Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutREVISION 6-18-19OFFICE USE ONLY:
DATE FILED: �� - ��' 19-dIANNED
REVISION FEE: I BY
St Lucie Coup y
PERMIT # T I ® `)
RECEIPT #
PLANNING & DEVELOPMENT SERVICES
'BUILDING & CODE REGULATION DIVISION
2300 VIRGINIA AVENUE
FORT PIERCE, FL 34982-5652
(772) 462-1553
APPLICATION FOR BUILDING PERMIT REVISI
PROJECT INFORMATION
LOCATION/SITE
ADDRESS:
4410 HIGHWAY Al A - QUEENS ISLAND PRESERVE aka ACQ JAVIAST LOT 1
R�CEIVM
JUN 18 2019
ST. Lucie County, Permitting
0
i
DETAILED DESCRIPTION OF PROJE!CT
REVISIONS:
AS -BUILT ALTERATIONS TO PILE LOCATIONS FOR FOUNDATION - LOWER BEAM ADJUSTMENTS TO SUIT
CONTRACTOR INFORMATION:
STATE of FL REG./CERT. #: CGC047289
BUSINESS NAME: UBALDO BLANCO GC INC
QUALIFIERS NAME: UBALDO BLANCO
ADDRESS: 437 GOLDEN ISLE drive APT-8F
CITY: HARMONY STA'
PHONE (DAYTIME): (786) 512-5717
OWNER/BUILDER INFORMATION:
NAME: VENETIAN ADMINISTRATION LLC
ADDRESS: 7400 FLAGLER AVENUE
CITY: MIAMI
PHONE (DAYTIME:
: FLORIDA
ST. LUCIE CO CERT. #: 30970
FAX:
STATE: FLORIDA
FAX:
ARCHITECT/ENGINEER INFORMATION:
NAME: KNIGHT MCGUIRE & ASSOCIATES
ZIP: 33009
ZIP: 33144
ADDRESS: 80 ROYAL PALM POINTE SUITE 401
CITY: VERO BEACH STATE: FLORIDA ZIP: 32960
PHONE (DAYTIME): (772) 569-5505 FAX: (772) 569-1455
SLCCC: 9/23/09 FILE
Revised 06130/17
April 16, 2019
American Foundation, Inc.
10780 NW 138th St. #D6
Hialeah Gardens, FL 330
RE: Pile Installation Certification
Proposed Residence
Lot #1
4410 N Hwy. AIA
Fort Pierce, FL
Soilprobe Engineering & Testing, Inc. ha
installation for the above referenced proj E
Foundation corresponding to the date of A
witnessed by a representative of this office.
and document pile installation operation ont,
RECSIVED
JUN 18 2,099
ST. Lucie County, Permitting
completed field observation of auger cast piles
;. Piling operation was conducted by American
ril 16, 17, 18, 19, and 23, 2019 and installation
he purpose of this site inspections was to observe
A total number of sixty four (64) piles were placed at locations staked in the field by the owner's
representative and to depths as indicated in! the attached field inspection logs. Pile installation
data for each pile are presented in the attached field installation logs.
Following our observation of pile installation operation at the scheduled time, and our
knowledge of project documents we certify that the referenced piles were adequately installed
for achieving an allowable bearing capac'ty of 40 tons compression and 12 tons tension
respectively.
Sincerely,
Soilprobe-En*neering & Testing, Inc.
No
Enc. Pile installation logs
Location sketch
ME
00
b3CTG�tCYecYi}ui4og z a
0DI _C;;'540
SOILPROBE ENGINEERING AND TESTING, INC.
1611 Auger Cast Pile Log
PROJECT: PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's
POOL Logged By: AO 5000 psi Load Bearing (tons)
SOILPROBE ENGINEE RING'& 40 comp
TESTING, INC. ADDRESS: 4410, 4416, 4422 N Hwy A1A Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @ 4" O.C. @ top of pile and @10" .O.C. @ balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Strokes Pump
Actual
Grout Amt.
C.Y.
Factor Grout
Kips
comp tension
Date: April 16, 2019
Notes
1
1
2:20
30
1.50
50
2.05
1.36
80
24
Start 7: 3 Arrived- - -7:30- - -- -
2
2 1
2:00
30
1.50
50
2.05
1.36
80
24
ADONEL #4416 9 cy
3
3 -
1:59
30.
1.50
51
2.09
1.39
80
24
4
4
2:32
30
1.50
50
2.05
1.36
80
24
Stop 8:20
5
5
1:48
30
1.50
48
1.96
1.31
80
24
Start 8:24 Arrived 8:18
6
6
2:12
30
1.50
50
2.05
1.36
80
24
ADONEL #4009 9 cy
7
7
2:23
30
1.50
49
2.00
1.34
80
24
8
8
2:00
30
1.50
48
1.96
1.31
80
24
9
9
2:00
30
1.50
59
2.41
1.61
80
24
Stop 9:26 Start 9:25
10
10
2:40
30
1.50
64
2.62
1.75
80
24
ADONEL #7004 Arrived 9:15
11
11
2:16
30
1.50
50
2.05
1.36
80
24
9 cy
12
12
1:45
30
1.50.
53
2.17
1.45
80
24
Stop 10:15 Start 10:15
13
13
1:47
30
1.50
50
2.05
1.36
80
24
ADONEL #7012 Arrived 10:00
14
14
2:33
30
1.50
50
2.05
1.36
80
24
9 cy
15
15
2:15
30
1.50
55
2.25
1.50
80
24
16
16
2:29
30
1.50
56
2.29
1.53
80
24
Stop 11:00 Start 11:00
17
17
2:18
30
1.50
51
2.09
1.39
80
24
ADONEL #7016 Arrived 10:37
18
18
2:22
30
1.50
51
2.09
1.39
80
24
Test taken 9 cy
19
19
2:16
30
1.50
52
2.13
1.42
80
24
20
1 20
1:53
30
1.50
52
2.13
1.42
1 80
1 24
Pag.: 1/12
SOILPROBE ENGINEERING AND TESTING, INC.
1611 Auger Cast Pile Log
PROJECT: PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's Load Bearing (tons)
POOL ILogged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410, 4416, 4422 N Hwy A1A Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @ 4" O.C. @ top of pile and @10" O.C. @ balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
Kips
comp tension
Date: April 16, 2019
Notes
1
21
2:07
30
1.50
53
2.17
1.45
80
24
Stop 11:28 Start -`--1"1:29
2
1 22
2:17
30
1.50 1
54
2.21
1.47
80
24
ADONEL #4009 Arrived 11:00
3
23
3:00
30
1.50
50
2.05
1.36
80
24
9 cy
4
24
2:16
30
1.50
52
2.13
1.42
80
24
5
25
2:32
30
1.50
50
2.05
1.36
80
24
Stop 1:04 Start 1:04
6
26
2:42
30
1.50
52
2.13
1.42
80
24
ADONEL - #8001 Arrived 12:29
7
27
2:26
30
1.50
50
2.05
1.36
80
24
9 cy
8
28
2:31
30
1.50
55
2.25
1.50
80
24
9
29
3:04
30
1.50
50
2.05
1.36
80
24
10
30
2:11
30
1.50
52
2.13
1.42
80
24
Stop 1:50 Start 1:50
11
31
1:59
30
1.50
50
2.05
1.36
80
24
ADONEL #7012 Arrived 1:00
12
32
1:56
30
1.50
50
2.05
1.36
80
24
Test taken 9 cy
13
33
2:23
1 30
1.50
48
1.96
1.31
80
-24
14
34
2:13
30
1.50
56
2.29
1.53
80
24
Stop 2:25
15
35
2:00
30
1.50
52
2.13
1.42
80
1 24
Start 2:31 Arrived 1:40
16
36
1:56
30
1.50
60
2.45
1.64
80
1 24
ADONEL #7016 9 cy
17
37
2:07
30
1.50
60
2.45
1.64
80
24
18
38
2:19
30
1.50
53
2.17
1.45
80
24
19
39
2:49
30
1.50
54
2.21
1.47
80
24
Stop 3:07 Start_ 3:07
20
1 40
2:13
30
1.50
1 52
2.13
1.42
80
24
ADONEL #7004 Arrived 2:38
Pag.: 2/12
SOILPROBE ENGINEERING AND TESTING, INC.
1611 Auger Cast Pile Log
PROJECT: PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's Load Bearing (tons)
POOL ILogged By; AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410, 4416, 4422 N Hwy A1A Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @ 4" O.C. @ top of pile and @10" O.C. @ balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
Icips
comp tension
Date: April 16, 2019
Notes
1
41
2:14
30
1.50
52
2.13
1.42
80
24
9 cy
2
42
2:34
30
1.50
52
2.13
1.42
80
24
3
43
2:39
30
1.50
59
2.41
1.61
80
24
Stop 3:47 Start 3:47
4
44
2:39
30
1.50
50
2.05
1.36
80
24
ADONEL #4009 Arrived 3:15
5
45
2:05
30
1.50
58
2.37
1.58
80
24
9 cy
6
46
1 2:20
30
1.50
55
2.25
1.50
80
24
7
47
2:26
30
1.50
60
2.45
1.64
80
24
Stop 4:22 Start 4:22
a
48
2:13
30
1.50
53
2.17
1.45
80
24
ADONEL #8001 Arrived 4:04
9
49
2:15
30
1.50
50
2.05
1.36
80
24
9 cy
10
50
2:51
30
1.50
52
2.13
1.42
80
24
Stop 5:00
11
12
13
14
15
16
17
18
19
20
Pag.: 3/12
SOILPROBE ENGINEERING AND TESTING, INC.
1611 Auger Cast Pile Log
PROJECT: PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's
POOL Logged By: AO 5000 psi Load Bearing (tons)
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410, 4416, 4422 N Hwy AlA Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @4" o.c. at top of pile and @10" o.c. at balance
-
Pile I.D.
- --
Auger
Time
- -MIN.-_ _
Depth
(feet)
_
Theorical
Grout Am't
C.Y.
Pump
Strokes.
Actual
Grout Amt.
C.Y.
Grout
Factor
KipsDate:
comp tension
April 17, 2019
Notes
1
51
2:24
30
1.50
50
2.08
1.38
80
24
Start 7:30 Arrived- -7:20 -
2
52
2:39
30
1.50
51
2.12
1.41
80
24
ADONEL #7016 9 cy
3
53
2:36
30
1.50
50
2.08
1.38
80
24
4
54
2:43
30
1.50
50
2.08
1.38
80
24
Stop 8:19
5
55
2:56
30
1.50
52
2.16
1.44
80
24
Start 8:24 Arrived 8:08
6
56
2:34
30
1.50
49
2.03
1.36
80
1 24-
ADONEL #8001 Test taken 9 cy
7
57
3:14
30
1.50
48
1.99
1.33
80
24
8
58
3:10
30
1.50
51
2.12
1.41
80
24
9
59
2:55
30
1.50
50
2.08
1.38
80
24
Stop 9:13 Start 9:13
10
60
2:15
30
1.50
55
2.28
1.52
80
24
ADONEL #7010 Arrived 9:07
11
61
2:28
30
1.50
50
2.08
1.38
80
24
9 cy
12
62
2:52
30
1.50
55
2.28
1.52
80
24
13
63
2:05
30
1.50
53
2.20
1.47
80
24
Stop 10:04 Start 10:04
14
64
2:41
30
1.50
49
2.03
1.36
80
24
ADONEL #4001 Arrived 9:57
15
65
2:27
30
1.50
50
2.08
1.38
80
24
9 cy
16
66
1:58
30
1.50
48
1.99
1.33
80
24
17
67
2:38
30
1.50
55
2.28
1.52
80
24
18
68
2:21
30
1.50
49
2.03
1.36
80
24
Stop 10:55 Start 10:55
19
69
2:34
30
1.50
51
2.12
1 1.41
80
24
JADONEL #7016 Arrived 10:35
20
70
2:12
30
1.50
52
2.16
1 1.44
80
24
1 9 cy
Pag.: 4/12
SOILPROBE ENGINEERING AND TESTING, INC.
16" Auger Cast Pile Log
PROJECT: PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's Load Bearing (tons)
POOL ILogged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410, 4416, 4422 N Hwy A1A Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @4" o.c. at top of pile and @10" o.c. at balance
Pile I.D.
-
Auger
Time
_ MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
Ki s
p
comp tension
Date: April 17, 2019
Notes
1
71
3:05
30
1.50
50
2.08
1.38
80
Z4-
-- - - -
2
72
2:42
30
1.50
47
1.95
1.30
80
24
Stop 11:35
3
73
2:20
30
1.50
50
2.08
1.38
80
24
Start 11:42 Arrived 11:22
4
74
3:35
30
1.50
50
2.08
1.38
80
24
ADONEL #8001 Test taken 9 cy
5
75
2:51
30
1.50
51
2.12
1.41
80
24
6
76
2:27
30
1.50
48
1.99
1.33
80
24
7
77
2:40
30
1.50
51
2.12
1.41
80
24
Stop 12:23 Start 12:23
8
78
2:45
30
1.50
52
2.16
1.44
80
24
ADONEL #7010 Arrived 12:00
9
79
2:42
30'
1.50
53
2.20
1.47
80
24
9 cy
10
80
2:30
30
1.50
50
2.08
1.38
80
24
11
81
2:22
30
1.50
52
2.16
1.44
80
24
Stop 1:37 Start 1:37
12
82
1:59
30
1.50
51
2.12
1.41
80
24
ADONEL #7003 Arrived 1:26
13
83
2:45
30
1.50
52
2.16
1.44
80
24
9 cy
14
84
2:23
30
1.50
51
2.12
1.41
80
24
15
85
2:18
30
1.50
52
2.16
1.44
80
24
16
86
2:14
30
1.50
55
2.28
1.52
80
1 24
Stop 2:24 Start 2:24
17
1 87
2:37
30
1.50
53
2.20
1.47
80
24
ADONEL #4001 Arrived 1:41
18
88
3:02
30
1.50
50
2.08
1.38
80
24
9 cy
19
89
2:30
30
1.50
50
2.08
1.38
80
24
20
90
2:25
30
1.50
50
2.08
1.38
80
24
Stop 2:55 Start 2:55
Pag.: 5/12
SOILPROBE ENGINEERING AND TESTING, INC.
16" Auger Cast Pile Log
PROJECT: PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's Load Bearing (tons)
POOL ILogged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410, 4416, 4422 N Hwy A1A Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @4" o.c. at top of pile and @10" o.c. at balance
Pile I.D.
- _
Auger
Time
_ __MIN.-
Depth
(feet)
Theorical
Grout Am't
C.Y.
Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
Kips
comp tension
Date: April 17, 2019
Notes
1
91
2:53
30
1.50
56
2.32
1.55
80
24
ADONEL #8001- - - --Arrived- - - _ -2:20
2
92
2:27
30
1.50
52
2.16
1.44 ,
80
24
9 Cy
3
93
2:27
30
1.50
51
2.12
1.41
80
24
4
94
2:39
30
1.50
48
1.99
1.33
80
24
Stop 4:03 Start 4:03
5
95
2:21
30
1.50
50
2.08
1.38
80
24
ADONEL #7010 Arrived . 3:10
6
96
2:38
30
1.50
50
2.08
1.38
80
24
9 cy
7
97
1 2:56
30
1.50
50
2.08
1.38
80
24
Stop 5:20
8
98
2:40
30
1.50
52
2.16
1.44
80
24
Start Arrived 5:18
9
99
1:52
30
1.50
47
1.95
1.30
80
24
ADONEL #4010 9 cy
10
100
2:11
30
1.50
53
2.20
1.47
80
24
11
101
2:37
30
1.50
50
2.08
1.38
.80
24
Stop 6:00
12
"
13
14
15
16
17
18
19
20
Pag.: 6/12
SOILPROBE ENGINEERING AND TESTING, INC.
16" Auger Cast Pile Log
PROJECT: PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's
POOL Load Bearing (tons)
Logged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410, 4416, 4422 N Hwy A1A Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @4" o.c. at top of pile and @10" o.c.at balance
_
Pile I.D.
Auger
Time
MIN, _
Depth
(feet)
Theorical
Grout Ain't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
KipsDate:
comp tension
April 18, 2019
Notes
1
102
3:00
30
1.50
50
2.01
1.34
80-
--24
Start- 8:12- Arrived - - -7:43 _
2
103
2:34
30
1.50
50
2.01
1.34
80
24
ADONEL #7010 9 cy
3
104
2:55
30
1.50
55
2.21
1.47
80
24
4
105
3:19
30
1.50
50
2.01
1.34
80
24
Stop 8:50
5
106
3:50
30
1.50
50
2.01
1.34
80
24
Start 8:57 Arrived 8:42
6
107
2:14
30
1.50
50
2.01
1.34
80
24
ADONEL #7009 Test taken 9 cy
7
108
2:57
30
1.50
48
1.93
1.29
80
24
8
109
2:31
30
1.50
51
2.05
1.37
80
24
-.
9
110
2:35
30
1.50
48
1.93
1.29
80
24
Stop 10:07 Stan`, 10:07
10
111.
3:00
30
1.50
52
2.09
1.39
80
24
ADONEL #7014 Arrived 9:56
11
112
3:00
30
1.50
48
1.93
1.29
80
24
9 cy
12
113
2:40
30
1.50
51
2.05
1.37
80
24
13
114
3:15
30
1.50
52
2.09
1.39
80
24
14
115
2:55
30
1.50
53
2.13
1.42
80
24
Stop 10:55 Start 10:55
15
116
2:25
30
1.50
52
2.09
1.39
80
24
ADONEL #7016 Arrived 10:27
16
117
2:11
30
1.50
50
2.01
1.34
80
1 24
9 cy
17
118
2:40
30
1.50
51
2.05
1.37
80
24
18
119
2:05
30
1.50
52
2.09
1.39
80
24
Stop 11:49 Start 11:49
19
120
2:53
30
1.50
53
2.13
1.42
80
24
ADONEL #7009 Arrived 11:45
20
121
2:23
30
1.50
54
2.17
1.45
80
24
9 cy
Pag.: 7/12
SOILPROBE ENGINEERING AND TESTING, INC.
1611 Auger Cast Pile Log
PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's
PROJECT: Load Bearing (tons)
POOL Logged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410, 4416, 4422 N Hwy A1A Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @4" o.c. at top of pile and @10" o.c.at balance
Pile I.D.
Auger
Time
__MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
Kips
comp tension
Date: April 18, 2019
-
Notes
1
122
2:33
30
1.50
53
2.13
1.42
80
24
2
123
2:41
30
1.50
49
1.97
1.31
80
24
Stop 1:17 Start 1:17
3
124
.2:26
30
1.50
52
2.09
1'.39
80
24
ADONEL #7014 Arrived 12:50
4
125
2:57
30
1.50
51
2.05
1.37
80
24
9 cy
5
126
3:09
30
1.50
50
2.01
1.34
80
24
6
127
3:28
30
1.50
50
2.01
- 1.34
80
24
7
128
3:00
30
1.50
53
2.13
1.42
80
24
Stop 2:15 Start 2:15
8
129
2:37
30
1.50
51
2.05
1.37
80
24
ADONEL #7010 Arrived 1:35
9
130
2:49
30
1.50
52
2.09-
1.39
80
24
9 cy
10
131
2:48
30.
1.50
52
2.09
1.39
80
24
11
132
2:49
30
1.50
53
2.13
1.42
80
24
Stop 3:14 Start 3:14
12
133
2:32
30
1.50
51
2.05
1.37
80
24
ADONEL #4005 Arrived 2:24
13
134
2:04
30
1.50
51
2.05
1.37
80
24
Testtaken 9 cy
14
135
2:00
30
1'.50
54
2.17
1.45
80
24
15
136
2:14
30
1.50
55
2.21
1.47
80
24
16
137
2:07
30
1.50
53
2.13
1.42
80
24
Stop 4:20 Start 4:20
17
138
2:23
1 30
1.50
50
2.01
1.34
80
24
ADONEL #7009 Arrived 2:52
139
2:00
30
1.50
52
2.09
1.39
80
24
9 cy
L20
140
2:33
30
1.50
54
2.17
1.45
80
24
Stop 5:30
Pag.: 8/12
SOILPROBE ENGINEERING AND TESTING, INC.
- 1611 Auger Cast Pile Log
PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's
PROJECT: Load Bearing (tons)
POOL Logged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410, 4416, 4422 N Hwy A1A Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: (6) #6 full length bars with #3 ties @4" at top of pile and @10" at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
Kips
comp tension
Date: April 19, 2019
Notes
1
141
2:57
30
1.50
48
2.16 - --
---1:44--
-80--
-24 - -
Start7:53 Arrived- - 7:34 - --
2
142
2:16
1 30.
1.50
50
2.25
1.50
80
24
ADONEL #7016 Test taken 9 cy
3
143
2:21
30
1.50
50
2.25
1.50
80
24
4
144
2:21
30
1.50
49
2.21
1.47
80
24
5
145
2:38
30
1.50
50
2.25
1.50
80
24
Stop 8:39 Start 8:39
6
146
3:00
30
1.50
50
2.25
1.50
80
24
ADONEL #8001 Arrived 8:02
7
147
2:17
1 30
1.50
51
2.30
1.53
80
24
9 cy
8
148_
2:27
30
1.50
48
2.16
1.44
80
24
9
149
2:22
30
1.50
55
2.48
1.65
80
24
Stop 9:35 Start 9:35
10
150
2:24
30
1.50
50
2.25
1.50
80
24
ADONEL #7014 Arrived 8:54
11
151
3:22
30
1.50
50
2.25
1.50
80
24
9 cy
12
152
2:30
30
1.50
53
2.39
1.59
80
24
13
153
2:36
30
1.50
48
2.16
1.44
80
24
Stop 10:39 Start 10:39
14
154
2:51
30
1.50
50
2.25
1.50
80
24
ADONEL #7004 Arrived 9:39
15
155
2:44 .
30
1.50
52
2.34
1.56
80
24
9 cy
16
156
2:14
30
1.50
51
2.30
1.53
80
24
17
157
2:32
30
1.50
53
2.39
1.59
80
24
Stop 11:32 Start 11:32
18
158
2:35
30
1.50
55
2.48
1.65
80
24
ADONEL #4009 Arrived 10:23
19
159
2:27
30
1.50
55
2.48
1.65
80
24
9 cy
20
160
1:59
30
1.50
50
2.25
1.50
80
24
Pag.: 9/12
SOILPROBE ENGINEERING AND TESTING, INC.
1611 Auger Cast Pile Log
PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's
PROJECT: POOL Load Bearing (tons)
Logged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410, 4416, 4422 N Hwy A1A Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL _
Field Notes:
- Steel Spec's: (6) #6 full length bars with #3 ties @4" at top of pile and @10" at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes
Actual
Grout Amt.
C.Y.
Grout
Factor
Kips
comp tension
Date: April 19, 2019
Notes
1-
161 -
- -2:50- -
- 30 - -
— -1.50 -
-52 —
-2:34--
- 1.56--
80—
-24
Stop 12:22 Start 12:22
2
162
2:15
30
1.50
55
2.48
1.65
80
24
ADONEL #7016 Arrived 11:42
3
9 cy
4
Stop 1:30
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Pag.: 10/12
SOILPROBE ENGINEERING AND TESTING, INC.
1611 Auger Cast Pile Log
PROJECT PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's Load Bearing (tons)
POOL ILogged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410, 4416, 4422 N Hwy A1A Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
Steel Spec's: Auger Cast Pile with (6) #6 full length bars with #3 ties @V at top of pile and @10" at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes
Actual
-
Grout Amt.
C.Y.
Grout
Factor
KipsDate:
comp tension
April 23, 2019
Notes
1
163
2:34
30
-- 1.50-
- -50
--2.13-
-1.42 -
- 80
-24-
Start- 9:50 __ --Arrived _ _ 9:34
2
164
1 3:01
30
1.50
49
2.08
1.39
80
24
ADONEL #7007 Test taken 9 cy
3
165
2:35
30
1.50
55
2.34
1.56
80
24
4
166
2:22
30
1.50
50
2.13
1.42
80
24
Stop 10:39
5
167
2:14
30
1.50
52
2.21
1.47
80
24
Start 10:40 Arrived 10:15
6
168
2:41
30
1.50
54
2.30
1.53
80
24
ADONEL #7016 9 cy
7
169
2:09
30
1.50
54
2.30
1.53
80
24
8
170
2:19
30
1.50
52
2.21
1.47
80
24
9
171
2:40
30
1.50
51
2.17
1.45
80
24
Stop 11:20 Start 11:20
10
172
2:44
30
1.50
50
2.13
1.42
80
24
ADONEL #4009 Arrived 10:49
11
173
2:58
30
1.50
52
2.21
1.47
80
24
9 cy
12
174
2:27
30
1.50
50
2.13
1.42
80
24
13
175
2:16
30
1.50
50
2.13
1.42
80
24
Stop 12:18 Start 12:18
14
176
2:25
30
1.50
54
2.30
1.53
80
24
ADONEL #7015 Arrived 11:51
15
177
2:00
30
1.50
52
2.21
1.47
80
1 24
9 cy
16
178
3:33
30
1.50
54
2.30
1.53
80
24
17
179
2:22
30
1.50
52
2.21
1.47
80
24
Stop 1:12
18
180
2:17
30
1.50
50
2.13
1.42
80
24
Start 1:25 Arrived 12:40
19
181
2:29
30
1.50
53
1 2.25
1 1.50
80
24
IADONEL #8001 9 cy
20
1 182
2:26
30
1.50
55
1 2.34
1 1.56
80
1 24
Pag.: 11/12
SOILPROBE ENGINEERING AND TESTING, INC.
16" Auger Cast Pile Log
PROJECT: PROPOSED TWO-STORY RESIDENCE & Contractor: SION HOMES Grout Spec's Load Bearing (tons)
POOL ILogged By: AO 5000 psi
SOILPROBE ENGINEERING & 40 comp
TESTING, INC. ADDRESS: 4410, 4416, 4422 N Hwy A1A Misc. Info:
Engineers Sign and Seal: 12 tension
CITY: Fort Pierce, FL
Field Notes:
Steel Specs: Auger Cast Pile with (6) #6 full length bars with #3 ties @4" at top of pile and @10" at balance
Pile I.D.
Auger
Time
MIN.
Depth
(feet)
Theorical
Grout Am't
C.Y.
Pump
Strokes.
Actual
Grout Amt.
C.Y.
Grout
Factor
KipsDate:
comp tension
April 23, 2019
Notes
1
183
2:10
30
1.50
55
2.34
1.56
80
24
Stop 1:57
-- 2-
1-84
- 2:34
- 30-
1.50-
- 56
2.38
1.59
80
24
Start 2:06 Arrived 1:00
3
185
2:28
30
1.50
55
2.34
1.56
80
24
ADONEL #7000 Test taken 9 cy
4
186
2:50
30
1.50
56
2.38
1.59
80
24
5
187
2:44
30
1.50
55
2.34
1.56
80
24
Stop 2:41
6
188
2:25
30
1.50
48
2.04
1.36
80
24
Start 2:58 Arrived 2:36
7
189
2:05
30
1.50
54
2.30
1.53
80
24
ADONEL #7016 9 cy
8
190
2:22
30
1.50
55
2.34
1.56
80
24
Stop 3:30
9
10
11
12
13
14
15
16
17
18
F20
Pag.:12/12
48 49 5 4' 40
{ V
[ .�gecr�__ �,,�� .�.�:?gym' �omx. .. ���•; f_r4'•-�_
i y}Y } L+:fz°4EifC�sl3�txEt•
4 i �k,wTl7roaLCN.?2C, -�
i
42
34
i 5
t i i 47.
Tsnw.mm3w i
45
�fy 1 �riT
6
h
jzsxnn.hc 44 , t �i.=saur�zn: 0 46
4
--
. , Pam, 5
� f { 6 cvbvrrx ~'s
27
w..
12'
hT"Y F.
I
14 f, 2
15
r.
V 18 19
AUGEI -CAST FlL'� LAYOUT
sM�rr: ate• — � �`
SOMPROBE ENGINEERING AND Pile Location Sketch
TESTING American Foundation Lot #1
3931 SW 47th Ave. #104 4410 N Hwy AlA
Davie, FL 33314 Fort Pierce, FL
Tel. (954) 584-6115