Loading...
HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASE01-29-' 19 13:31 .FROM- 7728787656 SCANNED 1,_ J-048 P0003/0005 F-047 230.0 Fort. 7'72-4 l-equast for Date: Project Address: 11WEDUftl0ment Services & Cbdie It ulation DIVISIoln giniai Ave- RECEIVEID C.e; 'FL 34982 -2165 Fax 772-4�62-6 JAN 2 �19 ST. Luele ceunf;yr Permitting Temporary Power Retease Permit Number THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED PROPERTY,.FOR A PERIOD'NOTTO EXCEED TFIIRTY (30) DAYS, FOR THE PURPOSE OFTT:STING SYSTEMS AND EQUIPMENT IN PREPAPATIaN FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE REQUEST WF:'HERE33Y ACkNOW�GE AND ' I E'AS FOiLflWS: 1. 7his temporary power release is request occupancy of any type, other than that � 2. As witness by our signatures, we herein including Building Division Prolicy, which 3. All conditions and requirements listed in Power for Testingo Have been fulfilledat 4. Alb requests for an. extension beyond 3o the reason for the request. Power may the Knal Inspection has not been appro, the Stop Work Order_ WE MEREY RELEASE AND AGREE. TO HOLD HA ALL LIABILITIES AND •CLAIMS OF ANY TYPE. OF OF THIS TRANSACTION, INCLUDING ANY DAME DISCONNECTION OF El_EC rRICAL POWER IN Ti �d for the above sated purpose only, and there will be no ermitted by .construction during this time period. agree do abide by afl terms and conditions of this agreement, s incorporated herein'by reference. the attached docurnent entitled "Requirements for 30 Day d the premise is ready for compliance inspaMon. lays must be made in writing to the Building 'Official st2t9ng in remoVed1rom the sb and/br a Stop Work Order issued if ad within 30 days. A fee of $100.00 will be required to rift ILESS, ST ME COUNTY, AND THEM EMPLOYEES FROM tTURtw WHICH MAY ARISE NOW OR IN THE FUTURE OUT WHIC i-'MAY BE INCUR RRED DUE TO THE EVENT OF VIOLATION OF THIS AGREEMENT OWNER SIGNA DATE 7GF-N*CONTRACTORS S DATE ELECTRICAL CONTRAIMR SIGNATURE DATE