Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT1 �P From fax5616880909 1.161.688.0909 Tud Mar 19 14:38:15 20114 MDT Page 2 of 2 St Lucie County Inspections 2300 Virginia Avenue Ft Pierce, FL 34982 1 e 611 05_(D_5_zS (722); 462-2172 SCAN CERTIFICATE OF T] CONSTRUCTION PERMIT # 1805-0545 JOB AD BUILDER GHO Homes PEST CONTROL CONTRACTOR PEST CONTROL LICENSE # JF0001886 We, the undersigned, hereby certify that we have termites in accordance with the standards of the 1 Square feet of area treated: 220 Percentage of solution:.50% Date of treatment: 03/15/19 Pest BY TREATMEAUCie CoUr"" TREATMENT 15343 Waldo Pepper St, Port St. Lucie, FL 34987 ed the above -described construction for subterranean Pest Control Association. Chemicals used: Sentricon Always Active HD Total gallons used: Time of treatment: AM ® Footing FBC104.2.6 Certificate of Protective Treatment for prevention of termites. ® 1 st Treatment A weather resistant jobsite posting board shall be provided to receive ❑ Re -treat duplicate Treatment Certificates as each required protective treatment is ❑ Slab completed, providing a copy for the person the poermit is issued to and another co ;for the building permit files. The Treatment Certjfcate shall ❑ 1 st Treatment provide the product used, identity of the applicator, time and date of the ❑ Re -treat treatment, sill location, area treated, chemical used,.percent concentration and numherofgallons used, to establish a verifiable record ofprotective ❑ Driveway treatment. If the soil chemical barrier method for termite prevention is used, final exteriortreatment shall be completed prior to f nal building approval. ❑ 1 st Treatment ❑ Re -treat St Lucie County requires for the final inspection for CO, a Permanent ❑ POOIS Sticker to be placed on the electrical panel box cover, listing all the ❑ 1st Treatment treatments and dates of applications. ❑ Re -treat ❑ Other ❑ 1 st Treatment Signature of exterminator El Re -treat ® Perimeter for Final Inspection NOTE: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged.