Loading...
HomeMy WebLinkAboutCONSTRUCTION PLAN - PAVING-GRADING DRAINAGEVA 44 WMAA TOWNHOM S IN SECTION 27, TOWNSHIP 35 SOUTH, RANGE 40 EAST ST. LUCIE COUNTY, FLORIDA PREPARED FOR OLEANDER PROP RTI S OF FT. PIERCE, c ti EDWARDS ROAD , i F V _ 1M, Q �� w� of j ,° SOUTHLAND, DR. LLr z7 1 DixIELnN L' I i If � I1 � — r l*is PROJECT L .�.L ... ,. FARMER M, RKET RD. �----------- __7 r. ti• i, LOCATION MAP N.T.S. SECTION 27, TOWNSHIP 35 SOUTH, RANGE 40 EAST FILE NAME: 17-007.002 DETAILS & COVER SHEET.DWG MON , PLANS FOR CONSTRUCTION OF THE FOLLOWING ITEMS: 1, BUILDING NUMBER 1,2 AND 3 AND ASSOCIATED DRIVEWAYS. 2. LANDSCAPING ASSOCIATED WITH BUILDING NUMBER 1,2 AND 3. 3, ASPHALT ROAD. 4. STORM WATER DETENTION AREAS AND SWALES. 5. STORM WATER DRAINAGE PIPING AND INLETS. 6. 2" WATER MAIN AND SERVICES UP TO CURB STOPS, 7. 8" GRAVITY SEWER MAIN AND ALL SERVICES UP TO CLEANOUTS. 8. 2 SANITARY MANHOLES. CULPEPPER TIC AN PROJECT VICINITY & TERPEN I NG INC CONSULTING ENGINEERS I LAND SURVEYORS 2980 SOUTH 25TH STREET * FORT PIERCE, FLORIDA 34981 * (772) 464-3537 151 S.W. FLAGLER AVE * STUART, FLORIDA 34994 * (772) 220-3376 STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS AUTHORIZATION NO. 4286 ALL ELEVATIONS SHOWN ARE NGVD 1929. TO CONVERT ANY ELEVATION TO NAVD 1988 SUBTRACT 1.49'. INDEX TO SHEETS SHEET NO. DESCRIPTION 1 COVER SHEET 2 HORIZ. CONTROL AND PAVEMENT MARKINGS 3 PAVING, GRADING, DRAINAGE PLAN 4 UTILITY PLAN & PROFILE 5 1 PAVING, & DRAINAGE DETAILS 6-7 UTILITY DETAILS 8 SWPP & CLEARING PLAN 9 SWPP DETAILS 10 SPECIFICATIONS LEGAL DESCRIPTION LOTS 3, 4, 5 AND 6, BLOCK 7 OF DIXIELAND SUBDIVISION, AS DELINEATED UPON "AN UNRECORDED PLAT OF DIXIELAND SUBDIVISION IN THE SOUTHEAST QUARTER OF SECTION 27, TOWNSHIP 35 SOUTH, RANGE 40 EAST", WHICH IS ATTACHED TO A DEED OF CONVEYANCE FILED NOVEMBER 15,1949 AND RECORDED IN DEED BOOK 152, PAGES 401-403 OF THE PUBLIC RECORDS OF ST. LUCIE COUNTY, FLORIDA. CONTAINING 0.953 ACRES, MORE OR LESS.Py APPROVED Approval Order Planning & Development Setvlces DATE: 1/9/2019 REVISIONS SHEET NO. DATE E M� J°pt°\0 O•. �\ C E N S . /,L ���� ���� No 7904 JAN 10 2019 RECEIVED * .W �p STATE OF :41j R at VL4. MORIN, P.E. FL. REIG. NO. 79043 DIXIELAND TOWNHOMES C&T PROJECT NO. 17-007.002 SHEET 1 OF 10 0 5; m rn C14 0 0- rr C-4 O O O rn O V) 0 0 X 0 0 0 0 0 DIXIELAND DRIVE (60' ROVI) --------------- 7 --------------------------------------------------------------------------------------------------------------------------- AS, ROW 15' LAB r16.0 I 80, 114 to 10' LANDSCAPE BUFFER W, I u,u,,r4l,r'uRlFr-FR I FIELD B,K./PG.1 ;2/ BUILDING 5 UNIT A MIN. FFE=22.40 rn bo CN' BUILDING 5 NUNIT B MIN. FFE=22.40 CULPEPPER & TERPENING, INC CONSULTING ENGINEERS I LAND SURVEYORS 2980 SOUTH 25th STREET & FORT PIERCE, FLORIDA 34981 151 SW FLAGLER AVENUE - STUART, FLORIDA 34994 PHONE 772-464-3537 * FAX 772-464-9497 * w .ct-eng-com STATE OF PWRID A CERTIHICA'110\ N. LB 4286 :F Al2+64,32 EdL= -------------------------------------------------------------------- cl) cn BUILDING 1 UNITT NIT A cu MIN. FFE=22. m, MIN. FFE=22.45 F'1,2 33" BUILDING 1 UNIT B MIN. FFE=2�*45 I MIN. FFE=22.45 C? c) cl) t35,67' N 2 Z 8009A 37' 8,00, 8 33' 5 9' BUILDING 2 UNIT A FFE=21.95 BUILDING 2 UNIT B FFE=21.95 �1 3.59'� BUILDING 3 UNIT A MIN. FFE=22.45 BUILDING 3 UNIT B MIN. FFE=22.4! NOTE: DIMENSIONS FOR BUILDING 1 ARE TYPICAL FOR ALL REMAINING BUILDINGS. PATIO TYP -AC PAD T'(P. 10' LANDSCAPE BUFFER -REVISIONS- BY DATE REVISED PLAN SHEET. UPDATED DIMENSIONING. DEM 9/21/18 BY DATE DESIGNED ER 8/21/18 CALCS. ---- ---- DRAWN ER 8/21/18 DETAILED ---- ---- CHECKED DEM 9/21/18 APPROVED — — — — I ---- I GRAPHIC SCALE 20 0 10 20 IN peer I I inch = 20 ft. APPROVED Approval # I DIXIELAND TOWNHOMES PWIWJM & Development Services JAN 10 2019 RECEIVED E E N g z NO 79043 TATE VID E. MO IN, P.E. FL. G. HORIZONTAL CONTROL AND PAVEMENT MARKINGS DATE: 8/21/18 HORIZ. SCALE: 1" VERT. SCALE: NA JOB No. 17-0( SHEET 2 of I z Of 0 0 d 0 m f d a0 65 m 0 N 0 0- DIXIELAND TOWNHOMES SITE DATA APPLICANT: PROPERTY OWNER BRIAN P. BEAN, DIRECTOR BRIAN P. BEAN, DIRECTOR OLEANDER PROPERTIES OF FORT PIERCE, LLC OLEANDER PROPERTIES OF FORT PIERCE, LL( 5900 SILVER OAK DRIVE 5900 SILVER OAK DRIVE FT. PIERCE, FL 34982 FT. PIERCE, FL 34982 ENGINEER: SURVEYOR: DAVID MORIN, P.E. TOM KIERNAN, P.S.M. CULPEPPER & TERPENING, INC. CULPEPPER & TERPENING, INC. 2980 SOUTH 25TH. STREET 2980 SOUTH 25TH. STREET FORTPIERCE,FL 34981 FORTPIERCE,FL 34981 PHONE: (772) 464-3537 PHONE: (772) 464-3537 ARCHITECT: ANDERSON SLOCOMBE, AIA FLORIDA CARIBBEAN ARCHITECTURE, INC. 7 ERWOOD PLACE BOYNTON BEACH, FL 33426 PHONE: (561) 308 6694 1.) PROJECT NAME: DIXIELAND TOWNHOMES 2.) LOCATION: 310 DIXIELAND DRIVE FORT PIERCE, FLORIDA 34982 3.) PROJECT DESCRIPTION FIVE 2- 4.) SEC/TOWNSHIP/RANGE: SECTION 27 /TOWNSHIP 35S / RANGE 40E 5.) PARCEL ID NUMBER: 2427-801-0087-000/9 6) SITE AREA: TOTAL SITE AREA 0.95 ACRES 41,382 SF 7.) ZONING: RM-11 8.) LAND USE: MULTI -FAMILY RESIDENTIAL 9.) DENSITY: ALLOWABLE: 11 UNITS PER ACRE = 10.45 UNITS ACTUAL: 10 UNITS 10.) FLOOD ZONE: ZONE X Map Number 12111C0189J 11.) REQUIRED SETBACKS: REQUIRED MINIMUM FRONT 25 FEET REAR 15 FEET SIDE 10 FEET LANDSCAPE BUFFER 10 FEET 12.) BUILDING HEIGHT: ACTUAL 22'-6" MAX. ALLOWED 35' 13.) SITE COVERAGE DESCRIPTION ACREAGE SQ. FT PERCENT OF SITE GROSS SITE AREA 0.95 41,382 100.000/1, BUILDING COVERAGE 0.22 9.485 22.92% MAX. ALLOWABLE COVERAGE 0.38 16,553 40.00% 14.) UTILITYSERVICE: WATER SERVICE: FPUA WASTEWATER SERVICE: ELECTRIC SERVICE: FPUA 15.) ROAD FRONTAGE: ACTUAL: 176.88 FEET MINIMUM PER CODE: 60 FEET 16.) LOT WIDTH: ACTUAL: 176.88 FEET MINIMUM PER CODE: 100 FEET THE S TORM WA TER MA NA GEMEN T SYSTEM FOR DIXIELAND TOWN HOMES SHALL BE OWNED AND MAINTAINED BY IS THE PROPERTY OWNER. THE SYSTEM A DRY DETENTION SYSTEM USING A 3-INCH ORIFICE TO CONTROL THE DISCHARGE FROM THE SITE. FPUA NOTES: 1) ALL ELEVATIONS AND BENCHMARKS SHOWN • HEREON ARE RELATIVE TO THE NATIONAL GEODETIC VERTICAL DATUM (N.G.V.D.) OF 1929. 2) SURVEY DATA PROVIDED BY CULPEPPER & TERPENING, INC., DATED JANUARY 19, 2017. Know what's below. Call before you dia. 4-; OHT ROW_ _ - - - - H� - - r- c4 X O iU , QkiU _ 7, c�� Vq - pHD OHU,.IU -�3 OHUbI HD. _ _ X., _. _ v, � X�q, �X � � X'�x���5 X,oa�X'��° 1�� X X X X � X n 16�� a'. �� }o k h�� ��} STA12+64.32X��� �F1 bX1--------------------x _. ----- '----- --------- ---------------------------- = � _--- ii- X'\ T MATCH EXISTING s2. 14' 41 30•w (ILL` 1 I 254.313' _ - o.- r -+ �� ter-/\ I) 20- N �IMATCH EXISTING X1 D DIX I E A N D DRIVE (6 0' R 0 W) 2k 1 c� -------------------�� --------- ---------- -- ------ 4 ------------------------------------------ -------------- ----- ------------- - hb,l_L RI-1 STOP SIGN `b. MES 6 " & 24" STOP, .....GA S, 2424 AN -1j9 X1`b' F �2,roFlzxle• - c r' 4 8 v/�i, _ ✓� v ^ --> - CONNECT TO ERCPo o.az16 - - -�- R 0 W', MES 5 '176.879' EXISTING SWALE a. -`` EXISTING 16 OAK TREE \S 36 ,_s118.60"W �- (TO BE PRESERVED) ID°0L 77 LAN DSC E: i� l Ice iae � me +^a X -J '\ �,�.. OS-1 IC BUFFCR 9.40 `. r cr - EXISTING 16" OAK TREE (TO BE PRESERVED) r 1 -- S -DRP - - ALL ELEVATIONS SHOWN v SWALE 2 ARE N GVD 1929. TO EXI (NG i6" OAK TREj i I f i Q yam - TO BE PRESERVED CONST. 22 LF OF 15" DDP 1 c ST z21 (>P;J �` IecP o 0.0ox CONVERT ANY ELEVATION - S-2 RCPo a'o �- X�� o XA, 10' LANDSC E N 20.83 TO NAVD 1988 SUBTRACT BUFFER ; BUILDING 1 E a A x ! UNIT'A ___(_T���BE, PRESERVED) ;3rs'"- 1 1 . 49 �.' �� � n 19.10 21.03 : i1s'�- ' HP MIN. FFE=22 451� , fl. �i INSTALL TREE BARRICADE �� tii.1Tr1P. FOR PRESERVATION L' , 77. i I BUILDIN& 5 UNI3'A1 1, MIN. IF FE40 .,�I . D h M^ D I. tM\7 I BUILDING 5' SWALE 1 UNIT B r2L Q �j MIN. FFE 2,40 zo.ss IJa in X � TREE PRESEERVATION 14" PALM 10" OAK 12" OAK 14" PALM BARRICADE PER DETAIL LEGEND L -- EXISTING PAVEMENT EXIST. WATER MAIN Now PROPOSED ASPHALT PAVEMENT ` EXIST. 2" WATER SERVICE PROPERTY LINE - PROP. SANITARY/WATER SERVICE -TB PROPOSED TOP OF BANK SHEET FLOW PROPOSED POND BOTTOM PROP. DRAINAGE -PROPOSED SWALE BOTTOM SWALE 5 EXIST. OAK TREE 20.00 PROPOSED ELEVATIONS } n EXIST. PALM TREE E) IST. ELEVATIONS r7 f} jwr' DDP DRY DETENTION POND - - LANDSCAPE BUFFER SINGLE SANITARY CONNECTION ♦� SINGLE WATER CONNECTION DOUBLE SANITARY CONNECTION DOUBLE WATER CONNECTION I FI F RFF I FIELD BK./PG. CULPEPPER & TERPENING, INC CONSULTING ENGINEERS I LAND SURVEYORS 2980 SOUTH 25th STREET • FORT PIERCE, FLORIDA 34981 151 SW FLAGLER AVENUE • STUART, FLORIDA 34994 PHONE 772-464-3537 • FAX 772-464-9497 e w .ct-eag.com STATL ON' FLORIllA CN1tTlY ICATION N,. 1134286 II DDP 5 FIRE TR K TURNARO D CONST. 29-21, 2 GUEST PARKING 20.93 t D SPACES 2L44 I I L%m BUILDING,4 zlso UNIT A RI MIN. FFE=22.45 BUILDING 4 UNIT B JI MIN. FFE=22.45 �� 2L8Q 20 flQ -mil t L IM JI\\ SWALE 4 INSTALL TREE J BARRICADE I e BUILDING 1 I� I N UNIT B N _.,_. MIN. FIFE II � . M "I: i � aoi 20.67 ;- B)A6ING 2 UNIT A FFE=21.95; `BUILDING UNIT B I� ?, FFE=21.95 20.00 mr FIRE TRUCK TURNAROUND BUILDING 3 II UNIT A MIN. FFE=22.45 r@izITi I I t pq1'6 BUILDING 3 I N �,. UNIT B:' MIN. FFE=22.4 I� m OBUFFER IL )``0 177.804 SWALE 3 �STA. 0+00.00 EXISTING 12" PALM TREE (TO BE PRESERVED) X: A PAVING. GRADING. & DRAINAGE PLAN - REVISIONS - BY DATE REVISED FOR ST. LUCIE COUNTY REVIEW DEM 01/08/19 BY DATE DESIGNED ER 8/21/18 CALCS. ---- ---- DRAWN ER 8/21/18 DETAILED ---- ---- CHECKED I DEM 9/21/18 APPROVED I ---- ---- 1 X1\bg X1g1 PATIO TYR. X,gO I AC FjAD rd a X. 0 � 10' LANDSCAPE X°l BUFFER 1 X,\b X'I GRAPHIC SCALE 20 0 10 20 ( a1 MT) 1 inch = 20 it. DRAINAGE STRUCTURE TABLE STRUCTURE NAME STRUCTURE DETAILS CS-1 Cylindrical Structure RIM 19.00 Slab Top Circular N INV = 17.45 Frame SD-1 RIM = 20.35 TYPE 'C' INLET W INV = 18.25 SD-2 RIM = 20.68 TYPE 'C' INLET W INV = 17.00 E INV =17.00 DRAINAGE STRUCTURE TABLE STRUCTURE NAME STRUCTURE DETAILS MES-1 MITERED END SECTION E INV = 18.00 MES-2 E INV = 17.00 MITERED END SECTION MES-3 MITERED END SECTION W INV = 17.00 MES-4 E INV = 17.40 MITERED END SECTION MES-5 W INV = 17.40 MITERED END SECTION MES 6 S INV - 17.40 MITERED END SECTION APPROVED Approval Order n I Ro, ; -C;;j )C( DIXIELAND TOWNHOMES PMrmkV & Development services JAN 10 2019 RECEIVED \D ......... EM09j rrrr ate, O'•��C ENS*-.. rrri No 79043 STATE OF r� O • .` Al A DAVID E. MOR PAVING, GRADING & DRAINAGE PLAN 79043 DATE: 8/21/18 HORIZ. SCALE: 1"=20' VERT. SCALE: N/A JOB No. 17-007 SHEET 3 of 10 z Of 0 0 0 0 c m a m of m 0 m 0 a CONST. ROW (1) 6"X2" TS&V _ - TOP EL. = 14.80 - - - - - - - - - -�- p OHU OHU OHU OHU OHU OHU OHU �f}� OHU OHU OHU OHU OHU OPEN CUT & PATCH BSP #1 INSTALL 2" DR-9 HDPE SEE FPUA DETAIL W-6EXISTING 6" PVC WATER EXISTING 6" FIRE WATER MAIN MAIN HYDRANT IN 3' SCHEDULE STA12+64,32 6" GATE VALVE - �FF(10t1'-------------------------------------------------BENCH------------- -'-------------------------------�0 PVC-�VtSIN6-------- - --------- - BENCHMARK (5' BEYOND PAVEMENT ON - - - SANITARY MANHOLE RIM EACH SIDE) %j % � ELEV. 18.87 NGVD 11711-+ PROFILE GRADE DIXIELAND DRIVE (603 ROW) EXISTING 8" PVC C-6 .r LINE w SANITARY SEWER / ----------------------------------------- L------------------------------------------ ------------------------------------- I ROW C-4 176.879' C-5 I S89' 36' 48.60"W ANDS E L __ EXISTING SANITARY LANDS MANHOLE RIM EL=18.87 ALL ELEVATIONS SHOWN - - - -c -/ W. INV=13.29 ARE NGVD 1929. TO I CONST. 6" CONVERT ANY ELEVATION C-- o SAN. CLEANOUT (TYP.) TO NAVD 1988 SUBTRACT 10' LANDSCAPE I N-I I cP.D.S.) BUFFER CONST. 2" DR-9 POLYETHYLENE I i WATER MAIN WITH 3' SCHEDULE BUILDING 1 s' UE UNIT A 1.49. 40 PVC CASING UNDER ALL DRIVEWAYS MIN. FFE=22.45 (36" OF COVER) DS To ; DS MH j I I W. INVERT EL _ = 17.99 BUILDING 1 I N UNIT B rn BUILDING 5 INVERT i I, CN MIN. FFE=22.45 UNIT A N 3 MIN. FFE=22.40 I 04 z - 9T TD t0 I DS MH.. N N I BUILDING 5 I PATIO UNIT B " ro rrP. N (h N I MIN. FFE=22.40 INVERT EL AC PAD N = 17.55 BUILDING 2 I TrP. z I UNIT A C-1 FFE=21.95 133' TO UTILITY CROSSINGS DS MH .: I " 6 _. 70' LANDSCAPE CLEARANCE BOTTOM OF PIPE TOP OF PIPE FINISH GRADE PIPE COVER CROSSING ID TYPE (INCHES) (ELEV.) (TYPE) (ELEV) (TYPE) (ELEV) (INCHES) 18" X 12" RCP STORM OVER 2" 18.00 18.08 18" X 12" RCP 16.58' 2" POLYETHYLENE 20.13' 6.60" CROSSING 1 POLYETHYLENE WATER MAIN STORM WATER MAIN CROSSING 2 15" RCP STORM OVER 2" 18.00" 17.24' 15" RCP STORM 15.74' 2 POLYETHYLENE 20.10' 18.84" POLYETHYLENE WATER MAIN WATER MAIN CROSSING 3 15" RCP STORM OVER 8" 30.00" 16.91' 15" RCP STORM 14.41' 8" PVC SANITARY 20.75' 23.64" SANITARTY PVC SERVICE 23" X 14" RCP STORM OVER 8" 35.40" 17.17' 23" X 14" RCP 14 22' 8" PVC SANITARY 20.15' 17.76" CROSSING 4 SANITARY PVC STORM SERVICE CROSSINGS 23" X 14" RCP STORM OVER 2" 18.00" 17.17' 23" X 14" RCP 15.67' 2" POLYETHYLENE 20.20' 18.36" POLYETHYLENE WATER MAIN STORM WATER MAIN 2" EXISTING 8" PVC CROSSING 6 2" POLYETHYLENE WATER 29.16" 16.00' POLYETHYLENE 13.57' SANITARY 20.00' 45.48" MAIN OVER 8" SANITARY PVC WATER MAIN SERVICE NOTE: ALL LOCATIONS AND DEPTHS OF UTILITIES ARE APPROXIMATE AND ARE TO BE FIELD LOCATED AND VERIFIED BY CONTRACTOR. 28 24 20 16 SS-02 STA: 0+27.45, 7.85 R CONST. SAN. MH RIM EL. 20.85 N INV. 15.00 12 NOTES: • 1) ALL ELEVATIONS AND BENCHMARKS SHOWN • HEREON ARE RELATIVE TO THE NATIONAL GEODETIC e VERTICAL DATUM (N.G.V.D.) OF 1929. 2) SURVEY DATA PROVIDED BY CULPEPPER & TERPENING, INC., DATED JANUARY 19, 2017. Know what's below. Call before you dia. 0+00 FI ELD 15.00 I L I I BUILDING 4 I; UNIT A MIN. FFE=22.45E I I BUILDING 4 � � I UNIT B ' MIN. FFE=22.45 CONST. WATER SERVICE (TYP)�--+ BSP#2 CONST. BLOW -OFF -77 ASSEMBLY 1 +00 BUFFER BUILDING 2 ya m UNIT B I> FFE=21.95 ' CONST. SINGLE WATER SERVICE I (TYP.) BUILDING 3 I UNIT A INVERT EL MIN. FFE=22.45 I, = 17.99 201' TO 206' TO DS MH I INVERT EL = 17.99 I. BUILDING 3 UNIT B 10' LANDSCAPE BUFFER UTILTY PLAN UTILTY PROFILE scu.e: H: 1"-20' V1•-4' CONST. 219 LF OF 8" SDR-26 PVC SAN. 0 0.69X CULPEPPER & TERPENING, INC CONSULTING ENGINEERS I LAND SURVEYORS 2980 SOUTH 25th STREET • FORT PIERCE, FLORIDA 34981 151 SW FLAGLER AVENUE • STU ART, FLORIDA 34994 PHONE 772-464-3537 • FAX 772-464-9497 • w .ct-eng.com Sl :9T' Of H ORI D % CEItTIHCA I l O,A ]a-1114'86 MIN. FFE=22.4 I 89' 36' 48,60" E 177.804' PROFILE UNE GRADE CONST. 15" RCP STA. 2+08.77 BOTTOM OF PIPE EL.16.81 CONST. 14"X23" RCP STA. 2+40.07 DM OF PIPE EL.17.07 INV. 1 2+00 STA: 2+46.30, 7.86 R CONST. SAN. MH RIM EL. 19.60 S INV. 13.50 W INV. 12.80 C IAIV 19 on - REVISIONS - BY DATE REVISED FOR ST. LUCIE COUNTY REVIEW DEM Ot 08 19 2+80 2+80 BY DATE DESIGNED ER 8/21/18 CALCS. ---- ---- DRAWN ER 8/21/18 DETAILED ---- ---- CHECKED DEM 9/21/18 APPROVED I ---- ---- GRAPHIC SCALE 20 0 10 20 (vise) 1 inch = m & R LEGEND PROPOSED CONCRETE -- - EXISTING PAVEMENT NEW PAVEMENT PROPERTY UNE -- - PROPOSED TOP OF BANK 'PROPOSED POND BOTTOM PROPOSED SWALE BOTTOM EXIST. ELEVATIONS • 6" SANITARY CLEANOUT m SINGLE WATER CONNECTION DOUBLE SANITARY CONNECTION SANITARY STRUCTURE TABLE STRUCTURE NAME STRUCTURE DETAILS STA 2+46.30, 7.86 R SS-01 RIM = 19.60 48" SANITARY S INV = 13.50 MANHOLE W INV = 12.80 E INV = 12.90 SS-02 STA 0+27.45. 7.85 R 48" SANITARY RIM = 20.85 MANHOLE N INV = 15.00 ---cis--- EXIST. GAS LINE EXIST. WATER MAIN EXIST. SANITARY SEWER PROP. SANITARY PROP. WATER SERVICE PROP. DRAINAGE r EXIST. OAK TREE EXIST. PALM TREE I�? APPROVED Approval Order DIXIELAND TOWNHOMES l"MmAn d Development Ser&e6 JAN 10 2019 RECEIVED 0*0tPSeqP"w+'i ZI No 79043 sue: ¢Z p. STATE OF : mow. �i�0-.40R1Qr' ���� S At - till 7� )AVID E. MORIN, P.E. FL. RE . UTILITY PLAN & PROFILE 79043 DATE: 8/21/18 HORIZ. SCALE:1" = 20' VERT. SCALE: 1" = 4' JOB No. 17-007 SHEET 4 of 10 DIMENSIONS & QUANTITIES x n B [ E F I H 1 ry giAl 513E5 NfPE/E f1l Olx6 I5Y) so<u41< si,ph OwWe Y"A ieige Qo SYaMINP W<IgM- I ,ono MPo lo.l. 1, 11,A 01M 41`e .1w. 11", All, All l"ll I'll rs - nai ah p le 1%/ - —o.oa US B s E. " 3 3 '.... -_A1 > _ IS n' V SC� B3l' 5 _ 3 B 5 .. 11 . U e U t lY' f11 2 T 1< 1l >ag p 21 tlnS ", B 1>cB 11 lass n soB r Bso ie :loll '..11 ;lB. a .".M,m of<rengln.. 0 6an , . , of 4,ue m I'll T "C I I I {/ ,r I llo l V, 1'., �/ N All .1e �.. loll — 1 ....... TOP VIEW SINGLE PIPE MATCI Illool"I'll —L— eye onm , <o. B< Y tle, Ii �R P I I I I II i I 1 _. -- — --- — -- r..— it I < r., a Ee� WYI<.W� 1 TOP VIEW -MULTIPLE PIPE 11 All "I All SECTIONtl lAr `°'-<' '""" ,SINGLE AND MULTIPLE ROUND CONCRETE PIPE FY 20I7-18 Lvoex snEo� Ao FDOT4 DESIGN STANDARDS SIDEIDRAIIh M3THRIi F> E.Oill 5'F. d'T30N 273 lof7 MITERED END SECTION SECTION A -A N.T.S. SECTION D-D N.T.S. NOTES: 1) ALL ELEVATIONS AND BENCHMARKS SHOWN HEREON ARE RELATIVE TO THE NATIONAL GEODETIC VERTICAL DATUM (N.G.V.D.) OF 1929. 2) SURVEY DATA PROVIDED BY CULPEPPER & TERPENING, INC., DATED JANUARY 19, 2017. FINISHED FLOOR A. 1.0 FOUNDATION - PER ARCH PLANS --------------- EXISTING GRADE • • Know what's below. CBII before you N.T.S. PLAN �a � 11. alrn SECTION HORIZONTAL WALL REINFORCING SCHEDULES (TABLE 1) LL! HEOU (In'//il TYPE C Bo x<. I m rm. 11- lllll 1 wa-."..,rr.. <�x. TYPE 'C' INLET SOD AND LAA EXIST 9.0 17. " EXISTING V, u GRADE x'' nlr"` SECTION B-B 6.0% SLOPE N'AX') `- WATER ynivr o« I FIELD BK./PG.I 10' 1 _ 10' 1 I 6" 6„ I 6" I +0.1 0.0 +0.1 1.0% 1.07. \ CROSSWALK 30• RI-1 30• x 30• (TYR HIGH INTENSITY REFLECTIVE FDOT STANDARD STOP SIGN e' To 1z' 1 EDGE OF PAVEMENT � r i STOP SIGN & STOP BAR DETAIL N.T.S. (4: 1 SLOPE MAX.) SANITARY SEWER 1-1/2" TYPE SP 9.5 ASPHALTIC CONCRETE 6" LIMEROCK OR COQUINA BASE (LBR 100) COMPACTED TO 98% OF MAX. DENSITY PER ASTM D-1557 OR A.A.S.H.T.O. T-180 L12" STABILIZED SUBGRADE (LBR 40) COMPACTED TO 98% OF MAX. DENSITY PER ASTM D-1557 OR A.A.S.H.T.O. T-180 N.T.S. TYPICAL PAVEMENT SECTION CULPEPPER & TERPENING, INC CONSULTING ENGINEERS I LAND SURVEYORS 2980 SOUTH 25th STREET . FORT PIERCE, FLORIDA 34981 151 SW FLAGLER AVENUE . STUART, FLORIDA 34994 PHONE 772-464-3537. FAX 772-464-9497 . w .ct-eng.com S'I'A'l tH OF FLORIDA CERTIFICATION vo, LB 4286 6x6x10 WIRE WELDED MESH OR FIBERMESH. )A_ 31 DIXIELAND DRIVE U- 0 2 0_ SOD AND LANDSCAPE 7' —I 18, MATCH EXIST 4" CONCRETE PAVEMENT CLASS I — 4000 PSI 12" STABILIZED SUBGRADE LBR-40. COMPACT TO 95% MAXIMUM DENSITY. CONCRETE PARKING/DRIVEWAY PAVEMENT SECTION N.T.S. NOTE INSTALL j" EXPANSION JOINTS ALONG ALL BUILDING, CURB, GUTTER, AND INLET STRUCTURE FACES, AND CHANGES IN PAVEMENT MATERIAL. INSTALL CONTRACTION/CONTROL JOINTS AT A MAXIMUM OF 12' ON CENTER EACH WAY. JOINTS SHALL BE CUT TO A DEPTH OF 1-112". CONTRACTION/CONTROL JOINTS SHALL ALIGN WITH CURB JOINTS. 1 FINISHED FLOOR 21.9 19.1 &'3 FOUNDATION 20.0 LPER . ARCH._ PLANS ------- 17.5-------- -- - - �EX. GRADE PROPOSED GRADE SECTION C-C N.T.S. 4" Co SLAB 12"xi TOP ELEV. 17.50' 2' A A _ J 3"0 BLEEDER INV. 17.50' �-- B PLAN VIEW TYPE "C" INLET W/ STEEL GRATE R 12 x4 WEI 18.25 \ ERCP 3"O BLEEDER INV. 17.50' DRY DETENTION 12"x18" INVERT BOTTOM ELEV.= 17.50' ERCP ELEV. SEED & MULCH 17.50' rl 1 2'x2'x4" Co SLAB TOP ELEV. 17.50' SECTION A —A —REVISIONS — BY DATE 1010g1A29BiF1 _N 0 12%4" WEIR 12"x18" ERCP SECTION B—B CONTROL STRUCTURE CS-1 DETAIL N TS BY DATE DESIGNED ER ---- CALCS. ---- ---- DRAWN ER 8/21/18 DETAILED ---- ---- CHECKED DEM 9/21/18 APPROVED I---- ---- Plarmirtg & Development APPROVED services .,pprovol Order ^ JAN 10 2019 RECEIVED 3"0 BLEEDER INV. 17.50'`� ��FFFFTFtr�� ' \D E MO '*� 4P.GENSF /�,' ��0,A. No 79043 = 9 STATE OF ' ¢� :o� cL p P. ' ��4.` DAVID E. MORIN, P.E. FL. REG. NO. 79043 DATE:8/21/18 DIXIELAND TOWNHOMES HORIZ. SCALE: N/A VERT. SCALE: N/A PAVING & DRAINAGE DETAILS JOB No. 117-007 SHEET 5 of 10 FlNISHED MAXIMUM TRENCH WIDTH ORAOE 2 x PIPE DEPTH + W W PEACE AND PER SPECIF7CATM 0 2 3� W PIPEit MAX. WIDTH IN. 2� Z50 j MAX MAX INVERT --I- 1/2 PIPE "00. HAND PLACED LOWER QUADRANT TO BE SELECT MATERIAL SHAPED TO RECEIVE PIPE BELL AND BARREL NOTES.• 1) THE CONTRACTOR SHALL COMPLY WITH REQUIREMENTS OF THE FLORIDA TRENCH SAFETY ACT. 2) INITIAL BACKFILL SHALL BE HAND PLACED TO 12- ABOVE THE PIPE BACKFlLL SHALL BE MECHANICALLY TAMPED TO A MINIMUM OF f 00% OF MAX. DENSITY AS DETERMINED BY AASHTO METHOD T-99. TYPICAL TRENCH DETAIL N.T.S. IF TYPICAL TRENCH DETAILS M-1 R FYI PPo: oOEREIGwNEED^°180201 FWP, IERCEY0.5iEDWAL. UiIETRESENGI I" FLND AUTHORITY rs. A AWROLED' MtE` SHFET AC 1010 1 OE 1 te DRYCON DIRECT BURY LUG BY KIN - INNOVATIONS PART T1ER/LIN51 \ FINISH GRADE /12T-1ION CONTINUOUS jf0 THHN MULTI S R`ND TRADE WIRE i H HALF HITCH ON J ALF HITCH EACH SIDE BEHIND EACH BELL FINISH GRADE E ME ERB 70 BY F.P.U. JIO THHN MULTI STRAND CONDUCTOR COPPER � TRACE WIRE BRANCH SPLICE AT ALL TEES FIRE HYDRANTS & SERVICE TAPS HALF HITCH AT ALL SERVICE TAPS & EACH ENO OF ALL RMNGS YF-11 NOTES: 1) TRACE WIRE IS REQUIRED ON ALL PIPE AS NOTED BY UTILITIES ENGINEER AND SHOWN IN STANDARD DETAILS. 2) INCLUDE ALL COST OF AURA. & LABOR IN PRICE OF PIPE. 3) CONTRACTOR IS RESPONSIBLE FOR CONTINUITY OF ALL TRACE WIRE. TRACE WIRf (N.TS.) BACKFILLING R O IIR M NTS N.T.S. NOTES: 1) W CERTAIN SOIL CONDITIONS A FOUNDATION MAY BE REQUIRED. 2) BEDDING IS REQUIRED PRIMARILY TO BRING THE TRENCH BOTTOM UP TO GRADE. BEDDING MATERIALS SHALL PROVIDE A UNIFORM AND ADEQUATE LONGITUDINAL SUPPORT UNDER THE PIPE. 3) MUNCHING MATERIAL SHALL BE HAND PLACED TO THE SPRINCLINE OF ME PIPE. WTERX SHALL BE CONSOLIDATED UNDER THE PIPE AND HAND TAMPED TO PROVIDE ADEQUATE SIDE SUPPORT. 4) INITIAL BACKFILL MATERIAL SHALL BE HAND PLACED TO 12- ABOVE THE TOP OF PIPE THE SOIL SHALL BE COMPACTED TO f00% MAX. OENSITY(A4SHT0 T-99) 5) BACKFAL SHALL BE COMPACTED TO 100% OF MAX. DENSITY AS PER AASHTO 7-99, TO A POINT 30" BELOW PROPOSED PROFILE CR40E OR EXISTING GRADE. THE FINAL 30' OF SACKFUL. SHALL BE COMPACTED TO 98% OF MAX. DENSITY AS PER AASHTO T-1BO. 6) DENSITY TEST SHALL BE PERFORMED AT AREAS DETERMINED BY THE UTILITIES ENGINEER OR PERMIT AGENCY HAVING JURISDICTION, AT THE CONTRACTORS EXPENSE. 7) CONTRACTOR TO COMPLY WITH ALL FEDERAL, STATE AND LOCAL TRENCH SAFELY REGULATIONS. .AEE�BIi-TPFNCN 1 iMIBOFNflY W1mH puma _ _ 1ROlCN WOTN BEENOlE1 NBN4.E ®,H¢ AeNIAEn uEcwexxawxnrt ExO,RIGM9.B11'NA rEATmPNGF,ttsE D'!FNN) PLAN VIEW TAfX COO AuwsacEe ,r 1z AaPFW.TO amEacF TrPEaMaoWAero aE>mnR �°PN uATwMAD.wsrrmn0 �PMarl WasBlT� � �e E161N3 �-NW.YTKI(CPV ��� WWnaaaTr� I romNCWEte / _- TNT�wV,9sin aAasu�yN-i �e � oENBRYTiEa1IREMENrs: ,,� .+aoxrm,EvxN�wae.ENao®n s y� I .,omctm. a^)ww;,®Nleanna •oeW r-1R arAen®e�Aoa _�__:; 1]' •N1I i.1M. WPNWAY La63CEN '�tY T i tl%T+IRNII➢.MWT W1ELl TAN ♦ OB%F1R WNEYMY6 YAD1N •�ATIRNWMEDAIEA9EEY(YO Mxro1N.oPEFRON SECTION Vlf�YV moeaPlw.�Tr NOTE& ,. PMBHITOBiM910N9 TtltLPl311WNLLWRwN1Hf1E188lVALBF'FlALIMb WONT YdINFlAl WEWOMp013 WRFILH LAr&YAtIPNM LLBf80FMM. 2'MIOI.YIMIFLVp1CA IKICR COLLEC1MBlP0•IBCPEN 4YR'MIIHNM WfBCFM RDAON•dNIHaHTd, 4M BR91EMIFARCfI0X8WAllE 0.9UAD WrtHABRYLLTOfmILAEtE S MFNOi.£1801FHIlWIIMI@IRBtltMN'NIXYIFL,'IYMBApFCFB1 Wf YLYETWNRb TYE9ATIFEM�YIIN. I.MBITxN Nl6YH'.TIONBIWLBE WHUAOMnN'NPNMT1CCpK:K1E. NAtORIGRB00.l�BRMMOIB6TNYINLLXNL.WE WHMYM WITi/8P1YLT dLv W MMeigOMFA ATE WNIRYTCRN411RIN®lO[OCLMBLfMLPN4Y@M MAPoOMB NIAMT004HLLAY. M WIIPII:IO NIGENO/ WMRNB?NAFNNOBATM9raELO:MIOHa. MYH18.T IA19BI uAnarE NwL ae N AcwamNce ro Pnat aaCwn n1. 6IDXIPEI WATERNMLL WTCN WTM6l9E Y ITN.) STIMCIE COUNTY LIT&lPTROADCUT WATER&WASTEWATER PAVEMENT RESTORATION C MINTRUCTM STANDARDS .TUTU G15 PAVEMENT RESTORATION (COUFFrY) N OTES: 1) ALL ELEVATIONS AND BENCHMARKS SHOWN • HEREON ARE RELATIVE TO THE NATIONAL GEODETIC VERTICAL DATUM (N.G.V.D.) OF 1929. 2) SURVEY DATA PROVIDED BY CULPEPPER & TERPENING, INC., DATED JANUARY 19, 2017. Know what's below. Call before you dig. W ICa FT. PIERCE UTILITIES AUTHORITY FIELD BK./PG. NQ1E�: 1) THE ENGINEER SHALL BE RESPONSIBLE FOR DETERMINING THE REQUIRED LENGTH TO BE RESTRAINED BASED UPON THE PROJECT AREA SOIL TYPE PROPOSED TRENCH CONDITIONS AND DEPTH PRESSURE GF 150 PSI, AND A SAFETY FACTOR OF TWO (2). A DRAWING OF EVERY TYPICAL FITTING ASSEMBLY WITHIN THE PROJECT SHALL BE SUBMITTED WHICH REFLECTS THE RESTRAINT DETAIL PROPOSED FOR USE. INCLUDING LENGTH OF PIPE RESTRAINT. 2) REQUIRED RESTRAINED LENGTH CALCULATIONS SHALL ALSO CONSIDER THE CONDITIONS OF OTHER BENDS OR FITTINGS THAT WILL BE LOCATED WITHIN THE CALCULATED RESTRAINED LENGTH (L) OF THE BEND OR FMNG IN QUESTION. 3) EVERY JOINT OR FITTING MUST BE RESTRAINED ON BOTH SIDES OF THE BEND AND FOR TEES ALONG THE BEND ALSO. 049dAYA J oYav1AY 2,@L r 41Q1. 1 i y- - N C IT_ I 1r eorroM,Is*saNxr ecrsroeEvvN. , OAON46MxIflifTfPo11 CEMERtNEaplAOl]LpiNBT%E aF OPNi cur NnN tt war Trr& se FnOVLr as NATcx EAETrO ewvACE NATOUY.YYlB1p0lBSLE �6 mW,xcrxtl®XXENIIAIDIOYiTNCPTiRIpINWM C8.l11ID WONNCRt.®tl]OK NE�x'AiO.s NDTEam.avPal COrsncrloNfEtlIIRINBnn a�rrmmE aNN amuu. awavu arwL ee m+Arm N r uxEra Mdaa,MueauTnNWrAAn cDE.rcTEE roAwaal,eex Cp1MYNKR9iY�HPRN110T0. MlTgO C'. �a WOMt'MW1r. W1CN0RNr TYPENritfA]W®BOF AwlwraRTrPEea =. NOTE& 1. WmAc®oAserNreNUEoa!mwalweeeAeawruPAole 2 MBEANI@NtdWLRRAC6DNCLIY®YIXtNQ�161bYF. APPKG&TNOEAW UYOtT0�Ud1LV 4EGWAGA1LYCd.MCT®ITl (.rx10EiW�IY,�OEIkAIl9®BYMtl(IOF,R Y AMMLTCONTE. IHM'HH1rA]Ni9 NrteEvlA'L#CVFAtlH1F6. A. AU Wuasrt AWTEEREaE IEnMH4ELY rwm. 0. ffiWY[EWTOdtN460IXYNfB(fWTHFl.61N3NMEP44 diAe aROyAR ppECl®NYPE.EI AM MO®NIID]fl4'JICE VAIN WOTgHWE1BPf. e AYfYr6TaO t®IB(IY r®IBBIWLBETII.81iM84'JIBMN) NCFILRTOFMDiP➢2IM F/GHfiBldlf tNMRO 1MdM B<�LYIWYI®INER WGTWIIWNBIXNOCMflAM11' R4G1 NCI®M aAE. mwL r cu+macreD N Trw oa NorE odwEa pOCiaMwRWREIWLnI1ERNu!n.nLxLEN+rueE tYfPaW BYACERI!®WdNICR✓. flrF1Y1LBIt YVllK �WA� WLYIMIN'/ONMRM(1Hv9 CdELLTWIB. MF@rBIrNECF VANWrC@INIYONAtL RMA6OWJIIY•MIHYFr WEST �]NCiMRE(mA aMMNOirOIlNYA1NM1GMMaNIUVOMfAGMxI. ACgH sAucpryn®pOM�rt�oOErtYTeenElau ae r mMErArEagrsarncE Pwmkro pNILN.KGIKH ST.L .CWMI' FLEXIBLE PAVEtffl4T MURRAY TER REPLACEMENTOETA0. CONSTRUCIT STPl✓DAR06 NANN 612 gZ PIE FLEXIBLE PAVEMENT REPLACEMENT DETAIL R-4 A DATE: I R54STN BY.' APPD. WATER /ASTEWATER ENGINEERING DESK)N D: LE DI£R FIJIM FT PIERCE UTILITIES AUTHORITY DRAWN BY. JAW SCALE.' NT.5. PPRDVID: JLC G E: WIO GHEE I OF 1 CULPEPPER & TERPENING, INC CONSULTING ENGINEERS I LAND SURVEYORS 2980 SOUTH 25th STREET . FORT PIERCE, FLORIDA 34981 151 SIN FLAGLER AVENUE . STUART, FLORIDA 34994 PHONE 772-464-3537 . FAX 772-464-9497 . w xt-eng.Gom S aTe O) rl O R DD 1 0-RTI1*IciT10] No, I B i286 1 D'-D" IT DUCTILE IRON PIPE SEE BELOW AS NECESSARY 0 0 I a NOTE. PLEASE REFER TO FORT PIERCE UTTLTLES STANDARD SEPARATION STATEMENT FOR WAR / SEWER CONFLICTS. UTILITY CROSSING DETAIL N.T.S. P UTILITY CROSSING DETAIL M-5 tH p ! _WAiER/WASicWAiER ENGINEEWNG n, Fr. PIERCE unl.mEs AUTHORITY` Axt rs. A APpFTeO: oA2: sHm ac mro 1 or , GENERAL POLICY MERE COST JUSTIFIED AND OPERATIONALLY FEASIBLE IT IS THE GENERAL POLICY OF THE F.P.U.A TO PROVIDE WATER. ELECTRIC, SEWER AND GAS SERVICE FROM THE STREET SIDE OF A PIECE OF PROPERTY. DEPENDINC ON FACTORS SUCH AS LOCATION OF EXISNNG SUPPLY SOURCE FACILITIES, REAR OR SIDE LOT LINE SUPPLY AIRY BE AUTHORIZED. BUT ONLY WITH PRIOR APPROVAL FROM THE FP.UA - _ _ _ _ _ - _ _ _ - _ _ _ ® A' 11.. THE PREFERRED POINT OF CONNECTION TO THE FAUA. WAR METER, AREA Q SHALL BE LOCATED IN THE CORNER OF THE PROPERTY SELECTED BY THE FP.UA. AS THE BEST LOCATION FOR THE WATER METER. EVERY EFFORT WILL BE MADE TO SELECT THE CORNER WHERE TWO WATER SERVICES AND METERS CAN BE CONNECTED. 2. IF PHYSICAL BARRIERS OR OTHER OBSTACLES PREVENT ME CONNECTION OF ME BUILDING SERVICE LINE TO THE FAUA. WAR SERVICE, WITHIN AREA Q , ME F.P.U.A ENGINEERING DEPARTMENT MAY AUTHORIZE THE CONNECTION ALONG THE PORTION OF ME R/W LINE MARKED AREA ® , OR ALONG THE PROPERTY LINES MARKED AREA ®. J. HORIZONTAL SEPARATION OF WATER AND WASTEWATER SERVICES SHOULD BE A MINIMUM OF 6 FEET AND PREFERABLY 10 FEET. 4. ALL METERS SHALL BE INSTALLED /N AN UNRESTRICTED AREA FOLLOWING EASE OF ACCESS AND PROVIDING ADEQUATE PROTECDON. 5. THE F.P. UA SHALL BE RESPONSIBLE FOR ME MAINTENANCE AND REPAIR OF ME WAR LATERAL WITHIN THE EASEMENT OR RIGHT-OF-WAY, UP TO THE POINT OF CONNECTION. WATER METER PLACEMENT (ICES.) 2 1/2' P.Oc. WH, W G W/ J/4' \ �- r pUILEf OR /YPR%£0 FOWL /'✓ C 1 � ORA'�.V.fR H. 40 U T FIFE HYPWN! wii P BACTERIOLOGICAL S,IMPUNG POINT O FIRE HYDRANT (N.'..) 21 4'1EMP0RIRY WRITER (PAINTED &NE) FINISHED GRADE roRo culls sroP I' PIX)EThnENE SERVICE TINE CORPQW110N STW FI102 0. APP.PoYFO EDUN. BACTERIOLOGICAL SAMPLING POINT0WATERMAIN (N.TS.) NQTF' AFlLA 1EST)NG REMOW I' P.F. TINE ANO W WIIN BRMS I. Al WRPMN SW. jj DACIEMOLOGICAL54MPLINC PONIT W-6 �A� INSTALL R.P.M. BESIDE 5 1/4' WEIGHTED VALVE BOX LID & O EO.P. LETTERING 'WATER' OR 'SEWER' ON COVER T(LER/UNION PART GONG. PAD 24' SQUARE J12T-147510 x 4' THICK IN UNPAVED AREAS W/REINFORCED FINISHED GRADE CONCRETE MESH N VALVE OPERATOR SHALL ADJUSTABLE �.-- BE NO LONGER THAN VA RISER 24' EXTENSION NECESSARY) (IFTHHN MAGNETIC WIRE GATE VALVE GINGHAM & TAYLOR INSTALL R.P.M. 6' PAST 5 j' HEAVY DUTY ME VALVE BOX WITH VALVE 110 W/4' THE TRAFFIC FLOW MECHANICAL JOINT SKIRT 4905-1.4 - RESTRAINTS (TYP.) MER/UNION PART 1127-147510 SEE NOTE J2 TRACE WIRE- - 1/2- PVC CONDUIT • II ll 1I " II f l' II No , 'I[ 1. BLUE REFLECTNE PAVEMENT MARKER (RPM) FOR WAR VALVES AND GREEN RPM FOR WASTEWATER VALVES PAVEMENT WOE. INSTALL R.P,M. ON THE 2. FOR WATER AND WASTEWATER VALVES INSTALLED IN PAYED PAD OF 5 Yi WEIGHTED AREAS. ELIMINATE CONCRETE PAD AND ENGAGE THE MAGNENC VALVE BOX LID & O WIRE IN 1/2- PVC INSIDE THE VALVE BOX SEVEN INCHES EO.P. BELOW GRADE. VALVE AU?KER INFO: 3. DIP MAY BE USED AS RISERS ONLY IF A VALVE BOX IS NOT SIZE TYPE OF VALVE MANUFACTURED FOR THAT DEPTH. NO PVC RISERS UTILITY TYPE SHALL BE USED IN ANY CIRCUMSTANCES. g OF TURNS TYPICAL GATE VALVE & VALVE BOX DETAIL N.T.S. iGNETIC WIRE AFFIXED BY :NTIFICATION TAPE P.) POLYETHYLENE TUBING SERVICE EXISTING WAR MAIN CORPORATION STOP "--THHN WIRE STAINLESS STEEL DOUBLE STRAP SERVICE SADDLE • SEE PLAN FOR EASEMENT W ROME TYPE METER BOX AND METER LOCATION BY CONTRACTOR FlNISHED GRADE Exisn EIERS TO E INST WATER NMAIN SEE NOTE /4 3�BYP�.P;A U OR 2^ POLYETHYLENE TUBING SERVICE LOCKABLE METER VALVE CST110LESSORPORAION STOP (NOTE 5) (CURB STOP FORD PART f 341-XXX THHN WIRE WITH ONE SHOT LOCK (STERLING SECURITY Sr.. STEEL DOUBLE JR-05) STRAP SERVICE SADDLE NOTES: WITH I.P. THREAD 1, BLUE 10 GAUGE THHN WIRE SHALL BE ATTACHED TO THE SERVICE LINE. 2. WHERE SERVICES UNDER PAVEMENT ARE REQUIRED. THE POLYETHYLENE TUBING SHALL BE INSTALLED WITHIN SCHEDULE 40 PVC GAGING PIPE. J. 1' & 3/4- METER SIZES SHALL REQUIRE A LOCKABLE METER VALVE. (CURB STOP) 4. MINIMUM COVER IN UNPAVED AREAS SHALL BE 30",, IN PAVED AREAS OR PLANNED ROADWAYS OR SWALES MIN. COVER SHALL BE 36".. 5. FOR 2' COMMERCML SERVICE INSTALLATIONS, FPVA WILL INSTALL ABOVE GROUND METER PER DETAIL W-5. TYPICAL SINGLE WATER SERVICE CONNECTION (N.TS.) BY DATE DESIGNED ER 8/21/18 CALCS. ---- ---- DRAWN ER 8/21/18 DETAILED ---- ---- CHECKED I DEM 9/21/18 APPROVED I ---- ---- 24- 30' --I SAGM4 TRAFFIC TYPE METER BOX AIR-391 (24 1/41x 13 5/8 ) W SEE N FOR EASEMENT BLUE R.P.M. -It M R LOCATION WIRE NUT 4- 2. SO, BENDS FlNISHED GRADE 2' LOCKABLE CURB STOP POLYETHYLENE TUBING 2 h SECTION `W TAP CAP NOTE.' I. CAP SHALL BE RESTRAINED PER MANUFACTURER'S RECOMMENDARONS AND FP.UA. REOUIREMENS. 2. BLUE RPM FOR BLOWOFF ASSEMBLY J. CONCRETE SLAB TO BE 3000 PSI WITH 6" X 6' WIRE MESH. MANUAL BLOWOFF ASSEMBLY (N.TS.) Planning & Development APPROVED services Approval Order JAN1 0 2019 iz1__��� ya9 RECEIVED `Omttn1m1111 J\0 E. MOR ` No 79043 9° STATE OF :1�J DIXIELAND TOWNHOMES UTILITY DETAILS DAVID E. MORIN, P.E. FL. REG.'NO.'79043 DATE: 8/21/18 HORIZ. SCALE: NA VERT. SCALE: NA JOB No. 17-007 SHEET 6 of 10 FORT PIERCE TI ITEES AUTHORITY WATER DISTRIBUTION NOTES 1. ALL CONSTRUCTION MATERIAL, INSTALLATION AND TESTING SHALL CONFORM TO THE STANDARD SPECIFICATIONS OF THE FORT PIERCE UTILITIES AUTHORITY. 2. WATER MAINS WHERE SPECIFIED AS POLYVINYL CHLORIDE (PVC) SHALL CONFORM TO AWWA -900 OR C-905, PRESSURE CLASS 150. DR (18). WATER MAINS WHERE SPECIFIED AS POLYETHYLENE (PE)jSHALL CONFORM TO AWWA C-901 OR C-906, STANDARD CODE DESIGNATION PE3408, PIPE QLABS 200, DIM SIGN RATIO (OR) 17 FOR DIRECT BURY, (DR) 11 FOR DIRECTIONAL BORING, AND (DR) 9 FOR 2 INCH AND SMALLER PIPELINES. 3, WATER WN, PRESSURE SPECIFIED A (MINIMUM). DL PIPE . SH4LL CONFORM TO MI;11AWWA Ci51/A21.51 AND SMALL 4. POLYVINYL CHLORIDE WATER MAIN SHALL BE BLUE IN COLOR OR WHITE IN COLOR WITH BLUE STRIPES. THE USE OF IDENTIFICATION WE ATTACHED TO THE TOP OF THE PIPE MAY BE USED IN LIEU OF MARKING ON THE PIPE ALSO DIP PIPE SHALL REQUIRE THE USE OF IDENPFCATION TAPE AND THHN WIRE. CEMENT LINED -I1 A21.f0 CLASS 250 IN. E THING TO ANSI AWWA C 0 M BE DUCTILE IRON CONFOR / 5. FITTINGS SHALL / AND FACTORY COATED 6. GATE VALVES SHALL BE MUELLER RESILIENT SEAT, KENNDY KEN -SEAL, AMERICAN OR APPROVED EQUAL. VALVES SHALL CONFORM TO AWWA C-509. 7. WATER LINES SHALL BE BACKFILLED AND COMPACTED IN ACCORDANCE WITH FPUA DESIGN AND CONSTRUCTION STANDARDS. THE CONTRACTOR SHALL SUBMIT CERTIFIED DENSITY TESTS AS REQUIRED BY FPUA ENGINEERING AND THE CITY, COUNTY, FOOT. IN CASES WHERE PAVED AREAS FALL WITHIN THE JURISDICTION OF LOCAL OR STATE AGENCIES THE COMPACTION REQUIREM IS SHALL NOT BE LESS THAN THE MINIMUM REQUIRED BY THE APPROPRIATE RESPONSIBLE AGENCY. 8 o ENGINEER AND CITYEWA77ONS FROM ENG FELD CHANCES OR INEER. SIGN SHALL BE MADE WITHOUT PRIOR APPROVAL OF THE F 9. THE CONTRACTOR SHALL NOTIFY FRIA ENGINEERING AND CITY/COUNTY/FDOT ENGINEERING 48 HOURS PRIOR TO COMMENCING CONSTRUCTION. 10. A PRE -CONSTRUCTION CONFERENCE BETWEEN THE ENGINEER, THE CONTRACTOR, FPUA CITY/ COUNTY/FDOT ENGINEER SHALL BE MANDATORY PRIOR TO COMMENCEMENT OF CONSTRUCTION. 11, TRAFFIC CONTROL, BARRICADES, ETC., SHALL BE IN ACCORDANCE WITH THE FLORIDA DEPARTMENT OF OF TRANSPORTATION STANDARDS AND APPROVED BY THE CRY ENGINEER. 12. MINIMUM COVER SHALL BE 36 INCHES EXCEPT AS APPROVED BY THE UTILITIES ENGINEER AND CITY/ COUNTY/FOOT ENGINEER. PIPES WITH COVER LESS THAN 30 INCHES SHALL BE CONSTRUCTED OF DUCTILE IRON OR IN PVC CASING. 13. DISTURBED AREAS SHALL BE RESTORED IN CONFORMANCE WITH THE APPLICABLE GOVERN17 AGENCY REOUREMENTS. to EXISTING UTILITIES AND DRAINAGE SHALL BE FIELD VERIFIED PRIOR TO CONSTRUCTION AND PROTECTED BY THE CONTRACTOR. 15. WATER MAINS SHALL BE TESTED AND DISINFECTED IN ACCORDANCE WITH THE APPLICABLE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION AND AWWA C-651 FOR DISINFECTION. CLEMOUT WATER DISTRIBUTION I G- FT. PIERCE UDUTtS AUTHORITY DOUBLE LATERAL SERVICE CONNECTION AT PROPERTY LINE OF WAY UNE SINGE CFRVICE LATERAL CONNECTION ®= BALL TPE WASTEWATER LOCATOR INSTALLED ABOVE THIS POINT BALL BY 3M CORP. OR APPROVED EQUAL SERVICE LATERAL SNAIL TERMINATE WITH A CLEMOUT SERVICE CONNECTION (N.TS.) SERVICE CONNECTION NviTSMUR NOTES: 1) ALL ELEVATIONS AND BENCHMARKS SHOWN , HEREON ARE RELATIVE TO THE NATIONAL GEODETIC VERTICAL DATUM (N.G.V.D.) OF 1929. 2) SURVEY DATA PROVIDED BY CULPEPPER & TERPENING, INC., DATED JANUARY 19, 2017. Know what's below. Call before you diq. Gi MAIN TEE-WYE AWN FT. PIERCE UTILIITET AUTHORITY I FI F TIFF I FIELD BK./PG.I FORT PIERCE UTILITIES AUTHORITY WATER DISTRIBUTION NOTES CONTINUED 76, THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING EXISTING UTILITIES AND DRAINAGE. 17. THE CONTRACTOR SHALL FURNISH RECORD DRAWING INFORMATION TO THE ENGINEER INCLUDING LOCATIONS OF VALVES. FITTINGS, SERVICE CONNECTIONS, BLOWOFFS, AIR RELEASE VALVES, AND ANY OTHER PERTINENT INFORMATION NECESSARY TO LOCATE ITEMS CONSTRUCTED UNDER THIS PROJECT, AS REQUIRED BY THE UTILITIES ENGINEER, 18. THE CONTRACTOR SHALL TAP EXISTING LINES UNDER THE SUPERVISION OF THE FORT PIERCE UTILITIES AUTHORITY ONLY AFTER TESTING AND DISINFECTION HAS BEEN COMPLETED AND APPROVED ON THE TAPPING VALVE AND SLEEVE. 19, WATER MAIN SHALL BE MARKED BY THE USE OF CONTINUOUS 10 GAUGE THHN MULTI STRANDED WIRE (BLUE IN COLOR) AND MENTIMATION TAPE WITH 'WATER" MARKED ON TAPE, PERMANENTLY ATTACHED TO THE TOP OF THE WATER MAIN IN ACCORDANCE WITH THE FORT PIERCE UTILITES AUTHORITY SPECIFICATIONS. 20. SERVICE TAPS SHALL BE PLACED APPROXIMATELY TEN FEET AWAY FROM GATE VALVES, AS SHOWN, FOR TESTING, FOLLOWING TESTING AND STERILIZATION OF WATER LINE. CONTRACTOR SHALL PLACE A BRASS PLUG IN CO RPoRATIDN STOPS AND CURB STOPS SHALL BE REMOVED FROM TESTING LOCATIONS. ALL FITTINGS AND VERGED IN ACCORDANCE WITH 2 RESTRAINTS TO BE USED ON L 1. MECHANICAL MANUFACTURER'S OR ENGINEERS RECOMMENDATIONS (WHICHEVER IS MORE STRINGENT) AND FPUA REQUIREMENTS. 22, ALL MAINS SHALL BE TESTED AT A MINIMUM OF 150 PSI. TESTING METHODS SHALL CONFORM TO AWWA C-600. - 2 HR MINIMUM TEST 2Z I/2 - 14 ,000 L- LEAKAGE IN GPH S= LENGTH OF PIPE IN FEET 0- PIPE DWAETER IN INCHES P- TESTING PRESSURE IN PSI 23, PRIOR TO ANY TESTING, ALL MAINS 6' IN GA. AND LARGER SHALL HAVE A SWAB PASSED THRU THE ENTIRE LENGTH OF THE LINE. NOTE SWAB SHOULD BE PLACED IN 1st JOINT OF NEW LINE. ENO OF MAIN SHOULD BE 'TURNED UP" AT 45% AND EXTENDED SO THAT SWABBING AND A FULL BORE FLUSH CAN BE ACCOMPLISHED. BLOW -OFF ASSY CAN THEN BE PLACED. WHERE LINES BRANCH, SWABS WILL BE PLACED IN BRANCH LINES AND SEQUENTIALLY SWABBED AND FLUSHED. 24. A MINIMUM SIX FEET AND PREFERABLY TEN FEET HORIZONTAL SEPARATION SHALL BE WONTAINED BETWEEN THE WATER MAIN AND ANY WASTEWATER LINES. 6 INCHES MINIMUM VERTICAL SEPARATION IF WATER MAIN IS OVER WASTEWATER AND 12 INCHES IF WATER MAIN IS UNDER SHALL BE MAINTAINED BETWEEN THE WATER MAIN AND ANY WA!IMATER LINES. THE DISTANCE SHALL BE MEASURED FROM OUTSIDE OF PIPE TO OUTSIDE OF PIPE OR STRUCTURE. WHERE THIS MINIMUM SEPARATION CANNOT BE MAINTAINED, THE CROSSING SHALL BE ARRANGED SO THAT THE WASTEWATER PIPE JOINTS AND THE WATER MAIN PIPE JOINTS ARE EQUIDISTANT FROM THE POINT OF CROSSING. AND THE WATER MAIN SHALL BE CONSTRUCTED OF DUCTILE IRON PIPE (DIP) AT THE CROSSING. SUFFICIENT LENGHTS OF DIP MUST BE USED TO PROVIDE A MINIMUM SEPARATION OF 10 FEET BETWEEN ANY TWO JOINTS. ALL JOINTS ON THE WATER MAIN W17HIN 20 FEET OF THE CROSSING MUST BE MECHANIGALLY RESTRAINED. A MINIMUM VERTICAL CLEARANCE OF 6 INCHES MUST BE WINAINED AT ALL CROSSINGS. 25. WHERE A WATER MAIN IS TO BE INSTALLED BELOW A STORM GRAIN PIPE, A MINIMUM OF 6 INCHES OF VERTICAL CLEARANCE BETWEEN PIPES SHALL BE CONSTRUCTED OF DIP AT THE CROSSING. AND SHALL BE MECHANICALLY RESTRAINED WITHIN 20 FEET OF THE CROSSING. 26. CONTRACTOR SHALL COMPLY WITH RORID4 TRENCH SAFETY ACT REOUIREMENTS. FINISHED GRADE F SEE NOTE 1 APPLY 2 LAYERS OF RAM -NECK SEALANT MUD IN_' OUTSIDE SEE MANHOLE SCHD! J/8" GROUT ON PRECAST CONC. RINGS INSIDE & OUT SEE NOTE 2 2 COATS OF COAL TAI PIPE SHALL EMEND 1 INSIDE MANHOLE PACK NTH NON -SHRINKING GROUT N.N. COUPLING FOR FIELD INSTALLATION NEOPRENE BOOT WITH STAINLESS STEEL ACCESSORIES OR APPROVED EQUAL SHALL BE USED FOR PRECAST MANHOLES PIPE DIM.;A" "B'" "C"" ROT. SLAB T"� B'-24' 4'-0' 'B' 76' 8' 30'-36' 5-0' S 88" 10' 42'-4B' 6'-0" b' 100' 12' TYPICAL MANHOLE DIMENSIONS NOTES 1) MANHOLE FRAME & COVER WITH THE WORDS - SMRARY SEWER" CAST IN THE COVER. U.S. FOUNDRY 170 OR APPROVED EQUAL. 2) ALL CONCRETE MANHOLES TO BE 4000 P.S.I. TO MEET OR EXCEED ASTM C478 ALL CEMENT TO BE TYPE 11 ACID RESISTANT. REINFORCING AREA OF 0.02 SQ. IN/FT FOR WALL SECTION MIN. TO MEET OR EXCEED ASTM A 185. 3) A MAXIMUM OF 2 LAYERS OF PRECAST CONCRETE RINGS, IF REQUIRED. 4) RAIN GUARDS SHALL BE INSTALLED IN MANHOLES THAT HAVE GRAVITY WINS 12" OR LESS. STANDARD MANHOLE DEPTH 5'-0' AND GREATER (N.TS.) CULPEPPER St TERPENING, INC CONSULTING ENGINEERS I LAND SURVEYORS 2980 SOUTH 25th STREET. FORT PIERCE, FLORIDA 34981 151 SW FLAGLER AVENUE . STUART, FLORIDA 34994 PHONE 772-464-3537 . FAX 772-464-9497 . w .ct-engxom STd"CF. OI'FLOluDA CHIiTII'I(=TIION N,, 1,134286 FORT PIERCE UTILITIES AUTHORITY WAST WAT R C245TRUCTION NOTES 1. ALL CONSTRUCTION MATERIAL. INSTALLATION AND TESTING SHALL CONFORM TO THE STANDARD SPECIFICATIONS OF THE FORT PIERCE UTILITIES AUTHORITY. 2 GRAVITY SEWER MAIN SHALL HAVE LOCATOR CAPE WITH 'SEWER"GREEN H GR4VTY SEWER MAIN SHALL, BE POLMNYL MARKED ONT PN COLOR, E AND SH4LL CONFORM TO ASTM 0-3034. 3. THE MANHOLE BASE SHALL BE SET ON A FIRM, DRY AND STABLE OR COMPACTED BASE FOUNDAnM IF NECESSARY, THE CONTRACTOR SHALL UTILIZE ROCK TO PROVIDE A FIRM AND SUITABLE MANHOLE BASE FOUNDATION. 4. WASTEWATER LINES SHALL BE BACKFILLED AND COMPACTED IN ACCORDANCE WITH FPU4 DESIGN AND CONSTRUCTION STANDARDS, THE CONTRACTOR SHALL SUBMIT CERTIFIED DENSITY TESTS AS REQUIRED BY FPUA ENGINEERING AND THE CITY ENGINEERING DEPARTMENT. IN CASES WHERE PAVED AREAS FALL WITHIN THE JURISDICTION OF LOCAL OR STATE AGENCIES, THE COMPACTION REQUIRE- MENTS SHALL NOT BE LESS THEN THE MINIMUM REQUIRED BY THE APPROPRIATE RESPONSIBLE AGENCY. 5. A 1% MINIMUM SLOPE SHALL BE MAINTAINED ON ALL SANITARY SERVICE LATERALS. 6. THE CONTRACTOR SHALL FURNISH RECORD DRAWING INFORMATION TO THE ENGINEER CONSISITING OF PIPE SIZES, LOCATION OF SERVICE TEE WYES, DIAMETER OF SERMES, LOCATION OF ANY ERTINCS. FINAL RIM AND INVERT ELEVATION OF ALL MANHOLES AND ANY OTHER PERTINENT INFORMATION NECESSARY ID LOCATE ITEMS CONSTRUCTED UNDER THIS PROJECT. 7. MAINTAIN SIX FEET AND PREFERABLY 10 FEET HORIZONTAL DISTANCE BETWEEN WATER MAINS AND SEWER MAINS AS A MINIMUM. ` ON LINER CAL STORM SEWERS SHOULD CROSS LTI & WASTEWATER FORCE WIN S, WASTEWATER COLLECTION DISTANCE OF 12 INCHES BETWEEN MINIMUM VERTICAL RPIPE UNDER WATER MAINS WHENEVER POSSIBLE A MIN THE INVERT OF THE UPPER PIPE AND THE CROWN OF THE LOWER PIPE SHALL SI PROVIDED WHENEVER POSSIBLE. WHERE THIS MINIMUM SEPARATION CANNOT D MAINTAINED, THE CROSSING SHALL BE ARRANGED POINT THAT THE WASTEWATER PIPE JOINTS WIN THE WATER PIPE CTM ARE EQUIDISTANCE FROM THE POINT OF CROSSING, AND THE WATER MAIN SHALL BE CONSTRUCTED OF DUCTILE IRON PIPE (DIP) AT THE CROSSING. BETWEEN SUFFICIENT LENGTHS IN DIP MUST BE USED TO PROWWATER I MINIMUM SEPARATION OF G FEET BETWEEN ANY TWO JOINTS. ALL JOINTS ON THE WATER MAIN WITHIN 20 FEET OF THE CROSSING MUST MECHANICALLY RESTRAINED. A MINIMUM VERTICAL CLEARANCE OF B INCHES MUST BE MAINTAINED AT ALL CROSSINGS. 9. A PRE -CONSTRUCTION CONFERENCE BETWEEN THE ENGINEER, THE CONTRACTOR, AND FPUA/CITY COUNTY/FOOT SHALL BE MANDATORY PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 10. NO FIELD CHANGES OR DEVIATIONS FORM THE DESIGN SHALL BE MADE WITHOUT PRIOR APPROVAL FPWCIN/COUNN/FOOT ENGINEER, 11. TRAFFIC CONTROL. BARRICADES, ETC. SHALL BE IN ACCORDANCE WITH THE FLORIDA DEPARTMENT OF TRANSPORTATION STANDARDS. 12. CONTRACTOR SHALL NOTIFY FORT PIERCE UTILITIES AUTHORITY 48 HOURS PRIOR TO COMMEENCNNG CONSTRUCTION. 13, WASTEWATER FORCE MAIN SHALL BE POLYVINYL CHLORIDE CONFORMING TO AWWA C-900, AND SHALL BE CUSS 150, DR-18. 14. WASTEWATER FORCE MAIN SHALL BE GREEN IN COLOR. 15. FITTINGS SHALL BE DUCTILE IRON, CONFORMING TO ANSII/AWWA C-1 f0/A21.10 CLASS 230 MIN. AND INTERIOR EPDXY COATED. 16. WASTEWATER FORCE MAIN SHALL BE MARKED BY THE USE OF CONTINUOUS 10 CAUSE THHN WIRE (GREEN IN COLOR) PERMANENTLY ATTACHED TO THE TOP OF THE FORCE MAIN WITH LOCATOR TAPE MARKED SEWER" ON TAPE IN ACCORDANCE WIN FPUA SPECIFICATIONS. 17 MINIMUM COVER SHALL BE 36 INCHES, PIPES WITH COVER LESS THAN 30 INCHES SHALL REQUIRE PRIOR APPROVAL OF THE UDLIIES ENGINEER AND SHALL BE CONSTRUCTED OF DUCTILE IRON PIPE. 18. EACH SERVICE LATERAL WILL BE MARKED WITH A LOCATOR BALL AS MANUFACTURED BY 3M CORPORATION, OR APPROVED EQUAL AS REQUIRED BY FPUA ENGINEER. 19. ALL MANHOLES SHALL HAVE SEWER RAIN GUARDS INSTALLED AS REQUIRED BY FPUA ENGINEER. 20, THE CONTRACTOR SHALL COMPLY WITH THE FLORIDA TRENCH SAFETY ACT REQUIREMENTS. NOTES: 1) INVERT CHANNELS TO BE CONSTRUCTED FOR SMOOTH FLOW WITH NO OBSTRUCTIONS. 2) SPILLWAYS SNALL BE CONSTRUCTED BETWEEN PIPES WITH DIFFERENT INVERT ELEVATIONS PROVIDING FOR SMOOTH ROWS. FLOW PATTERNS S-12 ® fOR YIYFRI CHNYiELi wrE: REY9IXt � walE�srEwrcre EncINEEww sn scue FT PIERCE UTIlJTIES AUTHORITY R.I. A arPRorEo: MR: sxrEr JLC m10 1 6` 1 PLUG (SEE NOTE 1) O PLUG MAIN OR LATERAL WYE J TSEE111%E NO IL TYPE WASTEWATER LOCATOR BY 3M CORP. OR APPROVED EQUAL. 2) MINIMUM SLOPE OF 1/8' PER FOOT, USE GREATER SLOPE WHERE POSSIBLE. 3) SERVICE LATERAL SHALL TERMINATE WITH A CLEANOUT. 4) INSTALL CLFANOUT AT THE PROPERTY LINE REFER TO DETAIL S-1 FOR SPECIFIC PROPERTY LAYOUT RVIy(CE CIYuONNECTION (N.TS.) SERVICE CONNECTION S_2 R BY' FIER/W0.5iFlYa F ENGINEER.WG IVY �, scue FT. PIERCE URLI/IES AUIHORRY SpI i A IR.ROVED: MrE: SXEf, Jtc mm r or r DRAIN VALVE 0 NYLON PULL HANDLE NOTES.' 1) SEWER RAIN GUARDS SHALL BE INSTALLED ON ALL MANHOLES WHERE GRAVITY MAINS ARE 12' OR LESS AND IN AREAS DESIGNATED BY ENGINEER TO BE IN A FLOOD AREA 2) SEWER RAIN GUARDS SHALL BE MANUFACTURED BY PARSON ENWRONMENTAL PRODUCTS, INC., PART Il PUI-23S (PARSON MANHOLE INSERTS) WITH DOUBLE VALVING, OR APPROVED EQUAL. 3) RAINGUARDS MUST BE SNUG" FIT RAINGUARD DETAIL (N.T.S.) RAINGUARD �`� IC M1iSWY: APIq WP1CR aSrEWA R ENLNEEflINC a��, � FT. PIERCE UTILITIES AUTHORITY aRrrtovEs: were sxEm .M1C 1010 1 OF 1 BY I DATE DESIGNED ER 8/21/11 CALCS. ---- ---- DRAWN ER 8/21/1 DETAILED ---- ---- CHECKED I DEM 9/21/1 APPROVED I ---- ---- 24"X24"X12' SQUARE SLAB POURED TO GRADE IN UNPAVED AREAS WITH FIBERGLASS MESH REINFORCEMENT AND /4 REBAR 3' FROM OUTER PERIMETER 1'-0" 1 CLEANOUT FRAME & COVER U.S. FOUNDRY 7621 OR APPROVED EQUAL 4WYE P.V.C. 6'-6' PLUG SECTION 24144'X12" SQUARE SLAB POURED TO GRADE IN UNPAVED AR&5 WITH FIBERGLASS MESH REINFORCEMENT AND #4 REBAR 3' FROM OUTER PERIMETER ■/. M Z RESIDENTIAL CLEANOUT DETAIL (N. T. S) APPROVED A proval Order , DIXIELAND TOWNHOMES UTILITY DETAILS Plamdng & Development services JAN 10 2019 RECEIVED AO'��i1D E A4 No 79043 ' % STATE OF •41 1'%4/�9 DAVID E. MORIN, P.E. FL. REG.-NO. 79043 DATE:8/21/18 HORIZ. SCALE:NA VERT. SCALE: NA JOB No. 17-OOF SHEET 7 of 1 III r r' FIELD NOTES: , 1) ALL ELEVATIONS AND BENCHMARKS SHOWN , HEREON ARE RELATIVE TO THE NATIONAL GEODETIC VERTICAL DATUM (N.G.V.D.) OF 1929. 2) SURVEY DATA PROVIDED BY CULPEPPER & TERPENING, INC., DATED JANUARY 19, 2017. Know what's below. Call before you din. CULPEPPER & TERPENING, INC CONSULTING ENGINEERS I LAND SURVEYORS 2980 SOUTH 25th STREET • FORT PIERCE, FLORIDA 34981 151 SW FLAGLER AVENUE • STUART, FLORIDA 34994 PHONE 772-464-3537 • FAX 772-464-9497 • w .ct-eng.com STATE OF FLORIDA CERTIFICATION No. LB 4286 GRAPHIC SCALE 20 0 10 20 (ai7w) 1 inch = co fL LEGEND i EXISTING PAVEMENT L J NEW PAVEMENT PROPERTY LINE —Te PROPOSED TOP OF BANK PROPOSED POND BOTTOM —PROPOSED SWALE BOTTOM EXIST. ELEVATIONS In ~ PROPOSED INLET PROTECTION u Will PROPOSED SILT FENCE EXIST. WATER MAIN - EXIST. 2" WATER SERVICE * SEE STORMWATER POLLUTION PREVENTION PLAN ON SHEET 8 _CROWN DRIP LINE OR OTHER LIMIT OF TREE PROTECTION AREA. U PROP. DRAINAGE EXIST. OAK TREE (TO BE CLEARED) b ~' EXIST. PALM TREE (TO BE CLEARED) EXIST. OAK TREE (TO BE PRESERVED) EXIST. PALM TREE (TO BE PRESERVED) TREE PROTECTION FENCE: MINIMUM 4' DIAMETER NYLON OR POLY ROPE, YELLOW OR ORANGE. MUST BE 4' MINIMUM FROM GROUND & NOT ATTACHED TO GROUND. 2"x2"x6' STEEL POSTS OR APPROVED EQUAL. MAINTAIN EXISTING GRADE WITH IN pp TREE PROTECTION FENCE UNLESS OTHERWISE INDICATED NOTES: r" 1- NO PRUNING SHALL BE PERFORMED EXCEPT BY APPROVED ARBORIST. 2- NO EQUIPMENT SHALL OPERATE INSIDE THE PROTECTIVE FENCING INCLUDING DURING FENCE INSTALLATION AND REMOVAL. BY DATE DESIGNED ER 8/21/18 CALCS. ---- ---- DRAWN ER 8/21/18 DETAILED ---- ---- CHECKED DEM 9/21/18 APPROVED ---- ---- TREE BARRICADE DETAIL Planning & Development Services RECEIVED APPROVED e* G� ��G E N sF ®®o® O A_provalOrder c No 79043 Oi� l STATE OF : tf� iff w` AM DAVID E. MORIN,' P.E. FL. —REG. NO. 79043 DIXIELAND TOWNHOMES SWPP & CLEARING PLAN DATE: 8/21/18 HORIZ. SCALE:1" = 21 VERT. SCALE: NA JOB No. 17-00 SHEET 8 of 1 s, m rn 00 rn 0 -o m 0 a Project Name and location information: Dixieland Townhomes. Dixieland Dr., Section 27, Township 35 South , Range 40 East, St Lucie County, Florida Describe the nature of the construction activity: Describe the intended sequence of major soil disturbing • 0-2 days, site prep and stabilized construction activities: entrance; • 3-6 days, install perimeter sediment and erosion controls; • 7-10 days, clearing/grubbing over all areas except those that are designated as buffers/conservation easements; • 11-90 days; site grading and utilities • 90-120 days, stabilize site. Total area of the site: 0.95 Acres Total area of the site to be disturbed: 0.95 Acres Existing data describing the soil or quality of any Waveland Fine Sand and Waveland-Lawnwood Complex stormwater discharge from the site: Sand Estimate the drainage area size for each discharge .95 Acres point: Latitude and longitude of each discharge point Lat: N270 23' 59,74" and identify the receiving water or MS4 for each Long: W80' 19' 16.85" discharge point: Discharge to St Lucie County Canal Give a detailed description of all controls, Best Management Practices (BMPs) and measures that will be implemented at the construction site for each activity identified in the intended sequence of major soil disturbing activities section. Provide time frames in which the controls will be implemented. NOTE: All controls shall be consistent with performance standards for erosion and sediment control and stormwater treatment set forth in s. 62-40.432, F.A.C., the applicable Stormwater or Environmental Resource Permitting requirements of the Department or a Water Management District, and the guidelines contained in the State of Florida Erosion and Sediment Control Designer and Reviewer Manual, FDOT, FDEP (2007) and any subsequent amendments. • Prior to clearing, a silt fence (trenched 6 inches deep and backfilled on the uphill side), shall be installed around the perimeter of the site. A rock entrance road (that is 50ft long with a 6 inch depth of FDOT #1 stone and lined with filter fabric) shall be constructed to minimize the effects of truck traffic and sedimentation tracking both on and off of the site. • All inlet(s)/outfalls, once installed, shall be protected from erosion and sediment runoff by the use of filter fabric and properly installed geohay inlet filters. Disturbed portions of the site where construction activities have permanently ceased shall be stabilized with sod or other permanent stabilization methods (if other methods are used, this SWPPP will be modified) no later than 14 days after the last construction activity. Seeding shall be the same as in temporary seeding. • All installation shall be commenced as depicted on the attached site map and installation "typicals" sheet. Describe all temporary and permanent stabilization practices. Stabilization practices include temporary seeding, mulching, permanent seeding, geotextiles, sod stabilization, vegetative buffer strips, protection of trees, vegetative preservations, etc. • Temporary seeding shall be rye grass or other appropriate ground covers depending upon season of installation that is applied at manufacturer's recommendations to any disturbed areas that are inactive more than 14 days. • Filter fabric shall be placed under the rock entrance/exit Describe all structural controls to be implemented to divert stormwater flow from exposed soils and structural practices to store flows, retain sediment on -site or in any other way limit ,stormwater runoff. These controls include silt fences, earth dikes, diversions, swales, sediment traps, check dams, subsurface drains, pipe slope drains, level spreaders, storm drain inlet protection, rock outlet protection, reinforced soil retaining systems, gabions, coagulating agents and temporary or permanent sediment basins. • A silt fence (with the same installation as indicated under the Best Management Practices heading) shall be placed around the entire perimeter. • Inlet(s)/Outfalls shall be protected with filter fabric and properly installed geohay inlet flters(with the same installation as indicated under the Best Management Practices heading). Describe all sediment basins to be implemented for areas that will disturb 10 or more acres at one time. The sediment basins (or an equivalent alternative) should be able to provide 3,600 cubic feet of storage for each acre drained. Temporary sediment basins (or an equivalent alternative) are recommended for drainage areas under 10 acres. I No temporary sedimentation basins are proposed. The detention basin (prior to being connected to a dischargd structure) may be used as a temporary sediment basin if needed. Describe all permanent stormwater management controls such as, but not limited to, detention or retention systems or vegetated swales that will be installed during the construction process. • A stormwater detention basin shall be constructed per ERP permit and all disturbed areas shall be grassed. NOTES: 1) ALL ELEVATIONS AND BENCHMARKS SHOWN HEREON ARE RELATIVE TO THE NATIONAL GEODETIC VERTICAL DATUM (N.G.V.D.) OF 1929. 2) SURVEY DATA PROVIDED BY CULPEPPER & TERPENING, INC., DATED JANUARY 19, 2017. Know what's below. Call before you dig. Waste disposal, this may include construction All construction materials and debris will be debris, chemicals, litter, and sanitary wastes placed in a dumpster and hauled off site to a landfill or other proper disposal site. No materials will be buried on site. Offsite vehicle tracking from construction Off site vehicle tracking of sediments and dust entrances/exits: generation will be minimized via a rock construction entrance, street sweeping and the use of water to keep dust down. The proper application rates of all fertilizers, Florida -friendly fertilizers and pesticides will be herbicides and pesticides used at the constraction used at a minimum and in accordance with the site: manufacturer's suggested application rates. No fertilizers and pesticides will be stored on site. The storage, application, generation and All paints and other chemicals will be stored in a locked migration of all toxic substances: covered shed. Other: Port-o-lets will be placed away from storm sewer systems, storm inlet(s), surface waters and wetlands. No vehicle maintenance shall be conducted on -sire. A washdown area shall be designated at all times and will not be located in any area that will allow for the discharge of polluted runoff. A small -vegetated berm shall be placed around the washdown area. Provide a detailed description of the maint nance plan for all structural and non-structural controls to assure that they remain in good and effective operatin condition. Contractor shall provide routine maintenat cc of permanent and temporary sediment and erosion control features in accordance with the technical s ecifications or as follows, whichever is more stringent: • Silt fence shall be inspected at least week y. Any required repairs shall be made immediately. Sediment deposits shall be removed when they reac I approximately one-half the height of the barrier. • Maintenance shall be performed on the rock entrance when any void spaces are full of sediment • Inlet(s)/outfalls shall be inspected immediately after each rain event and any required repairs to the geohay filter inlets, silt fence, or filter fabric shall be performed immediately. • Bare areas of the site that were previousl seeded shall be reseeded per manufacturer's instructions. • Mulch and sod that has been washed out shall be replaced immediately. • Maintain all other areas of the site with proper controls as necessary. Inspections: Describe the inspection and inspection documentation procedures, as required by Part V.DA of the pemmit. Inspections must occur at least once a week and within 24 hours of the end of a storm event that is 0.50 inches or greater ( ee attached form). Qualified personnel will inspect all points of discharges, all disturbed areas of construction that have not been stabilized, constructed areas and ocations where vehicles enter and exit the site, and all BMPs at least once every 7 calendar days ar within 24 hours of the end of a rainfall event that is 0.5 inches or greater. Where sites have been filially stabilized, said inspections shall be conducted at least once every month until the Notice of Terraination is fled. Identify and describe all sources of non-stormwater discharges as allowed in Part IV.A.3. of the permit Flows from fire fighting activities o not have to be listed or described. It is expected that the following non-sto water discharges may occur from the site during construction period: wash water (where n) spills or leaks of toxic or hazardous materials have occurred), and uncontaminated groundwater (from dewa ring excavation). Dewatering shall be done in accordance with the requirements of the SFWMD Water Use I en nit . If said discharges do occur, they will be directed to the temporary sediment basin prior to discharge. Any pumped water shall be treated so as to not allow a discharge of polluted stormwater. Treatment can incluc e silt fences, settling ponds; the proper use of flocculating agents or other appropriate means. All contractor(s) and subcontractor(s) iden ified in the SWPPP must sign the following certification: "I certify under penalty of law that I unde-stand, and shall comply with, the terms and conditions of the State of Florida Generic Permit for Stormwater Discharge from Large and Small Construction Activities and this Stormwater Pollution Prevention Plan prepared thereunder." FIELD BK. CULPEPPER St TERPENING, INC CONSULTING ENGINEERS I LAND SURVEYORS 2980 SOUTH 25th STREET • FORT PIERCE, FLORIDA 34981 151 SW FLAGLER AVENUE • STUART, FLORIDA 34994 PHONE 772-464-3537 • FAX 772-464-9497 • w .ct-eng.com STATE OF FLORIDA CERTIFICATION No. LB 4286 :EXISTING. GROUND 2- TO 4-IN. ROCK 50-FT. MINIMUM A I A 6-IN. MINIMUM SIDE VIEW (NTS) 2- TO 4 K ROCK W161 .l — 50-FT. MINIMUM . 6 FI, MINIMUM 12 -FT MINIMUM J J/J y� Yy PLAN) VIEW (NTS) 12-FT. MINIMUM 6-IN A --FILTER CLOTH MINIMUM SECTION A —A (NTS) Fs*wsa��ws�: 4 3-IN. MMMUM 2- TO 4-IN: ROCK SOIL TRACKING PREVENTION DEVICE Figure V-14: Illustration of a Soil Tracking Prevention Device BY DATE DESIGNED ER 8/21/18 CALLS. ---- ---- DRAWN ER 8/21/18 DETAILED ---- ---- CHECKED I DEM 9/21/18 APPROVED I ---- ---- A DRAIN GRATE 5%SUOPE A PLAN VIEW ATTACH FILTER FABRIC SEGURILY TO 2X4 WOOD TOP FRAME NECESSARY FRAME, OVERLAPPING POR STABILITY FABRIC TO NEXT STAKE �PONDING HT. 18` MAX.r,7 2x4 WOOD FRAME 4 SIDES OF D.I. Sb' MAX / \;'m SECTION A -A NOTES, I. DROP INLET SEDIMENT BARRIERS ARE TO BE 4. THE TOP OF THE FRAME (PONDIN(s HEIGHT) USED FOR SMALL, NEARLY LEVEL DRAINAGE MUST BE WELL. SELOW THE GROUND ELEVATION' AREAS,(LESS THAN 5%) DOWNSLOPE TO PREVENT RUNOFF PROM BY- 2. USE 2X4 WOOD OR EQUIVALENT METAL STAKES, PASSIN6 THE INLET. A TEMPORARY DIKE MAY (S PT. MIN. LENGTH) BE NECESSARY ON THE DOWNSLOPE SIDE OP S. INSTALL 2X4 WOOD TOP FRAME TO INSURE THE STRUCTURE. STABILITY. Figure 4.5a. Silt Fence Drop Inlet Sediment Barrier SPACING OF POSTS ARE 5- TO 8-FT. APART HEIGHT BACKFILL TRENCH. FABRIC MATERIAL MUST BE SECURELY FASTENED TO THE POSTS OR (IF USED) TO THE WIRE MESH WOOD OR STEEL POST INSTALLED BEFORE COMPACTING BACKFILL MATERIAL \ RUNOFF FABRIC MATERIAL MUST BE PLACED IN A 6-IN. x 6-IN. TRENCH WITH A "L" SHAPE BEFORE BACKFILLING AND COMPACTING THE SOIL. TRENCHING METHOD FABRIC MATERIAL WHEN FABRIC IS INSTALLED IN A TRENCH WITH COMPACTED SOIL, ANCHORS CAN BE ATTACHED TO REDUCE THE POTENTIAL OF "BLOWOUTS" (NOT NEEDED IF "SUCING" METHOD IS USED) STEEL OR WOOD POST INSTALLED AFTER COMPACTION OF "SLICE" RUNOFF a- TO 12-IN. SLICING METHOD ATTACHING TWO SILT FENCES WHEN TRENCHING IS USED PLACE THE END POST OF ONE FENCE INSIDE ��,,,.,.--""�✓ THE END POST OF THE OTHER FENCE ROTATE BOTH POSTS A7 LEAST 1 „i DEGREES IN A CE DIRECTION TO CREATE A TIGHT TO ^ SEAL N'ITI1 THE FABRIC MATERIAL N W DIRECTION OF RUNOFF WATER ` DRIVE BOTHPOSTS LU ABOUTI2 INTO THE •..y W GROUND AND BURY THE °0 N Z U FLAP IN A TRENCH Q LU 020M Hy°'°" p SILT FENCE BARRIER INSTAL,�At�% �•!�l�,CIOi' Figure V-40: Illustration of a Silt Fence Barrier 4C''. APPROVED A proval Order „ i$ti DIXIELAND TOWNHOMES r r a , i 1 No 79043 rut: ;rut '. STATE OF : <u FkI01-1161 DATE: 8/21 /18 HORIZ. SCALE: NA VERT. SCALE: NA JOB No. 17-007 SHEET 9 of 10 L pq rn ro m 0 -ii 0 a `T a d L 0 88 0 0 N 0 0 0 0 0 I n o, c rn M 0 i a 0 a 0 E 0 3 a C 0 a N O O 0 0 0 I i n NOTES: 1) ALL ELEVATIONS AND BENCHMARKS SHOWN HEREON ARE RELATIVE TO THE NATIONAL GEODETIC VERTICAL DATUM (N.G.V.D.) OF 1929. 2) SURVEY DATA PROVIDED BY CULPEPPER & TERPENING, INC., DATED JANUARY 19, 2017. Know what's below. Call before you 1. GENERAL A. Mobilization: Mobilization shall meet the requirements of FDOT Section 101! This work shall include, but is not limited to, operations necessary fpr the movement of personnel, equipment, supplies, and incidentals to the project site, and for the establishment of temporary offices, buildings, safety equipment and first aid supplies, sanitary and other facilities, as required by State and local laws and regulations. the costs of bonds and any required insurance, and any other preconstruction expense necessary for the start of work, excluding the cost of construction materials, shall also be included in this section. This section also includes any and all work related to the final cleanup. B. Construction Surveying: The Owner shall provide horizontal control consisting of four control points. The Owner shall also provide vertical benchmarks as shown on the plans. This control shall be provided one time only. The Contractor is responsible for all other construction surveying. The Contractor is responsible to protect these reference points and the construction staking throughout the job. The Contractor shall bear the cost of any necessary restaking. C. Soil Testing: Soil Testing shall be performed by a certified testing laboratory. 2. EARTHWORK AND GRADING Materials arjd construction methods for earthwork, excavation, embankment and gradingi shall meet the requirements of FDOT Section 120 and shall be performed to acquire final grades, elevations and typical sections as shown on the plans for the proposed work. A. Clearing and Grubbing: Clearing and grubbing shall meet the requirements of FDOT Section 110 and shall be performed within the limits of the project work. This work shall include, but is not limited to, the removal of existing trees, brush stumps, roots and other objectionable material to a depth of 18 inches below the natural ground or design grade, whichever is lower. The areas to be cleared and grubbed generally consist of rights —of —way, utility easements, water management tracts, and portions of the lots as detailed on the plans. The :Contractor shall confirm with the Owner the removal of any trees on the lots for possible preservation. All material shall be removed from the site of the project and shall be disposed of in accordance with local, regional, State and Federal laws, regulations and ordinances. There shall be absolutely no clearing and grubbing or placement or removal of material from within the area designated as "Wetland Preserve" oil their buffers. B. Rough Grade': The Contractor shall grade the rights —of —way and lots to meet the requirements of FDOT Sections 110 and 120 and shall conform to the lines, grades, and typical sections as shown on the plans. C. Fine Grade: The Contractor shall fine grade the roadway to meet the requirements of FDOT Sections 110 and 120 and shall conform to the lines, grades and typical sections as shown on the plans. D. Sod: Sod shall meet the requirements of FDOT Section 570, 575, and 981 and shall be placed adjacent to the curbing for a minimum width of 24 inches. E. Seed and Mulch: Seed and mulch shall meet the requirements of FOOT Sections 570, 575, and 981 and shall be placed in the rights—of—wdy and all disturbed areas. 3. PAVING IMPROVEMENTS All paved areas shall meet the requirements of AASHTO Specifications, FOOT and St. Lucie County and shall be constructed to the typical sections as shown on the'! plans. The Contractor shall retain the services of an independent testing laboratory to conduct all required testing and retesting to comply with these Specifications. 1`he Owner shall bear the cost of initial testing and the Contractor shall ,correct any deficient work at his own expense. A. Asphaltic Concrete: Asphaltic concrete materials and construction methods shall meet the requirements of FDOT Sections 300, 320, 330 and 331 and shall be Type SP 9.5 with a 1-1/2" thickness. Prime Coats shall meet the requirements of FDOT Sections 300-1 through 300-7 and !shall have an application rate of 0.10 gallons per square yard, unless'! a variation rate is approved by the Engineer. B. Base: The base course shall be 6 Inches of compacted LBR 100 base rock material as shown on the typical sections on the plans. The base shall be co r' patted to 98 percent of the maximum density as determined by AASHTO T-180. C. Subgrade: The subgrade shall be 8 inches thick and shall extend six inches beyond the edge of the base course within the limits shown on the plans. S'ubgrade shall be compacted to 98 percent of the maximum d nsity as determined by AASHTO T-180. If normal compaction methods do not meet the required densities, the subgrade shall be staff 1lized as directed by the Engineer. D. Concrete Sidewalk: Concrete sidewalk shall meet the requirements of FDOT Section 522 and shall be constructed to the typical section shown on the plans. E. Painted Traffic Striping: Painted traffic stripes shall meet the requirements of FDOT Section 710. F. Stop Sign an p Bar: Stop signs and bars shall meet the requirements of FDOT Section! 700 and the Manual of Uniform Traffic Control Devices and shall be,constructed in the locations as shown on the plans. �FIIvF RFF I FIELD BK./PG.I THE WORK Existing Utilities and Structures: Existing utilities, structures and facilities shown on the Drawings were located as accurately as possible from the records examined. No guarantee is made that all existing facilities are shown or that those shown are entirely accurate. The Contractor shall assure himself of the actual location of the utilities, structures, or facilities prior to performance of any work in the vicinity. The utility companies or utility agencies will co—operate with the Contractor's operations. Prior to start of the work, the Contractor shall request each utility agency to advise him of the location of their facilities in the vicinity. The Owner will assume no liability for damages sustained or cost incurred because of the Contractors operation in the vicinity of existing utilities or structures, or to the temporary bracing and shoring of some. In the event that it is necessary to shore, brave, or swing a utility, the utility company or department affected should be contacted and their permission secured as to the method used for any such work. Restoration or Damaged Structures or Utilities: It shall be the responsibility of the Contractor to repair, rebuild or restore to its former condition, any and all portions of existing utilities, structures, equipment, appurtenances or facilities, other than those to be paid for under this Contract, which may be disturbed or damaged due to this construction operation, at no cost to the Owner. Final Cleanup: Upon completion of the work, but before final payment will be made, the Contractor shall clear and remove from the project area, all folsework, equipment, surplus and discarded materials, rubbish and temporary structures which result from the work under this Agreement, and shall restore in an acceptable manner, all property which has been damaged during the prosecution of the work. Record Information: Upon completion of the work, but prior to submittal of the request for final payment, the Contractor shall obtain and submit record information to the Owner. This information shall include the following: 1. Water and Wastewater Systems: a. Horizontal and Vertical location and size of all water mains, meters, services, valves, and hydrants; b. Horizontal and Vertical location, size and type of all sanitary manholes; sewer main diameter, inverts and lengths, and services: 2. Drainage System: a. High points and low points of swales; b. Locations and grate and invert elevations of all structures; c. Location, size, type, length and invert of all culverts. 3. Paving and Grading: Location and elevation of high and low points in roadway and any other changes in grade. The record information shall be certified by a Florida Professional Land Surveyor. Locations shall be made by reference to centerline stationing and offset or by other means acceptable to the Owner. Elevations shall be according to National Geodetic Vertical Datum (NGVD). The information shall be submitted on a clean set of construction drawings which can be obtained from the Engineer. Guarantee: All materials and the installation thereof which are furnished and installed by the Contractor, under the terms of the Agreement, shall be guaranteed by the Contractor against defective workmanship, mechanical and physical defects, leakage, breakage, and other damages and failure under normal operation for a period of one (1) year from the date of final payment or acceptance by ultimate owner, said date to constitute the commencement of the one (1) year warranty period. All materials and Installations proving to be defective within the specified period of the guaranty shall be replaced, without cost to the Owner, by the manufacturer or the Contractor. The period of guarantee of each such replacement shall be from and after the date of installation thereof. 1. Grassing shall be furnished and installed in conformance with the approved landscape plan. All disturbed areas not shown to be planted, mulched, etc. shall be sodded. 2. Sod shall be placed such that the top of the grass is at the some elevation as the top of adjacent finish grade. 3. The location of existing utilities shown is approximate only and must be field verified by the Contractor prior to beginning work. 4. These plans shall not be used for construction unless they are marked "Approved for Construction" in the title block. 5. Contractor to obtain and review all permits prior to starting construction 6. Drawing scale may change due to reproduction. 7. Maintenance of traffic must be in conformance with FOOT Specifications. 8. All nuisance exotic vegetation on —site must be removed in conjunction with site development. 9. Contractor to confirm limits of preserve areas and fence appropriately prior to starting construction. 10. Geo—technical Exploration performed by Ardamon & Associates, Inc., dated April 10, 2018. The contractor is directed to the site preparation section of the report and advised that compliance with the instruction in that section is required. CULPEPPER & TERPENING, INC CONSULTING ENGINEERS I LAND SURVEYORS 2980 SOUTH 25th STREET • FORT PIERCE, FLORIDA 34981 151 SW FLAGLER AVENUE • STUART, FLORIDA 34994 PHONE 772-464-3537 • FAX 772-464-9497 . w .ct-eng.com S LATE OF FLORIDA MMHCATION N. LE 4286 —REVISIONS — I BY I DATE I BY DATE DESIGNED ER 8/21/18 CALCS. — — — — ---- DRAWN ER 8/21/18 DETAILED — — — — ---- CHECKED DEM 9/21/18 APPROVED ---- ---- Planning & Development APPROVED services pproval Order - JAN 10 2019 RECEIVED DIXIELAND TOWNHOMES SPECIFICATIONS No 79043 STATE OF +++�'•,CORip DAVID E. MORIN, P.E. FL. DATE: 8/21/18 HORIZ. SCALE: NA VERT. SCALE: NA JOB No. 17-007 SHEET 10 of 10