HomeMy WebLinkAboutFBC CONSERVATION CODESCANNED
BY
St Lucie Cour
Date: '7 Permit t
Contractor. 14w? QJ �c ,��Le i1J�LS
Construction: a 04 Construction Test
Test conditions:
Date:
Time:
Indoor Temperature (F): -�
outdoor Temperature (F): ?
Duct Leakage: ❑ Default mop. Leak Free
Test Pressure: —,aS (Pa)
Baseline Duct Pressure (optional)(Pa)
Duct Press. (Pa) Flow Ping Fan Press
g & Development Services
& Code Regulation Division
30 Virginia Ave, Rm 201
)rt Pierce, FL 34982
A7-2165 Fax 772-462-6443
GY CONSERVATION CODE
Sealing Certification
e and Performance Method
R'50�rvaa
JUL 8 0 2019
Formatting Department
St. Luca Co
unty
l 71 1�1 tt=r73 3 Lot M
Address:
i Test
., 4��ad - a� z_a
ry Location of Supply Ductwork x�r��i��,t=.V t" f+� S`=
iry Location of Return Ductwork g*11 c.J i —
c Proposed On =
Testing Comaany //
Company Name: fq6At 0A- Li1Gi�%J 1PS�r'ity Address:
❑ Fait
Total Leakage (cfm):
Total Leakage per 100 sgft: D-97
CFM25 x 100 divided by the CFA = Duct Leakage CFW100 sgft.
1'1 S
I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 6- Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.
Signature:
Printed Name: fQUSS�I �eL�e ��c� License/Certificate M QUO 7 f Z
A14