Loading...
HomeMy WebLinkAboutPROJECT INFORMATIONMain Level l toy— iL1 vpn:�l r L\-) 5j tub is at top of drawing, plumbing is on the left side. plumbing leak behind wall, wall all mushy Need to replace tile, backer board and vanity. New v, 3a r 1 m 450 -o 53KJS!O — THESE PLANS AND ALL_P_ROP_OSED-WORK �I C�NCFAI D F �I � hI I N ARE SU9JECT TO ANY CORRECTIONS s� Luc ^nun RurLD �TREVLF«' :17 Fl7R CO, 'ARE THE RESPONSIBILITY OF THE REQUIRED BY FIELD INSPECTORS THAT REV 'AWED Y001�T1 �R O REO R9 MAY BE NECESSARY IN ORDER TO DATE s(zl 1C®MP6Y iNIT191,A1tln APPLIQAI I. CQA 9, PLANS AND PERMIT MUST JOR onNoI NSPECTION WILLa ® is �j �® q:)d I O f"gd �Nc, on c Main Owl 2018-05-07-1031 P 5/7/2018 Page: 1