Loading...
HomeMy WebLinkAboutTERMITE TREATMENT OPTIONNuelle Engineering Donald J. Nuelle P.E. 815 University Boulevard Apt Jupiter, FL 33458 Cellular 561-629-6975 GHO Homes 590 NW Mercantile Place Port St. Lucie, FL 34986 Attn: Bill Handler st 301 Re: Termite Treatment Option Dear Mr. Handler.: Per your request, I have in; the FBC and find the baiting meth have been specified on the found; soil treatment note is an error and R318.1.7 If a registered termiticide formulated ar subterranean termite prevention, Sectic however, a signed contract assuring lh baiting system that is in compliance wit shall be provided to the building official be installed prior to final building appro r Date: 10/17/2015 ected the termite treatment requirements in i (which is used on all GHO homes) should on notes instead of the soil treatment. The hould be omitted. registered as a bail system is used for i R3,18.1.1 through Section R318.1.6 do not apply; installation, maintenance and monitoring of the the requirements of Chapter 482, Florida Statutes, dor to the pouring of the slab, and the system must rl If you or any other interested party has any questions or requires additional information please feel free to contact me at any time. Zonalcf j. Nuelle P.E �.-- P.E. # 046