10/07 FOR SLAB ON GRADE FOR DUMPSTER 90 Approved Ken Arnold 12/01/2006 50 Engineer Approval Acc Ken Arnold 04/04/2007 ENGINEER REPORT DATED 3/27/07 ---- PROVIDE PRODUCT 4.5" IN AND TO.C., 3 EACH SIDE OF CENTERLINE 3.5'AND 2'O.C. 50 Engineer Approval Acc Ken Arnold 04/27/2007 ,RE COMPLETE FASTERNERS AS REQUIRED. 91 Partial Approval Private Provider 11/20/2006 50 Engineer Approval Acc Ken Arnold 04/27/2007 11/17/06 TO COMPLETE UNDERGROUND PLUMBING ROUGH RY 1ST FLOOR BATHROOMS (4) TOTAL (2) ON GRID LINE C AND 50 Engineer Approval Acc Ken Arnold 04/27/2007 �TED 3/6/07 FOR DECK PREPARATION, W.W.M OK TO POUR 93 Not Required Private Provider 12/17/2007 50 Engineer Approval Acc Ken Arnold 07102/2007 qGS/SOFFIT SHEATHING AT EXTERIOR ENTRY LOCATIONS AS 50 Engineer Approval Acc Ken Arnold 07/10/2007 qGS/SOFFIT SHEATHING AT EXTERIOR ENTRY LOCATIONS. AS 50 Engineer Approval Acc Ken Arnold 07/06/2007 50 Engineer Approval Acc Ken Arnold 07/06/2007 qG FRAMING ABOVE ENTRY DOORS APPROVED AS NOTED. 50 Engineer Approval Acc Ken Arnold 05/30/2007 Permit Nu 10510-0102 0510-0102 423 Plumbing Top Out 5 07/06/2007, ' 50 Engineer Approval Ken Arnold 07/06/2007 PEER ENGINEER INSPECTION REPORT DATED 6/21/07 FOR NORTH BUILDING PHASE 1 2ND ROUGH PLUMB NOT READY FAIL 0510-0102 423 Plumbing Top Out 5 81 Disapproved Private Provider 09/28/2007 FOASE I NORTH BUILDING FINAL PLUMBING AS A FAIL 1)NEED TO COMPLETE INSTALLATION OF FIXTURES AND TOILET ROOM PARTITIONS TO VERIFY REQUIRED CLEARANCES. 0510-0102 480 Plumbing Final 5 12/13/200 50 Engineer Approval Acc Ken Arnold 12/13/2007 PER ENGINEER REPORT DATED 12/12/2007 FOR FINAL PLL MBING INSPECTION PHASE 1 AS A PASS BY INSPECTOR DAVID LOUNSBURY. BN 3026Re-inspection 1 0510-0102 480 Plumbing Final 5 81 Disapproved Private Provider 10/08/2007 PER PLUMBING INSPECTION REPORT DATED 9/27/07 AS A FAIL 1) NEED TO COMPLETE INSTALLATION OF FIXTURES AND TOILET ROOM PARTITIONS TO VERIFY REQUIRED CLEARANCES. PER DAVID LOUNSBERRY BN3026 0510-0102 500 Smoke Draft Stop 5 50 Engineer Approval Acc Ken Arnold 12117/2007 PER ENGINEER REPORT 92 Accepted As Noted Barbara Counsello 10/11/2007 0510-0102 259 Power Release Form 7 sub contr hold needs to contact contr lic dept. recvd faxed power, release form.1 0/11/07 bac 0510-0102 800 Address Final 7 12/17/2007 50 Engineer Approval Acc Ken Arnold 12/17/2007 PER ENGINEER INSPECTION REPORT DATED 121/14/2007 D�VID LOUNSBURY BN3026 1 0510-0102 165 Handicap Restrooms 8 12/18/2001 81 Disapproved Scott Attey 12/18/2007 THE DOOR CLOSERS MUST MEET ADA REQIERMENTS f SVYEEPS FROM 70 DEGREES WILL TAKE #3 SECONDS TO MOVE WITH IN #3 INCHES OF THE LATCH.,AND THE OPENING FORCE USTNOTBE GREATER THAN 5 LBS. 0510-0102 165 Handicap Restrooms 8 12/20/200 90 Approved Scott Attey 12/20/2007 Re -inspection I Resulted: Thu Dee 20 13:54:12 EST 2007 0510-0102 172 Hurricane Panels (shutterf 8 12/17/200 93 Not Required Private Provider 12/17/2007 PER ENGINEER INSPECTION REPORT DATED 12/14/2007 ' HURRICANE PANELS NOT NEEDED AS WINDOWS ARE IMPACT RESISTANT. DAVID LOUNSBURY BN3026 0510-0102 180 Building Final 8 12/18/20JI 81 Disapproved Scott Attey 12/18/2007 ALL DOOR CLOSERS REQUIRED FOR ADA EXTERIOR DOORS MUST MEET THE CODE, SWEEPS FROM 70 DEGREES WILL TAKE #3 SECONDS TO MOVE WITH IN #3 INCHES OF THE LATCH AND HAVE AN OPENING FORCE NOT GREATER THAN 8.5 LBS. *ALL EXIT DOORS WITH CRASH BARS MUST BE OPERATIC NAL. 0510-0102 180 Building Final 8 12/20/2007 90 Approved Scott Attey 12/20/2007 Re -inspection 1 0510-0102 261 30 Day Expired 8 12/26/2007 90 Approved Ken Arnold 12126/2007 0510-0102 700 ITAM—De-plo 2jM 90 Approved .MW�� 8 4,2/,I�W_20 ' Mike Matthy 12/26/2007 0510-0102 801 Paving and Drainage Certi 8 12/18/2( 12/18/07 partial pending as built engineering- per mike halter. 0510-0102 801 Paving and Drainage Certi 8 12/19/2( Re -inspection 1 0510-0102 803 Parking/Handicap Sign &,' 8 12/1 0510-0102 808 Landscaping[Trees 8 12/18/2( PARTIAL APPROVED WITH CONDITION THAT SHOCKING SPECIES (IE LIVE OAKS WITHIN 60 DAYS 12/19/2007. 0510-0102 808 Landscaping/Trees 8 Re -inspection 2 0510-0102 996 Final Termite Treatment 8 12/18/2( 0510-0102 999 Final Inspection 8 per engineer letter dated December 18, 2007 from Christopher 0510-0102 808 Landscaping/Trees 9 FINAL ROOF INSPECTION ----- FAIL ----- 1) PROVIDE PRODUCT APPROVAL FOR ROOF SKYLIGHTS 2) NEED TO COMPLETE SECURING GALVINIZED CAPS TO 3) NORTH BUILDING OVEFLOW SCUPPER AT EAST REGIC 91 Partial Approval Michael Halter 12/18/2007 90 Approved Michael Halter 12/19/2007 90 Approved Scott Attey 12/18/2007 91 Partial Approval Brian Pauley 12/19/2007 ,ND OAKS BE REPLACED WITH HEALTHY APPROPRIATE 92 Accepted As Noted Amy Mott 12/26/2007 90 Approved Scott Attey 12/18/2007 12/26/2007 Throop BN4338 and Michael J. O'Connor PE 44082 81 Disapproved Private Provider 09/21/2007 �D TO BE SHUTTERED FOR NON -IMPACT GLAZED OPENING. JRBS NOT BEING UTILIZED FOR EQUIPMENT. IS OBSTRUCTED WITH MODIFIED FLASHING. I Permit Nu 10510-0102 1