Loading...
HomeMy WebLinkAboutPROJECT INFORMATIONi Building Analysis AHU1 Front ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-882-5700 Email: For: Coastal Floor 8532 South US Location: Fort Pierce, FL, US Elevation: 25, ft Latitude: 27°N Outdoor: Heating Drybulb (T) 42 Dailyrange (T) - Wet bulb (° F) - Wind speed (mph) 15.0 MA 1, Port St. Lucie, FL 34952 Job: Coastal Floors Date: Jan 19, 2016 By: Tom Platania License: CAC1815254 Indoor: Heating Indoor temperature (TF) 70 Design TD (T) 28 Relative humidity (%) 36 ding Moisture difference (gr/lb) 23.2 90 Infiltration: 15 ( L ) Method Simplified 78 Construction quality Average 7.5 Component Btuh/ftz Btuh j % of load Walls 3.3 6036 16.5 Glazing 25.2 7620 20.8 Doors 9.2 194 0.5 Ceilings 2.3 4579 12.5 Floors 1.0 1924 r 5.2 Infiltration 19.0 6153 16.8 Ducts 1396 3.8 Piping d. 0 Humidification 3250 8.9 Ventilation 5538 15.1 Adjustments 0, Total 1 1 36691 100.0 hrl 1Rnn i nT Component Btuh/ttz Btuh % of load Walls 2.7 5050 10.7 Glazing 59.0 17838 37.8 Doors 17.8 373 0.8 Ceilings 3.4 6837 14.5 Floors 0 0 0 Infiltration 1.1 363 0.8 Ducts 2432 5.2 Ventilation 3264 6.9 Internal gains 11049 23.4 Blower 0 0 Adjustments 0, Total 1 1 472061 100.0 Latent Cooling Load = 10824 Btuh Overall U-value = 0.118 Btuh/ftl--°F Data entries checked. wrightsaft" Right -Suite® Universal 201515.0.24RSU17939 stal Floors\Finals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW C E.NS°.` o® sue0 o No 6307 s p' 'ir Q° ST E OF 8seal- eeX0®® Cooling 72 18 50 67.9 2016-Feb-10 11:05:55 Page 1 1 Building Analysis i . } z AHU2 Back ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-882-5700 Email: Job: Coastal Floors Date: Jan 19, 2016 By: Tom Platania Web: www.ProCalcs.Net License: CAC1815254 For: Coastal Floor 1 8532 South US Highway 1, Port St. Lucie, FL 34952 Location: Fort Pierce, FL, US Elevation: 25 ft Latitude: 27°N Outdoor: Heating Dry bulb (°F) 42 Dailyrange (°F) - Mt bulb (° F) - Indoor: Heating Cooling Indoor temperature (°F) 70 72 Design TD (°F) 28 18 Relative humidity (%) 36 50 ling Moisture difference (gr/lb) 23.2 67.9 90 Infiltration: 15 (L ) Method Simplified 78 Construction quality Average Component Btuh/ftz Btuh % of load Walls 3.0 3446 10.0 Glazing 25.2 7620 22.1 Doors 9.2 388 1.1 Ceilings - 2.3 4686 13.6 Floors 0.6 1218, 3.5 Infiltration 20.0 6883' 20.0 Ducts 14081 4.1 Piping 01 0 Humidification 3456, 10.0 Ventilation 53931 15.6 Adjustments 0 Total 344991 100.0 Inl 1Rnn I nT Component Btu NIP Btuh of load Walls 2.8 3270 8.0 Glazing 40.4 12215 29.9 Doors 9.1 383 0.9 Ceilings 3.8 7726 18.9 Floors 0 0 0 Infiltration 1.7 579 1.4 Ducts 2057 5.0 Ventilation 3380 8.3 Internal gains 11244 27.5 Blower 0 0 Adjustments 0 Total 1 1 408551 100.0 Latent Cooling Load = 10868 Btuh Overall U-value = 0.111 Btuh/ftz-°F Data entries checked. 2016-Feb-1011:05:55 vvrightsaf#° Right-Suite(g) Universal 2015 15.0.24 RSU17939 page 2 stal Floors\Finals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW 1701 SW i Building Analysis AHU3 Offices ProCalcs, LLC i St., Port Saint Lucie, FL 34987 Phone: 772-882-5700 Email: Job: Coastal Floors Date: Jan 19, 2016 By: Tom Platania Web: www.ProCalcs.Net License: CAC1816254 For: Coastal Floor 8532 South US Highway 1, Port St. Lucie, FL 34952 Location: Fort Pierce, FL, US Elevation: 25 ft Latitude: 27°N Outdoor: Heating Drybulb (°F) 42 Dailyrange (TF) - Wet bu I b (° F) Wind speed (mph) 15.0 Indoor: Indoor temperature (°F) Design TD (T) Relative humidity (%) Cooling Moisture difference (gr/lb) 90 Infiltration: 15 (L ) Method 78 Construction quality 7.5 Component Btuh/flz Btuh % of load Walls 3.0 2020 23.7 Glazing - 0 0 0 Doors 0 0 0 Ceilings 2.3 1477 17.3 Floors 1.3 865' 10.1. Infiltration 0 10281 12.0 Ducts 0, 0 Piping 0 0 Humidification 1178 13.8 Ventilation 1967 23.0 Adjustments 0 Total 85351 100.0 11m`WIT111111,1111 Component Btuh1fe Btuh of load Walls 2.7 1818! 16.9 Glazing 0 01 0 Doors 0 01 0 Ceilings 3.8 2436' 22.6 Floors 0 0' 0 Infiltration 0 113 1.0 Ducts 0 0 Ventilation 1233 11.4 Internal gains 5176I 48.0 Blower 0' 0 Adjustments 0 Total 10775 100.0 Heating 70 28 40 23.2 Simplified Average Cooling 72 18 50 67.9 Latent Cooling Load = 4555 Btuh Overall U-value = 0.079 Btuh/ftz--°F WARNING: window to floor area ratio = 0.0% - less than 5%. W rl Ih twat 2016 Feb 1011: age 39Right-Suite®Universal 2015 15.0.24 RSU17939 page 3 stal Floors\Finals\Coastal Floors Project 3.rup Calc = RTS Front Daor faces: SW i it i Right -Suite® Universal 2015 Load Calculation Job: Coastal Floors Date: Jan 19, 2016 Computer Closet By: Tom Platania ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-882-5700 Email: ProCalcs@gmail.com Web: www.ProCalcs.Net License: CAC1815254 For: Coastal Floor 8532 South US Highway 1, Port 'St, Lucie, FL 34952 Zone: Co YlplAer Closet LV1M: 9.0 x 13.0 x 9.0 1. DESIGN CONDITIONS - COOLING Outdoor Conditions —> Indoor Conditions —> TOD Correction —> Difference 2. GLAZING SOLAR HEAT GAIN - Type _ Orien Area Tilt Jul 1600 LDT ) ry Blb RH Moisture 90 59 72 50 0 Range Wet Blb 15 78 60 18 67.9 Mult = 1.0 ] — Lat 27A5 °N Const Wt = M ) IF IntShd SCMult SC Sens/A Sens 3:7 TRANSMISSION GAINS Type Orien GrArea NtArea Uval Sol -air TD Shad Clr ConvSens RadSens Sens WALL-01 se 117 117 0.120 29.6 N m 180 243 423 WALL-02 - 68 68 0.102 18.0 - m 46 60 106 FLOR-01 - 117 117 0 0 - 0 0 0 CEIL-01 - 117 117 I 0.082 54.8 - 1 88 371 459 4. INTERNAL HEAT GAIN PEOPLE Activity Schedule Dept store 7ato10p LIGHTS Lamp/blst + fixture Schedule Fluor MB + Rec trof 7ato10p Fluor MB + Rec trof Fluor MB + Rec trot Fluor MB + Rec trof Sens Latent Total Sensible Latent sn # people Btuh/prsn Btuh/prsn 0 2 2 250 200 470 0 0 0 0 0 0 W/ftz ' W Total Factor Space Sens W fract 1.00 0 117 0.95 1.0 444 j 0 0 0 1.20 1.0 0 0 0 0 1.20 1.0 0 0 r 0 0 1.20 1.0 0 r + wrightsoft' Right -Suite® Universal 2015 15.0.2I RSU17939 stal Floors\Flnals\Coastal Floors Project 3.rup Calc = RTS Front Dolor (aces: SW r i 400 0 2016-Feb-10 11:05:56 Page 1 APPLIANCES / PLUG LOADS Application Schedule Plug load 7ato10p MOTORS Power (hp) #/ t2 Schedule 0 0 0 0 0 0 I i i Usage Sensible Latent Sens Latent Btuh Btuh Vft2 W 1 50 0 1.00 3.412 0 193 0 f//ft2 0 0 1.00 0 0 0 0 off 0 0 1.00 0 0 0 0 Offt2 0 0 1.00 0 0 0. 0 0 0 1.00 0 0 0 0 iifft2 0 0 1.00 0 0 0 0 Total Per mtr Load Sens Btuh factor 0 0 0 1.00 0 0 0 0 1.00 0 0 0 0 1.00 0 5. - INFILTRATION Sens Latent - 0 cfm x db Temp Diff 18.0 x 1.10 0 X IVI0151:. Lill[ 01.Z7 A v.vo 6. SUBTOTAL COOLING LOAD FOR SPACE Sensible. Latent 2095 1048 Envelope 2095 400 Less external cooling 0 Redistribution 0 0 7. SUPPLY DUCT HEAT GAIN Gain factor 0 x Line 6 Sensible Gain 0 8. COOLING FAN SIZING Sum of Duct Gain 7 ), Line 6) & Drawthru Fan 2095 L 8 Sens I ) / (Xfer x Supply TD cfm Est Cooling cfm 2095) 1.10 x 17.0 112 Actual Cooling Fan I 137 9. VENTILATION OA 14 cfm x db Temp Diff 18.0 x 1.10 278 x Moist. Diff 67.9 x 0.68 648 10. RETURN AIR PLENUM Lights Total power (W) 117 0 I larlsrluaalvn Ivau tNlanuni UFFVl aluna%.c1 Space load credit (plenum lower surface) 0 11. RETURN DUCT HEAT GAIN Gain factor 0 x Line 6 Sensible Gain 0 12. TOTAL COOLING LOADS ON EQUIPMENT (Btuh) 2373 1048 e 2016-Feb-10 11:05:56 wrighftOft' Right -Suite® Universal 2015 15.0.24 RSU17939 Page 2 stal Floors\Finals\Coastal Floors Project 3.rup Cale = RTS Front Dior faces: SW SPACE HEATING LOAD CALCULATION 13. HEATING DESIGN TEMPERATURE Heating TD = (Inside DB - Outside DB) _ ( 70 - 42) = 28 L noun - i.v J 14. TRANSMISSION LOSSES Type Expos GrArea NetArea Uval HTD Loss WALL-01 se 117 117 0.120 28.0 392 WALL-02 - 68 68 0.102 28.0 193 FLOR-01 - 13 13 0.600 28.0 218 CEIL-01 - 117 17 0.082 28.0 268 15. INFILTRATION Loss 5 cfm x db Temp Diff 28.0 x 1.10 162 16. SUBTOTAL HEATING LOAD FOR SPACE 1233 Envelope 1233 Less external heating 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT HEAT LOSS Loss factor 0 x Line 16 Loss 0 Less transfer - e - _ - - 0 Redistribution 0 18. VENTILATION OA 14 cfm x db Temp Diff 28.0 x 1.10 432 19. HUMIDIFICATION IIIAIum rx" UU-IMMU of Glazing panes 20. RETURN DUCT HEAT LOSS 19 cfm x • - 0.20 Piping Iv10A - JL.V IVI I -- Max = 52.0 for 2 pane ) afm/d = 0.6 gpd 23@ 0 21. TOTALMEATING LOAD ON EQUPMENT (Btuh) 1899 Loss factor x Line 16 Loss I o 1 WI"1 11tSOft° 2016-Feb-1011:05:56 9 Right -Suite® Universal RSU17939 Page stal FloorsWinals\Coastal Floors. Project Imp Calc = RTS Front Door faces: SW Right -Suite® Universal 2015 Load Calculation Job: Coastal Floors Date: Jan 19, 2016 s Janitor CL By: Tom Platania ProCalcs, LLC j 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-882-5700 Email: ProCalcs@gmaii.com Web: www.ProCalcs.Net License: CAC1815254 For: Coastal Floor 8532 South US Highway 1, Port St; Lucie, FL 34952 Zone: -_Janitor CL { LWH: 9.0 x 7.5 x 9.0 1. DESIGN CONDITIONS - COOLING Dry Bit Outdoor Conditions —> 90 Indoor Conditions —> 72 TOD Correction —> 0 D'ff 18 Jul 1600 LDT ) RH Moisture 59 50 Range Wet Bib 15 78 60 I erence Mult = 1.0. ] = 2. GLAZING SOLAR HEAT GAIN Lat = 27.45 ° N Const Wt = M Type Orien Area - Tilt ShdF IntShd SCMUlt SC Sens/A Sens 3. TRANSMISSION GAINS Type Orien GrArea NtArea Uval Sol -air TD Shad Clr ConvSens RadSens Sens WALL-01 - 149 149 0.066 18.0 m 65 86 151 FLOR-01 - 68 68 0 0 0 0 0 CEIL-01 - 68 68 0.082 54.8 1 51 214 265 4. INTERNAL HEAT GAIN PEOPLE Activity Schedule Dept store 7ato10p LIGHTS Lamp/blst + fixture Schedule Fluor MB + Rec trof 7ato10p Fluor MB + Rec trof Fluor MB + Rec trof Fluor MB + Rec trof Sens Latent Total Sensible Latent sn # people Btuh/prsn Btuh/prsn IO 0 0 250 200 0 0 0 0 0 0 0 W/ft2 W Total Factor Space Sens W fract 1.00 0 68 0.95 1.0 256 0 0 0 1.20 1.0 0 0 0 0 1.20 1.0 0 0 0 0 1.20 1.0 0 2016•Feb-10 11:05:56 wrightsvft' Right -Suite® Universal 2015 15.0.24 RSU17939 Page 1 slat Floors\Finals\Coastal Floors Project 3.rup Calc = RTS Front Doi r faces: SW APPLIANCES / PLUG LOADS Application Schedule Plug load 7ato10p MOTORS Power (hp) Schedule 0 0 0 tt2 0 0 0 Usage F W 10 0 1.00 f # 0 0 1.00 f # 0 0 1.00 P # 0 0 1.00 P # 0 0 1.00 12 # 0 0 1.00 Total Per mtr Btuh 0 0 0 0 0 0 0 0 0 Sensible Latent Sens Latent Btuh Btuh 3.412 0 111 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Load Sens factor 1.00 0 1.00 0 1.00 0 5. INFILTRATION Sens Latent 0 cfm -> x db Temp Diff 18.0 x 1.10-- 0 x Moist. Diff 67.9 x - 0.68 0 6. SUBTOTAL COOLING LOAD FOR SPACE Sensible Latent 784 374 Envelope 784 0 Less external cooling 0 Redistribution 0 0 7. SUPPLY DUCT HEAT GAIN Gain factor 0 Line 6 Sensible Gain 0 8. COOLING FAN SIZING Sum of Duct Gain (7 ), Line (6) & Drawthru Fan 784 L 8 Sens ) / (Xfer x Supply TD cfm Est Cooling cfm = ( 784) / ( 1.10 x 17.0 42 Actual Cooling Fan > 51 9. VENTILATION OA 8 cfm > x d 151 Temp Diff 18.0 x 1.10 160 x Moist. Diff 67.9 x 0.68 374 10. RETURN AIR PLENUM Lights Total power (W) 68 0 Transmission load (plenum upper surface) 0 Space load credit (plenum lower surface) 0 11. RETURN DUCT HEAT GAIN ` Gain factor 0 z Line 6 Sensible Gain 0 12. TOTAL COOLING LOADS ON EQUIPMENIT (Btuh) I I I. 944 374 W11 ItSdi° 9 Right -Suite® Universal 201515.0.24RSU17939 2016-Feb-1011:05:56 Page stallFloors\Finals\coastal Floors Project 3.rup Calc = RTS Front Door faces: SW SPACE HEATING LOAD CALCULATION 13. HEATING DESIGN TEMPERATURE Heating TO = (Inside DB - Outside DB) _ ( 70 - 42) = 28 Mult = 1.0 ] — 14. TRANSMISSION LOSSES Type Expos GrArea NetAr la Uval HTD Loss WALL-01 - 149 149 0.066 28.0 275 FLOR-01 - 0 0 0.600 28.0 0 CEIL-01 - 68 68 0.082 28.0 155 15. INFILTRATION Loss 3 cfm x db Temp Diff 28.0 x 1.10 93 16. SUBTOTAL HEATING LOAD FOR SPACE 523 Envelope 523 Less external heating 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT HEAT LOSS Loss factor --- 0 x Line 16 Loss 0 Less transfer _. 0 Redistribution 0 18. VENTILATION I OA 8 cfm x db Temp Diff 28.0 x 1.10 249 19. HUMIDIFICATION Inside RH desired 40.0 (Max = 32.0 for 1 pane ) of Glazing panes i (Max = 52.0 for 2 pane ) 20. RETURN DUCT HEAT LOSS 11 cfm x - 13.20 g/100cfm/d 0.4 -gpd 136 Piping 0 21. TOTAL HEATING LOAD ON EQUPMEN (Btuh) 907 Loss factor x Line 16 Loss Wii htsoft' 2016 Feb 10 11: age 39Right-Suite®Universa12015 15.0.24 RSU17939 Page 3 stall Floors%Finals%Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW Right -Suite® Universal 2015 Load Calculation Job: Coastal Floors Date: Jan 19, 2016 M@IlS By: Tom Platania ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-882-5700 Email: ProCalcs@gmail.com Web: www.ProCaIcs.Net License: CAC1815254 For: Coastal Floor 8532•South US Highway 1, Port St. Lucie, FL 34952 Zone: Men"s- ,, LWH: 7.5 x 6.5 x 9.0 1. DESIGN CONDITIONS - COOLING I Jul 1600 LDT ) Dry Bib RH Moisture Range Wet Bib Outdoor Conditions -> 90 59 15 78 Indoor Conditions -> 72 50 60 TOD Correction -> 0 Difference 18 67.9 - - Mult 1.0 2. GLAZING SOLAR HEAT GAIN = Lat 27.45 ° N Const Wt = M. Type Orien Area Tilt. ShdF IntShd SCMUlt SC Sens/A Sens 3. TRANSMISSION GAINS - Type Orien GrArea NtArea Uval Sol -air TD Shad Clr ConvSens • RadSens Sens FLOR-01 - 49 49 0 0 - - 0 0 0 CEIL-01 - 49 49 0.082 54.8 - 1 -_ 37 155 191 4. INTERNAL HEAT GAIN PEOPLE Activity Schedule Restroom 7ato10p LIGHTS Lamp/blst + fixture Schedule Fluor MB + Rec trof 7ato10p Fluor MB + Rec trof Fluor MB + Rec trof Fluor MB + Rec trof Sens Latent Total Sensible Latent xsn people Btuh/prsn Btuh/prsn 100 0 0 210 140 96 I 10 0 0 0 0 0 W/ftz W Total Factor Space Sens W fract 1 1.00 0 49 0.95 1.0 185 0 0 0 1.20 1.0 0 0 0 0 1.20 1.0 0 i 0 0 0 1.20 1.0 0 wrightsoft* Right -Suite® Universal2015 15.0.21 RSU17939 stal Floors%Finals%Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW 68 0 2016-Feb-10 11:05:56 Page 1 APPLIANCES / PLUG LOADS Application Usage Sensible Latent Sens Latent Schedule Btuh Btuh Plug load Vft2 W 7ato10p 0.50 0 1.00 3.412 0 80 0 Iv # 0 0 1.00 0 0 0 0 I l2 # 0 0 1.00 0 0 0 0 ft2 # 0 0 1.00 0 0 0 0 ftz # 0 0 1.00 0 0 0 0 fft2 # 0 0 1.00 0 0 0 0 MOTORS Power (hp) Kft2 Total Per mtr Load Sens Schedule Btuh factor 0 0 0 0 0 1.00 0 0 0 0 0 0 1.00 0 0 0 0 0 0 1.00 0 5. INFILTRATION Sens Latent 3 cfm x db Temp Diff 18.0 x 1.10 58 x Moist. Diff 67.9 x 0.68 135 6. SUBTOTAL COOLING LOAD FOR SPACEI Sensible Latent 611 203 Envelope 611 203 Less external cooling 0 Redistribution 0 0 7. SUPPLY DUCT HEAT GAIN Gain factor 0 x Line 6 Sensible Gain 0 8. COOLING FAN SIZING I Sum of Duct Gain 7) Linel (6) & Drawthru Fan 611 L 8 Sens 6 ) / (Xfer x Supply TD cfm Est Cooling cfm 611) / ( 1.10 x 17.0 33 Actual Cooling Fan 40 9. VENTILATION OA 0 cfm -> x db Temp Diff 18.0 x 1.10 0 x Moist. Diff 67.9 x 0.68 0 10. RETURN AIR PLENUM Lights Total power (W) 49 0 Transmission load .(plenum upper surface) 0 Space load credit (plenum lower surface) 0 11. RETURN DUCT HEAT GAIN Gain factor 0 z Line 6 Sensible Gain 0 12. TOTAL COOLING LOADS ON EQUIPMENT (Btuh) 611 203 I r V1/1•i ld° 2016- Feb-10 11:05:56 9 Right -Suite® Universal Paget stal FloorsNFinals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW SPACE HEATING LOAD CALCULATION 13. HEATING DESIGN TEMPERATURE Heating TD = (Inside DB - Outside DB) 70 - 42) = 28 Mult = 1.0 ] — 14. TRANSMISSION LOSSES 1 Type Expos GrArea NetArl a Uval HTD Loss FLOR-01 - 0 0 0.600 28.0 0 CEIL-01 49 49 0.082 28.0 112 15. INFILTRATION Loss 4 cfm x db Temp Diff 28.0 x 1.10 135 16. SUBTOTAL HEATING LOAD FOR SPACII 247 Envelope 247 Less external heating 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT HEAT LOSS Loss factor 0 x Line 16 Loss 0 Less transfer 0 Redistribution 0 18. VENTILATION OA 0 cfm x db Temp Diff 28.0 x 1.10 0 19. I HUMIDIFICATION Inside RH desired 4010 (Max = 32.0 for 1 pane ) of Glazing panes 0 (Max = 52.0 for 2 pane ) 20. RETURN DUCT HEAT LOSS 4 cfm x 0.20 g%100cfm/0 0.1 gpd 56 Piping 0 21. TOTAL HEATING LOAD ON EQUPMENT (Btuh) 300 Loss factor x Line 16 Loss II I I Wil htSO t• ' 201s Fe1r101 Page 3jRight-Suite Universa1201515.0.24RSU17939 Page3 stal Floors\Finals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW I Right -Suite® U Office 1 ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-81 ersal 2015 Load Calculation Job: Coastal Floors Date: Jan 19, 2016 By: Tom Platania Email: ProCalcs@gmail.com Web: www.ProGaics.Net License: GAG1815254 For: Coastal Floor 8532 South US Highway 1, Port St. Lucie, FL 34952 Zone: Office1: LWH: 16.5 x 111.0 x 9.0 1. DESIGN CONDITIONS - COOLING Jul 1600 LDT ) Dry Blb RH Moisture Range Wet Blb Outdoor Conditions —> 90 59 15' 78 Indoor Conditions —> 72 50 60 TOD Correction —> 0 Difference 18 67.9 Mult = 1.0 ] — 2. GLAZING SOLAR HEAT GAIN Lat 27 A5 ° N Const Wt = M Type Orien Area Tilt ShdF IntShd SCMUlt SC Sens/A Sens 3. TRANSMISSION GAINS Type Orien GrArea NtArea Uval Sol -air TD Shad Clr ConvSens- RadSens Sens WALL-01 se 99 99 0.120 29.6 N m 152 205 358 FLOR-01 - 182 182 0 0 - 0 0 -0 CEIL-01 - 182 182 0.082 54.8 - 1 137 575 712 4. INTERNAL HEAT GAIN PEOPLE Activity Schedule Office 7ato10p LIGHTS Lamp/blst + fixture Schedule Fluor MB + Rec trof 7ato10p Fluor MB + Rec trof Fluor MB + Rec trof Fluor MB + Rec trof Sens Latent Total Sensible Latent fly/prsn # people Btuh/prsn Btuh/prsn 0 2 2 250 200 470 0 0 0 0 0 0 W/ft2 W Total Factor Space Sens W fract 1.00 0 182 0.95 1.0 689 j 0 0 0 1.20 1.0 0 0 0 0 1.20 1.0 0 0 0 0 1.20 1.0 0 i wri htsoft' Q Rlght-Suite®Universal 2015 15.0.214 RSU17939 stall FloorslFlnals\Coastal Floors Project 3.rup Calc = RTS Front DoIor faces: SW 400 0 2016-Feb-1011:05:56 Page 1 APPLIANCES / PLUG LOADS 0 Application Usage Schedule Plug load V1f/ftz W 7ato10p 6.50 0 1.00 ft2 0 0 1.00 ftz 0 0 1.00 0 0 1.00 Sensible Latent Sens Latent Btuh Btuh 3.412 0 299 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.00 0 0 0 0 ft2 # 0 0 1.00 0 0 0 0 MOTORS Power (hp) ft2 Total Per mtr Load Sens Schedule Btuh factor 0 0 0 0 0 1.00 0 0 0 0. 0 0 1.00 0 0 0 0 0 0 1.00 0 5. INFILTRATION Sens Latent 0 cfm x db Temp Diff 18.0 x 1.10 0 x Moist. Diff 67.9 x i 0.68 0 6. SUBTOTAL COOLING LOAD FOR SPACE Sensible Latent 2529 1364 Envelope 2529 400 Less external cooling 0 Redistribution 0 0 7. SUPPLY DUCT HEAT GAIN Gain factor 0 x Line 6 Sensible Gain 0 8. COOLING FAN SIZING Sum of Duct Gain 7) Line 6) & Drawthru Fan 2529 L 8 Sens I ) / (Xfer x Supply TD cfm Est Cooling 2529) / ( 1.10 x 17.0 135cfm Actual Cooling Fan 165 O VrM'rlLATTl1N 1 OA 21 cfm --> x db Temp Diff 18.0 x 1.10 413 x Moist. Diff 67.9 x 0.68 964 10. RETURN AIR PLENUM Lights Total power (W) 182 0 Transmission load (plenum upper surface) 0 Space load credit (plenum lower surface) 0 I 11. RETURN DUCT HEAT GAIN Gain factor 0 ix Line 6 Sensible Gain 0 12. TOTAL COOLING LOADS ON EQUIPMENT (Btuh) 2942 1364 i I I 2016-Feb-10 11:05:56 wrightsoft' Right -Suite® Universal 2015 15.0.24 RSU17939 Paget stal Floors\Finals\Coastal Floors Project 3.rup Cate = RTS Front Doi r faces: SW Y ' SPACE HEATING LOAD CALCULATION 13. HEATING DESIGN TEMPERATURE Heating TD = (Inside DB - Outside DB) _ ( 70 - 42) = 28 Mult = 1.0 ] — 14. TRANSMISSION LOSSES Type Expos GrArea NetArea Uval HTD Loss WALL-01 se 99 99 0.120 28.0 332 FLOR-01 - 11 11 0.600. 28.0 185 CEIL-01 182 182 0.082 28.0 416 15. INFILTRATION Loss 8 cfm x db Temp Diff 28.0 x 1.10 251 16. SUBTOTAL HEATING LOAD FOR SPACE 1183 Envelope 1183 Less external heating 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT HEAT LOSS Loss factor 0 x Line 16 Loss - _ - 0 Less transfer 0 Redistribution 0 18. VENTILATION OA 21 cfm x db Temp.Diff 28.0 x 1.10 643 19. HUMIDIFICATION insiria RH dasirPrj 40I Max = 32-0 for 1 nane 1 of Glazing panes 20. RETURN DUCT HEAT LOSS 29 cfm x 0.20 Piping Max = 52.0 for 2 pane ) cfm/d = 0.9 gpd 359 0 21. TOTAL HEATING LOAD ON EQUPMENT (Btuh) 2178 Loss factor x Line 16 Loss wrightSOftn 9Ri ht-Suite®Universa12015 15.0.2I RSU17939 stal Floors%Finals\Coastal Floors Project 3.rup Calc = RTS Front Dop r faces: SW 2016-Feb-1 0 11:05:56 Page 3 Right -Suite® U Office 2 ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-81 rsal 2015 Load Calculation Job: Coastal Floors Date: Jan 19, 2016 By: Tom Platania Email: ProCalcs@gmail.com Web: www.ProCalcs.Net License: CAC1815254 For: Coastal Floor 8532 South US Highway 1, Port St. Lucie, FL 34952 Zone: Office 2,' LWH: 16.5 x 11.0 x 9.0 1. DESIGN CONDITIONS - COOLING Outdoor Conditions —> Indoor Conditions —> TOD Correction —> Jul 1600 LDT ) ry Bib RH Moisture Range Wet Bib 90 59 15 78 72 50 60 0 Difference I 18 67.9 - - r RA..0 4 n t — L rvrun - I.v t 2. GLAZING SOLAR HEAT GAIN - I ( Lat = 27 A5 ° N Const Wt = - M Type Orien Area Tilt ShdF IntShd SCMUlt SC Sens/A Sens 3. TRANSMISSION GAINS Type Orien GrArea NtArea WALL-01 se 99 99 WALL-02 sw 149 149 FLOR-01 - 182 182 CEIL-01 - 182 182 4. INTERNAL HEAT GAIN PEOPLE Activity Schedule Office 7ato10p LIGHTS Lamp/blst + fixture Schedule Fluor MB + Rec trof 7ato10p Fluor MB + Rec trof Fluor MB + Rec trof Uval Sol -air TD Shad Clr ConvSens RadSens Sens 0.120 29.6 N m 152 205 358 0.120 64.5 N m 143 189 331 0 0 - 0 0 0 0.082 54.8 - 1 137 575 712 Sens Latent Total Sensible Latent sn people Btuh/prsn Btuh/prsn 0 2 2 250 200 470 0 I 0 0 0 0 0 i W/ftz W Total Factor Space Sens W fract 1 1.00 0 182 0.95 1.0 689 0 0 0 1.20 1.0 0 0 0 0 1.20 1.0 0 400 0 i Fluor MB + Rec trof 0 0 0 1.20 1.0 0 I 2016-Feb-1011:05:56 Wit htSOf° Right -Suite® Universal 2015 15.0.24 RSU17939 Page 1 stal Floors\Finals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW I APPLIANCES / PLUG LOADS Application Usage Sensible Latent Sens Latent Schedule Btuh Btuh Plug load W/ftz W 7ato10p 0.50 0 1.00 3.412 0 299 0 ft2 0 0 1.00 0 0 0 0 lftz # 0 0 1.00 0 0 0 0 0 0 1.00 0 0 0 0 fftZ # 0 0 1.00 0 0 0 0 ft2 # 0 0 1.00 0 0 0 0 MOTORS Power (hp) #/ft2 Total Per mtr Load Sens Schedule Btuh factor 0 0 0 0 0 1.00 0 0 0 0 0 0 1.00 0 0 0 0 0 0 1.00 0 5. INFILTRATION Sens Latent 0 cfm > x db Temp Diff 18.0 x 1.10 0 x Moist: Diff 67.9 x 0.68 0 6. SUBTOTAL COOLING LOAD FOR SPACE. Sensible Latent 2860 1364 Envelope - 2860 400 Less external cooling 0 Redistribution 0 0 7. SUPPLY DUCT HEAT GAIN Gain factor 0 x Line 6 Sensible Gain 0 8. COOLING FAN SIZING Sum of Duct Gain (7 ), Line (6) & Drawthru Fan 2860 L 8 Sens I ) / (Xfer x Supply TD cfm Est Cooling cfm = ( 2860) / ( 1.10 x 17.0 153 Actual Cooling Fan 193 9. VENTILATION OA 21 cfm x db Temp Diff 18.0 x 1.10 413 x Moist. Diff 67.9 x 0.68 964 10. RETURN AIR PLENUM Lights Total power (W) 182 0 Transmission load (plenum upper surface) 0 Space load credit (plenum lower surface) 0 11. 'RETURN DUCT HEAT GAIN Gain factor 0 x Line 6 Sensible Gain 0 12. TOTAL COOLING LOADS ON EQUIPMENT (Btuh) i I I i I 3273 1364 0 2016-Feb-10 11:05:56 wrightSOft° RlghtSune®Universal 201515.0.2I4 RSU17939 Paget stal r Floors\Finals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW I f SPI+ CE HEATING LOAD CALCULATION 13. HEATING DESIGN TEMPERATURE Heating I u = (Insloe ut3 - VUtslae ut3) rll - arc) — 40 Mult = 1.0 ] — 14. TRANSMISSION LOSSES Type Expos GrArea NetArea WALL-01' se 99 199 Uval 0.120 HTD 28.0 Loss 332 WALL-02 sw 149 149 FLOR-01 - 28 I28 0.120 0.600 28.0 28.0 497 462 CEIL-01 - 182 82 0.082 28.0 416 15. INFILTRATION 1 Loss 8 cfm x db Temp Diff 28.0 x 1.10 251 16. SUBTOTAL HEATING LOAD FOR SPACE 1958 Envelope 1958 Less external heating 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT HEAT -LOSS Loss factor ---.--0 x Line 16 Loss 0 Less transfer 0 Redistribution 0 - 18. VENTILATION OA 21 cfm x db Temp Dill 28.0 x 1.10 - 643 19. HUMIDIFICATION Inside RH desired 40.0 Max = 32.0 for 1 pane ) of Glazing panes 0 (Max = 52.0 for 2 pane ) 20. RETURN DUCT HEAT LOSS 29 cfm x 0.20 g/100cfm/d 0.9 gpd 3W Piping 0 21. TOTAL HEATING LOAD ON EQUPMENTI Btuh) 2952 Loss factor x Line 16 Loss r WrightSo2016- Feb-1011:05:56 f#• Right-Suite® Universal 15.0.24 RSU17939 Page stal Floors\ Finals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW i Right -Suite® Ui Show Room Bk ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-88 rsal 2015 Load Calculation Job: Coastal Floors Date: Jan 1.9, 2016 By: Tom Platania Email: ProCalcs@gmail.com Web: www.ProCalcs.Net License: CAC1815254 For: Coastal Floor 1 8532 South US Highway 1, Port St. Lucie, FL 34952 Zone:. Show Room Bk E LWH: 22.0 x 42.5 x 16.0 1. DESIGN CONDITIONS - COOLING Outdoor Conditions —> Indoor Conditions —> TOD Correction —> Difference - 2. - GLAZING SOLAR HEAT GAIN Type Orien Area Tilt Jul 1600 LDT ) lry Bib RH Moisture 90 59 72 50 0 Range Wet Bib 15 78 60 d- bf.0 Mult = 1.0 ] — Lat = 27.45 °N Const Wt = = M. ) JF IntShd SCMUlt SC Sens/A Sens 3. TRANSMISSION GAINS Type Orien GrArea NtArea Uval Sol -air TD Shad Clr ConvSens RadSens Sens DOOR-01 n 42 42 0.330 30.5 - 157 213 370 WALL-01 - 352 310 0.066 18.0 - In 137 179 315 FLOR-01 - 935 935 0 0 - 0 0 0 CEIL-01 - 935 935 0.082 54.8 - 1 705 2964 3670 4. INTERNAL HEAT GAIN PEOPLE Activity Schedule Dept store 7ato10p LIGHTS Lamp/blst + fixture Schedule Fluor MB + Rec trof 7ato10p Fluor MB + Rec trof Fluor MB + Rec trof Fluor MB + Rec trof Sens Latent Total Sensible Latent ft2/prsn people Btuh/prsn Btuh/prsn . 10 3 3 250 200 705 0 0 0 0 0 0 W/tt W Total Factor Space Sens W fract 1.00 0 935 0.95 1.0 3551 11 0 0 0 1.20 1.0 0 0 0 0 1.20 1.0 0 0 0 0 1.20 1.0 0 wri htSOft' 9 Rlghl-Suile®Universal 201515.0.24LRSU17939 stal Floors\Finals\Coastal Floors Project 3.rup Calc = RTS Front Doir faces: SW 600 0 2016-Feb-10 11:05:56 Page 1 APPLIANCES / PLUG LOADS Application Schedule Plug load 7ato10p MOTORS Usage W/ft2 W 01.25 0 1.00 ft2 10 0 1.00 ft2 0 0 1.00 ft2t2 0 1.000 ft2µt2 1 0 0 1.00 ft2 1 0 0 1.00 Sensible Btuh 3.412 0 0 0 0 0 Latent Sens Latent Btuh 0 771 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sens 0 0 0 Power (hp) tff Total Per mtr Load Schedule Btuh factor 0 0 0 0 I 0 1.00 0 0 0 0 0 1.00 0 0 0 0 0 1.00 5. INFILTRATION I 20 cfm x- db Temp Diff 18.0 x 1.10 x Moist. Diff 67.9 x 0.68 Sens Latent 396 - 923 6. SUBTOTAL COOLING LOAD FOR SPACE Sensible Latent 9777 5148 Envelope - 97707 1523 Less external cooling Redistribution 0 0 - 7. SUPPLY DUCT HEAT GAIN Gain factor 0 ix -Line 6 Sensible Gain 0 8." COOLING FAN SIZING - Sum of Duct Gain (7 ), Linel (6) & Drawthru Fan = 9777 L 8 Sens I ) / (Xfer x Supply TD ) = cfm Est Cooling cfm = ( 9777) / ( 1.10 x 17.0 ) = 523 Actual Cooling Fan = 515 9. VENTILATION OA 79 cfm x db Temp Diff 18.0 x 1.10 1555 x Moist. Diff 67.9 x 0.68 3626 10. RETURN AIR PLENUM Lights Total power (W) 935 0 Transmission load (plenum upper surface) 0 Space load credit (plenum lower surface) 0 11. RETURN DUCT HEAT GAIN Gain factor 0 x Line 6 Sensible Gain 0 12. TOTAL COOLING LOADS ON EQUIPMENT (Btuh) 11332 5148 wri htsOft° 2016-Feb-1011:05:56 Q Right-Suite®Universal 2015 15.0.24i RSU17939 Page 2 stal FloorslFinals%Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW i SPACE HEATING LOAD CALCULATION 13. HEATING DESIGN TEMPERATURE Heating TD = (Inside DB - Outside DB) 70 - 42) = 28 Mult = 1.0 ] — 14. TRANSMISSION LOSSES Type Expos GrArea NetArea Uval HTD Loss DOOR-01 n 42 I42 0.330 28.0 388 WALL-01 - 352 310 0.066 28.0 574 FLOR-01 - 0 0 0.600 28.0 0 CEIL-01 - 935 935 0.082 28.0 2141 15. INFILTRATION Loss 115 cfm x db Temp Diff 28.0 x 1.10 3533 16. SUBTOTAL HEATING LOAD FOR SPACE 6636 Envelope 6636 Less external heating 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT HEAT LOSS Loss factor --- ` 0 x Line 16 Loss 0 Less transfer 0 Redistribution - . 0 18. VENTILATION OA 79 cfm- - x db Temp Diff 28.0 x 1.10 2419 19. HUMIDIFICATION Inside RH desired 40.0 Max = 32.0 for 1 pane- - ) of Glazing panes 0 (Max = 52.0 for 2 pane ) 20. RETURN DUCT HEAT -LOSS 193 cfm x 0.20 g/100cfm/d 6.2 gpd 2340 Piping 0 21. TOTAL HEATING LOAD ON EQUPMENT Btuh) 11395 Loss factor x Line 16 Loss i Wlrl i15t>Irir' 2016 Feb-10 11: ggRight-Suite®Universal 2015 15.0.24 R0U17939 Page stal FloorsTinalsicoastal Floors Project 3.rup Calc = RTS Front Door faces: SW Right -Suite® Un;versal 2015 Load Calculation Job: Coastal Floors Date: Jan 19, 2016 Il Show Room Bk By: Tom Platania ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-882-5700 Email: ProCalcs@gmail.com Web: www.ProCalcs.Net License: CAC1815254 i. Proillict Inforriiatibn For: Coastal Floor 8532 South US Highway 1, Port St. Lucie, FL 34952 Zone: Show Room nBk W LWH: 21.5 x 42.5 x 16.0 1. DESIGN CONDITIONS - COOLING Jul 1600 LDT ) Dry Bib RH Moisture Range Wet Bib Outdoor Conditions —> 90 59 15 78 Indoor Conditions —> 72 50 60 TOD Correction —> 0 Difference 18 67.9 Mult- = 1.0 ] — 2. GLAZING SOLAR HEAT GAIN, Lat - = 27.45 ° N Const Wt =- : M Type Orien ' Area Tilt ShdF IntShd SCMUlt Sc- Sens/A Sens 3. TRANSMISSION GAINS Type Orien GrArea NtArea . Uval Sol -air TD Shad Clr ConvSens RadSens Sens WALL-01 nw 680 659 0.120 61.4 N m 578 817 1396 DOOR-01 nw 21 21 0.330 61.4 - 122 128 250 WALL-02 - 344 344 0.102 , 18.0 - m 234 306 540 FLOR-01 - 914 914 0 0 - 0 0 0 CEIL-01 " - 1914 914 0.082 54.8 - 1 689 2897 3586 4.. INTERNAL HEAT GAIN PEOPLE Activity Schedule Dept store 7ato10p Total rsn # people 0 4 4 0 0 0 I o WrightSOfk' Right -Suite® Universal2015 15.01.24 RSU17939 stal FloorskFinalsToastal Floors Project 3.rup Calc = RTS Front Door faces: SW Sens Latent Sensible Latent Btuh/prsn Btuh/prsn 250 200 939 800 0 0 0 0 2016-Feb-10 11:05:56 Page 1 LIGHTS Lamp/blst + fixture Schedule Fluor MB + Rec trof 7ato10p Fluor MB + Rec trof Fluor MB + Rec trof Fluor MB + Rec trof APPLIANCES / PLUG LOADS Application Schedule Plug load 7ato10p MOTORS - Power (hp) Schedule 0 0 0 0 0 0 5. INFILTRATION , 10 cfm -y x db Temp Diff x Moist. Diff W/ft2 W Total Factor Space Sens W fract 0.90 0 822 0.95 1.0 3123 0 0 0 1.20 1.0 0 0 0 0 1.20 1.0 0 0 0 0 1.20 1.0 0 Usage Sensible Latent Sens Latent Btuh Btuh 12 W 5 0 1.00 3.412 0 754 0 tz # 0 0 1.00 0 0 0 0 tz # 0 0 1.00 0 0 0 0 t2 # 0 0 1.00 0 0 0 0 r # 0 1.00 0 0 0 00 ll # 0 0 1.00 0 0 0 0 Total Per mtr Load Sens Btuh factor 0 0 0 1.00 0 0 0 0 1.00 0 0 0 0 1.00 0 18.0 x 1.10 67.9 x 0.68 Sens Latent 198 461 6. SUBTOTAL COOLING LOAD FOR SPACE Sensible Latent 1.0787 5174 Envelope 10787 1261 Less external cooling 0 Redistribution 0 0 7. SUPPLY DUCT HEAT GAIN Gain factor 0 x Line 6 Sensible Gain 0 8. COOLING FAN SIZING Sum of Duct Gain (7 ), Line (6) & Drawthru Fan = 10787 L 8 Sens ) / (Xfer x Supply TD ) = cfm Est Cooling cfm = ( 1 0787) / ( 1.10 x 17.0 ) = 577 Actual Cooling Fan > = 496 9. VENTILATION OA 85 cfm -> x x db Temp Diff Moist. Diff 18.0 x 1.10 67.9 x 0.68 1678 3913 Wry htsoft, I 201s Feb 10 11: ag2 Right-Suite®Universal2015 15.0.24 RSU17939 Page 2 stal FloorsTinalMCoastal Floors Project 3.rup Calc = RTS Front Door faces: SW 10. ,RETURN AIR PLENUM Lights Total power (W) 822 0 Transmission load (plenum upper surface) 0 Space load credit (plenum lower surface) 0 11. RETURN DUCT HEAT GAIN Gain factor 0 x Line 6 Sensible Gain 0 12. TOTAL COOLING LOADS ON EQUIPMENT Btuh) 12465 5174 SPI CE HEATING LOAD CALCULATION 13. HEATING DESIGN TEMPERATURE Heating TD = (Inside DB -Outside DB) _ ( 70 - 42) = 28 14. TRANSMISSION LOSSES Type Expos GrArea NetArea Uval HTD Loss WALL-01 nw 680 659 0.120 _ 28.0 2207 DOOR-01 nw 21 21 0.330 28.0 194 WALL-02 - 344 344 0.102 28.0— 984 FLOR-01 - 43 143 0.600 28.0 _ 714 CEIL-01- - 914 - .914 0.082 28.0---- 2093 15. INFILTRATION a. Loss 93 cfm x db Temp Diff - 28.0 x 1.10 2865 16. SUBTOTAL HEATING LOAD FOR SPACE 9057 Envelope 9057 Less external heating 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT HEAT LOSS Loss factor 0 x Line 16 Loss 0 Less transfer 0 Redistribution 0 18. VENTILATION OA 85 cfm x db Temp Diff 28.0 x 1.10 2610 19. HUMIDIFICATION Inside RH desired 40.0 Max 32.0 for 1 pane ) of Glazing panes 0 (Max = 52.0 for 2 pane ) 20. RETURN DUCT HEAT LOSS 178 cfm x 3.20 g/100ctm/d = b. i gpa Piping ZIM 0 21. TOTAL HEATING LOAD ON EQUPMENT (Btuh) 13820 Loss factor x Line 16 Loss wri htSOftrF9 Right-Suite®Universa1201515.0.24RSU17939 stal Floors\Finals\Coastal Floors Project 3.rup Calc = RTS FrontiDoorfaces: SW 2016-Feb-10 11:05:56 Page 3 RightSuite® U I p W Shnw Rnnm Fr ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-88 12015 Load Calculation Job: coastal Floors Date: Jan 19, 2016 By: Tom Platanla Email: ProCalcs@gmail.com Web: www.ProCalcs.Net License: CAC1815254 For: Coastal Floor 8532 South US Highway 1, Port S,- Lucie, FL 34952 Zone:. Show Room Fr E LWH: 22.0 x 50.5 x 16.0 1. DESIGN CONDITIONS- COOLING ( Jul 1600 LDT ) Dry Blb RH Moisture Range Wet Blb Outdoor Conditions -> 90 59 15 78 Indoor Conditions -> 72 50 60 TOD Correction -> n Difference 2. GLAZING SOLAR BEAT- GAIN Type Orien Area Tilt GLAZ-01 se 156 90 GLAZ-02 sw 15 90 GLAZ-03 sw 45 90 GLAZ-04 sw 86 90 18 67.9 Mult = -1.0 ] Lat = 27A5 °ly Const Wt M ) dF IntShd SCMult SC Sens/A Sens shd n 1.00 0.57 27.7 4326 0.17 n 1.00 0.57 34.2 513 1.0 n 1.00 0.57 21.2 954 1.0 n 1.00 0.57 21.2 1832 3. TRANSMISSION GAINS Type Orien GrArea NtArea Uval Sol -air TD Shad Clr ConvSens RadSens Sens GLAZ-01 se 1.56 156 0.900 18.0 N 935 5549 6484 GLAZ-02 sw 15 15 0.900 18.0 N 90 631 721 GLAZ-03 sw 45 45 0.900 18.0 N 270 1307 1577 GLAZ-04 sw 86 86 0.900 18.0 N 518 2509 3027 WALL-01 se 808 652 0.120 29.6 N m 1003 1353 2357 WALL-02 sw 352 206 0.120 64.5 N m 198 261 459 FLOR-01 - 1111 1111 0 0 0 0 0 CEIL-01 - 1111 1111 0.082 54.8 1 838 3522 4360 4. INTERNAL HEAT GAIN PEOPLE Activity Schedule Dept store 7ato10p Sens Latent Total Sensible Latent rsn # people Btuh/prsn Btuh/prsn 0 4 4 250 200 939 800 0 0 0 0 0 0 0 wrightsoft 9Ri ht-SuiteQtl Universal 2015 15. .24 RSU17939 stal FloorsTinals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW 2016-Feb-10 11:05:56 Page 1 LIGHTS Lamp/blst + fixture W/ft2 W Total Factor Space Sens Schedule W fract Fluor MB + Rec trof 1.00 0 1111 0.95 1.0 4219 7ato10p Fluor MB + Rec trof 0 0 0 1.20 1.0 0 Fluor MB + Rec trof 0 0 0 1.20 1.0 0 Fluor MB,+ Rec trot 0 0 0 1.20 1.0 0 APPLIANCES / PLUG LOADS Application Usage Sensible Latent Sens Latent Schedule Btuh Btuh Plug load vu/ft2 W 7ato10p 0.25 0 1.00 3.412 0 916 0 fft2 # 0 0 1.00 0 0 0 0 ft2 # O 0 1.00 0 0 0 0 0 0 1.00 0 0 0 0 ft2 # 0 0 1.00 0 0 0 0 K? # 0 0 1.00 0 0 0 0 MOTORS Power (hp) WTr Total Per mtr Load Sens Schedule Btuh factor 0 0 0 0 0 1.00 0 0 0 0 0 0 1.00 0 0 0 0 0 0 1.00 0 5. INFILTRATION I Sens Latent 10 cfm x idb Temp Diff 18.0 x 1.10 198 x 1Moist. Diff 67.9- x 0.68 461 6. SUBTOTAL COOLING LOAD FOR SPACE Sensible Latent 25257 5720 Envelope I 25257 1261 Less external cooling 0 Redistribution 0 0 7. SUPPLY DUCT HEAT GAIN Gain factor 0.05 x Line 6 Sensible Gain 1263 S. COOLING FAN SIZING Sum of Duct Gain 7 ), Line (6) & Drawthru Fan 26520 L 8 Sens ) ! (Xfer x Supply TD cfm Est Cooling cfm 26520) / ( 1.10 x 17.0 1419 Actual Cooling Fan 1435 9. VENTILATION OA 97 cfm x db Temp Diff 18.0 x 1.10 1912 x , Moist. Diff 67.9 x 0.68 4459 htsoft' 2016Feb-Feb11:age 2 WYI9Right-Suite®Universal 2015 15.0.24 RSU77939 page 2 stal FloorsWinalslCoastal Floors Project 3.rup Calc = RTS Fronti Door faces: SW 10. RETURN AIR PLENUM Lights Total power (W) 1111 0 Transmission load (plenum upper surface) 0 Space load credit (plenum lower surface) 0 11. RETURN DUCT HEAT GAIN Gain factor 0.03 x Line 6 Sensible Gain 758 12. TOTAL COOLING LOADS ON EQUIPMEI T (Btuh) 29190 5720 SPACE HEATING LOAD CALCULATION 13. HEATING DESIGN TEMPERATURE Heating TD = (Inside DB - Outside DB) 14. TRANSMISSION LOSSES Type Expos GrArea NetArea Uval GLAZ-01 se 156 156 0.900 GLAZ-02 sw 15 15 0.900 GLAZ-03 _ sw 45 45 0.900 GLAZ-04 sw 86 86 0.900 WALL-01 se 808 652 0.120 WALL-02 sw 352 206 0.120 FLOR-01 - 73 I73 0.600 CEIL-01 1111 1111 0.082 70 - 42) = 28 f Mult = 1.0 HTD Loss 28.0 3931 28.0 378 28.0 1134 28.0 2177 28.0--- 2183 -- 28.0 689 28.0 1218 28.0- 2544 15. INFILTRATION Loss 109 - cfm x db Temp Diff 28.0 x 1.10 3350 16. SUBTOTAL HEATING LOAD FOR SPACE 17605 Envelope 17605 Less external heating 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT HEAT LOSS Loss factor 0.05 x Line 16 Loss 880 Less transfer 0 Redistribution 0 18. VENTILATION OA 97 drn x db Temp Diff 28.0 x 1.10 2974 19. HUMIDIFICATION Inside RH desired 3210 Max = 32.0 for 1 pane ) of Glazing panes 1 !0 Max = 52.0 for 2 pane ) 20. RETURN DUCT HEAT LOSS 206 cfm x 0.03.48 g/100cfm/d 3.0 gpd 192s Piping 0 21. TOTAL HEATING LOAD ON EQUPMENT Loss factor x Line Btuh) 16 Loss 23104 i rF SOft'' Wrigh Right -Suite® Universal 201515.0I24RSU17939 i 2016-Feb-10 11:05:56 Page stal FloorsXFinals\Coastal Floors Project 3.rup Calc = RTS Front oor faces: Sw Right -Suite® Universal 2015 Load Calculation Job: Coastal Floors Me Date: Jan 19, 2016 Show Room Fr W By: Tom Platania ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-882-5700 Email: ProCalcs@gmail.com Web: www.ProCalcs.Net License: CAC1815254 For: I Coastal Floor 8532 South US Highway 1, Port St. Lucie, FL 34952 I Zone: Show Room Fr W I LWH: 21.5 x 50.5 x 16.0 1. DESIGN CONDITIONS - COOLING ( Jul 1600 LDT ) Dry Bib RH Moisture Range Wet Bib Outdoor Conditions -> 1 90 59 15 78 Indoor Conditions -> 72 50 60 TOD Correction -> 0 I Difference 18 67.9 Mult 1.0 - 2. GLAZING SOLAR HEAT GAIN Lat = . 27A5 °N Const Wt M) Type Orien Area Tilt ShdF IntShd SCMUlt SC Sens/A Sens GLAZ-01 sw 15 90 0.17 n 1.00 0.57 34.2 513 GLAZ-02 sw 45 90 1.0 n 1.00 0.57 21.2 954 GLAZ-03 sw 86 90 1.0 n 1.00 0.57 21.2 1832 GLAZ-04 nw 156 90 0.22 n 1.00 0.57 29.4 4580 3. TRANSMISSION GAINS I Type Orien GrArea NtArea Uval Sol -air TD Shad Clr ConvSens RadSens Sens GLAZ-01 sw 15 15 0.900 18.0 N 90 631 721 GLAZ-02 sw 45 45 0.900 18.0 N 270 1307 1577 GLAZ-03 sw 86 86 0.900 18.0 N 518 2509 3027 GLAZ-04 nw 156 156 0.900 18.0 N 935 5803 6738 WALL-01 sw 344 198 0.120 64.5 N m 190 251 441 WALL-02 nw 808 652 0.120 61.4 N m 572 809 1381 FLOR-01 - 1086 1086 0 0 0 0 0 CEIL-01 - 1086 1086 0.082 54.8 1 819 3442 4261 4. INTERNAL HEAT GAIN PEOPLE Sens Latent Activity Total Sensible Latent Schedule ftz/prsn # people Btuh/prsn Btuh/prsn Dept store 1 0 4 4 250 200 939 800 7ato10p 0 0 0 i 0 0 0 0 wrl htsOft° 201s Feb 10 11: age1gRight-Suite®Unlversal 2015 15.0.24 RSU17939 lPagel stal FloorsTinaMCoastal Floors Project 3.mp Calc = RTS Front Door faces: SW I LIGHTS Lamp/blst + fixture Schedule Fluor MB + Rec trof 7ato10p Fluor MB ± Rec trot Fluor MB + Rec trof Fluor MB + Rec trof APPLIANCES / PLUG LOADS Application Schedule Plug load 7ato10p W/ft2 W Total Factor Space Sens W fract 1.00 0 1086 0.95 1.0 4123 0 0 0 1.20 1.0 0 0 0 0 1.20 1.0 0 0 0 0 1.20 1.0 0 Usage Sensible Latent Sens Latent Btuh Btuh IfF W 0 1.00 3.412 0 896 0f25µl l2 0 0 1.00 0 0 0 0 ft2 0 0 1.00 0 0 0 0 ft2 0 0 1.00 0 0 0 0 0 0 1.00 0 0 0 0 ft2 # 0 0 1.00 0 0 0 0 MOTORS Power (hp) Kft2 Total Per mtr Load Sens Schedule = Btuh factor 0 0 0 0 0 1.00 0 0 0 0 0 0 1.00 0 0 0 0 0 0 1.00 0 5. INFILTRATION Sens Latent 10 cfm x db Temp Diff 18.0 x 1.10 198 x Moist. Diff 67.9 x 0.68 461 6. SUBTOTAL COOLING LOAD FOR SPACE Sensible Latent 24302 . 5650 Envelope 24302 1261 Less external cooling 0 Redistribution 0 0 7. SUPPLY DUCT HEAT GAIN Gain factor 0.05 x Line 6 Sensible Gain 1215 8. COOLING FAN SIZING Sum of Duct Gain 7) Line 6) & Drawthru Fan 25517 L 8 Sens Xfer x Supply TD drn Est Cooling cfm 25517) 1.10 x 17.0 1366 Actual Cooling Fan 1454 9. VENTILATION OA 95 drn x db Temp Diff 18.0 x 1.10 1882 x Moist. Diff 67.9 x 0.68 4389 2016-Feb-10 11:05:5 wrightsoflt' Right -Suite® universal2015 15.0.24 RSU17939 page stal Floors\Ftnalslcoastal Floors Project 3.rup Calc = RTS front Door faces: SW 10. RETURN AIR PLENUM Lights Total power (W) 1086 0 Transmission load (plenum upper surface) 0 Space load credit (plenum lower surface) 0 11. RETURN DUCT HEAT GAIN Gain factor 0.03 x Line 6 Sensible Gain 729 12. TOTAL COOLING LOADS ON EQUIPMENT Btuh) 28128 5650 SPACE HEATING LOAD CALCULATION 13. HEATING DESIGN TEMPERATURE Heating TD =. (Inside DB - Outside DB) 70 - 42) = 28 Mult = 1.0 ] - 14. TRANSMISSION LOSSES Type Expos GrArea NetArea Uval HTD Loss GLAZ-01 sw 15 15 0.900 28.0 378 GLAZ-02 sw 45 45 0.900 28.0 1134 - GLAZ-03 sw 86 _ 86 0.900 28.0 2177 GLAZ-04 nw 156 1156 0.900 28.0 3931 WALL-01 sw 344 1198 0.120 28.0 662 WALL-02 nw 808 652 0.120 28.0 - 2183 . FLOR-01 - 72 172 0.600 28.0 = 1210 - CEIL-01 - 1086 1086 0.082 I 28.0 2486 15. INFILTRATION Loss 107 cfm x db Temp Diff 28.0 x 1.10 3288 16. SUBTOTAL HEATING LOAD FOR SPACIE 17450 Envelope 17450 Less external heating 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT HEAT LOSS Loss factor 0.05 x Line 16 Loss 873 Less transfer 0 Redistribution I 0 18. VENTILATION OA 95 cfm x db Temp Diff 28.0 x 1.10 2928 19. HUMIDIFICATION Inside RH desired 32.0 (Max = 32.0 for 1 pane ) of Glazing panes 10 (Max = 52.0 for 2 pane ) 20. RETURN DUCT HEAT LOSS 202 drn x 0.03.48 g/100cfm/d 3.0 gpd 1624 Piping ! 0 21. TOTAL HEATING LOAD ON EQUPMENT (Btuh) 22871 Loss factor x Line 16 Loss I i ft ! 201s Feb-1011:05:56 rF Wri htSO Right-Suite®Universa12015 15.0.24 RSU17939- Page 3 stal Floors\Finals\Coastal Floors Project 3.rup Calc = RTS Front! Door faces: SW Right -Suite® Universal 2015 Load Calculation Job: coastal Floors Date: Jan 19, 2016 t •t Wo111ens By: Tom Platanla s ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-882-5700 Email: ProCalcs@gmaii.com Web: www.ProCaics.Net License: CAC1815254 I 6ject Information For: Coastal Floor 8532 South US Highway 1, Port St. Lucie, FL 34952 ' e Zone: Womens LWH: 7.5 x 6.5 x 9.0 1. DESIGN CONDITIONS - COOLING ( Jul 1600 LDT ) Dry Bib RH Moisture Range Wet Bib Outdoor. Conditions -> 90 59 15 78 Indoor Conditions -> 72 50 60 TOD Correction -> 0 - Difference 18 - _ 67.9 Mult 1.0 2. GLAZING SOLAR HEAT GAIN f ( Lat _ 27 A5 ° N Const Wt M) -- Type Orien Area Tilt ShdF IntShd SCMUlt SC Sens/A Sens 3. TRANSMISSION GAINS Type Orien GrArea NtArea Uval - Sol -air TD Shad Clr ConvSens ° RadSens Sens FLOR-01 - 49 49 0 0 - - 0 0 0 CEIL-01 - 49 49 0.082 54.8 - 1 37 155 191 4. INTERNAL HEAT GAIN PEOPLE Activity Schedule Restroom 7ato10p LIGHTS Lamp/blst + fixture Schedule Fluor MB + Rec trof 7ato10p Fluor MB + Rec trof Fluor MB + Rec trof Fluor MB + Rec trot Sens Latent . r Total Sensible Latent irsn # people Btuh/prsn Btuh/prsn 100 0 0 210, 140 96 0 0 0 0 0 0 W/it2 W Total Factor Space Sens W fract 1.00 0 49 0.95 1.0 185 0 0 0 1.20 1.0 0 0 0 0 1.20 1.0 0 0 0 0 1.20 1.0 0 68 0 ALL Wry ht.soft * 201s Feb 10 11: ge I9Right-Suite®Universal 2015 15.0.24 RSU17939 Page stal Floors\FinalslCoastal Floors Project 3.rup Calc = RTS Front Door faces: SW I APPLIANCES / PLUG LOADS Application Schedule Plug load 7ato10p MOTORS Power (hp) Schedule 0 0 0 f? 0 0 0 Usage F W 10 0 1.00 12 # 0 0 1.00 12 # 0 0 1.00 tz # 0 0 1.00 12 # 0 0 1.00 tZ # 0 0 1.00 Total Per mtr Btuh 0 0 0 0 0 0 0 0 0 Sensible Latent Sens Latent Btuh Btuh 3.412 0 80 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Load Sens factor 1.00 0 1.00 0 1.00 0 5. INFILTRATION Sens Latent 3 cfm > x db Temp Diff 18.0 x 1.10 58 x Moist. Diff 67.9 x 0.68 - 135 6. SUBTOTAL COOLING LOAD FOR SPACE Sensible Latent 611 203 Envelope 611 203 Less external cooling 0 Redistribution 0 0 7. SUPPLY DUCT HEAT GAIN Gain factor 0 x- Line 6 Sensible Gain 0 8. COOLING FAN SIZING Sum of Duct Gain (7 ), Line 6) & Drawthru Fan 611 L 8 Sens Xfer x Supply TD cfm Est Cooling cfm = ( 611 ) / ( 1.10 x 17.0 33 Actual Cooling Fan 40 9. VENTILATION OA 0 cfm -> x db Temp Diff 18.0 x 1.10 ` 0 x Moist. Diff 67.9 x 0.68 0 10. RETURN AIR PLENUM Lights Total power (W) 49 0 Transmission load (plenum upper surface) 0 Space load credit (plenum lower surface) 0 11. RETURN DUCT HEAT GAIN Gain factor 0 x Line 6 Sensible Gain 0 12. TOTAL COOLING LOADS ON EQUIPMENT (Btuh) 611 203 rF wrightsaft' Universal 2015 15.0.24 RSU17939 2016-Feb-10 11:05:56 Right -Suite® Page 2 stal FloorsTinals\Coastal Floors Project 3.rup Calc = RTS Frontboor faces: SW I I SPACE HEATING LOAD CALCULATION 13. HEATING DESIGN TEMPERATURE Heating TD = (Inside DB - Outside DB). _ ( 70 - 42) = 28 Mult = 1.0 ] — 14. TRANSMISSION LOSSES Type Expos GrArea NetArea Uval HTD Loss FLOR-01 - 0 0 0.600 28.0 0 CEIL-01 49 49 0.082 28.0 112 15. INFILTRATION Loss 4 cfm x db Temp Diff 28.0 x 1.10 . 135 16. SUBTOTAL HEATING LOAD FOR SPACE 247 Envelope 247 Less external heating 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT HEAT LOSS Loss factor 0 x Line 16 Loss 0 Less transfer - 0 Redistribution - - 0 18. VENTILATION OA 0 cfm x db Temp Diff 280 x 1.10 0 19. HUMIDIFICATION Inside RH desired 40.0 (Max. = 32.0 for 1 pane of Glazing panes 0 (Max = 52.0 for 2 pane ) 20. RETURN DUCT_ HEAT LOSS 4 cfm x 1 0.20 g/100.dm/d = 0.1 gpd 50 Piping 0 21. TOTAL HEATING LOAD ON EQUPMENT (Btuh) 300 Loss factor x Line 16 Loss f wri htSO t° 9 Right -Su Neil Universal 201515.0.24 RSU1luau stal FloorslFinalslCoastal Floors Project 3.rup Cal. = RTS Front Door faces: SW 2016"Feb-10 11:05:56 Page 3 Right -Suite® AHU1 Front ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-882-5 Universal 2015 Short Form Job: Coastal Floors Date: Jan 19, 2016 By: , Tom Platanla 00 Email: ProCalcs@gmail.com Web: www.ProCalcs.Net License: CAC1815254 For: Coastal Floot 8532 South US Highway 1, Port St. Lucie, FL 34952 Htg Clg Outside db F) 42 90 Outside RH N 59 Outside wb F) 78 Daily range F) 15 Moisture dill. grAb) 68 Heating Equipment Make Model Type Efficiency Heating Input Heating Output Humidifier Leaving Air Temp Actual Heating Fan NAME Show Room Bk W Show Room Fr W AHU1 Front Elec strip 100 EFF 101.0 kW 341.1 MBtuh 8 7. gpd 942 °F 1285 cfm Equipment Loc ation System Type Fan Motor Heat I ype Fan & Motor Combined Efficier Static Pressure Across Fan Htg Clg Inside db (°F) 70 72 Inside RH (0/6) - 50 Inside wb (°F) - 60 Design TD (°F) 28 18 Cooling Equipment Make Trane Model 4TTB3060D 1 /TEM4A0C60S51 Type Split AC COP / EER /SEER 13.5 Sensible Cooling 45.6 MBtuh Latent Cooling 12.9 MBtuh Total Cooling 58.5 MBtuh Leaving Air Temp 55.0 F Actual Cooling Fan 1950 cfm AHU1 Front PEAKCV PACKAGE 0 % 0 in H2O Area ' I Heat I Sensible I Latent . I Htg I Clg I Time ftz Loss Gain Gain cfm cfm 914 13820 12465 5174 439 496 Jul1600 LDT 1086 I 22871 I 28128 I 5650 I 846I 14541Jul 1600 LDT 2000 36691 40593 1 10824 1 12851 19501 Jul 1600 LDT wr1 hti:.St1'ft' 2016- Feb-1011:05:56 Right- Suite®Universal 2015 15.L24-RSU17939 Page 1 stal FloorstFinals\Coastal.Floors Project 3.rup Calc = RTS Front Door faces: SW Ri ht-Suite® Universal 2015 Short Form Job: Coastal Floors n g Date: Jan 19, 2016 AHU2 Back By: Tom Platania ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-882-5700 Email: ProCalcs@gmail.com Web: www.ProCalcs.Net License: CAC1815254 For: Coastal Floor 8532 South 6S Highway 1, Port St. Lucie, FL 34952 Htg Clg Htg Clg Outside db F) 42 90 Inside db F) 70 72 Outside RH N 59 Inside RH N 50 Outside wb F) 78 Inside wb F) 60 Daily range F) 15 Design TD F) 28 18 Moisture dill. grAb) 68 Heating Equipment Cooling Equipment Make Model Type - Efficiency Heating Input _ Heating Output Humidifier Leaving Air Temp Actual Heating Fan Make Trane Model 4TTB3060D1 /TEM4A0C60S51 Elec strip Type. Split AC 100 EFF COP / EER / SEER 13.5 10.0 kW Sensible Cooling- 45.6 MBtuh 34.1 MBtuh Latent Cooling 12.9 MBtuh 9.2 gpd Total Cooling- -_- 58.5 MBtuh 117.3 F Leaving Air Temp 55.0 F 657 dm Actual Cooling Fan 1950 drn Equipment Location AHU2 Back System Type PEAKCV Fan Motor Heat Type PACKAGE Fan & Motor Combined Efficiency 0 Static Pressure iAcross Fan 0 in H2O NAME Area Heat I Sensible I Latent I Htg I Clg I TimeIft2ILossGainGaindmdm Show Room Bk E I 935 I 11395 I 11332 I 5148 I 1801 5151 Jul 1600 LDT Show Room Fr E 1111 23104 29190 5720 477 1435 Jul' 1600 LDT AHU2 Back 2046 34499 40522 10868 1 6571 19501 Jul 1600 LDT 2 Wrightseft' Right -Suite® Universal 2015 15.I.24 RSU17939 stal Floors\Finals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW 2016-Feb-1011:05:56 Page 2 Right -Suite( r11P11M AHU3 Office ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772=81 Universal 2015 Short Form Job: Coastal Floors Date: Jan 19, 2016 By: Tom Platania Email: ProCalcs@gmail.com Web: www.ProCalcs.Net License: CAC1815254 For: Coastal Floor 8532 South 6S Highway 1, Port St. Lucie, FL 34952 Htg . Clg. Outside db F) 42 90 Outside RH N 59 Outside wb F) 78 Daily range F) 15 Moisture dill. grAb) 68 Heating Equipment Make Model Type _ Efficiency - Heating_Input Heating Output Humidifier Leaving Air Temp Actual Heating Fan - Elec strip 100 EFF 5.0 kW 17.1 MBtuh 3.1 gpd 145.4 °F 266 cfm Equipment Location System Type Fan Motor Heat, Type Fan & Motor Combined Efficiency Static Pressure lAcross Fan Htg Clg Inside db (°F) 70 72 Inside RH N 50 Inside wb (°F) 60 Design TD . (°F) 28 18 Cooling Equipment Make Trane Model - 4TTR4018L1/TEM6A0B24H21 Type _ Split AC COP / EER / SEER 16.0 Sensible Cooling 15.0, MBtuh. Latent Cooling 3.8 MBtuh Total Cooling 18.8 MBtuh Leaving Air Temp 55.0 F Actual Cooling Fan 627 cfm AHU3 Offices PEAKCV PACKAGE 0 0 in H2O NAME I Area V I Heat LOSS I Sensible IGain Latent Gain I Htg cfm I Clg cfm I Time Office 2 182 2952 3273 1364 75 193 Jul 1600 LDT Office 1 182 2178 2942 1364 45 165 Jul 1600 LDT Mens 49 300 611 203 9 40 Jul 1600 LDT Womens 49 300 611 203 9 40 Jul 1600 LDT Computer Closet 117 1899 2373 1048 47 137 Jul 1600 LDT Janitor CL 1 68 907 944 1 374 1 20 51 Jul 1600 LDT AHU3 Offices 645 8535 10754 4555 1 2061 6271 Jul 1600 LDT wrightsoft' Right -Suite® Universal 2015 15 .24 RSU17939 stal FloorsTinals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW 2016-Feb-10 11:05:56 Page 3 Right -Suite® Universal 2015 Load Summary Job: coastal Floors Date: Jan 19, 20% AHU1 Front By: Tom Piatania ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-882;5700 Email: ProCalcs@gmaii.com Web: www.ProCalcs.Net License: CAC1815254 r-roject intormation For: ' Coastal Floor 8532 South US Highway 1, Port St. Lucie, FL 34952 Zone __ _ AHU1- Front COOLING LOAD 1. DESIGN CONDITIONS I at Jul 1600 LDT Peak load at Jul 1800 LDT Inside: 72 OF Outside: 90 OF TD: 18 OF RH: 59 % M istDiff: 67.9 gr/lb Mult: 1.0 Ins.wb 60 OF Sensible Latent 2. SOLAR RADIATION THROUGH GLASS 7879 3. TRANSMISSION GAINS Sensible 16039 Walls: 3758 Glass: 4183 Doors: 250 Partitions: 0 Floors: 0 Ceilings: 7848 4. INTERNAL HEAT GAIN Sensible Latent 10775 1600 Occupants: 1879 1600 Lights: _ -. 7247 •. Motors: - 0 Appliances: 1649 0 5. INFILTRATION. Outside air cirri: 20 396 923 - - 6. SUBTOTAL: Space load Sensible_ Latent 35089 2523 Envelope 35089 2523 Less external 0 Redistribution 0 0 7. SUPPLY DUCT 1215 8. SUBTOTAL: Space load supply duct 36304 Actual cfm: 1950 at supply TD: 17 9. VENTILATION: Make-up air cfm: 180 3560 8302 - 10. RETURN AIR LOAD: Lighting + plenum (net) 0 11. RETURN DUCT 729 12. TOTAL LOADS ON EQUIPMENT 40593 10824 w_ _ _._.. . HEATING LOAD_ 13. DESIGN CONDITIONS Mult:' 1.0 Inside: 70 OF Outside: 42 OF TD: 28 OF 14. TRANSMISSION LOSSES 20354 Walls: 6036 Glass: 7620 Doors: 194 Partitions: 0 Floors: 1924 Ceilings: 4579 15. INFILTRATION: Outside air cfm: 200 6153 16. SUBTOTAL: Space load 26507 Envelope 26507 Less external 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT: 873 18. VENTILATION: Make-up air cfm: 180 5538 19. HUMIDIFICATION 3250 Piping 0 20. RETURN DUCT 524 21. TOTAL HEATING LOAD 'ON EQUIPMENT 36691 2016-Feb-10 11:05:56 wrightsoft° Right -Suite® Universal 2015 15.0.24 RSU17939 Page 1 7stal FloorsTinals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW 1101 SW Zone: Right -Suite® U r rt , AHU2 Back ProCalcs, LLC St., Port Saint Lucie, FL 34987 Phone: rsal 2015 Load Summary Job: Coastal Floors Date: Jan 19, 2016 By: Tom Platania Email: ProCalcs@gmail.com Web: www.ProCalcs.Net License: CAC1815254 For: Coastal Floot 8532 South US Highway 1, Port St. Lucie, FL 34952 AHU2-Back: m__ ..COOLING LOAD 1. DESIGN CONDITI,ONS at Jul 1600 LDT Peak load at Jul 1700 LDT Inside: 72 °F Outside: 90 T TD: 18 °F RH: 59 % MoistDiff. 67.9 , grAb Mult: 1.0 Ins.wb 60 'F Sensible Latent 2. SOLAR RADIATION THROUGH GLASS 7624 3. TRANSMISSION GAINS Sensible 15714 Walls: 3131 Glass: 4183 Doors: 370 Partitions: 0 Floors: 0 Ceilings: 8030 4. INTERNAL HEAT GAIN Sensible Latent 11102 1400 Occupants: 1644 1400 Lights: 7770— Motors:. 0 Appliances: 1688 _ 0 5. INFILTRATION: Outside air cfm: = 30 593 1384 6. SUBTOTAL: Space load Sensible Latent 35034 2784 Envelope 35034 2784 Less external 0 Redistribution 0 0 7. SUPPLY DUCT 1263 8. SUBTOTAL: Space load supply duct 36297 Actual cfm:- 1950 at supply TD: 17 9. VENTILATION: Make-up air cfm:. 175 3467 8084 10. RETURN AIR LOAD: Lighting + plenum (net) 0 11. RETURN DUCT 758 12 TOTAL LOADS ON EQUIII ENT 40522 10868 w _... _. ... _. HEATING_LOAD. 13. DESIGN CONDITIONS : Mult: 1.0 Inside: 70 °F Outside: 42 T TD: 28 T 14. TRANSMISSION LOSSES 17358 Walls: 3446 Glass: 7620 Doors: 388 Partitions: 0 Floors: 1218 Ceilings: 4686 15. INFILTRATION: Outside air cfm: 224 6883 16. SUBTOTAL: Space load 24241 Envelope 24241 Less external 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT: 880 18. VENTILATION: Make-up air cfm: 175 5393 19. HUMIDIFICATION 3456 Piping 0 20. RETURN DUCT 528 21. TOTAL HEATING LOAD ON EQUIPMENT 34499. t 2016-Feb-10 11:05:56 Wfl.1 tL.SOft` Right -Suite® Universal201515.0.24RSU17939 Paget stal FloorsTinals\Coastal'Floors Project 3.rup Calc = RTS Front Door races: SW Right -Suite® U AHU3 Offices ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-882 Email: 2015 Load Suffmary Job: coastal Floors Date: Jan 19, 2016 By: Tom Platania Web: www.ProCalcs.Net License: CAC1815254 For: Coastal Floor 8532 South US Highway 1, Port St. Lucie, FL 34952 Zone. ' AHU3 Offices 1. DESIGN CONDITIONS Inside: 72 °F Oi RH: 59 % M 2. SOLAR RADIATION THRI 3. TRANSMISSION GAINS Walls: Glass: Doors: Partitions: Floors: Ceilings: 4.- INTERNAL HEAT GAIN Occupants: Lights: Motors: Appliances: . 5. INFILTRATION: i 6. - SUBTOTAL: Space loa Envelope Less external Redistribution 7. SUPPLY DUCT 8. SUBTOTAL: Space Ic Actual cfm: 9. VENTILATION:, 10. RETURN AIR LOAD: 11. RETURN DUCT 12. TOTAL LOADS ON EQUI 13. DESIGN CONDITIONS Inside: 70 °F O 14. TRANSMISSION LOSSES Walls: Glass: Doors: Partitions: Floors: Ceilings: 15. INFILTRATION: 16. SUBTOTAL: Space loa Envelope Less external Less transfer Redistribution 17. SUPPLY DUCT: 18. VENTILATION: 19. HUMIDIFICATION Piping 20. RETURN DUCT 21. TOTAL HEATING LOAD COOLING.LOAD at Jul 1600 LDT Peak load at Jul 1700 LDT side: 90 °F TD: 18 T stDiff. 67.9 grAb Mult: 1.0 1ns.wb 60 °F Sensible Latent UGH_ GLASS 0 Sensible 4258 1727 0 0 0 0 2531 Sensible Latent 5115 1337 1602 1337 2450 1064 0 utside air cfm: 6 116 270 Sensible Latent 9489 1606 9489 1606 0 0 0 0 d + supply duct 9489 i27 at supply TD: 17 ake-up air cfm: 64 1264 2948 Lighting + plenum (net) 0 0 MENT. 10754 4555 Mult: 1.0 tside: 42 T TD: 28 T 4363 2020 0 0 0 865 1477 utside air cfm: 33 1028 5391 5391 0 0 0 0 ake-up air cfm: 64 1967 1178, 0 0 IN EQUIPMENT 8535 Wrightsoftp Right -Suite® Universal 201515.0.24 RSU17939, stal FloorsTinals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW 2016-Feb-10.11:05:56 Page 3 Right -Suite® Uniiversal 2015 Load Summary Job: coastal Floors Computer Closet By: 1 TomPlatan a ProCalcs, LLC 1701 SW Port Saint Lucie, FL 34987 Phone: 772-882- Email: Web: www.ProCalcs.Net License: CAC1815254 For: Coastal Floor 8532 South US Highway 1, Port St. Lucie, FL 34952 Zone:- . Computer. Closet Z.00LING LOAD' _ 1. DESIGN CONDITIONS at Jul 1600 LDT Peak load at Jul 1600 LDT Inside: 72 °F Outside: 90 °F TD: 18 °F RH: 59 % M istDiff- 67.9 grflb Mult: 1.0 Ins.wb Sensible 2. SOLAR RADIATION THROUGH GLASS 0 3. TRANSMISSION GAINS Sensible 988 Walls: 529 Glass: 0 Doors: 0 Partitions: 0 Floors: 0 Ceilings: 459 4. INTERNAL HEAT GAIN - Sensible Latent 1107 Occupants: 470 400 Lights: 444 Motors: 0 Appliances: 193. 0 5. INFILTRATION: Outside air cfm: - 0 0 6. SUBTOTAL: Space load Sensible Latent 2095 Envelope 2095 400 Less external 0 Redistribution 0 0 7. SUPPLY DUCT 0 8. SUBTOTAL: Space load supply duct 2095 Actual cfm: 1137 at supply TD: 17 9. VENTILATION: Make-up air cfm: 14 278 10. RETURN AIR LOAD- Lighting + plenum (net) 0 11. RETURN DUCT I 0 12. TOTAL LOADS ON EQUIPMENT 2373 HEATING, LOAD ._, _.. 13. DESIGN CONDITIONS Mult: 1.0 Inside: 70 °F Outside: 42 °F TD: 28 °F 14. TRANSMISSION LOSSES Walls: 585 Glass: 0 Doors: 0 Partitions: 0 Floors: 218 Ceilings: 268 15. INFILTRATION: Outside air cfm: 16. SUBTOTAL: Space load Envelope 1233 Less external 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT: 18. VENTILATION: Make-up air cfm: 19. HUMIDIFICATION Piping 20. RETURN DUCT 21. TOTAL HEATING LOAD i ON EQUIPMENT. l 14 1071 162 1233 0 432 234 0 0 1899 60 °F Latent 400 _ 0 400 648 1048 I 2016-Feb-10 11:05:56 wrightsoft Rlght-Suite®Universal 201515.0.24 RSU17939 Page 4 stal FloorstFinals%Coastal Floors Project 3.rup Calc = RTS Front floor faces: SW 1701 SW Commargo St., Port Saint Zone .. ;-:JanitorCL' Right-Suite(g) Universal 2015 Load Summary Job: Coastal Floors Date: Jan 19, 2016 Janitor CL By: Tom Platania ProCalcs, LLC ie, FL 34987 Phone: 772-882-6700 Email: ProCalcs@gmail.com Web: www.ProCalcs.Net License: CAC1815254 For: Coastal Flooe 8532 South US Highway 1, Port St. Lucie, FL 34952 COOLINGLO AD 1: DESIGN CONDITIONS Inside: 72 °F O RH: 59 % M 2. SOLAR RADIATION THI 3. TRANSMISSION GAINS Walls: Glass: Doors: Partitions: Floors: Ceilings: 4. INTERNAL HEAT GAIN Occupants: - Lights: Motors: Appliances: 5. INFILTRATION: 6. . SUBTOTAL: Space to Envelope Less external Redistribution 7. SUPPLY DUCT 8. SUBTOTAL: Space Actual cfm: 9. VENTILATION: 10. RETURN AIR LOAD: 11. RETURN DUCT 12. TOTAL LOADS ON EQU Jul 1600 LDT le: 90 °F Diff. 67.9 gdlb GLASS Sensible 151 0 0 0 0 265 Sensible 0 256 0 111 air cfm: Sensible - 784 0 0 d + supply duct 51 at supply TD: ake-up air cfm: Lighting + plenum (net) Peak load at Jul 1600 LDT TD: 18 °F Mult: 1.0 Ins.wb Sensible 0 416 Latent 0 0 0 Latent 0 60 °F Latent 0 0 0 0 - - 0 - 784 - 17 - - 8 160 374 0 - 0 - 944 374 368 0 784 13. DESIGN CONDITIONS I Mult: 1.0 Inside: 70 T Outside: 42 °F TD: 28 °F 14. TRANSMISSION LOSSES 430 Walls: 275 Glass: 0 Doors: 0 Partitions: 0 Floors: 0 Ceilings: 155 15. INFILTRATION: Outside air cfm: 3 93 16. SUBTOTAL: Space load 523 Envelope 523 Less external 0 Less transfer 0 Redist0bution 0 17. SUPPLY DUCT: 0 18. VENTILATION: Make-up air cfm: 8 249 19. HUMIDIFICATION 135 Piping 0 20. RETURN DUCT 0 21. TOTAL HEATING LOAD ON EQUIPMENT 907 201s Feb 1011:05:56 t Wi'1 ht stoitT Right -Suite® Universal 2015 15.0.24 RSU17939 Page s stal Floors\Finals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW W Right -Suite® Universal 2015 Load Summary Job: Coastal Floors Date: Jan 19, 2016 I• . Mens By: Torn Platania ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-882-5700 Email: ProCalcs@gmail.com Web: www.ProCalcs.Net License: CAC1815254 For: Coastal Floor 8532 South US Highway 1, Port St. Lucie, FL 34952 Zone:,,, Mens: i COOLING LOAD 1. DESIGN CONDITIONS at Jul 1600 LDT Peak load at Jul 1600 LDT Inside: 72 °F Outside: 90 °F TD: 18 °F RH: 59 % MoistDiff. 67.9 grAb Mult: 1.0 Ins.wb 60 °F Sensible Latent 2. SOLAR RADIATION THROUGH GLASS 0 3. TRANSMISSION GAINS Sensible 191 Walls: 0 Glass: 0 Doors: 0 Partitions: 0 Floors: 0 Ceilings: 191 4. INTERNAL HEAT GAIN _ Sensible Latent 362 68 Occupants: 96 68 Lights: 185 Motors: 0 Appliances: 80 0 5. INFILTRATION: Outside air cfrri: 3 58 135 6. SUBTOTAL: Space load Sensible Latent 611 203 Envelope 611 203 Less external 0 Redistribution i 0 0 7. SUPPLY DUCT 1 0 8. SUBTOTAL: Space load +-supply duct 611 Actual cfm: 140 at supply TD: 17 9. VENTILATION: Make-up air cfm: 0 0 0 10. RETURN AIR LOAD: Lighting + plenum (net) 0 11. RETURN DUCT 0 12. TOTAL LOADS ON -EQUIPMENT 611 203 HEATING LOAD 13. DESIGN CONDITIONS' Mult: 1.0 Inside: 70 °F Outside: 42 °F TD:. 28 °F 14. TRANSMISSION LOSSES 112 Walls: 0 Glass: 0 Doors: 0 Partitions: 0 Floors: 0 Ceilings: 112 15. INFILTRATION: Outside air cfm: 4 135 16. SUBTOTAL: Space load 247 Envelope 247 Less external 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT: O 18. VENTILATION: Make-up air cfm: 0 0 19. HUMIDIFICATION 53 Piping 0 20. RETURN DUCT 0 21. TOTAL HEATING LOAD DN EQUIPMENT 300 2016-Feb-1011:05:56 wrightsOtt° Right -Suite® Universal 2015 15I0.24 RSU17939 Page 6 stal Floors\Finals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW Right -Suite® Universal 2016 Load Summary Office 1 ProCalcs, LLC j Job: Coastal Floors Date: Jan 19, 2016 By: Tom Platania 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-882-5700 Email: ProCalcs@gmail.com Web: www.ProCalcs.Net License: CAC1815254 ect- Information For: Coastal Floor 8532 South US Highway 1, Port St. Lucie, FL 34952 I I Zone: Office 1 COOLING LOAD 1. DESIGN CONDITIONS at Jul 1600 LDT Peak load at Jul 1600 LDT Inside: 72 °F Outside: 90 °F TD: 18 °F RH: 59 % MoistDiff: 67.9 gNlb Mult: 1.0 Ins.wb 60 °F Sensible Latent 2. SOLAR RADIATION THROUGH GLASS 0 3. TRANSMISSION GAINS Sensible 1070 Walls: 358 Glass: 0 Doors: 0 Partitions: 0 Floors: 0 Ceilings: 712 4. INTERNAL HEAT GAIN Sensible Latent 1458 400 Occupants: 470 - 400 Lights: 689 Motors: 0 Appliances: 299 0 5. INFILTRATION: Outside air cfm: 0 0 0 6. SUBTOTAL: - Space load Sensible Latent 2529 400 Envelope 2529 400 Less external j 0 Redistribution 0 0 7. SUPPLY DUCT j - 0 8. SUBTOTAL: Space load + supply duct 2529 Actual cfm: 1165 at supply TD: 17 9. VENTILATION: Make-up air cfm: 21 413 964 10. RETURN AIR LOAD: Lighting + plenum (net) 0 11. RETURN DUCT 0 12. TOTAL LOADS ON EQUIPMENT 2942 1364 HEATING LOAD 13. DESIGN CONDITIONS , Mult: 1.0 Inside: 70 °F Outside: 42 °F TD: 28 °F 14, TRANSMISSION LOSSES 932 Walls: j 332 Glass: 0 Doors: 0 Partitions: 0 Floors: 185 Ceilings: 416 15. INFILTRATION: 'Outside air cfm: 8 251 16. SUBTOTAL: Space load 1183 Envelope .1183 Less external 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT: 0 18. VENTILATION: Make-up air cfm: 21 643 19. HUMIDIFICATION 352 Piping 20. RETURN DUCT 0 21. TOTAL HEATING LOAD ON EQUIPMENT 2178 2016-Feb-I0 11:05:56 WrightSOft` Right -Suite® Universal 201515.0.24RSU77939 Page stal Floors%Flnals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW Right -Suite® Un Office 2 ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-882-! rsal 2015 Load Sunimry Job: Coastal Floors Date: Jan 19, 2016 By: Tom Platanla Email: ProCalcs@gmaii.com Web: www.ProCalcs.Net License: CAM 815254 For: Coastal FlooV 8532 South US Highway 1, Port St. Lucie, FL 34952 Zone: Office.2 COOLING LOAD 1. DESIGN CONDITIONS at Jul 1600 LDT Peak load at Jul 1800 LDT Inside: 72 °F Outside: 90 °F TD: 18 °F RH: 59 % MdistDiff: 67.9 grAb Mult: 1.0 Ins.wb Sensible 2. SOLAR RADIATION THROUGH GLASS 0 3. TRANSMISSION GAINS Sensible 1402 Walls: 689IGlass: 0 Doors: 0 Partitions: 0 Floors: 0 Ceilings: 712 4. INTERNAL HEAT GAIN -- Sensible Latent 1458 Occupants: -- 470 400 Lights: I 689 Motors: 0 Appliances: 299 0 5. INFILTRATION: Outside air.cfm: 0 0 6. SUBTOTAL: Space load Sensible Latent 2860 Envelope 2860 400 Less external 0 Redistribution 0 0 7. SUPPLY DUCT 8. SUBTOTAL: Space load +supply duct Actual cfm: 1 193 at supply TD: 9. VENTILATION: Make-up air cfm: _- 10. RETURN AIR LOAD: i Lighting -';-plenum (net) 11. RETURN DUCT 12. TOTAL LOADS ON EQUIPMENT HEATING LOAD ; T13. DESIGN CONDITIONS Mult: Inside: 70 °F Outside: 42 T TD: 14. TRANSMISSION LOSSES Walls: 829 Glass: i 0Doors: Partitions: 462Floors: Ceilings: 416 15. INFILTRATION: Outside air cfm: 16. SUBTOTAL: Space load Envelope 1958 Less external 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT: 18. VENTILATION: Make-up air cfm: 19. HUMIDIFICATION Piping 20. RETURN DUCT 21. TOTAL HEATING LOAD ON EQUIPMENT 17 21 8 21 1.0 28 °F 0 2860 413 0 0 3273 '1364 60 °F Latent 1706 251 1958 0 643 352 0 0 2952 400 _ 0 400 964 WTI htsoft" I 2016•Feb-1011:05:56 g Right -Suite® Universal 2015 '15.0.24 RSU17939 Page 8 stal FloorsTinals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW RightSuite® Universal 2015 Load Summary Job: Coastal Floors a Date: Jan 19, 2016 Show Room Bk E By: Tom Platanla ProCalcs, LLC 1701 SW Commarpo St.. Port Saint Lucie, FL 34987 Phone: 772-882-5700 Email: ProCalcs@gmaii.com Web: www.ProCalcs.Net License: CAC1815254 For: Coastal Floor 8532 South US Highway 1, Port St. Lucie, FL 34952 i Zone: Show Room Bk E COOLING LOAD 1. DESIGN CONDITIONS ;at Jul 1600 LDT Peak load at Jul 1600 LDT Inside: 72 °F Outside: 90 °F TD: 18 °F RH: 59 % MoistDiff: 67.9 grAb Mult: 1.0 Ins.wb I Sensible 2. SOLAR RADIATION THROUGH GLASS 0 3. TRANSMISSION GAINS Sensible 4355 W II 315 - a s. Glass: 0 Doors: 370 Partitions: 0 Floors: 0 Ceilings: 3670 4. INTERNAL HEAT GAIN Sensible Latent Occupants:- 705 600 Lights: - 3551 Motors: 0 Appliances- 771 0 205. 6. INFILTRATION: Outside air cfrri: SUBTOTAL: ..Space load Sensible Latent Envelope 9777 1523 Less external 0 Redistribution 0 0 7. SUPPLY DUCT 8. SUBTOTAL: Space load + supply duct Actual cfm: 515 at supply TD: 17 9. VENTILATION: Make-up air cfm: 79 10. RETURN AIR LOAD: Lighting + plenum (net) 11. RETURN DUCT 12. TOTAL LOADS ON EQUIPMENT HEATINGLOAD 5027 396 9777 60 °F Latent 600 923 1523 0 - 9777 - 1555 3626 0 - 0 - 11332 5148 13. DESIGN CONDITIONS i Mult: 1.0 Inside: 70 °F Outside: 42 °F TD: 28 °F 14. TRANSMISSION LOSSES 3104 Walls: 574 Glass: 0 Doors: 388 Partitions: 0 Floors: 0 Ceilings: 2141 15. INFILTRATION: Outside air cfm: 115 3533 16. SUBTOTAL: Space load 6636 Envelope 6636 Less external 0 Less transfer I 0 Redistribution 0 17. SUPPLY DUCT: 0 18. VENTILATION: Make-up air cfm: 79 2419 19. HUMIDIFICATION 2340 Piping 0 20. RETURN DUCT 0 21. TOTAL HEATING LOAD ON EQUIPMENT 11395 Wrl htSOf' Right-Suile®Universal 2015 15.0I 24 RSU17939 2016-Feb-1011:05:56 Page 9 stal Floors\Finals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW Right -Suite® Universal 2015 Load SunTmry Job: Date: Show ROOM Bk W By: ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-882-5700 Email: ProCalcs@gmail.com Web: www.ProCalcs.Net License: CAC1815254 Coastal Floors Jan 19, 2016 Tom Platania i Peoject Infdrniation For: Coastal Floor 8532 South US Highway 1, Port St. Lucie, FL 34952 I Zone: Show Room Bk W COOLING, LOAD. 1. DESIGN CONDITIONS at Jul 1600 LDT Peak load at Jul 1700 LDT Inside: 72 T Outside: 90 'F TD: 18 °F RH: 59 % MoistDiff: 67.9 grAb Mult: 1.0 Ins.wb 60 °F Sensible Latent 2. SOLAR RADIATION THROUGH GLASS 0 3. TRANSMISSION GAINS ! Sensible 5772 Walls: 1936 Glass: 0 Doors: 250 Partitions: 0 Floors: 0 Ceilings: 3586 4. INTERNAL HEAT GAIN Sensible Latent 4816 800 Occupants: 939 800 Lights: Lights: 3123 - Motors: ! - 0 - Appliances: 754 0 5. INFILTRATION: Outside air cfm: 10 198 461 6. SUBTOTAL: Space load Sensible Latent 10787 1261 Envelope 10787 1261 Less external 0 - Redistribution 0 0 7. SUPPLY DUCT 0 8. SUBTOTAL: Space load + supply duct 10787 Actual cfm: 1 496 at supply TD: 17 9. VENTILATION: Make-up air cfm: 85 1678 3913 10. RETURN AIR LOAD: Lighting + plenum (net) 0 11. RETURN DUCT 0 12. TOTAL LOADS ON EQUIPMENT 12465 5174 l _,HI5ATING, LOAD. 13. DESIGN CONDITIONS I Mult: 1.0 Inside: 70 T Outside: 42 °F TD: 28 °F 14. TRANSMISSION LOSSES; 6192 Walls: 3191 Glass: 0 Doors: 194 Partitions: 0 Floors: 714 Ceilings: 2093 15. INFILTRATION: 'Outside air cfm: 93 2865 16. SUBTOTAL: Space load 9057 Envelope 9057 Less external 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT: 0 18. VENTILATION. !Make-up air cfm: 85 2610 19. HUMIDIFICATION 2153 Piping 0 20. RETURN DUCT 0 21. TOTAL HEATING LOAD ON EQUIPMENT 13820 2016-Feb-10 11:05:56 WrlghtSOft' Right -Suite® universal 2015 15.0.24 RSU17939 Page 10 stal. Floors\Finals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW 0 Right -Suite® Universal 2015 Load Summary Job: t" i Date: t ` " Show Room Fr E By: ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772 882; 5700 Email: ProCalcs@gmail.com Web: www.ProCalcs.Net License: CAC1815254 Coastal Floors Jan 19, 2016 Tom Platania I Project• • For: Coastal Floor 8532 SouthiUS Highway 1, Port St. Lucie, FL 34952 Zone 'Show Room Fr E .. n °. COOLING ,LOAD. . 1. DESIGN CONDITIONS at Jul 1600 LDT Peak load at Jul 1800 LDT Inside: 72 °F Outside: 90 °F TD: 18 °F RH: 59 % MoistDiff. 67.9 grAb Mult: 1.0 lns.wb 60 °F Sensible Latent 2. SOLAR RADIATION THROUGH GLASS 7624 3. TRANSMISSION GAINS Sensible 11359 Walls: 2816 Glass: 4183 IDoors: 0 Partitions: 0 Floors: 0 Ceilings: 4360 4. INTERNAL HEAT GAIN_ Sensible Latent 6075 800 Occupants: - 939 800 Lights: 4219 - Motors: 0 - Appliances: 916 0 5. INFILTRATION: Outside air cfm: 10 198 461 -- 6. SUBTOTAL: Space load Sensible Latent 25257 1261 Envelope 25257 1261 Less external 0 - Redistribution 0 0 7. SUPPLY DUCT 1263 8. SUBTOTAL: Space load + supply duct 26520 Actual cfm: 1435 at supply TD: 17I9. VENTILATION: Make-up air cfm: 97 1912 4459 10. RETURN AIR LOAD: Lighting + plenum (net) 0 I1. RETURN DUCT 758 12. TOTAL LOADS ON EQUIPMENT 29190 5720 HEATING LOAD__ . 13. DESIGN CONDITIONS j Mult: 1.0 Inside: 70 °F - Outside: 42 °F TD: 28 °F 14. TRANSMISSION LOSSES 14255 Walls: 2872 Glass: 7620 Doors: 1 0 Partitions: 0 Floors: 1218 Ceilings: 2544 15. INFILTRATION: Outside air cfm: 109 3350 16. SUBTOTAL: Space load 17605 Envelope 17605 Less external 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT: I 880 18. VENTILATION: Make-up air cfm: 97 2974 19. HUMIDIFICATION 1116 Piping 0 20. RETURN DUCT 528 21. TOTAL HEATING LOAD ON EQUIPMENT I 23104 2016-Feb-1011:05:56 WTI nt9aft" f 9 Rig Universal 2015 15.0.24 RSU17939 Page 11 stal Floorffinals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW Right -Suite® Universal 2015 Load Summary Job: Coastal Floors Date: Jan 19, 2016 v I Show Room Fr W By: Tom Platania ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-882;5700 Email: ProCalcs@gmail.com Web: www.ProCalcs.Net License: CAC1815254 For: Coastal Floor 8532 South JUS Highway 1, Port St. Lucie, FL 34952 Zone: Show Room:Fr W _ COOLING..LOAD 1. DESIGN CONDITIONS at Jul 1600 LDT Peak load at Jul 1900.LDT Inside: 72 °F Outside: 90 °F TD: 18 °F RH: 59 % Mi istDiff: 67.9 grflb Mult: 1.0 Ins.wb 60 °F Sensible Latent 2. SOLAR RADIATION THROUGH GLASS 7879 3. TRANSMISSION GAINS Sensible 10267 Walls: 1822 Glass: 4183 Doors: 0 Partitions: 0 Floors: 0 Ceilings: 4261 4. INTERNAL HEAT GAIN Sensible Latenf 5959 800 Occupants: 939 800 Lights: 4123 - Motors: 0 Appliances: 896 0 5. INFILTRATION: (Outside air cfm: 10 198 461 - - 6. SUBTOTAL: Space load Sensible Latent 24302 1261 Envelope 24302 1261 Less external 0 Redistribution 0 0 7. 8. SUPPLY DUCT = SUBTOTAL: Space load + supply duct - 1215 25517 Actual cfm: 1454 at supply TD: 17 9. VENTILATION: Make-up air cfm: 95 1882 4389 10. RETURN AIR LOAD: Lighting + plenum (net) 0 11. RETURN DUCT 729 12. TOTAL LOADS ON EQUIPMENT 28128 5650 HEATING LOAD' :` _ . 13. DESIGN CONDITIONS. I Mult: 1.0 Inside: 70 T Outside: 42 °F TD: 28 °F 14. TRANSMISSION LOSSES 14162 Walls: 2845 Glass: 7620 Doors: I 0 Partitions: 0 Floors: 1210 Ceilings: I 2486 15. INFILTRATION: I. Outside air cfm: 107 3288 16. SUBTOTAL: Space load 17450 Envelope 17450 Less external { 0 Less transfer I 0 Redistribution I 0 17. SUPPLY DUCT: i 873 18. VENTILATION: Make-up air cfm: 95 2928 19. HUMIDIFICATION 1097 Piping 0 20. RETURN DUCT 524 21. TOTAL HEATING LOAD ON EQUIPMENT 22871 I 2016 Fetr10 7: 66 WTightSOft" Right -Suite® Universal 2015I15.0.24 RSU17939 P1age12 stal FloorsTinals%Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW a Right-bune® universal 2016 Load Summary T° Womens ProCalcs, LLC 1701 SW Commargo St., Port Saint Lucie, FL 34987 Phone: 772-882-5700 Email: Job: Coastal Floors Date: Jan 19, 2016 By: Tom Platania Web: www.ProCalcs.Net License: CAC1815254 For: Coastal Floor 8532 South US Highway 1, Port St. Lucie, FL 34952 Zone: Womens I COOLING, LOAD 1. DESIGN CONDITIONS at Jul 1600 LDT Peak load at Jul 1600 LDT FInside: 72 °F Outside: 90 °F TD: 18 RH: 59 % MoistDiff: 67.9 gr/lb Mult: 1.0 Ins.wb 60 °F I Sensible Latent 2. SOLAR RADIATION THROUGH GLASS 0 3. TRANSMISSION GAINS Sensible 191 Walls: 0 Glass: 0 Doors: 0 Partitions: 0 Floors: 0 Ceilings: 191 4. INTERNAL HEAT GAIN Sensible Latent. 362 68 Occupants: 96 68 Lights: 185 Motors: - 0 Appliances: 80 0 5. INFILTRATION: - Outside air cfm: 3- 58 135 6. SUBTOTAL: Space load Sensible Latent 611 203 Envelope j 611 203 Less external 0 Redistribution 0 0 7. SUPPLY DUCT 0 8. SUBTOTAL: Space load + supply duct 611 Actual cfm: 1 40 at supply TD: 17 9. VENTILATION: (Make-up air cfm: 0 0 0 10. RETURN AIR LOAD: Lighting + plenum (net) 0 11. RETURN DUCT 0 12. TOTAL LOADS ON EQUIPMENT 611 203 HEATING LOAD 13. DESIGN CONDITIONS Mult: 1.0 Inside: 70 °F Outside: 42 T TD: 28 T 14. TRANSMISSION LOSSES 112 Walls: 0 Glass: 0 Doors: 0 Partitions: 0 Floors: 0 Ceilings: 112 15. INFILTRATION: Outside air cfm: 4 135 16. SUBTOTAL: Space load 247 Envelope 247 Less external 0 Less transfer 0 Redistribution 0 17. SUPPLY DUCT: 0 18. VENTILATION: Make-up air cfm: 0 0 19. HUMIDIFICATION 53 Piping 0 20. RETURN DUCT 0 21. TOTAL HEATING LOAD ON EQUIPMENT 300 2016-Feb-10 11:05:56 wrightsoft, Right -Suite® Universal 2015'15.0.24 RSU17939 Page 13 slal Floors\Finals\Coastal Floors Project 3.rup Calc = RTS Front Door faces: SW