Loading...
HomeMy WebLinkAboutENGINEERINGN UN-1"P. ENGINEERING S. Consultants In: Geotechnical Engineering - E Geophysical Services - Materials Testing - Building Code Administration, Compliance In 820 Brevard Avenue, Rockledge, FL 32955 - P: 321.638.0 SAL CIENCES nvironmental Sciences Threshold Inspection specition & Plan Review 808 - F: 321.638.0978 Construction M, FIELD AND LABORA Client: Ryan Homes 1450 Centrepark Blvd Suite 340 West Palm Beach, FL 33401 Project: Oakland Lake Subdivision Lot 23 180 ,Fort Pierce, St. Lucie County, FL As requested, Universal Engineering Sciences, Inc. (UES) field, inspection services on the above project. Testing res sheets. The contents of this package are summarized bell UB5 Project No.: 0310.1700251.0011 Date Typed: May 04, 2018 3 Testing Services� REPORT COVER PAGE , Ueto t Mo resentative(s) performed construction materials testing and/or and/or inspection observations are reported on the attached Scope of Work Work Order No. I Date II Type of Report 96444-1 1 05103/20181 Field Inspection Report We hope this information is sufficient for your immediate needs. If you have any questions, please do not hesitate to contact the undersigned. Sincerely, Universal Engineering Sciences, Inc. Certificate of Authorization No. 0000M �'- Richard E. Hoaglin, P.E. FLORIDA Professional Engineer No. 48796 JUL 1 m ICC Email: cbugg@nvrinc.com; elibrihi@nvrinc.com; jomcalli@nvrnc.com; sign adn seal to ryan homes Project: UaKland LaKe Subdivision Lot Z3 ,Fort Pierce, St. Lucie County, FL Date of Activity: 05/03/2018 Technician: Cliff Cherrna,. As Requested, a Universal Engineering Sciences Technician was present at the above referenced location for the purpose of Technician was unable to conduct compaction testing duel to excessive debris (Vegitation) deposited on the surface of lot # 23. JUL 11 2018 U N I R ENGINEERING SI Consultants In: Geotechnical Engineering - Ei Geophysical Services - Materials Testing •' Building Code Administration, Compliance In: 820 Brevard Avenue, Rockledge, FL 32955 - P: 321.638.0 AL iNCES nental Sciences old Inspection i & Plan Review - F: 321.638.0978 • UES Project No. Date Typed: 0310.1700251.0011 May 04, 2018 Construction Mae trials Testing Services FIELD AND LABORATORY REPORT COVER PAGE RECEIVED Client: Ryan Homes 1450 Centrepark Blvd Suite 340 JUN 2`8 2018 West Palm Beach, FL 33401 Permitting Departmen+- Project: Oakland Lake Subdivision Lo 23 St. Lucia county ,Fort Pierce, St. Lucie County, As requested, Universal Engineering Sciences, Inc. (LIES) representative(s) performed construction materials testing and/or field inspection services on the above project. Testing results and/or inspection observations are reported on the attached sheets. The contents of this package are summarized below: Scope of Work Work Order No. Date IType of Report 96444-1 05/03/2018 1 Field Inspection Report We hope this information is sufficient for your immediate needs. If you have any questions, please do not -hesitate to contact the undersigned. I 2018 File Copy -)ARTIAL APPROV, Sincerely, Universal Engineering Sciences, Inc. Certificate of Authorization No. 00000549 Richard E. Hoaglin, P.E. 2018.05.04 16:43:59 -04'00' Richard E. Hoaglin, P.E. FLORIDA Professional Engineer No. 48796 This item has been electronically signed and sealed by Richard E. Hoaglin, P.E. using a Digital Signature. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. ICC Email: cbugg@nvrinc.com; elibrihi@nvrinc.com; jomcalli@nvrinc.comr sign adn seal to ryan homes I I-, U NIVERSAL UES Project No: 0310.1700251.0011 UES DOCS No: UES Report No: 03-96444 ENGINEERING $I,C I E N C ES On -Site Time (hrs): 0.25 Consultants In: Geotechnical Engineering • Environmental Sciences Lab Time (hrs): 0.00 Geophysical Services • Materials Testing Threshold Inspection Travel Time (hrs): 0.25 Ell Building Code Administration, Compliance Inspection & Plan Review Total Time (hrs): 0.50 820 Brevard Avenue, Rockledge, FL 32956 - P: 321.638.0808 - F: 321.638.0978 Client: Ryan Homes 1450 Centrepark Blvd S l ite 340 West Palm Beach, FL 33401 Project: Oakland Lake Subdivision Lot 23 ,Fort Pierce, St. Lucie County, FL Date of Activity: 05/03/2018 Technician: Cliff Cherrnay As Requested, a Universal Engineering Sciences Technician was present, at the above referenced location for the purpose of Technician was unable to conduct compaction testing due to excessive debris (Vegitation) deposited on the surface of lot # 23. TERMITE PRETREAT SPECIALIST! Jy D/L/I�EN TERMITE SERVICES Notice of Preven (as required by Florida Building Code 1 10=DILIGENT MyDiligent.com State License JB228623 e Treatment for Termites 2326.5 and Broward County Chapter FBC 105.2.2) CONCRETE WASHOUT SERVICES I �pTERMITE PROTECTION G� PEST CONTROL %MOSQUITO CONTROL RODENT CONTROL SERVICE ORDER NUMBER �`' T SERVICE DATE TIME -� v WEATHER CONDITIONS DEVELOPMENT NAME (PROJECT) CONTRACTOR'S NAME CONTACT PE SON STRUCTURE ADDRESS (LOT/BLOCK) Uv v CITY, STATE, ZIP CODE COUNTY C��O��N.,TACT PHONE NUMBER NOTES �/1' '/\Ad LA` - l l\ TREATMENT TYPE/AREA I ❑'FLOATING .aMNOLITHIC Cl PATIO ❑ CUTOUTS ❑ FOOTERS ❑ FRONT ENTRY TREATMENT TYPE ❑ TAMP & TREAT ❑ TREAT ONLY ❑ FINAL PRODUCT /9'bOMINION ACTIVE INGREDIENT IS F ❑ PREMISE ❑ RETREA ❑ GARAG El DRIVEWAY ❑ EXTERIOR PERIMETER FOR RENEWAL T ❑ BORA CARE TREATMENT ❑ STEM WALL ❑ OTHER — ❑ ADDITION ❑ TERMITE BAIT STATION Cl DEMON TC ❑ TERMIDOR ❑ BORACARE CONCENTRATION ❑ .05% ❑ .06% iC] .1 % ❑ .12% ❑ .25% ❑ OTHER SQUARE FOOTAGE �i q � L LINEAR FOOTAG SQUARE FOOTAGE VERIFIED r❑ YES ❑ NO JOB READY CONDITIONS MET "6 YES ❑ Nn - ❑ MEASURED OR VERIFIED PER DETAILS GALLONS APPLIED / - Cl OTHER As per 2326.5 FBC - If soil chemical barrier method for termite prevention'is used. Final exterior treatment shall be completed prior to final building approval. Certificate of Compliance: The building has received a complete treatment for the prevention of subterranean termites. Treatment is in accordance with rules and laws established by the Florida Department of Agriculture and Consumer Services. (Per the Florida Building Code.) If this notice is for the final exterior treatment, initial and date this line FINAL STICKER ❑ ELECTRICAL PANEL ❑ WATER HEATER OTHER Payment Terms: Customer's payment in full is due at time of initial service. be assessed on all unpaid balances that are not satisfied by the due date. In balance the following fees will be assessed including but not limited to: colic payment fee. Customer will be responsible for paying all costs associated w Date Date Applicator (Diligent Services) Customer (Property Owner or Agent) {TERMITE MONITOR INSTALLED ❑ YES ❑ NO) stomer agrees that a finance charge in the amount of 18% per annum will event a collection process becomes necessary to recover an unpaid on service fee, attorney's fee, finance charges and non -sufficient funds any collection process. Corporate 3500 NW Boca Raton Blvd. I Suite 714 1 Boca Raton, Florida 33431 1 1-800-DILIGENT