Loading...
HomeMy WebLinkAboutBLOWER DOOR TEST FORMPlanning & De Building & Coc 2300 Virginia 1 Fort Pierce, FL Phone: 772-46 BLOWER House In - Date: Contractor: Job Address: 5?k3 t,. OJ A�o Construction: (�j New Coi House Infiltration Test Results CFM (50) _ Volume = 35 425 ACH (50) = CFM (50) x 60 / Volume = Passing results must be & ACH (50) or less Services Regulation Division Rm 201 Fax: 772-462-6443 TEST FORM 2%;MiiF__U BY St Lucie CounP, ation Test Certification and Performance Method Permit #: t / D �� -e 'r b C' ye, Dn — Complete SLC Climate Zone 2 RECEIVED MAR 13 L019 ST. Lwcie Cgunty, Permitting - DUC V A. ( ) Existing —After Addition Test Date: 3) 11 1161 Tass anical Ventilation required less than 3 ACH ( ) Fail FBC, Energy The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes pier hour in Climate Zones 3 through 8. Testing shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. FBC, Residential Where the air infiltration rate of a dwelling unit is less than lair changes per hour when tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3. Testiine Company 1 Company Name: v � i Address: (Q �2N � C�kr W�C�C° cY-`l (fV • P' ,Sz- L I hereby certiprt�at the above House Infi(tr on results demonstrate compliance with FBC Energy Conservation requirement in a cords a 1th Section lR 2.4.1.2 Climate Zone 2. Signature: �f Printed N me- S-6 �P License/Certification#: _eJ{' : � l i Planning &Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 =EE LL, Fort Pierce, FL 34982 772-462-2165 Fax 772-462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method Date: Permit #:I ` U" o f - ` 5 Lot #: Contractor: ��!� Address: t 5'311 3 Construction: tost Construction Test I ❑ Rough -in Test Test Conditions: Date: 7 l< < l Floor Area (ft2): A J 2 Time: 30 Primary Location of Supply Ductwork t Indoor Temperature (F)Primary Location of Return Ductwork C' Outdoor Temperature (F): Total Leakage Test (Outside) / Duct Leakage: ❑ Default- ❑ Prop. Leak Fri Proposed On = �/ Test Pressure: d 5 (Pa) 1 Baseline Duct Pressure (optional) (Pa) �•{'UC't \ av\ 0 � 0o Duct Press. (Pa) Flow Ring Fan Press I Flow (cfm) Results: xi Pass ❑ Fail Installed Pa-71 2-5 Total Leakage (cfm): Total Leakage per 100 sgft: GF~ CFM25 x 100 divided by the CFA =Duct Leakage CFM/100 sgft. oi4waf - V, -- w, ON Testing Company � ���---;rf SL Company Name: Address: 0� 1� O rA/ Cv FL i I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5"h Edition FBC Energy Conservation requirements in accordance with Section R403.2.2. Signature: _ A'cense/Certificate Printed Name: �sc") L ��� #: fRJ�� �� / w 2