Loading...
HomeMy WebLinkAboutLETTER-CONCRETE SLAB4 James D. Bushouse, PE Consulting Engineers September 17, 2018 Mario Arbucci StLucie�dUnW. Coastal Construction and Design, Inc. RECEIVED 850 NW Federal Highway Stuart, Fl. 34994 SEP 19 2018 Z e , Re: Lambert Residence, Per it #1805-0348 ST. LucieCounty, - ___lI ting Dear Mario, I Per our conversation, the first floor concrete slabs on the above project do not requi�e a 95% compaction on the sub - grade. They are reinforced structural slabs supported on a pile and grade beam founda ion, which is not depend on the soil for support. You will still need to provide a vapor barrier and termite treatment under the -slab. If you have any questions address. Sin;c�el y, James D., Bushouse, P.E. Profes'sional'Engineer #20 State of Florida please contact me at the below 311 3300 NE 1Oth Terrace #24, Pompano Beach, Florida 33064 Phone:(954) 956, 2203 Fax: (954) 956-2204 216 E. Magnolia Street, Arcadia, Florida 34266 Phone: (863) 491-8242 Fax: (863) 491--8243 - jim@jamesbushouseinc.com - William Durden From: Sent: To: Subject: Attachments: Mario Arbucci <mart Sunday, October 07, Permits; William Durc PERMIT 1805-0348 S Scan0969.pdf ?comcast.net> 2:14 PM BEAM BATCH TICKET 4000 PSI