HomeMy WebLinkAboutENGINEERING & TESTINGLRECEIVED
MAR 0 9 2020
ST. L Itting
ude County, Perm J
Subsoil Investigation Report
prepared by:
,Oederal
*%n9ineering
esting, Inc.
Client. Darren Casey
Contact., William Arthur
Address: 9867 SW 184th Street
Palmetto Bay, Florida 33156
Project. Proposed Residence
Address: 2304 Atlantic Beach Blvd
North Hutchinson Island, FL 34949
Date: Friday, September 4, 2020
aterials Testing I Inspections I Environmental
Dederal
,U.Ingineering
�qvjl� Desting, Inc.
Table of Contents
Client Information -------------
Project Information -----------
General Soil Descriptions ---
Foundation Recommendations
Soil Parameters ---------------
Excavations --------------------
Settlement ------------------------
Grading --------------------------
Appendices
Soil Boring Log(s)
Project Location
Soil Boring Location(s)
Soil Classifications
Sampling Procedures
Limitations of Liability
For Your
Our findings in this report are based on soil conditions ei
be built, (if available at this stage), Florida Building Code
is preliminary (i.e. vacant land or building to be demolisl
proposed structure once the location & layout of the prop(
Please read this report in its entirety and follow all rc
agency (Building Department, etc.) withholding the C
costs. The Permitting Agency will require a final certific
of Occupancy. All of our recommendations need to be
densities on each lift, demucking verification, piling insf
Please schedule us at least 24 hours in advance for all 1
Firm, you must verify they will provide you with the pr
will only provide a certification letter if it has verified all
Phone: 954-784-2941
E-Fax: 954-784-7875
admin@fed-eng.com
www.fed-enq.com
pg. I
pg. 1
pg. 1
pg. 2
pg. 3
pg. 3
pg. 4
pg. 4
pg. 5
atered in the test bore locations only, proposed structure to
firements and standard engineering practices. If your report
additional borings are required within the foot print of the
structure is known.
lendations. Failure to do so may result in the permitting
ate of Occupancy. This will cause delays and additional
or signing off of the project prior to issuing the Certificate
wed to receive a final certification from F.E.T., including
i, etc., whichever recommendation applies to your project.
and inspections. If you choose to use another Engineering
certification in writing, as outlined in our report. Our firm
r, as recommended in our report.
L ( aO" �c- r
'OF
MIAM
,,MDADE F D P7T
ApproYed Lnbofatofy
Dederal
engineering
1,010esting, Inc.
Friday, September 4, 2020
Darren Casey
9867 SW 184th Street
Pahnetto Bay, Florida 33156
Attn.: William Arthur
RE: Subsoil Investigation
Proposed Residence
2304 Atlantic Beach Blvd
North Hutchinson Island, FL 34949
Dear Sirs:
Pursuant to your request, Federal Engineering & Testing,
above referenced site. The purpose of our investigal
--preparation and design.
A total of two (2) SPT borings were performed according
(25) below the existing ground surface. (See attached fieli
of soil stratas for the subject site:
Phone: 954-784-2941
E-Fax: 954-784-7875
admin@fed-eng.com
www.fed-enq.com
Job Order Number 20SB809
has completed a subsoil investigation on 09-02-2020 at the
was to verify subsoil conditions relative to foundation
:) ASTM D-1586 drilled down to a depth of twenty-five feet
sketch for locations). The following is a general description
From Depth To
Description of Soils
off
611
Topsoil & Vegetation
611
81
Light Brown Sand with $hell
80
18,
Bluish Gray Sand with Shell
18'
21'
_5'
Brown Sand with Shell
21'
2
Limerock with Shell
Groundwater table elevation was measured immediately
depth of three (3) feet below existing ground surface. F
variations and run off as well as varying ground elevatic
Site contractor must familiarize himself with site conditic
Surface flooding may result under hurricane conditions
project. The contractor shall make sure that groundwater
dewatering activities. Specialty groundwater contractors s
� the completion of each boring and was found at an average
-tuation in water level should be anticipated due to seasonal
construction dewatering and pumping activities in the area.
in the event groundwater controls and dewatering is needed.
Ind should be taken into consideration in the design of the
els on adjacent properties are not affected by the contractors
ill be consulted for all work below the groundwater level.
Fiiday, September 4, 2020
2304 Atlantic Beach Blvd
North Hutchinson Island, FL 34949
The boring log(s) attached present a detailed description o
shown on the boring log(s) is based on the examination o
field log(s). It indicates only the approximate boundaries
soil types may be gradual.
From a geotechnical engineering perspective, the site is
that the surface sand layers are compacted in place and
become evident during site clearing, grubbing and proof
Based on our understanding of the proposed structure
recommend the following procedures for foundation de.,
1) Strip the entire footings and building construction
ground vegetation (when encountered) down to
lines, root systems and drainage trenches, etc. ir.
construction areas. The city arborists should be c
any local codes.
2) Saturate and compact all construction areas with a
the ASTM D-1557 modified proctor method. Tv
direction.
3) Care should be taken when using vibration in
If vibration cannot be used for compaction,
compacted layer should not exceed 6 inches in
ederal
,Xn9ineering
esting, Inc.
the soils encountered at each location. The soil stratification
the recovered soil samples and interpretation of the driller's
)etween soil types. The actual transitions between adjacent
le for the construction of the proposed structure, provided
rolled. Localized areas of loose materials, if present, will
and must be removed prior to filling operations.
the information obtained from our field boring log(s); we
is plus five (5) feet past the outer perimeter of topsoil and
a granular material. Any underground structures, utility
be removed in their entirety from beneath the proposed
[cted prior to any land clearing to verify compliance with
y self propelled vibratory roller to a minimum of 95% of
a minimum of ten (10) passes with the roller in each
of existing structures in the vicinity of the construction area.
c compaction may be applied. However, in this case, the
4) Backfill construction areas to proper elevation if heeded using a clean granular material placed in lifts not to
I
exceed twelve (12) inches in thickness and compacted as per item 2.
5) Representative samples of the on -site and propo
classification and compaction characteristics.
6) All construction fill material above the water
deleterious material, and shall contain no more
sieve (0.075mm) and have a Unified Soil Classi
or SW. No particle size greater than three (3) in
7) Fill Material below the water table shall be
equivalent to about 12 inches above the water
material shall be clean granular soil, free of oi
than twelve (12) percent fines passing a U.S. St�
fill material should be collected and tested to determine the
D shall be clean granular soil, free of organics or other
twelve (12) percent fines passing a U.S. Standard No. 200
on (USCS) designation of GP, GW, GP -GM, GW-GM, SP
shall be used in the top 12 inches of the building pad.
-d f
ree draining gravel such as FDOT No. 57 stone or
unless dewatering is used. When dewatering is used, fill
or other deleterious material, and shall contain no more
No. 200 sieve (0.075mm).
Friday, September 4, 2020
2304 Atlantic Beach Blvd
North Hutchinson Island, FL 34949
-"age 3
8) Verify all densification procedures by taking aj
compacted material. Density tests shall be perfo
footings and column pad footings. This must
Compaction, but before Reinforcing Steel Placem(
from all areas to be tested prior to performing dens
9) After the installation of any plumbing and
recompacted and additional densities tests be T
10) All of the above Geotechnical work shall be
Testing's geotechnical engineer or his represe
Florida Building Code. Please call us at 954-78z
11) In the event of existing structures, existing footi
structural engineer and site contractor to protect
engineer s hall be notified of these conditions to i
The above foundation recommendations being achieved z
,1-4',psigned for a shallow foundation system with a permissi
-,iad certification requires satisfactory completion and verifi
Slabs placed upon compacted fill may be designed using a
soil parameters shall be used for retaining wall designs:
• Soil unit weight moist -------------------------
• Soil unit weight buoyant ----------------------
• Angle of internal ftiction ---------------------
• Active Earth pressure coefficient (Ka)---.
• Passive Earth pressure coefficient (Kp)---
• Angle of wall friction for steel piles -------
• Angle of wall friction for concrete / brick
• Angle of wall ffiction for uncoated steel --
Excavations shall not extend within one (1) foot of the E
underpinned. Trenching shall be in compliance with t.
requirements. Shorings shall be designed and inspected by
Provisions shall be made by the architect, engineer of
tying in new to 'existing structures. Mixing of differ
expansionjoints to address differential settlement.
aederal
ngineering
esting, Inc.
adequate number of field density tests in each layer of
ned on the slab areas, footing areas, interior bearing wall
)e scheduled immediately after Tamp and Spray and/or
,t. If reinforcing steel is already in -place, it must be removed
I piping; we recommend that the disturbed area be
to verify proper compaction of the disturbed areas.
formed under the supervision of Federal Engineering &
ve to verify compliance with our specifications and the
11 for scheduling.
or proposed drainage lines, provisions shall be made by the
footings from undermining and exposure. The geotechnical
uate the applicability of his recommendations.
verified; it is our opinion that the proposed structure be
soil bearing pressure not to exceed 2500 P.S.F. Building
on of all the above foundation recommendations.
of subgrade reaction value of 200 pci. The following
110 pcf
48 pef
300
0.33
3.0
300
200
150
3,le of repose next to existing footings or structures unless
:1
Florida Building Code, OSHA and Trench Safety Act
Florida licensed professional engineer.
ord and contractor to address differential settlements when
foundation types shall not be used unless provided with
Friday, September 4, 2020
2304 Atlantic Beach Blvd
North Hutchinson Island, FL 34949
')age 4
Aederal
ngineering
esting, Inc.
Detailed settlement analysis was beyond the scope of t�is report. Comparing the field test data obtained in this
exploration with our experience with structures similar to those proposed for this project, the estimated magnitude of
these settlements is 0.5 to I inch. Due to the granular nature of the subsurface materials, the foundation settlements
should occur as the loads are applied and should be virtuall� negligible by the end of the building shell completion.
All outside ground surfaces must be sloped away from th structure to avoid water accumulation and ponding. All rain
waters shall be discharged away from all building foundations. Verify all water, sewer, plumbing, sprinkler and drainage
I
lines are properly functioning with no leaks in the vicinity pf the foundation.
Regardless of the thoroughness of a geotechnical explorAtion, there is always the possibility that conditions may be
different from �those of the test locations; therefore, Feder�l Engineering & Testing, Inc. does not guarantee any subsoil
condition between the bore test holes. A site plan showirIg the location of the proposed structure was provided at the
time the soil borings were performed. Once plans and speclifications have been finalized and drawn, Federal Engineering
& Testing, Inc. shall be provided a copy of the finalized plans and specifications for review. For a more accurate
portrayal of subsurface conditions, the site contractor sh+d perform test pits. If different conditions are encountered,
Federal Engineering & Testing Inc., shall be notified to review the findings and make any recommendations as needed.
In accepting this report the client understands that all data from the soil borings is intended for foundation analysis only
and is not to be used for excavating, backfilling or pricing estimates. The site contractor must familiarize themselves
-with the job site conditions. I
Environmental analysis of the soil materials is not part of fhe scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an en ironmental analysis of the soil materials. For Environmental
due diligence, a Phase I and/or Phase H Environmental bite Assessment is recommended.
As a mutual protection to clients, the public and oursel
clients, and authorization for publication of statements, cc
pending our written approval.
Federal Engineering & Testing, Inc. appreciates the
Please feel free to contact us if we may be of further.,
\�01111111111/1111
J 0 H
IV
Sincerely, S
/V
0.
394
K�ith LeBlanc, P.Erz-
Federal Engineerini I
Florida Reg. No. 59j�,re"%- Z 0
I D
R
Certificate of AuthorizQp4A'
""/III I/ I I I I I I I I I%\\\\\\
all reports are submitted as the confidential property of
sions or extracts from or regarding our reports is reserved
tunity to be of service to you at this phase of your project.
to you.
Friday, September 4, 2020
2304 Atlantic Beach Blvd
North Hutchinson Island, FL 34949
qage 5
ADbendices
(f4ideral
ineering
stlng, Inc.
Dederal
Ongineering
�Oestlng, Inc.
SPT Test
Client: Darren Casey
Project: Proposed Residence
Address: 2304 Atlantic Beach Blvd
North Hutchinson Island, FL 34949
Report
Phone: 954-784-2941
E-Fax: 954-784-7875
admin@fed-eng.com
www.fed-eng.com
Date of Test: September 2, 2020
Hole No.: B-1
Location: See Attached Drawing
Depth (FT)
Soil Descript ons
Hammer Blows
'IN"
1
0" - 6"
Topsoil & Vegetaiton
2
4
6
2
2
3
3
2 4
8
4
6" - 8'
Light Brown Sand with S ell
4
3
8
13
6
5
8
7 5
16
8
11
9
9
9 10
22
10
12
10
I I
A A
A
12
8'- 18'
Bluish Gray Sand with S ell
A
A
13
A A
14
A
A
15
8 13
24
16
11
10
17
A A
18
18'- 21'
Brown Sand with Shell
A
A
19
A A
A
20
A
A
21
18 16
35
22
21'- 25'
Limerock with Shell
19
18
23
A A
A
24
A
A
25
A A
26
27
28
29
30
Water Level: 31111 Below Lan Surface
A Auger
Dederal
Mingineering
10JOC;"Oesting, Inc.
SPT Test
Client: Darren Casey
Project: Proposed Residence
Address: 2304 Atlantic Beach Blvd
North Hutchinson Island, FL 34949
Report
Phone: 954-784-2941
E-Fax: 954-784-7875
admin@fed-eng.com
www.fed-eng.com
Date of Test: September 2, 2020
Hole No.: B-2
Location: See Attached Drawing
ins
Depth (FT)
Soil Descripti
1 01
Hammer Blows
"N"
1
0" - 6" Tops il & Vegetation
4 4
2
6" - 5' Pale Gray Sand with Shell
3 3
7
3
2 3
8
4
5 4
8
6
9 10
17
7
9 8
8
11 7
19.
9
13 11
22
10
5'- 17' Bluish Gray Sand with Shel-
11 10
11
A A
12
A A
A
13
A A
14
A
A
15
—A
8 9
16
12 8
21
17
A A
18
IT- 22' Brown Sand with Shell
A
A
19
—A
A A
20
A
A
21
—A
17 19
'22
22'- 25' Limerock
19 16
38
23
A A
A
24
A A
25
A A
26
27
28
29
30
T-1
Water Level: 21811 Below Land Surfice
A = Auger
L L-1
.ol
Site Location,
Ns
lk
Image -�D 2020 TerraMetrics
J)
S-V
-k
B -2,'o
r2304 Atlantic Beach Blvd
B-1
f r
0
ederal
,&ngineering
esting, Inc.
Soil CWsifications
Correlation of Penetration Resistanci with Relative Density and Consistency
S 1-
andk-
Dynamic Cone Penetrometer
Penetrometer Resistance
Standard enetration
Bamm�rBlows
Relative Density
0-10
10-4
Very Loose
11-25
15-10
Loose
26-45
11-20
Firm
45-75
21-30
Very Firm
76-120
31-50
Dense
> 120
1 > 50
Very Dense
silts & C lay
Dynamic Cone Penetrometer
Penetrometer Resistance
Standard Penetration
Hamm�rBlows
Relative Density
0-6
10-2
Very Soft
7-15
13-5
Soft
16-30
6,-10
Firm
31-45
11-15
stiff
46-90
116-30
Very Stiff
91-150
�j -50
Hard
Rock Hardneis Description
Soft
Rock core crumbles when handled
Medium
Can break core with your hands
Moderately Hard
Thin �dges of rock core can be broken with fingers
Hard
Thin ed es of rock core cannot be broken with fingers
�g
Very Hard
R6ck core rings when struck with a hammer
Sand Quantity Modifiers .
Very Slight Trace
0-2%
Slight Trace
2-5%
Trace
5-10%
Little Trace
10-15%
Some
15-30%
With
>30%
Silt - Clay Quantity Modifiers
Slightly Silty /Clayey
0-5%
Silty / Clayey
5-30%
Very Silty / Clayey
30-50%
Particle Si2e
Boulder
> 12 in
Cobble
3 - 121
Gravel
4.76 mm - 3 in
Sand
0.074 mm - 4.76 mm
Silt
1 0.005 mm - 0.074 nim
Clay
I < 0.005 mm
Drilling & S
The soil borings were installed in accordance with Stand
Representative samples were collected utilizing spilt-ba
"Penetration Tests and Spilt -Barrel Sampling of Soil in
laboratory analysis were performed/collected during the i
Penetration Tests
During the sampling procedures, Standard Penetration T
standard penetration value (N) of the subsurface soil. The
blows of a 140-pound hammer falling thirty (30) inches, rei
subsurface soil. The sampler was lower into the bottom of
the hammer. The number of blows was recorded for ea
penetration. The "N" value is obtained by adding the secor
Water Level Measurements
Water Level depths were obtained during the test boring
Aicated depths are usually reliable groundwater levels.
recent rainfall conditions may influence the depths to grc
Soil Properties / Classification
All samples collected were classified in accordance with
soil material properties and compared with published liten
Ground Surface Elevations
Ground surface elevations have not been provided for the
of the various strata and materials encountered were from i
Aederal
gineering
esting, Inc.
ling Procedures
Penetration Tests procedures as set forth in ASTM D- 15 8 6.
techniques in accordance with the procedures set forth in
TM D-1586. The following field tests, measurements and
llation of each soil boring.
ts were performed at five (5) foot intervals to obtain the
-.andard penetration value (N) is identified as the number of
ired to advance the spilt -barrel sampler one (1) foot into the
e previously cleaned drill hole and advanced by blows from
� of the three (3) successive increments of six (6) inches
and third incremental numbers.
s. In relatively pervious soils, such as sandy soils, the
variations, tidal conditions, temperature, land -use and
levels.
Unified Soil Classification System criteria to determined
of the USDA Soil Conservation Survey.
A boring locations. Therefore, all references to depth
grade at the time of the drilling operations.
Limitati
Warranty
We warrant that the services performed by Federal Engineering and Testing,
Inc. (F.E.T.) are conducted in a manner consistent with the level of skill and
care ordinarily exercised by members of the profession currently practicing
under similar conditions. No other warranties, expressed or implied, are
made. While the services of F.E.T. are an integral and valuable part of the
design and construction process, we do not warrant, guarantee, or insure the
quality or completeness of services or satisfactory performance provided by
other members of the construction process and/or the construction plans and
specifications which we have not prepared, nor the ultimate performance of
building site materials. As mutual protection to clients, the public and
ourselves, all reports are submitted as the confidential property of clients, and
authorization for publication of statements, conclusions or extracts from or
regarding our reports is reserved pending our written approval. Reports are
not intended for 3rd party use.
SubsuiJace Exploration
Subsurface exploration is normally accomplished by test borings. The soil
boring log includes sampling information, description of the materials
recovered, approximate depths of boundaries between soil and rock strata and
groundwater data. The log represents conditions specifically at the location
the boring was made. The boundaries between different soil strata
a(W "cated at specific depths; however, these depths are in fact approximate
a��-a�.-pendent upon the frequency of sampling. The transitions between soil
stratum are often gradual. Water level readings are made at the time the
boring was performed and can change with time, precipitation, canal levels,
local well drawdown, and other factors. Regardless of the thoroughness of a
Geotechnical exploration there is always a possibility that conditions may be
different from those of the test locations; therefore F.E.T. does not guarantee
any subsoil condition surrounding the bore test holes. For a more accurate
portrayal of subsurface conditions, the site contractor should perform tests
pits. If different conditions are encountered, F.E.T. shall be notified to review
the findings and make any recommendations as needed.
Laboratory and Field Tests
Tests are performed in accordance with specific ASTM Standards unless
Dtherwise indicated. All criteria included in a given ASTM Standard are not
always required and performed. Each test report indicates the measurements
and determinations actually made.
Ownership of Tests I Reports
All test results and/or reports prepared by F.E.T. pursuant to this agreement
and/or Addendum(s) thereto, shall remain the property of F.E.T. until all
monies due and owing to F.E.T. under this Agreement and/or Addendum(s)
thereto, are paid in full.
Analysis and Recommendations
ry 1echnical report is prepared primarily to aid in the design of site work
__,,��tural foundations. Although the information in the report is expected
:o be sufficient for these purposes, it is not intended to determine the cost of
,onstruction or to stand alone as construction specifications.
(fdgederal
ineering
esting, Inc.
of Liability
Analysis and Recommendations cont.
In accepting this report the client understands that all data from the soil boring
is intended for foundation analysis only and is not to be used for excavating,
backfilling or pricing estimates. In accepting this report the client understands
that all data from the soil boring is intended for foundation analysis only and
is not to be used for excavating, backfilling or pricing estimates. The site
contractor must familiarize themselves with the job site conditions. Soil
boring(s) on unmarked vacant property or existing structure(s) to be
demolished is considered preliminary with further boring(s) to be performed
after proposed building pad is staked out. Report recommendations are based
primarily on data from test borings made at the locations shown on the test
boring reports. Soil variations may exist between borings and may not
become evident until construction. If variations are then noted, F.E.T. must
be contacted so that field conditions can be examined and recommendations
revised if necessary. The Geotechnical report states our understanding as to
the location, dimensions, and structural features proposed of the site. Any
significant changes in the nature, design, or location of the site improvements
must be communicated to F.E.T. so that the Geotechnical analysis,
conclusions, and recommendations can be appropriately adjusted.
Construction Observations
Construction observation and testing is an important element of Geotechnical
services. The Geotechnical Engineer's Field Representative (Field Rep.) is the
.1owner's representative" observing the work of the contractor, performing
tests, and reporting data from such tests and observations. The Geotechnical
Engineer's Field Representative does not direct the contractor's construction
means, methods, operations, or personnel. The Field Rep. does not interfere
with the relationship between the owner and the contractor, and except as an
observer, does not become a substitute owner on site. The Field Rep. is only
collecting data for our Engineer to review. The Field Rep. is responsible for
his/her safety only, but has no responsibility for the safety of other personnel
and/or the general public at the site. If the Field Rep. does not feel that the
site is offering a safe environment for him/her, the Field Rep. will stop his/her
observation/ testing until be/she deems the site is safe. The Field Rep. is an
important member of a team whose responsibility is to observe the test and
work being done and report to the client whether that work is being carried
out in general conformance with the plans and specifications.
Limitations ofReport
Federal Engineering & Testing, Inc. shall have no liability, in contract, tort or
otherwise, for any inaccuracy, defect, or omission in interpreting this report
and shall not in any event have any liability for lost profits or any other
indirect, special, incidental, consequential, exemplary or punitive damages. In
the event of future conflict between owners and contractors the following
applies: F.E.T.(s) legal and/or company representation and preparation for
representation fees will be billed on an hourly rate, i.e. deposition, expert
witness, etc. F.E.T. has no obligation to amend its conclusions or
recommendations after the date of this report. Any alterations or changes in
the location of the project should be brought to our attention at the earliest
convenience for review and applicability of this report.
Dederal
03'angineering
'Aj�oesting, Inc.
Soil /Aggregate Tests
Soil Borings
Density Compaction Tests
Grain Size Analysis
Moisture Contents
Soil Classifications
Limerock Bearing Ratios
Florida Bearing Values
Specific Gravity
Carbonate Analysis
Hydraulic Conductivity
Organic Contents
L.A. Abrasion
FDOT Inspections
QC Management
Earthwork Inspections
QC Concrete Inspections
QC Asphalt Inspections
Phase I Site Assessments
Site Inspections
Research of Property Records
Partial List of Services
Field Inspection Se ices
Fill & Quality Control Inspections
Demucking Inspections
Building Inspections
Pile Driving Inspections
Pile Load Tests
Steel Inspection
Threshold Inspection
Bolt Inspection
Weld Inspection
Vibration Monitoring
Geotechnical Engir
Foundation Engineei
Foundation Design 8
Subsoil Investigation
Pile Load Calculatior
Piling Installation Mo
ng
Recommendation
Phase 11 Site Assessments
Phase I Follow up on Contaminated Sites
Installation of Monitoring Wells
Soil Borings
Soil and dround Wat�r Analysis
TAS 105 Field Fastener Withdrawal Test
TAS 106 Tile Uplift Test
TAS 124 Bell Chamber / Bonded Pull Test
TAS 126 Moisture Survey
Windload Calculation
Drainage Calculations
Lightweight Concrete placement Inspection
Roof Assessment / Evaluation
Cap Sheet Inspection
Fastener Spacing Inspection
Tile/ Shingle/ Standing Seam Inspection
Base Sheet Installation Inspection
Insurance Mitigation
Retrofit Mitigation/Certification
Roof Drainage Calculations
Phone: 954-784-2941
E-Fax: 954-784-7875
admin@fed-eng.com
www.fed-enci.com
Asphalt Services
Backscatter Density Tests
Extractions & Gradations
Marshall Limits
Bulk Specific Gravity
Cores for Thickness Determination
Asphalt Pavement Monitoring
Asphalt Assessment
Concrete Tests
Concrete Strength Testing
Slump Tests
Windsor Probe Testing
Schmidt Hammer Testing
Core Testing
Air Content
Concrete Unit Weight
Flexual Strength Testing
Lead Base Paint Surveys
Report and Analysis
Air Monitoring
IRIN(;
RMS OF im
Z
11CRUNCE
J0
12MEM2
MIAMI-D=ADE
FD97T