Loading...
HomeMy WebLinkAbout0911-0038 BID WORKSHEETSCANNED BY Miramar Contractor Bid Worksheet - Mu09e cOUI1 U n its 1101-1001-0901 Item 1. Mobilization Description: Order materials, schedule manpower, transport equipment to the job site, and accommodate power and electric utility usage. All actions necessary to begin work on site including administrative and setup costs, dumpster� site protection and permitting.. Bid Item la - Mobilization $ 2,133.72 Total Permit Fee' $ 1,386.92 Total Description: Refuse removal, per cubic yard, remove and dispose in accordance with County requirements I Bid Item I - Refuse removal Unit Cost (Cubic Yard) $75 Ix 0 CY = $ 675.00 Total Item 2. Site Preparation—___ Description: Remove and securely store or discard shutters, shutter tracks and aluminum rails. Remove tile and thin -set, grind deck surface smooth to a CSP of 2 to 3. Bid Item 2a - Remove and haul away existing, shutters and shutter tracks Unit Cost (Linear Foot) $ 15.00 Ix I LF = F$_ - - 3,960.00 Total Bid Item 2b- Remove/Reinstall.existin aluminum rails securely stop. until completion Unit Cost (Linear Foot) L $ 28.00 Ix 0 LF JTotal * Not anticipated at this time, but unit price listed as reference j I Bid Item 2c - Remove existing deck surface and thin -set, grind surface to CSP of 2 to 3 Unit Cost (SquareFoot) 1 $ 4.00 Ix I SF = $ 2,480.00 JTotal Item 3. Sliding Glass Doors ' Description: Remove sliding glass doors and tracks. Grout and waterproof under door and repair any, defects, install new membrane, labor only to install new Miramar supplied impact resistant doors and ! tracks, repair & touch-up paint stucco at door opening. Bid Item 3a - Sliding Glass Doors 1 Unit Cost (Unit) $ 4,385.00 Ix 3 EA = $ 13,155.00 Total Bid Item 3c - Weather Wall Protection I i - -Unit-Cost (SquareFoot) - $__ _._ --4.75 Ix 1 1104 SF $. _ _ __.5,244.00 JTotal Item 4. Concrete Restoration Description: Repair identified spall and cracks per repair drawings Bid Item 4a - Concrete Repair Repair Type - Partial Depth Deck Spall Unit Cost (SquareFoot) $ 85.00 Ix I 150 SF = $ 12,750.00 Total - --id-Item-4b---Concrete-Repair------ l-Bepair Type -Horizontal Cracks Gravity repair Unit Cost (Linear Foot) 1 $ 28.00 Ix 1 25 LF = 1 $ 700.00 Total SPECIAL FORCES 908 SE LINCOLN AVENUE STUART, FL 34994 CGC 059083 PH (772) 692-0302� FAX (772) 692-4112 MIRAMAR CONTRACTOR BID WORKISHEET 1 I Bid Item 4c - Concrete Repair Repair Type - Overhead Rust Burn -Through Unit Cost (Each) $ 75.00 Ix 02 EA = $ 150.00 Total Item 5. Waterproofing and Deck Coating Bid Item 5a - Positive Sloping Unit Cost (SquareFoot) $ 2.6,0 Jx 1,860 . SF = $ 4,836.00 Total Bid Item 5b -Waterproofing (Deggusa Plotectosil) over entire balcony surface (includes. upper and lower surfaces) 1 Unit Cost (SquareFoot) $ 2.80J x 1,860 SF = $ 5,208.00 Total Bid Item 5c - Spray Deck Coating - STO Decocoat or BASF Sonoshield, i.e., deck traffic coating applied over balcony surface Unit Cost (SquareFoot) $ 4.50 Ix 930 SF = $ 4,185.00 Total - - --- - --- -- -- ,--- -- - - - - -------------- Project Estimate Total — T $ 56,863.64 — - i I Date:. Signature: Miramar Date_ _ .--._Signature; nature;_. _ _ __ _ _ _- Contractor i i tt�cl&Je1var� INT_ERNATfONAL t CONCRETE REPAIR sz zncre�-aKi}tiis� Mtn SPECIAL FORCES 908 SE LINCOLN AVENUE CGC 059083 PH (772) 692-0302 MIRAMAR CONTRACTOR BID WORKSIHEET I STUART, FL 34994 FAX (772) 692-4112 2 I MIRAMAR ( k 4 . 30U1 aS 70 ACCESS NEW 1NEWNO 0 NO ACCESS 0 0 ._ 76 {104 10 180 90 0 UANTITY �..j70 90 0 180 0 0 0 „� L!NAC�CM;�N,�' ACCESS NO ACCESS —�__88 OF ROOF _...__.._ NOACCESS ROOF ! __..._...................._.._...___.__ 386 0 7_---.—. 90 90 270 '_____...87F 0 I76 0 174