Loading...
HomeMy WebLinkAboutSEWAGE CONSTRUCTION INSPECTION & FINAL APPROVALAPPLICATION #:AP1220563 STATE OF FLORIDA PERMIT #:56-SF-1653199 DEPARTMENT OF HEALTH DOCUMENT #:FI1056149 ONSITE SEWAGE TREATMENT AM DI I SP - OSAL SYSTEM DATE PAID.01/19/2016 CONSTRUCTION INSPECTION AND Ult� P FEE, PAID:515..00 low RECEIPT #:56-PID-2879212 APPLICANT: Ralph Jr. & Catherine Ray St L Cie, Go AGENT: BSE Construction Group I PROPERTY ADDRESS: 485 Bridlewood Way FortPierce, FL34,945 I LOT: 2 BLOCK' E I SUBDIVISION: Dorian ID#: Q 10-801-0060-000-2 1 CHECKED [XI ITEMS ARE NOT IN COMPLIANCE WITH STATUTE OR RULE AND MUST BE CORRECTED. TANK INSTALLATION SETBACKS [01] TANK SIZE [1] 1090.00 [21 1 [271 SURFACE WATER FT 1 [021 TANK MATERIAL Polyethylene ] [28] DITCHES 36 FT 1 [031 OUTLET DEVICE 1 [291 PRIVATE WELLS. 75 FT 1041 MULTI -CHAMBERED ] (301 PU13LIC WELLS FT [051 OUTLET FILTER Polylok PL-68 ] [311 IRRIGATION WELLS FT 2 [061 LEGEND 1. 70-143-11 DC3 2. ] [321 POTABLE WATER 34 FT. 1 [071 WATERTIGHT 1 [331 BUILDING -FOUNDATIONS 7 FT (081 LEVEL 1 [341 PROPERTY LINES 15 FT [091 DEPTH TO LID 1 [351 OTHER FT DRAINFIELD INSTALLATION FILLED / MOUND SYSTEM [101 AREA [1] 509.4 [21 QFT [361 DRAINFIELD C . OVER [11] DISTRIBUTION BOX _'�EADER X [371 SHOULDERS [121 NUMBER OF DRAINLINES 1. 6.00 2. [381 SLOPES [131 DRAINLINE SEPARATION [391 STABILIZATION 05/24/2016 [14] DRAINLINE SLOPE 1 [151 DEPTH OF COVER ADDITIONAL INFORMATION [161 ELEVATION I BELOW I BM 4.00 1 (401 UNOBSTRUCTED AREA [171 SYSTEM LOCATION 1 (411 STORMWATER. RUNOFF [181 DOSING PUMPS 1 [421 ALARMS [191 AGGREGATE SIZE ] [431 MAINTENANCE AGREEMENT [201 AGGREGATE EXCESSIVE FINES ] (441 BUILDING AREA [213 AGGREGATE DEPTH 1 [45] LOCATION CONFORMS WITH SITE PLAN FILL / EXCAVATION MATERIAL 1 [461 FINAL SITE GRADING [221 FILL AMOUNT 1 [471 CONTRACTOR MICHAEL W STUHR (ASHTO [231 FILL TEXTURE ] (481 OTHER INFILTRATOR Quick4 Plus EQ36 LP [241 EXCAVATION DEPTH ABANDONMENT [251 AREA REPLACED ] [491 TANK PUMPED 01/27/2016 [261 REPLACEMENT MATERIAL 1 (501 TANK CRUSHED & FILLED 01/27/2016 Comments: Comments are on page 2. St. Lucie CHD DATE: 04/28/2016 CONSTRUCTION DISAPPROVED Envir onmental Specl ian i Ingram (ENVIRONMENTAL HEALTH) FINAL SYSTEM DISAPPROVED 1: d" t,,_— �9� St. Lucie CHD DATE: 05/24/2016 (Explanation of violations on following page) Environmental Specla;r 8 1 r an i Ingram (FNVIKUNlVll=NTACTMTH) DH 4016, 08/09 (Obsoletes all previous editiLs which may not be used) Page 2 of 3 Incorporated: 64E-6.063, FAC EID1653199 EH Database v 1.0.1 AP1220663 RECEIVED MAY-2`6 2016 STATE OF FLORIDA DEPARTMENT OF HEALTH ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM CONSTRUCTION INSPECTION AND FINAL APPROVAL Violation Number Comment APPLICATION #:AP1220663 PERMIT#: 5&SF-1 653199 DOCUMENT #:FI1056149 DATE PAID:01/19/2016 FEE PAID -.515. 0 0 RECEIPT #-.56-PID-2879212 Comments The -system is sized for 3 bedrooms with a maximum occupancy of 6 persons (2 per bedroom), for a total estimated flow of 300 gpd. Permit and SE modified from bed to trench after inspection. No violations, system ok to cover. Contractor notified by phone. Needs final inspection for'Mound system. New well arid well �abandonment inspected. 6 lines x 7chambers long, ith 3 chambers tied on end. Final system approved. Contractor and building department emailed qnal approval. DH 4016, 08/09 (obsoletes all previous editions whi incorporated: 64E-6.603, FAC EH Database v 1.0.1 APIZ may not be used) EID1653199 Page 2 of 3