HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASESCANNED
BY
St Lucie County
Planning & Develop
Building & Code Rei
2300 Virginia Ave
Fort Pierce, FL 349E
772-462-2165 Fa
Request for. 30-Day Tempora
Date:
Project. Address:
ent Services
lation Divisb
SEP 1 1 2019
ST. Lucie County, Permitting
Power Release
Permit Number: (? (,5 — , f o 4
PI-,-PJT� 11r e,N 4 kF-5, �Q'VE ) PC, 5T- Lue,r, J-i - 3.4 R8G
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRI L POWER TO THE ABOVE DESCRIBED
PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAY , FOR THE PURPOSE OF TESTING SYSTEMS
AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION IN CONSIDERATION OF APPROVAL OF THE
REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLO i S:
1. This temporary power release is requested for the above
occupancy of any type, other than that permittedby con,
2. As witness by our signatures, we hereby agree to abide I
including Building Division Policy, which is incorporated
3. All conditions and requirements listed in the attached do
Power for Testing" have been fulfilled and the premise i
4. All requests for an extension beyond 30 days must be
the reason for the request. Power may be removed fro,
the Final Inspection has not been approved within 30 d
the Stop Work Order.
stated purpose only, and there will be no .
truction during this time period.
y all terms and conditions of this agreement,
arein by reference.
ument entitled "Requirements for 30 Day
ready for compliance inspection.
ide in writing to the Building Official stating
the site and/or a Stop Work Order issued if
,s. A fee of $100.00 will be required to lift
WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM
ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WH CH MAY ARISE NOW OR IN THE FUTURE OUT
OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH �AY BE INCURRED DUE TO THE
DISCONNECTION OF ELECTRICAL POWER IN THE EVENT 0 VIOLATION OF THIS. AGREEMENT.
ox 1 sl 2-61 l
OWNER SIGNA DV _1k
41
GENERAL CONTRACTOR SIGNATURE DOE / .
ELECTRICAL CONTRACTORS ATURE DATE
St. Lucie County
Building and Zoning Department
Requirements for 30 Day Po er for Testing
I. Form entitled "Request for 30-Day Temporary Pow/ r Release" must be fully executed and posted in
the Building Department record files prior to inspection.
II. Inspection Requirements:
1. Address numbers shall be posted per county rd. No. 7.05.09.
2. All entrances, exits, windows and garage do rs must be lockable.
3. All circuits on exterior shall be terminated % a box with weatherproof cover. The same applies
to a disconnect. If circuits are at or above TV from grade they may be capped with wire nuts
and taped.
4. All breakers must be installed. Any blao space must be closed by a breaker or approved filler
plates.
5. Interior Wiring: All receptacles, light ixtures and fans must be trimmed. Any fixture below
7'6" from the floor or mezzanine tha/ is not available at the time of inspection must have an
Inviso plate installed. Fixtures at or that height may be capped with wire nuts and taped.
6. All smoke detectors must be installed.
7. Kitchen cabinets must be installed/any exception for special conditions or circumstances must
have an approval prior to schedul Id inspection.
8. Sewer and water connections must be complete. Only well pumps are excluded from this
requirement.
9. Exterior construction must be complete and weather tight, including stucco, siding, roof and
soffit.
10. Permit work shall be substan ially completed except for back orders, paint on exterior, carpet
and/or floor covering, pumps, air conditioners and driveway.