HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT1 �P
From fax5616880909 1.161.688.0909 Tud Mar 19 14:38:15 20114 MDT Page 2 of 2
St Lucie County Inspections
2300 Virginia Avenue
Ft Pierce, FL 34982
1
e 611 05_(D_5_zS
(722); 462-2172 SCAN
CERTIFICATE OF T]
CONSTRUCTION
PERMIT # 1805-0545 JOB AD
BUILDER GHO Homes
PEST CONTROL CONTRACTOR
PEST CONTROL LICENSE # JF0001886
We, the undersigned, hereby certify that we have
termites in accordance with the standards of the 1
Square feet of area treated: 220
Percentage of solution:.50%
Date of treatment: 03/15/19
Pest
BY
TREATMEAUCie CoUr""
TREATMENT
15343 Waldo Pepper St, Port St. Lucie, FL 34987
ed the above -described construction for subterranean
Pest Control Association.
Chemicals used: Sentricon Always Active HD
Total gallons used:
Time of treatment: AM
® Footing
FBC104.2.6 Certificate of Protective Treatment for prevention of termites.
® 1 st Treatment
A weather resistant jobsite posting board shall be provided to receive
❑ Re -treat
duplicate Treatment Certificates as each required protective treatment is
❑ Slab
completed, providing a copy for the person the poermit is issued to and
another co ;for the building permit files. The Treatment Certjfcate shall
❑ 1 st Treatment
provide the product used, identity of the applicator, time and date of the
❑ Re -treat
treatment, sill location, area treated, chemical used,.percent concentration
and numherofgallons used, to establish a verifiable record ofprotective
❑ Driveway
treatment. If the soil chemical barrier method for termite prevention is used,
final exteriortreatment shall be completed prior to f nal building approval.
❑ 1 st Treatment
❑ Re -treat
St Lucie County requires for the final inspection for CO, a Permanent
❑ POOIS
Sticker to be placed on the electrical panel box cover, listing all the
❑ 1st Treatment
treatments and dates of applications.
❑ Re -treat
❑ Other
❑ 1 st Treatment
Signature of exterminator
El Re -treat
® Perimeter for Final Inspection
NOTE: There must be a completed form for each required treatment or re -treatment and this form must be on the
job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a
re -inspection fee charged.