Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTPlanning & Develc Building & Code Re 2300 Virgi Fort Pierce, 772-462-2172 Fa CERTIFICATE OF TI CONSTRUCTION PERMIT #: %OS—C)2% JOB ADDR BUILDER/CONTRACTOR: �4 •O . i3 PEST CONTROL CONTRACTOR: EVICT -A -BUG PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pr, subterranean termites in accordance with the standa Square feet if area treated: c690 Percentage of solution:.05% Date of Treatment: 6`��~ 122 Footing 1st Treatment Re -Treat Driveway 1st Treatment Re -Treat Other 1st Treatment Re -Treat Note. There must be a completed form for each required site to be picked up by the inspector at time of each inspe fee charged. iment Services ulation Division is Ave L 34982 772-462-6443 SCANNED ay St Caucus County 4 ITE TREATMENT IL TREATMENT 3 Lfg51 & PEST CONTROL INC. ated the above described construction for of the National Pest Control Association. used: DOMINION 2L Cz gallons used: 0 5 of Treatment: lG 10 ;lab 1st Treatment Re -Treat 1st Treatment Re -Treat 'primeter for Final Inspection 13 -1 of Exterminator Date Trent or re -treatment and this form must be on the job or the scheduled inspection will fail and a re -inspection FBC104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014