Loading...
HomeMy WebLinkAboutENGINEERING IN-PLACE DENSITY TESTUNIV,"idRSAL Project No: 0310.1600172.0000 ENGINEERING SCIENCES UESReport No: 51039 ARD1 052516 Consultants In: Geotechnical Engineering • Environmental Sciences Geophysical Services • Construction Materials Testing : Threshold Inspection On -Site Time (hrs): 1.25 Building Inspection • Plan Review • Building Code Administration Lab Time (hrs): 0.00 820 Brevard Avenue • Rockledge, FL • 32955 i Travel Time (hrs): 1.25 321.638.0808 Fax: 321.638.0978 Total Time (hrs): 2.50 i Client: Mulligan Constructors 3601 Vineland Road, Suite 4 Orlando, FL 32811 Project: Racetrac #1136 - PSL Sav nnah Club 8630 S. US Highway 1,Port St. Lucie, St. Lucie County, FL Date of Activity: Wednesday, May 25, 2016 Technician: Cliff Cherrnay As requested, a Universal Engineering Sciences Technician was present at the above referenced project site for the purpose of earthwork testing for the;Pipe backfill. While on site, the technician observed the general condition of the areas to be tested and performed 4 density test(s) for Pipe backfill. All test(s) were performed in accordance with the ASTM D-6938 Nuclear Gauge Method and were found to meet the project compaction requirements of 95% of the maximum dry density per ASTM D-1557. The Contractor was notified of the test results or a copy was left for their records. This test(s) was performed without deviation from ASTM pros This report shall not be reproduced, except in full, without the approval of Universal Engineering Sciences. A UNIVtRSAL ENWNEERIN.G SCIENCES Consultants In: Geotechnical Engineering - Environmental Sciences Geophysical Services_! Construction Materials Testing - Threshold Inspection Building Inspection - Plan Review - Building Code Administration 820 Brevard Avenue - Rockledge, FL - 32955 321.638.0808 Fax:321.638.0978 j &S Project No: 0310.1600172.0000 UES Report No: 51039-1 DT 052516 Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 Project: Racetrac #1136 - PSL Savannah Club 8630 S. US Highway 1,Port St. Lucie, St. Lucie County, FL Area Tested: Pipe backfill Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 05/25/2016 Lab: ASTM D-1557 Technician: Cliff Cherrnay Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions only and do not address the condition of the underlying soils below the tested depths. Test # Location of Test Range (IN) Depth (IN) Proctor (2) Field Dry Density (PCF) Field Moisture "�o % Compaction Comments (3) 1 50 feet north of structure # 12 west test 0- 8.00 19322 112.0 11.0 100 A 2 50 feet north of structure # 12 east test 0- 8.00 19322 112.1 11.5 100 A 3 50 feet south of # 2 west test 0-8 8.00 19322 111.7 11.5 99 A 4 50 feet south of # 2 east test 0-8I 8.00 19322 111.5 10.2 99 A (1) Ref. Datum: 0 = Springline of Pipe (2) Proctor. Maximum Optimum # Dry Moisture Density Content 19322 112.5 9.5 This test was performed without deviation from ASTM procedures. (3) Comments Key A. Compaction meets min. requirements B. Compaction does not meet min. requirements C. Moisture does not meet requirements D. Recompaction required E. Recompacted, Retested, Meets Requirements This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences. r UNIV-idRSAL i ENGINEERING SCIENCES Consultants In: Geotechnical Engineering • Environmental Sciences Geophysical Services • Construction Materials Testing Threshold Inspection Building Inspection • Plan Review • Building Code Administration 820 Brevard Avenue • Rockledge, FL • 32955 321.638.0808 Fax:321.638.0978 Client: Mulligan Constructors 3601 Vineland Road, Suite 114 Orlando, FL 32811 -�S Project No: 0310.1600172.0000 UES Report No: 51087 ARD2 052616 On -Site Time (hrs): 1.25 Lab Time (hrs): 0.00 Travel Time (hrs): 1.25 Total Time (hrs): 2.50 Project: Racetrac #1136 - PSL Savannah Club 8630 S. US Highway 1,Port St. Lucie, St. Lucie County, FL Date of Activity: Thursday, May 26, 2016 Technician: Cliff Cherrnay As requested, a Universal Engineering Sciences Technician was present at the above referenced project site for the purpose of earthwork testing for the Pipe backfill, Pipe backfill. While on site, the technician observed the general condition of the areas to be tested and performed 4 density test(s) for Pipe backfill. All test(s) were performed in accordance with the ASTM D-6938 Nuclear Gauge Method and were found to meet the project compaction requirements of 95% of the maximum dry density per ASTM D-1557. While on site, the technician observed the general condition of the areas to be tested and performed 1 density test(s) for Pipe backfill. All test(s) were performed in accordance with the ASTM D-6938 Nuclear Gauge Method and were found to meet the project compaction requirements of 95% of the maximum dry density per ASTM D-1557. The Contractor was notified of the test results or a copy was left for their records. This test(s) was performed without deviation from ASTM procedure. This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences. r R �i VNIV�A S ENGINEERING SCIENCES Consultants In: Geotechnical Engineering - Environmental Sciences Geophysical Services - Construction Materials Testing - Threshold Inspection Building Inspection -Plan Review - Building Code Administration 820 Brevard Avenue - Rockledge, FL - 32955 321.638.0808 Fax:321.638.0978 j &S Project No: 0310.1600172.0000 UES Report No: 51087-1 DT 052616 Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 Project: Racetrac #1136 - PSL Savannah Club 8630 S. US Highway 1,Port St. Lucie, St. Lucie County, FL Area Tested: Pipe backfill i Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 05/26/2016 Lab: ASTM D-1557 Technician: Cliff Cherrnay Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions only and do not address the condition of the underlying soils below the tested depths. Test # Location of Test Range (FT) Depth (IN) Proctor (2) Field Dry Density (PCF) Field Moisture "�o % Compaction Comments (3) 1 50 feet north of structure # 2 1+2 12.00 19322 111.6 10.7 99 A 2 60 feet north of structure # 2 2+3 12.00 19322 111.5 11.2 99 A 3 50 feet south of structure #12 1+2 12.00 19822 112.0 10.2 100 A 4 60 feet south of structure #12 2+3 12.00 19322 112.4 11.5 100 A (1) Ref. Datum: 0 = Bottom of Pipe (2) This test This reps Proctor Maximum Optimum # Dry Moisture Density Content 19322 112.5 9.5 was performed without deviation from ASTM procedures. rt shall not be reproduced, except in full, without the written appr, (3) Comments Key A. Compaction meets min. requirements B. Compaction does not meet min. requirements C. Moisture does not meet requirements D. Recompaction required E. Recompacted, Retested, Meets Requirements oval of Universal Engineering Sciences. U N I V` min-R S A'1 L 1 ENGINEERING SCIENCES Consultants In: Geotechnical Engineering • Environmental Sciences Geophysical Services • Construction Materials Testing • Threshold Inspection Building Inspection • Plan Review • Building Code Administration 820 Brevard Avenue • Rockledge, FL • 32955 321.638.0808 Fax:321.638.0978 S Project No: 0310.1600172.0000 UES ReportNo: 51087-2 DT 052616 Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 ! ` Project: Racetrac #1136 - PSL Savannah Club 8630 S. US Highway 1,Port St. Lucie, St. Lucie County, FL Area Tested: Pipe backfill i Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 05/26/2016 Lab: ASTM D-1557 i Technician: Cliff Cherrnay Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions only and do not address the condition of the underlying soils below the tested depths. Field Dry Field Test Range Depth Proctor Density Moisture % Comments # Location of Test (FT) (IN) (2) (PCF) % Compaction (3) 5 West side of pipe 10 feet north of structure #12 0-8 12.00 19322 112.0 11.0 100 A south of D-6 (1) Ref. Datum (2) 0 = Springline of Pipe Proctor Maximum Optimum # Dry Moisture Density Content 19322 112.5 9.5 (3) Comments Key A. Compaction meets min. requirements B. Compaction does not meet min. requirements C. Moisture does not meet requirements D. Recompaction required E. Recompacted, Retested, Meets Requirements i This test was performed without deviation from ASTM procedures. This report shall not be reproduced, except in full, without the written app ioval of Universal Engineering Sciences. i ;N I UNIVERSAL ENGINEERING SCIENCES Consultants In: Geotechnical Engineering • Environmental Sciences Geophysical Services • Construction Materials Testing • Threshold Inspection Building Inspection • Plan Review • Building Code Administration Project No.: 0310.1600172.0000 Date Typed: May 27, 2016 LOCATIONS: • Atlanta • Daytona Beach • Fort Myers • Fort Pierce • Gainesville • Jacksonville • Kissimmee • Leesburg • Miami Ocala • Orlando (Headquarters) • Palm Coast • Panama City • Pensacola • Rockledge • Sarasota Tampa • West Palm Beach I Field and Laboratory Report Transmittal Sheet Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 328111 FILI: �;UPY Project: Racetrac #1136 -I PSL Savannah Club Main Building Permit # 1410-0401 8630 S. US Highway 1 Port St. Lucie, St' Lucie County, FL As requested, a representative of Universal Engineering Sciences, Inc. (UES) was at the referenced project to provide construction materials testing services. The results of the observations and/or Itests are summarized on the attached sheets. The reports are numbered as follows: 51104 ARD2, 51104 DT1, 51104 DT2. We trust this information is sufficient for your immediate needs. If you have any questions, please do not hesitate to contact the undersigned. I i i JUN - 3 NECD Reviewed By: Universal Engineering Sciences, Inc. Certificate of Authorization No. 549 i Richard E. HoagliP, P. �JJ I A STATE OF FLUKItim , ._ , Licensed Professional Engineer No. 48796 scarlson(cr�,mulliganconstructors.com; ciciojna,stlucieco.org Sign & Seal copy to: St Lucie County, Attn: Joe Ccio, 2300 Virgina Ave, Room 228, Ft Pierce, FL 34982 820 Brevard Avenue, Rockledge, Florida 32955 (321) 638-0808 Fax (321) 638-0978 www.UniversalEngineering.com i UNIV=RSAL i tuENGINEERING SCIENCES Consultants In: Geotechnical Engineering • Environmental Sciences Geophysical Services • Construction Materials Testing • Threshold Inspection Building Inspection • Plan Review • Building Code Admi i istration 820 Brevard Avenue • Rockledge, FL • 32955 321.638.0808 Fax:321.638.0978 Activity Record Client: Mulligan Constructors 3601 Vineland Road, Suite 1 Orlando, FL 32811 Project No: 0310.1600172.0000 UES Report No: 51104 ARD2 052716 On -Site Time (hrs): 1.50 Lab Time (hrs): 0.00 Travel Time (hrs): 1.25 Total Time (hrs): 2.75 Project: Racetrac #1136 - PSL Savannah Club 8630 S. US Highway 1, Port St. Lucie, St. Lucie County, FL Date of Activity: Friday, May 27, 2016 Technician: Cliff Cherrnay As requested, a Universal Engineering Sciences ITechnician was present at the above referenced project site for the purpose of earthwork testing for the pipe backfill, Building pad. While on site, the technician observed the general condition of the areas to be tested and performed 2 density test(s) for pipe backfill. All test(S) were performed in accordance with the ASTM D-6938 Nuclear Gauge Method and were found to meet the project compaction requirements of 95% of the maximum dry density per ASTM D-1557. 1 While on site, the technician observed the general condition of the areas to be tested and performed 6 density test(s) for Building pad. All test(s) were performed in accordance with the ASTM D-6938 Nuclear Gauge Method and were found to meet the project compaction requirements of 95% of the maximum dry density per ASTM 13-1557. The Contractor was notified of the test results or 6 copy was left for their records. This test(s) was performed without deviation from ASTM proceduri . This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences. UNIV)m.RSA ENGINEERING SCIENC S Consultants In: Geotechnical Engineering • Environmental Sciences Geophysical Services • Construction Materials Testing • Threshold Inspection Building Inspection • Plan Review • Building Code Admihistration 820 Brevard Avenue • Rockledge, FL • 32955 321.638.0808 Fax:321.638.0978 Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 Project: Racetrac #1136 - PSL Savannah Club 8630 S. US Highway 1, Port St. L�cie, Area Tested: pipe backfill Type of Test: Field: ASTM D-6938 Nuclear Lab: ASTM D-1557 Technician: Cliff Cherrnay Requirements: 95% of Proctor maximum dry density do not address the condition of the ur iS Project No: 0310.1600172.0000 UES Report No: 51104-1 DT 052716 St. Lucie County, FL Method Date of Test: 05/27/2016 tests apply to the fill and/or surficial soil conditions only and soils below the tested depths. Field Dry Test Range Depth P Proctor Density Y Field Moisture °/, Comments # Location of Test (FT) (IN) (2) (PCF) Compaction p 3 ( ) 1 20 feet north of structure # 12 1+Z 12.00 19322 111.7 10.0 99 A 2 30 feet north of structure # 12 2+3 1 I 12.00 19322 111.5 11.0 99 A (1) Ref. Datum (2) 0 = Bottom of Pipe Proctor Maximum Optimum # Dry Moisture Density Content 19322 112.5 9.5 (3) Comments Key A. Compaction meets min. requirements B. Compaction does not meet min. requirements C. Moisture does not meet requirements D. Recompaction required E. Recompacted, Retested, Meets Requirements This test was performed without deviation from ASTM procedures. This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences. I I aY UNIV�RSAh ENGINEERING SCIENC Consultants In: Geotechnical Engineering - Environmental Sciences Geophysical Services - Construction Materials Testing - Threshold Inspection Building Inspection - Plan Review -Building Code Admil istration 820 Brevard Avenue • Rockledge, FL • 32955 321.638.0808 Fax:321.638.0978 Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 Project: Racetrac #1136 - PSL Savannah 8630 S. US Highway 1, Port St. L Area Tested: Building pad Type of Test: Field: ASTM D-6938 Nuclear Gs Lab: ASTM D-1557 Technician: Cliff Cherrnay Requirements: 95% of Proctor maximum dry density. do not address the condition of the un ub �,S Project No: 0310.1600172.0000 UES Report No: 51104-2 DT 052716 St. Lucie County, FL e Method Date of Test: 05/27/2016 tests apply to the fill and/or surficial soil conditions only and soils below the tested depths. Test # Location of Test Range (FT) Depth (IN) Proctor (2) Field Dry Density (PCF) Field Moisture % % Compaction Comments (3) 3 NNV corner test 0-1 12.00 19322 112.0 10.5 100 A 4 SNV corner test 0-1 12.00 19322 110.5 9.9 98 A 5 S/E corner test 0-1 12.00 19322 110.6 9.7 98 A 6 N/E corner test 0-1 12.00 19322 111.0 10.5 99 A 7 Thickened wall footings S/E test 0-1 12.00 19322 112.0 10.7 100 A 8 Thickened wall footings NNW test 0-1 12.00 19322 111.0 11.1 99 A (1) Ref. Datum: 0 = Top of Final Grade (3) Comments Key (2) A. Compaction meets min. requirements Proctor Maximum Optimum B. Compaction does not meet min. requirements # Dry Moisture C. Moisture does not meet requirements Density Content D. Recompaction required E. Recompacted, Retested, Meets Requirements 19322 112.5 9.5 This test was performed without deviation from ASTM procedures. This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences. i ED Project No.: Date Typed: Client: Project: ENGINEERING S( Consultants In: Geotechnical Engineering Geophysical Services • Construction Mate Building Inspection • Plan Review • Buildi 0310.1600172.0000 May 9, 2016 AL IENCES Environmental Sciences 31s Testing • Threshold Inspection 3 Code Administration I Field and Laboratory Report Transmittal Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 Racetrac #1136 - PSL Savannah Club Permit #14100401 8630 S. US Highway 1 Port St. Lucie, St. Lucie County, FL Sheet LOCATIONS: • Atlanta • Daytona Beach • Fort Myers Fort Pierce ■ Gainesville Jacksonville Kissimmee • Leesburg • Miami ■ Ocala Orlando (Headquarters) • Palm Coast • Panama city • Pensacola Rockledge Sarasota • Tampa West Palm Beach As requested, a representative of Universal Engineering Sciences, Inc. (LIES) was at the referenced project to provide construction materials testing services. The results of the observations and/or tests are summarized on the attached sheets. The reports are numbered as follows: 50317 AR1, 19322 MP, 60434 ARD2, 60434 DTI, 60434 DT2, 60461 AR1, 60462 AR1. We trust this information is sufficient for your immediate needs. If you have any questions, please do not hesitate to contact the undersigned. I Reviewed By: f Universal Engineering S Iences, -Inc., DCertificate of Authorizafir n I+1o. 549 fi LMAY 1 8 RECD Richard E. Hoaglin,P:E,. ; STATE OF FLORWI, Licensed Professional -Engineer No. ;48796 scarlson@mulliganconstructors.com; cicioina stlucieco.org i 820 Brevard Avenue, Rockledge, Florida 32955 (321) 638-0808 Fax (321) 638-0978 www.UniversalEngineering.com I-_% I UNIVERSAI'L ENGINEERING SCIENCIES Consultants In: Geotechnical Engineering • Environmer tal Sciences Geophysical Services • Construction Materials Testing • Threshold Inspection Building Inspection • Plan Review • Building Code Adm nistration 820 Brevard Avenue • Rockledge, FL • 32955 321.638.0808 Fax:321.638.0978 UES Project No 0310.1600172.0000 UES Report No: 03GI-50317 On -Site Time (hrs): 0.50 Lab Time (hrs): 0.00 Travel Time (hrs): 1.00 Total Time (hrs): 1.50 Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 Project: Racetrac #1136 - PSL Savannah Club 8630 S. US Highway 1,Port St. Lucie, St. Lucie County, FL Date of Activity: 5/3/16 Technician: Cliff Cherrnay As Requested, a Universal Engineering Sciences Technician was present at the above referenced location for the purpose of picking up a proctor. UNIVERSAL ENGINEERING SCIENCES Consultants In: Geotechnical Engineering - Environmental Sciences - Construction Materials Testing I. i 820 Brevard Avenue - Rockledge, Florida 32955 - (3 1) 638-0808 REPORT OF MOISTU Client: MULLIGAN CONSTRUCTORS 3601 VINELAND ROAD, SUITE 14 ORLANDO FLORIDA 32811 Client No: 0310.1600172.0000 Date: May 5, 2016 DENSITY RELATIONSHIP OF SOIL Project: RACETRAC #1136 - Savannah Club 8630 SOUTH US HIGHWAY 1 PORT SAINT LUCIE, FLORIDA Location: NATIVE Date Sampled: 513116 Sampled By: CLIFF CHERRNAY SUMMARY OF TEST RESULTS MAXIMUM MOISTURE CONTENT SOIL DESCRIPTION DARK BROWN SILTY SAND FILL: NATURAL GROUND: 0 ON ON 0 0 ONE 0 MMEMMMMNM ON INN I NMIMIN NONE moommom mom MINION PROCTOR NO: 6063 LAB NO: 19322 NOTES -This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences. i I I r' I 91 UNIV'�RSAL ENGINEERING SCIENCES Consultants In: Geotechnical Engineering - Environmental Sciences Geophysical Services - Construction Materials Testing - Threshold Inspection Building Inspection -Plan Review -Building Code Administration 820 Brevard Avenue - Rockledge, FL • 32955 321.638.0808 Fax:321.638.0978 �'�i3 Project No: 0310.1600172.0000 UES Report No: 50434 ARD2 050616 On -Site Time (hrs): 1.50 Lab Time (hrs): 0.00 Travel Time (hrs): 1.00 Total Time (hrs): 2.50 Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 I Project: Racetrac #1136 - PSL Savannah Club 8630 S. US Highway 1,Port St.iLucie, St. Lucie County, FL Date of Activity: May 6, 2016 I Technician: Cliff Cherrnay As requested, a Universal Engineering Sciences Technician was present at the above referenced project site for the purpose of earthwork testing for the Building pad, Column footings. i While on site, the technician observed the general condition of the areas to be tested and performed 4 density test(s) for Building pad. All test(s) were performed in accordance with the ASTM D-6938 Nuclear Gauge Method and were found to meet the project compaction requirements of 95% of the maximum dry density per ASTM D-1557. I While on site, the technician observed the general condition of the areas to be tested and performed 12 density test(s) for Column footings. All test(s) were performed in accordance with the ASTM D-6938 Nuclear Gauge Method and were found to meet the project compaction requirements of 95% of the maximum dry density per ASTM D-1557. The Contractor was notified of the test results or ajcopy was left for their records. I This test(s) was performed without deviation from ASTM procedure.I This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences. UNIV"RSA ENGINEERING SCIENC Consultants In: Geotechnical Engineering - Environme Geophysical Services - Construction Materials Testing - Building Inspection - Plan Review - Building Code Adm 820 Brevard Avenue - Rockledge, FL- 32955 321.638.0808 Fax:321.638.0978 L ntaall Sciences Threshold Inspection inist'ration In -Place Dens Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 Project: Racetrac #1136 - PSL Savannah Cl 8630 S. US Highway 1,Port St. Lucie Area Tested: Building pad Type of Test: Field: ASTM D-6938 Nuclear Gaug4 Lab: ASTM D-1557 ':S Project No: 0310.1600172.0000 UES Report No: 50434-1 DT 050616 b , St. Lucie County, FL Method Date of Test: 05/06/2016 I Technician: Cliff Cherrnay Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions only and do not address the condition of the underlying soils below the tested depths. Test # Location of Test Range (FT)I ( ) Depth (IN) Proctor 2 () Field Dry Density (PCF) Field Moisture % % action Compaction p Comments 3 ( ) 1 Building pad N/W 0-1 12.00 19322 112.0 9.0 100 A 2 Building pad S/W 0-1 12.00 19322 111.5 9.4 99 A 3 Building pad S/E 0-1 i 12.00 19322 110.6 9.3 98 A 4 Building pad WE 0-1 12.00 19322 111.0 9.5 99 A (1) Ref. Datum: 0 = Top of Final Grade (2) Proctor Maximum Optimum Dry Moisture # Density Content 19322 112.5 9.5 (3) Comments Key A. Compaction meets min. requirements B. Compaction does not meet min. requirements C. Moisture does not meet requirements D. Recompaction required E. Recompacted, Retested, Meets Requirements This test was performed without deviation from ASTM procedures. This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences. i UNIVIIiiii!RSAL ENGINEERING SCIENCES Consultants In: Geotechnical Engineering • Environmental Sciences Geophysical Services • Construction Materials Testing • Threshold Inspection Building Inspection • Plan Review • Building Code Administration 820 Brevard Avenue • Rockledge, FL • 32955 321.638.0808 Fax:321.638.0978 Project No: 0310.1600172.0000 UES Report No: 50434-2 DT 050616 Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 I Project: Racetrac #1136 - PSL Savannah Club 8630 S. US Highway 1,Port St. Lucie, St. Lucie County, FL Area Tested: Column footings Type of Test: Field: ASTM D-6938 Nuclear Gaugle Method Date of Test: 05/06/2016 Lab: ASTM D-1557 � Technician: Cliff Cherrnay Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions only and do not address the condition of the underlying soils below the tested depths. Test # Location of Test Range (FT)I Depth (IN) Proctor (2) Field Dry Density (PCF) Field Moisture % % Compaction Comments (3) 5 Footing D-1 0-1 12.00 19322 112.0 9.4 100 A 6 Footing D-3 0-1 I 12.00 19322 112.5 9.2 100 A 7 Footing D-5 0-1 1 12.00 19322 111.7 8.6 99 A 8 Footing D-7 0-1 1 I 12.00 19322 111.5 9.2 99 A 9 Footing B-7 0-1 12.00 19322 111.2 9.3 99 A 10 Footing A-6 i 0-1 1 12.00 19322 111.7 10.0 99 A 11 Footing A-4 0-1 1 12.00 19322 112.2 10.2 100 A 12 Footing A-2.6 0-1 1 12.00 19322 112.1 9.7 100 A 13 Footing E-5 0-1 1 i 12.00 19322 111.5 9.2 99 A 14 Footing C-8 0-1 I 12.00 19322 111.8 9.4 99 A (1) Ref. Datum: 0 = Bottom of Footing (2) Proctor Maximum Optimum # Dry Moisture Density Content 19322, 112.5 9.5 This test was performed without deviation from ASTM procedures. I (3) Comments Key A. Compaction meets min. requirements B. Compaction does not meet min. requirements C. Moisture does not meet requirements D. Recompaction required E. Recompacted, Retested, Meets Requirements This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences. UNIV..caRSAL ENGINEERING SCIENCES Consultants In: Geotechnical Engineering - Environmental Sciences Geophysical Services - Construction Materials Testing - Threshold Inspection Building Inspection -Plan Review -Building Code Administration 820 Brevard Avenue - Rockledge, FL - 32955 321.638.0808 Fax:321.638.0978 :S Project No: 0310.1600172.0000 UES Report No: 50434-2 DT 050616 In -Place Density Test Report Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 Project: Racetrac #1136 - PSL Savannah Club 8630 S. US Highway 1,13ort St. Lucile, St. Lucie County, FL Area Tested: Column footings I Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 05/06/2016 Lab: ASTM D-1557 Technician: Cliff Cherrnay I I Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions only and do not address the condition of the underlying soils below the tested depths. Field Dry Test Range Depth Proctor Density Field Moisture %, Comment # Location of Test (FT)l (IN) (2) (PCF) Compaction (3 ) 15 Footing B-1 0-1 12.00 19322 112.1 9.5 100 A 16 Footing B-9.1 0-1 12.00 19322 111.4 9.6 99 A (1) Ref. Datum: 0 = Bottom of Footing (2) Proctor Maximum Optimum # Dry Moisture Density Content 19322 112.5 9.5 (3) Comments Key A. Compaction meets min. requirements B. Compaction does not meet min. requirements C. Moisture does not meet requirements D. Recompaction required E. Recompacted, Retested, Meets Requirements This test was performed without deviation from ASTM procedures. I This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences. i UNIVERSAL tuENGINEERING SCIENCES Consultants In: Geotechnical Engineering • Environmental Sciences Geophysical Services • Construction Materials Testing • Threshold Inspection Building Inspection • Plan Review • Building Code Administration 820 Brevard Avenue - Rockledge, FL - 32955 321.638.0808 Fax:321.638.0978 UES Project No: 0310.1600172.0000 UES Report No: 03GI-50461 On -Site Time (hrs): 1.50 Lab Time (hrs): 0.00 Travel Time (hrs): 3.00 Total Time (hrs): 4.50 Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 Project: Racetrac #1136 - PSL Savannah Club 8630 S. US Highway 1,Port St. Lucie, St. Lucie County, FL Date of Activity: 5/9/16 Technician: Anthony McAlpin i i As Requested, a Universal Engineering Sciences Technician was present at the above referenced location for the purpose of performed DCP in 2 locations fob column pad footings for store and one location in the dumpster pad down to 3 feet. Testing at each depth level, resulted in refusal of 20 blows. These results meet or exceed project requirements of 2500 psf. i I I UNIVERSAL tuENGINEERING SCIENCES Consultants In: Geotechnical Engineering • Environmental Sciences Geophysical Services • Construction Materials Testing • Threshold Inspection Building Inspection • Plan Review • Building Code Administration 820 Brevard Avenue • Rockledge, FL - 32955 321.638.0808 Fax:321.638.0978 UES Project No: 0310.1600172.0000 UES Report No: 03G1-50462 On -Site Time (hrs): 2.00 Lab Time (hrs): 0.00 Travel Time (hrs): 1.00 Total Time (hrs): 3.00 Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 Project: Racetrac #1136 - PSL Savannah Club 8630 S. US Highway 1,Port St. Lucie, St. Lucie County, FL Date of Activity: 5/9/16 Technician: Cliff Cherrnay As Requested, a Universal Engineering Sciences Technician was present at the above referenced location for the purpose of Performed DCP testing on column footings and dumpster pad. RECEIv-0 MAY I. 20�6 LO UNIVERS A L CATIONS: • Atlanta • Daytona Beach Fort Myers ENGINEERING SCIENCES Fort Piece Consultants In: Geotechnical Engineering Environmental Sciences Gainesville t Jacksonville Geophysical Services • Construction Matehals Testing • Threshold Inspection Kissimmee Building Inspection • Plan Review • Build! g Code Administration Leesburg • Miami • Ocala • Orlando (Headquarters) FILDt Palm Coast Project No.: 0310.1600172.0000 Panama City • Pensacola Date Typed: May 9, 2016 I Rockledge • Sarasota • Tampa • West Palm Beach Field and Laboratory Report Transmittal Sheet Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 Project: Racetrac #1136 - PSL Savannah Club Permit#141004011 8630 S. US Highway 1 Port St. Lucie, St. Lucie County, FL As requested, a representative of Universal Engineering Sciences, Inc. (UES) was at the referenced project to provide construction materials testing services. The results of the observations and/or tests are summarized on the attached sheets. The reports are numbered as follows: 60317 AR1, 19322 MP, 50434 ARD2, 50434 DTI, 50434 DT2, 50461 AR1, 50462 AR1. We trust this information is sufficient for your immediate needs. If you have any questions, please do not hesitate to contact the undersigned'. Reviewed By: Universal EngineeringJ$ciences;,.lnc. (Certificate of Authorizat'i6n No. 549- i richard E. HoagI-in, `r'.El" ; STATE OF FLOW.s; =4 - Licensed Professioi5al Engineer No. 48796 scarlson@mulliganconstructors.com; cicioiAstlucieco.org i l 820 Brevard Avenue, Rockledge, Florida 32955 (321) 638-0808 Fax (321) 638-0978 www.UniversalEngineering.com I I UNIVERSA�L UES Project No: 0310.1600172.0000 ENGINEERING SCIENCES ED UES Report No: 03GI-50317 Consultants In: Geotechnical Engineering • Environmental Sciences On -Site Time (hrs): 0.50 Geophysical Services • Construction Materials Testing • Threshold Inspection Lab Time (hrs): 0.00 Building Inspection • Plan Review • Building Code Administration Travel Time (hrs): 1.00 820 Brevard Avenue • Rockledge, FL - 32955 Total Time (hrs): 1.50 321.638.0808 Fax:321.638.0978 I Activity Report Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 Project: Racetrac #1136 - PSL Savannah Club 8630 S. US Highway 1,Port St. Lucie, St. Lucie County, FL Date of Activity: 5/3/16 Technician: Cliff Cherrnay As Requested, a Universal Engineering Sciences Technician was present at the above referenced location for the purpose of picking up a proctor. J f 1 UNIVERSAL; WdENGINEERING SCIENCES Consultants in: Geotechnical Engineering - Environmental Sciences - Construction Materials Testing 820 Brevard Avenue - Rockledge, Florida 32955 - (321) 638-0808 Client: Client No: 0310.1600172.0000 Date: May 5, 2016 REPORT OF MOISTURE DENSITY RELATIONSHIP OF SOIL MULLIGAN CONSTRUCTORS 3601 VINELAND ROAD, SUITE 14 ORLANDO FLORIDA 32811 Project: RACETRAC #1136 - Savannah Club 8630 SOUTH US HIGHWAY 1 PORT SAINT LUCIE, FLORIDA Location: NATIVE Date Sampled: 5/3/16 Sampled By: CLIFF CHERRNAY SUMMARY OF TEST RESULTS TEST METHOD ASTM D-1557 MAXIMUM DRY DENSITY OPTIMUM MOISTURE CONTENT DESCRIPTION NEW DARK BROWN SILTY SAND NEE NEE NJ NOON qlME QC► E ON ONO N OSOIL 01 0 ONE 0 0 0 NJ No MOOMENNO ENNOM ME NOMENO 0 NJ NOON 0 LAB NO: 19322 NOTES -This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences. I UNIVLASAL Project No: 0310.1600172.0000 ENGINEERING SCIENCES 91 UESReport No: 50434 ARD2 050616 Consultants In: Geotechnical Engineering • Environmental Sciences Geophysical Services • Construction Materials Testing • Threshold Inspection On -Site Time (hrs): 1.50 Building Inspection • Plan Review • Building Code Administration Lab Time (hrs): 0.00 820 Brevard Avenue Rockledge, FL 32955 Travel Time (hrs): 1.00 321.638.0808 Fax: 321.638.0978 Total Time (hrs): 2.50 Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 Project: Racetrac #1136 - PSL Savannah Club 8630 S. US Highway 1,Port St. jLucie, St. Lucie County, FL Date of Activity: May 6, 2016 j Technician: Cliff Cherrnay As requested, a Universal Engineering Sciences Technician was present at the above referenced project site for the purpose of earthwork testing for the Building pad, Column footings. While on site, the technician observed the general condition of the areas to be tested and performed 4 density test(s) for Building pad. All test(s) were performed in accordance with the ASTM D-6938 Nuclear Gauge Method and were found to meet the project compaction requirements of 95% of the maximum dry density per ASTM D-1557. i i While on site, the technician observed the general condition of the areas to be tested and performed 12 density test(s) for Column footings. All test(s) were performed in accordance with the ASTM D-6938 Nuclear Gauge Method and were found to meet the project compaction requirements of 95% of the maximum dry density per ASTM D-1557. The Contractor was notified of the test results or a jcopy was left for their records. This test(s) was performed without deviation from ASTM procedure. This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences. I I SS Project No: 0310.1600172.0000 UNIVIRSAL ENGINEERING SCIENCES U ES Report No: 50434-1 DT 050616 Consultants In: Geotechnical Engineering - Environmental Sciences Geophysical Services - Construction Materials Testing - Threshold Inspection Building Inspection -Plan Review -Building Code Administration 820 Brevard Avenue • Rockledge, FL - 32955 321.638.0808 Fax:321.638.0978 I In -Place Density Test Report Client: Mulligan Constructors I 3601 Vineland Road, Suite 14 Orlando, FL 32811 I Project: Racetrac #1136 - PSL Savannah Club 8630 S. US Highway 1,Port St. Lucie, St. Lucie County, FL Area Tested: Building pad Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 05/06/2016 Lab: ASTM D-1557 Technician: Cliff Cherrnay I Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions only and do not address the condition of the underlying soils below the tested depths. Test # Location of Test Range (FT ) Depth (IN) Proctor 2 () Field Dry Density (PCF) Field Moisture Moisture "/o Com Paction Comment (3 ) 1 Building pad N/W 0-1 I 12.00 19322 112.0 9.0 100 A 2 Building pad SM 0-1 12.00 19322 111.5 9.4 99 A 3 Building pad S/E 0-1 12.00 19322 110.6 9.3 98 A 4 Building pad WE 0-1 i 12.00 19322 111.0 9.5 99 A (1) R, (2) ;t. Datum: U = I op of Final Grade Proctor Maximum Optimum # Dry Moisture Density Content 19322 112.5 9.5 This test was performed without deviation from ASTM procedures. (3) Comments Key A. Compaction meets min. requirements B. Compaction does not meet min. requirements C. Moisture does not meet requirements D. Recompaction required E. Recompacted, Retested, Meets Requirements This report shall not be reproduced, except in full, without the written appiroval of Universal Engineering Sciences. UNIVtRSAL ENGINEERING SCIENCES Consultants In: Geotechnical Engineering • Environmental 511ciences Geophysical Services • Construction Materials Testing • Threshold Inspection Building Inspection • Plan Review • Building Code Administration 820 Brevard Avenue • Rockledge, FL • 32955 321.638.0808 Fax:321.638.0978 SS Project No: LIES Report No: Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 Project: Racetrac #1136 - PSL Savannah Club 8630 S. US Highway 1,Port St. Lucie, St. Lucie County, FL Area Tested: Column footings Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Lab: ASTM D-1557 Technician: Cliff Cherrnay 0310.1600172.0000 50434-2 DT 050616 Date of Test: 05/06/2016 Requirements: 95% of Proctor maximum dry density. Thl se tests apply to the fill and/or surficial soil conditions only and do not address the condition of the underllying soils below the tested depths. Test 0 Location of Test Range (FT) l Depth (IN) Proctor (2) Field Dry Density (PCF) Field Moisture o % Compaction Comment (3 ) 5 Footing D-1 0-1 12.00 19322 112.0 9.4 100 A . 6 Footing D-3 0-1 12.00 19322 112.5 9.2 100 A 7 Footing D-5 0-1 12.00 19322 111.7 8.6 99 A 8 Footing D-7 0-1 12.00 19322 111.5 9.2 99 A 9 Footing B-7 0-1 12.00 19322 111.2 9.3 99 A 10 Footing A-6 0-1 12.00 19322 111.7 10.0 99 A 11 Footing A-4 0-1 12.00 19322 112.2 10.2 100 A 12 Footing A-2.6 0-1 12.00 19322 112.1 9.7 100 A 13 Footing E-5 0-1 12.00 19322 111.5 9.2 99 A 14 Footing C-8 0-1 12.00 19322 111.8 9.4 99 A (1) Ref. Datum: 0 = Bottom of Footing (2) Proctor Maximum Optimum # Dry Moisture Density Content 19322 112.5 9.5 (3) Comments Key A. Compaction meets min. requirements B. Compaction does not meet min. requirements C. Moisture does not meet requirements D. Recompaction required E. Recompacted, Retested, Meets Requirements I This test was performed without deviation from ASTM procedures. This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences. I r � I UNIVIeRSAL ENGINEERING SCIENCES Consultants In: Geotechnical Engineering • Environmental Sciences Geophysical Services • Construction Materials Testing • Threshold Inspection Building Inspection • Plan Review • Building Code Administration 820 Brevard Avenue • Rockledge, FL - 32955 321.638.0808 Fax:321.638.0978 j S Project No: 0310.1600172.0000 UES Report No: 50434-2 DT 050616 In -Place Density Test Report Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 Project: Racetrac #1136 - PSL Savannah Club 8630 S. US Highway 1,Port St. Lucid, St. Lucie County, FL Area Tested: Column footings Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 05/06/2016 Lab: ASTM D-1557 Technician: Cliff Cherrnay I Requirements: 95% of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions only and do not address the condition of the underlying soils below the tested depths. Field Dry Test Range Depth Proctor Density Field Moisture % Comment 9 Location of Test (FT) (IN) (2) (PCF) % Compaction (3) 15 Footing B-1 0-1 1 12.00 19322 112.1 9.5 100 A 16 Footing B-9.1 0-1 I 12.00 19322 111.4 9.6 99 A (1) Ref. Datum: 0 = Bottom of Footing (2) Proctor Maximum Optimum # Dry Moisture Density Content 19322 112.5 9.5 This test was performed without deviation from ASTM procedures. (3) Comments Key A. Compaction meets min. requirements B. Compaction does not meet min. requirements C. Moisture does not meet requirements D. Recompaction required E. Recompacted, Retested, Meets Requirements This report shall not be reproduced, except in full, without the written approval of Universal Engineering Sciences. I I UNIVERSAIL ENGINEERING SCIENCES Consultants In: Geotechnical Engineering • Environmental Sciences Geophysical Services • Construction Materials Testing • Threshold Inspection Building Inspection • Plan Review • Building Code Adm'nistration 820 Brevard Avenue • Rockledge, FL • 32955 321.638.0808 Fax:321.638.0978 Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 Project: Racetrac #1136 - PSL Savanr 8630 S. US Highway 1,Port S1 Date of Activity: 5/9/16 Technician: Anthony McAlpin UES Project No: 0310.1600172.0000 UES Report No: 03G1-50461 On -Site Time (hrs): 1.50 Lab Time (hrs): 0.00 Travel Time (hrs): 3.00 Total Time (hrs): 4.50 ih Club Lucie, St. Lucie County, FL As Requested, a Universal Engineering Sciences Technician was present at the above referenced location for the purpose of performed DCP in 2 locations for column pad footings for store and one location in the dumpster pad down to 3 feet. Testing at each depth level, resulted in refusal of 20 blows. These results meet or exceed project requirements of 2500 psf. UNIVERSAENGINEERING SCIENConsultants In: Geotechnical Engineering - EnvironmeGeophysical Services - Construction Materials Testing - Building Inspection - Plan Review - Building Code Adm820 Brevard Avenue - Rockledge, FL • 32955 321.638.0808 Fax:321.638.0978 CES nial UES Project No: 0310.1600172.0000 UES Report No: 03GI-50462 Sciences On -Site Time (hrs): 2.00 Threshold Inspection Lab Time (hrs): 0.00 inistration Travel Time (hrs): 1.00 Total Time (hrs): 3.00 Activity Report Client: Mulligan Constructors 3601 Vineland Road, Suite 14; Orlando, FL 32811 Project: Racetrac #1136 - PSL Savannah Club 8630 S. US Highway 1,Port St. Lucie, St. Lucie County, FL Date of Activity: 5/9/16 Technician: Cliff Cherrnay As Requested, a Universal Engineering Sciences Technician was present at the above referenced location for the purpose of Performed DCP testing on column ;footings and dumpster pad. 7�r UNIVERSAL ENGINEERING SCIENCES Consultants In: Geotechnical Engineering • Environmental Sciences Geophysical Services • Construction Materials Testing • Threshold Inspection Building Inspection • Plan Review • Building Code Administration i Project No.: 0310.1600172.0000 I 4CANNED Date Typed: June 1, 2016 BY Field and Laboratory Report Transmittal Sheet Client: Mulligan Constructors 3601 Vineland Road, Suite 14 Orlando, FL 32811 I Project: Racetrac #1136 - PSL Savannah Club Main Building Permit # 1410-0401 8630 S. US Highway 1 Port St. Lucie, St. Lucie County, FL LOCATIONS: Atlanta • Daytona Beach • Fort Myers • Fort Pierce Gainesville • Jacksonville • Kissimmee • Leesburg Miami Ocala Orlando (Headquarters) • Palm Coast • Panama City • Pensacola • Rockledge • Sarasota • Tampa West Palm Beach As requested, a representative of Universal Engineering Sciences, Inc. (LIES) was at the referenced project to provide construction mi terials testing services. The results of the observations and/or tests are summarized on the attached sheets. The reports are numbered as follows: 61039 ARD1, 60139 DT1, 61087 ARD2, 51087 DT1, 51087 DT2. We trust this information is sufficient for your immediate needs. If you have any questions, please do not hesitate to contact the undersigned. JUN - 6 AECD D Reviewed By: Universal Engineering Sciences, Inc, Certificate of Authori?afinri No. Richard E. Hoaglin, R-.E: STATE OF FLORIDA Licensed Professional Erigi6eer No. 48796 scarlson@mullieanconstructors.com; cicioj0,Stluci6co.org Sign & Seal copy to: St Lucie County, Attn: Joe Cicio, 2300 Virgina Ave, Room 228, Ft Pierce, FL 34982 820 Brevard Avenue, Rockledge,;Florida 32955 (321) 638-0808 Fax (321) 638-0978 PW www. UniversalEngineering. com