HomeMy WebLinkAboutPROJECT INFORMATIONMain Level
l toy—
iL1
vpn:�l
r L\-)
5j tub is at top of drawing, plumbing is on the left side. plumbing leak behind wall, wall all mushy Need to replace tile, backer board and vanity. New v,
3a r 1 m
450 -o 53KJS!O
—
THESE PLANS AND ALL_P_ROP_OSED-WORK �I C�NCFAI D F �I � hI I N ARE SU9JECT TO ANY CORRECTIONS s� Luc ^nun RurLD �TREVLF«' :17 Fl7R CO, 'ARE THE RESPONSIBILITY OF THE REQUIRED BY FIELD INSPECTORS THAT REV 'AWED Y001�T1 �R O REO R9 MAY BE NECESSARY IN ORDER TO DATE s(zl 1C®MP6Y iNIT191,A1tln APPLIQAI I. CQA 9, PLANS AND PERMIT MUST JOR
onNoI NSPECTION WILLa
® is
�j
�® q:)d I
O f"gd �Nc, on c
Main Owl
2018-05-07-1031 P 5/7/2018 Page: 1