HomeMy WebLinkAboutBLOWER DOOR TEST FORMPlanning & De
Building & Coc
2300 Virginia 1
Fort Pierce, FL
Phone: 772-46
BLOWER
House In -
Date:
Contractor:
Job Address: 5?k3 t,. OJ A�o
Construction: (�j New Coi
House Infiltration Test Results
CFM (50) _
Volume = 35 425
ACH (50) = CFM (50) x 60 / Volume =
Passing results must be & ACH (50) or less
Services
Regulation Division
Rm 201
Fax: 772-462-6443
TEST FORM
2%;MiiF__U
BY
St Lucie CounP,
ation Test Certification
and Performance Method
Permit #: t / D ��
-e 'r b C' ye,
Dn — Complete
SLC Climate Zone 2
RECEIVED
MAR 13 L019
ST. Lwcie Cgunty, Permitting
- DUC V A.
( ) Existing —After Addition
Test Date: 3) 11 1161
Tass
anical Ventilation required less than 3 ACH
( ) Fail
FBC, Energy
The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per
hour in Climate Zone 1, 2 and 3 air changes pier hour in Climate Zones 3 through 8. Testing shall be conducted with a
blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in
Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an
approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building
thermal envelope.
FBC, Residential
Where the air infiltration rate of a dwelling unit is less than lair changes per hour when tested with a blower door at a
pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation
the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3.
Testiine Company
1
Company Name: v � i Address: (Q �2N � C�kr W�C�C° cY-`l (fV • P' ,Sz- L
I hereby certiprt�at the above House Infi(tr on results demonstrate compliance with FBC Energy Conservation
requirement in a cords a 1th Section lR 2.4.1.2 Climate Zone 2.
Signature:
�f
Printed N me-
S-6 �P License/Certification#: _eJ{' : � l
i
Planning &Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201 =EE
LL, Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443 FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
Date: Permit #:I ` U" o f - ` 5 Lot #:
Contractor: ��!� Address: t 5'311 3
Construction: tost Construction Test I ❑ Rough -in Test
Test Conditions:
Date: 7 l< < l Floor Area (ft2): A J 2
Time: 30 Primary Location of Supply Ductwork t
Indoor Temperature (F)Primary Location of Return Ductwork C'
Outdoor Temperature (F):
Total Leakage Test (Outside) /
Duct Leakage: ❑ Default- ❑ Prop. Leak Fri Proposed On = �/
Test Pressure: d 5 (Pa) 1
Baseline Duct Pressure (optional) (Pa) �•{'UC't \ av\ 0 � 0o
Duct Press. (Pa) Flow Ring Fan Press I Flow (cfm) Results: xi Pass ❑ Fail
Installed Pa-71
2-5 Total Leakage (cfm):
Total Leakage per 100 sgft: GF~
CFM25 x 100 divided by the CFA =Duct Leakage CFM/100 sgft.
oi4waf - V, -- w,
ON
Testing Company
� ���---;rf SL
Company Name: Address: 0� 1� O rA/ Cv FL
i
I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 5"h Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.
Signature: _ A'cense/Certificate
Printed Name: �sc") L ��� #: fRJ�� �� / w 2