HomeMy WebLinkAboutENGINEERINGN
UN-1"P.
ENGINEERING S.
Consultants In: Geotechnical Engineering - E
Geophysical Services - Materials Testing -
Building Code Administration, Compliance In
820 Brevard Avenue, Rockledge, FL 32955 - P: 321.638.0
SAL
CIENCES
nvironmental Sciences
Threshold Inspection
specition & Plan Review
808 - F: 321.638.0978
Construction M,
FIELD AND LABORA
Client: Ryan Homes
1450 Centrepark Blvd Suite 340
West Palm Beach, FL 33401
Project: Oakland Lake Subdivision Lot 23 180
,Fort Pierce, St. Lucie County, FL
As requested, Universal Engineering Sciences, Inc. (UES)
field, inspection services on the above project. Testing res
sheets. The contents of this package are summarized bell
UB5 Project No.: 0310.1700251.0011
Date Typed: May 04, 2018
3 Testing Services�
REPORT COVER PAGE
, Ueto t Mo
resentative(s) performed construction materials testing and/or
and/or inspection observations are reported on the attached
Scope of Work
Work Order No. I Date II Type of Report
96444-1 1 05103/20181 Field Inspection Report
We hope this information is sufficient for your immediate needs. If you have any questions, please do not hesitate to contact
the undersigned.
Sincerely,
Universal Engineering Sciences, Inc.
Certificate of Authorization No. 0000M
�'-
Richard E. Hoaglin, P.E.
FLORIDA
Professional Engineer No. 48796
JUL 1 m
ICC Email: cbugg@nvrinc.com; elibrihi@nvrinc.com; jomcalli@nvrnc.com; sign adn seal to ryan homes
Project: UaKland LaKe Subdivision Lot Z3
,Fort Pierce, St. Lucie County, FL
Date of Activity: 05/03/2018
Technician: Cliff Cherrna,.
As Requested, a Universal Engineering Sciences Technician was present at the above referenced location for the purpose of
Technician was unable to conduct compaction testing duel to excessive debris (Vegitation) deposited on the surface of lot # 23.
JUL 11 2018
U N I R
ENGINEERING SI
Consultants In: Geotechnical Engineering - Ei
Geophysical Services - Materials Testing •'
Building Code Administration, Compliance In:
820 Brevard Avenue, Rockledge, FL 32955 - P: 321.638.0
AL
iNCES
nental Sciences
old Inspection
i & Plan Review
- F: 321.638.0978
•
UES Project No.
Date Typed:
0310.1700251.0011
May 04, 2018
Construction Mae trials Testing Services
FIELD AND LABORATORY REPORT COVER PAGE
RECEIVED
Client: Ryan Homes
1450 Centrepark Blvd Suite 340 JUN 2`8 2018
West Palm Beach, FL 33401
Permitting Departmen+-
Project: Oakland Lake Subdivision Lo 23 St. Lucia county
,Fort Pierce, St. Lucie County,
As requested, Universal Engineering Sciences, Inc. (LIES) representative(s) performed construction materials testing and/or
field inspection services on the above project. Testing results and/or inspection observations are reported on the attached
sheets. The contents of this package are summarized below:
Scope of Work
Work Order No. Date IType of Report
96444-1 05/03/2018 1 Field Inspection Report
We hope this information is sufficient for your immediate needs. If you have any questions, please do not -hesitate to contact
the undersigned.
I
2018
File Copy
-)ARTIAL APPROV,
Sincerely,
Universal Engineering Sciences, Inc.
Certificate of Authorization No. 00000549
Richard E.
Hoaglin, P.E.
2018.05.04
16:43:59
-04'00'
Richard E. Hoaglin, P.E.
FLORIDA
Professional Engineer No. 48796
This item has been electronically signed and sealed by
Richard E. Hoaglin, P.E. using a Digital Signature. Printed
copies of this document are not considered signed and
sealed and the signature must be verified on any electronic
copies.
ICC Email: cbugg@nvrinc.com; elibrihi@nvrinc.com; jomcalli@nvrinc.comr sign adn seal to ryan homes
I
I-,
U
NIVERSAL
UES Project No: 0310.1700251.0011
UES DOCS No:
UES Report No: 03-96444
ENGINEERING $I,C I E N C ES On -Site Time (hrs): 0.25
Consultants In: Geotechnical Engineering • Environmental Sciences Lab Time (hrs): 0.00
Geophysical Services • Materials Testing Threshold Inspection Travel Time (hrs): 0.25
Ell Building Code Administration, Compliance Inspection & Plan Review Total Time (hrs): 0.50
820 Brevard Avenue, Rockledge, FL 32956 - P: 321.638.0808 - F: 321.638.0978
Client: Ryan Homes
1450 Centrepark Blvd S l ite 340
West Palm Beach, FL 33401
Project: Oakland Lake Subdivision Lot 23
,Fort Pierce, St. Lucie County, FL
Date of Activity: 05/03/2018
Technician: Cliff Cherrnay
As Requested, a Universal Engineering Sciences Technician was present, at the above referenced location for the purpose of
Technician was unable to conduct compaction testing due to excessive debris (Vegitation) deposited on the surface of lot # 23.
TERMITE PRETREAT SPECIALIST! Jy
D/L/I�EN
TERMITE SERVICES
Notice of Preven
(as required by Florida Building Code
1 10=DILIGENT
MyDiligent.com
State License JB228623
e Treatment for Termites
2326.5 and Broward County Chapter FBC 105.2.2)
CONCRETE WASHOUT SERVICES I �pTERMITE PROTECTION G� PEST CONTROL %MOSQUITO CONTROL RODENT CONTROL
SERVICE ORDER NUMBER �`' T SERVICE DATE TIME -� v WEATHER CONDITIONS
DEVELOPMENT NAME (PROJECT)
CONTRACTOR'S NAME
CONTACT PE SON
STRUCTURE ADDRESS (LOT/BLOCK)
Uv v
CITY, STATE, ZIP CODE COUNTY
C��O��N.,TACT PHONE NUMBER
NOTES
�/1' '/\Ad LA` - l l\
TREATMENT TYPE/AREA
I
❑'FLOATING .aMNOLITHIC Cl PATIO
❑ CUTOUTS ❑ FOOTERS ❑ FRONT ENTRY
TREATMENT TYPE
❑ TAMP & TREAT ❑ TREAT ONLY ❑ FINAL
PRODUCT
/9'bOMINION
ACTIVE INGREDIENT
IS F ❑ PREMISE
❑ RETREA
❑ GARAG El DRIVEWAY
❑ EXTERIOR PERIMETER FOR RENEWAL
T ❑ BORA CARE TREATMENT
❑ STEM WALL
❑ OTHER —
❑ ADDITION
❑ TERMITE BAIT STATION
Cl DEMON TC ❑ TERMIDOR ❑ BORACARE
CONCENTRATION
❑ .05% ❑ .06% iC] .1 % ❑ .12% ❑ .25% ❑ OTHER
SQUARE FOOTAGE �i q � L LINEAR FOOTAG
SQUARE FOOTAGE VERIFIED
r❑ YES ❑ NO
JOB READY CONDITIONS MET
"6 YES ❑ Nn -
❑ MEASURED OR VERIFIED PER
DETAILS
GALLONS APPLIED / -
Cl OTHER
As per 2326.5 FBC - If soil chemical barrier method for termite prevention'is used. Final exterior treatment shall be completed prior to final building approval.
Certificate of Compliance: The building has received a complete treatment for the prevention of subterranean termites. Treatment is in accordance with rules and
laws established by the Florida Department of Agriculture and Consumer Services. (Per the Florida Building Code.)
If this notice is for the final exterior treatment, initial and date this line
FINAL STICKER
❑ ELECTRICAL PANEL ❑ WATER HEATER OTHER
Payment Terms: Customer's payment in full is due at time of initial service.
be assessed on all unpaid balances that are not satisfied by the due date. In
balance the following fees will be assessed including but not limited to: colic
payment fee. Customer will be responsible for paying all costs associated w
Date
Date
Applicator (Diligent Services)
Customer (Property Owner or Agent)
{TERMITE MONITOR INSTALLED ❑ YES ❑ NO)
stomer agrees that a finance charge in the amount of 18% per annum will
event a collection process becomes necessary to recover an unpaid
on service fee, attorney's fee, finance charges and non -sufficient funds
any collection process.
Corporate 3500 NW Boca Raton Blvd. I Suite 714 1 Boca Raton, Florida 33431 1 1-800-DILIGENT