HomeMy WebLinkAboutSELF CERTIFICATION" SCANNED
BY
St Lucie County
Florida Department of RECErVEb Rick Scott
Governor
Environmental Protection MAY 03 i.'T.8 j
Carlos Lopez-Cantera
sT. Lucie County, h2an aMy Lt. Governor
Bob Martinez Cl_
2600 Blair Stone oad
Tallahassee, Florida 32 99-2400 Noah Valenstein
Secretary
/Keceivt for Submission
SELF CERTIFICATION FOR
A PROJECT AT � PRIVATE, SINGLE-FAWLY RESIDEN
04/21/2018
Self Certification File No.: i
File Name: 42 Aqua Ra Dr
- Self Cert Exempt Dock w
isen Beach, FL 34957
Boat Lift(s) (General)
� iy i, S.r,-, -�s,A0K RL 0-
FRONT
Mars
OR e S
REAR
ZNG:
TECH
Dear Bruce Jerner: On, 04/21/2018, you used the Florida Department of Environmental
Protection's electronic Self Certification Process to certify compliance with the terms and
conditions of the FederallState Programmatic General Permit (SPGP) Self Certification
Process for a project at private, single-family residence located at:
LAT -Degrees: 27 11
LONG - Degrees: -80
SITE ADDRESS: 42.
COUNTY: St. Lucie
For:
RAUL GARCIA
42 AQUA RA DR Je
You have certified the
conditions of the Self
conditions (attached f,,
1. Qualify for a rq
Chapter 62-330,
obtain a DEP Er
;s:15 Seconds:55.9307
utes:12 Seconds:17.6165
Ra Dr Jensen Beach, FL 34957
sen Beach, FL 34957
the project you propose to construct at the above location meets all the
;ertification Process. A project that is built in conformance to those
reference) will:
exemption under Section 403.813(1)(b) of the Florida Statutes (F.S.) and
Administrative Code (F.A.C.). As such, it is exempt from the need to
;ntal Resource Permit.;
2. Qualify for Consent by Rule or Letter of Ponsent (as applicable) under Chapter 253, F.S. and
Chapter 18-21, F.A.C. (and Chapter 258, F.S. and Chapter 18-20, F.A.C., if applicable), when
the project is located on submerged landsl owned by the State of Florida.;
Your Self -Certification is based solely or%
applies only to the statutes and rules in ef:
certification is effective only for the speci
constructed, operated, and maintained in i
limitations stated in the Self -Certification
your plans should be submitted to the Del
being required.
You have acknowledged that this Self Ce:
1. Construction of the project is not compli
2. site conditions materially change;
3. the terms, conditions, and limitations of
4. the governing statutes or rules are amens
the information you provided under this process, and
sect when your certification was completed. The
Ec project proposed, and only if the project is
onformance with all the terms, conditions, and
Process. In addition, any substantial modifications in
artment for review, as changes may result in a permit
will automatically expire if:
within one year from the self -certification date;
Self Certification are not followed; or
before construction of the project.
Completion of the Self Certification constitutes your authorization for Department or Corps
personnel to enter the property for purpose
Receipt of this Self -Certification constitut
submerged lands, as required by rule 18-2
The authorization must be visibly posted c
In waters that are accessible to manatees,
Protection sign by clicking here.
FEDERAL STATE PROGRAMMATIC
> of inspecting for compliance.
s authorization to use sovereignty/state-owned
.005, F.A.C.
.firing all construction activities.
btain information on your mandatory Manatee
You have certified that the project you prof
conditions of the SPGP Self -Certification P
conditions (attached for reference). Your pr
SPGP program. U.S. Army Corps of Engin(
attached. No further permitting for this acti,
transfer of ownership of the property by sale
authorized by this SPGP Self -Certification
transferred, the terms and conditions of this
on the new owner(s)of the property. Althou
Department of the Army permits is finite, tl
To validate the transfer of this SPGP Self-C
associated with compliance with its terms a
PERMIT (SPGP)
se to construct at the above location meets all the
)cess and will be built in conformance to those
posed activity as certified is in compliance with the
,rs (Corps) Specific conditions apply to your project,
ty is required by the Corps. In the event of the
or by any other means, when the structures or work
e still in existence at the time the property is
oPGP Self -Certification will continue to be binding
h the construction period for works authorized by
permit itself, with its limitations, does not expire.
rtification and the associated responsibilities
i conditions, the attached transfer of SPGP Self-
Certification request must be completed
of ownership. The address is given beloN
Certification is based solely on the infon
to the statutes and rules in effect when p
that your certification is effective only fr
is constructed, operated, and maintained
limitations stated in the SPGP Self-Certi
any substantial modifications are made ti
review of any plans to construct addition
result in a permit being required. You ha
automatically expire if: 1. construction o
2021, unless construction commenced of
2021, in which case the time limit for co.
midnight, July 25, 2022. However, in no
beyond the Self -Certification date; 2. sit(
and limitations of the Self -Certification
amended before construction of the proje
authorization for Department or Corps pi
for compliance. If you have any question
Contact information can be found at: httl
environmental-resources-coordination/dc
information, contact the Corps directly a
http://www.saj.usace.arTny.mil/Missions,
use the SPGP Self -Certification file num
with the U.S. Army Corps of Engineers F
Army Corps of Engineers (Jacksonville ]
Protection State Programmatic General �
and Section 404 of the Clean Water Act.l
ADDITIONAL INFORMATION
This Self -Certification Process does not
permits or authorizations from other age:
local) that may be required for the prcje(
construction of the project may result in
If you have any problems with the
245-8495 or by e-mailing us at EP
Sincerely, Florida Department of
ind submitted to the Department at the time of transfer
on the attached transfer form. This SPGP Self-
iation you provided under this process, and applies only
,ur certification was completed. You have recognized
r the specific project proposed, and provided the project
n conformance with all the terms, conditions, and
ication Process. This Self -Certification will not apply if
the project. You agree to contact the Department for
d structures or to modify the project, as changes may
re acknowledged that this Self -Certification will
.'the project is not completed by midnight, July 25,
a contract to construct was executed before July 25,
apleting the work authorized by the SPGP ends at
case can construction continue for more than one year
conditions materially change; 3. the terms, conditions,
re not followed; or 4. the governing statutes or rules are
ct. Completion of the Self -Certification constitutes your
rsonnel to enter the property for purposes of inspecting
please contact your local Department District Office.
s://floridadep.gov/water/submerged-lands-
cuments/district-office-contacts. For further
,n latory.aspx. When referring to your project, please
listed above. Authority for review - an agreement
:led Coordination Agreement between the U. S.
rict) and the Florida Department of Environmental
ut, Section 10 of the Rivers and Harbor Act of 1899
lieve you from the responsibility of obtaining other
ies (federal, state, Water Management District, or
Failure to obtain all applicable authorizations prior to
documents, please call the ERP Coordinator at (850)
Protection