Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutDRAWINGIon ME .....
milm
HANGER LEGEND
* ALL 2x HANSER5 5HOHN ARE ITw AHU26 UNLE55
NOTED OTHMK15E.
* ALL 4x SYS42 HAN6ER5 5HOHN ARE AHU46 UNLESS
NOTED OTHERHI5E.
* TRU55 INSTALLER 15 RESPONSIBLE FOR IN5TALLIN6
SPECIFIED HANGER FOR TRU55 TO TRUSS CONNECTION
PER MANUFACTURER SPECIFICATIONS,
ITN HANGERS UNLE55
NOTED
OTHERWISE
AHU26 (05
AHU46
O
AHU25 _
SQR
55R26 lO
0
AHU26-2 I
(P
55L26
`D
AHU25-2 _
(E�
55R46
AGU526-2T
@
551.46
;J
AGU526-2T _
®
M5R26-2 3
V
AGU526-5T _
©
M51-26-2 I
H
AGU528-5T
HU2
KTH602
®
ATH422 _
R
KTH003
O
®SPECIAL
GONNEG TION
BY OTHERS
SCANNED
BY
St Lucie County
APPROVED FOR
TRUSS LAYOUT ONLY
IiII IIIII„1
IT. rij, tea,,
c r�
pNO 50109 't
APR 0 2 2019
N❑TICE
1 field Bracing is not the responsibility of the truss
fabricator, truss designer, nor plate manufacturer. Per
erecting trusses are cautioned to seek professional
advice regarding erection bracing which is always req
to prevent toppling and dominoing during erection, anc
permanent bracing which may be required in specific
applications. Trusses shall be erected and fastened
straight and plumb position. When no sheathing is oppl
directly to the top chords, they shall be braced at 24
max. Where no rigid ceiling is applied directly to the
bottom Chords, they shall be braced at &'-0" o.c. max.
Trusses shall be handled with reasonable care during
erection to prevent excessive damage or personal in
See Engineering for connections, nailing schedules, etc
NOTE: Labeling trusses Is a service, not a requirement.
Engineered drawings supercede labeling of trusses. It is
the responsibility of the builder to utilize engineered
drawings when erecting trusses.
Girder truss to girder truss Connections which exceec
the capacity of a standard hanger or truss to wall
connections are the responsibility of the builder.
GENERAL NOTES
1, TRUSSES SPACED 24" ON CENTER, U.O.N.
2 ALL WALL, BEAM # COLUMN MOUNTED
TRUSS HANGERS BY BUILDER
3. SOME DOWN FRAMING BY BUILDER.
4, 50ME VALLEY FRAMING BY BUILDER.
5, BOT.= BOTTOM OF TRU55 FROM ELEV. 0'-0"
NOTICE: PLEASE CONTACT F.Q.T. PRIOR TO ANY
ALTERATION OF TRU55E5 PROVIDED BY
F.Q.T. WILL NOT BE RESPONSIBLE FOR A
TRUSS GUT OR ALTERED WITHOUT PRIOR
WRITTEN AUTHORIZATION
DESIGN CRITERIA: ASCE i/10 WIND SPEED: 10
BUILDING TYPE: ENCLOSED EXPOSURE: B
RISK CATEGORY: 11
ROOF LOADS
FLOOR LOADS
TOLL: 20
TOLL:
TGDL: I5
TGPL:
BOLL:
BGLL':—
BGDL: IO
BGDL:
TOTAL: 45 _
TOTAL:
i•25
ALLOIWIRREASEALLOWAB� ALE
DEFLECTION 560/240
DEFLECTION
FLFIRIDA
QUALITY TRUSS
TEL_I C95 - 384
FAX: (954) 978-8980
3635 PARK CENTRAL BL'/
POMPANO BEACH, EL, 3306Z
SH❑P DRAWING APPFREl
THIS DRAWING IS THE SOLE SOURCE
FABRICATI❑N OF TRUSSES AND V❑IDS
PREVI❑US ARCHITECTURAL OR OTHER LA`
APPROVAL OF THIS LAYOUT IS NEC[
BEFORE ANY WORK CAN BE DONE, PLD
VERIFY AND/OR INDICATE TRUSS PLACEN
DIRECTI❑NS, DIMENSI❑NS, BEARING C❑NDI
PITCHES, SHAPES, OVERHANGS. CHIMNEY,
CUPOLA LOADS AND C❑NNECTI❑NS SHALL
SUPPLIED BY A/E OF RECORD,
Approved Byl I
REV,
5/21/lq
REVi
REV,
0U5TOMER: V I LLAD LTA CONSTRUCTION
DATE, 3/II/Iq
SCALE, 3/1611=1'-0"
BY, GM
SUB DIV,
SALES:
ADDRESS, FORT 5T. LUCIE FL
PP`��.
COUNTY: 5T. LUCIE
l
PH6 NO.
LOT/BLOCK
MAYRIDE5 RES.