HomeMy WebLinkAboutBLOWER DOOR TEST15 li h ears, Inc
g tY 15 lightyears
SCANNED
776 Bennett Drive gY
Longwood, Florida 32750 St LUCie County
June 1, 2018
To: Local Building Department
SEP 2 4 2018
RE: Blower Door Test & Duct Leakage Test Reports
[Permitting Department
St. Lucie County, FL
To whom it may concern,
This letter is to request that the attached forms be accepted for compliance of the 2017 Florida Building
Code statute R402.4.1.2 Envelope leakage testing (Blower Door Testing) and R403.3.3 Duct testing.
The attached forms were provided by the' Florida Building Commission as the accepted forms to be
submitted. These forms are listed on theJ2017 Florida Building Code, Energy Conservation Technical
Assistance Manual, Document Number:ITAM-2017-1.0, released February 02, 2018, pages R-78 through
R-80 (page numbers 159-161).
Web link provided for quick access to the TAM document https://tinyuri.com/2017FBC-TAM
These forms meet all three required Residential Energy Efficiency Compliance Paths listed under R401.2,
Prescriptive, Performance, and Energy, Rating Index (ERI) paths.
We are working with building departments across Florida to standardized the form submittal process and
would like your department to allow these forms to meet compliance. If there are any issues with
accepting these forms, please reach out to me directly and I will ensure that we submit any specific form
that you will require. Tim Smithl(407)-951-3236 tsmith@151ightyears.com
Respectfully,
Timothy�mith
15 Lightyears, Chief Operations (Officer
Energy Technical Advisor I
RESNET Quality Assurance Designee
IECC Residential Energy Inspector/ Plans Examiner
Member, Building Officials Association of Florida Member and Code Development Committee
participating member. Also, representative to the Florida Building Commissions, Energy Technical
Advisory Committee for the BOAF- CDC
1
i
Envelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building CodIle, Energy Conservation, 6th Edition
Jurisdiction: yc,\Vv l a
Permit #:
J'ob Information`
Builder: �,,, l j Community: Gal�(whdLc, �CE Lot: 70
Address: Unit:
City: c� I State: Zip: 3C(gs-
Air Leakage TestResuits Passing resultk must meet either the Performance, Prescriptive,, or ERI Method
OPRESCRIPTIVE METHOD -The building or dwelling unit shall be tested and verified as having,an air leakage rate of not exceeding 7 air
'Changes p45r hour at a pressure of 0.2 inch w.g. (50 pascals) in Climate Zones 1 and 2,
ERFORMANCE or ERI METHOD- The 'building or dwelling,unit shall be tested and verifiedas having an air leakage rate of not exceeding
the selected ACH(50) value, as shown on FORM R405-2017 (Performance) or. R406-2017 (ERI), section labeled as Infiltration, sub -section ACH50.
ACH(50) Form R405-2017-Energy Calc
specified. on (Performance) orR406-2017-(ERI):
0 T X 60 _ i 2c0 S2— = I �� I� Method for calculating buildingyolume.,
CFM(50) Building Volume I ACH(50) 0: Re ' ved from architectural plans'.
PASS (Mechanical Ventilation is not required) Code software::calculated.
PASS (with Mechanical Ventilation)
0 Field measured and calcuNtetl
FAIL
R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure or 0.2 inch w.g. (50 Pascals).
Testing shall be conducted by either lndividuals as defined inlSeUion 553.993(5) or (7), Florida Statues, or individuals licensed as set, forth In Section
489.105(3)(f), (g), or (i) or an-approved,third party. A written report of the results of the test shall.be signed:by the party conducting,the.test.and
provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
Dunn
Duran testing:
ri
or windows and doors, fireplace and stove doors shall be closed,,but not°sealed, beyond the intended weatherstripping or other. infiltration`
control measures.
2-Dampers including exhaust, intake, makeup airi back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control,
�:
measures: °
3 riterior doors, if installed at the time of the test, shall' be, pen:
4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
S.Heating and cooling systems, if installed at the time of the test, shall be turned off..
6.Supply and return registers, if installed at the time of the�test,•shall be fully open. °
Testing Company
Company Name: 15 Lightyears, Inc I Phone: (855)438-1515
1 hereby verify that the above Air Leakage results arelin accordance with the 2017 6th Edition Florida Building Code Energy
Conservation requirements according to the compliance method selected above.
Signature of Tester: 1 Date of Test:
Austin Blankenship
Printed Name of Tester:
License/Certification #: J87RSA I Issuing Authority: RESNET
i
(Copy of License il Certificate of the tester must be attached)
Duct Leakage Test Report
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
jurisdiction: 5-7, Lt C('& C64-1,,
Job Information
Permit #: / �0, — 6015-
Builder: 414--e-s Community: 010WVA Lot: 0070
i
Address: 53L1 0'W-j L,�" C�rt,��i Unit:
City: �, ,°erCe.- I State: A Zip:
Duct Leakage Test Results(.
System 1
cfm25
System 2
cfm25
System 3
cfm25
Sum of any
additional systems
cfm25
Total of all
systems
1 �
`� cfm25
�CD/ - 1�5 q— = 3.3 ( Qn
Total of all Total Conditioned
systems Square Footag
ASS
Duct tightness shall be verified by testing in accorda
553.993(5) or (7), Florida Statutes, or individuals licei
Testing Company
Company Name: 15 Lightyears, Inc
I hereby verify that the above duct leakage testing
Conservation requirements according to the comp
Signature of Tester:
Printed Name of Tester:
License/Certification #:
n the
or. R406-2017..
R405-2017
1.06-2017
I
with ANSI/RESNET/ICC380 by either individuals as defined in Section
d as set forth in Section 489.105(3)(f), (g) or (i), Florida Statutes.
Phone: 55) 438-1515
Its are in accordance with the 2017 6th Edition Florida Building Code Energy
:e method selected above.
Austin Blankensh
Date of Test: Z! 151
J87RSA I Issuing Authority: RFSNFT
i
(Copy of License / Certificate of the tester must be attached)
Certificate of Achievement
THIS ACKNOWLEDGES THAT
Austin Blankenship
HAS MET THE STANDARD R E Q U-I-R ED-B Y R-ESN-ET;
CERTIFIED RATING FIELD INSPECTOR
Certification Date: 05/07/2018
Certification Expires: 05/07/2021
R F I # J87RSA
Tim Smith,
RESNET Quality Assurance Designee
15 1*iYhtyears
RESNET QA Provider # (1998-199)