HomeMy WebLinkAboutREVISION 9-28-16I Revr- S 1'o ►� -�-D Harbour Ridge Lifestyle Center RGD Rev #4 Narrative August 31st,;2016 CONSULTING ENGINEERS SCAN p nuau. CALL ra—m irLUMOIN411- M-EM1041NED stavnunu AIAOI IN 111rVU I BY S-101 Foundation Plan stLudeCOB* • Concrete column schedule updated to reflect dimensions and rebar changes in RFI 24. S-102 Roof Framing Plan • Truss layout updated to coordinate with shop drawing review on 5/23/2016. • Sections for the roof framin� to the mechanical wells at the stair landings provided. S-103 Mezzanine and Copula Framing Plan • Mezzanine plan 1 updated to show the mechanical -well stair. • Section 3 added to depict the framing at the roof and back side of the mechanical mansard roof well. • Sections and details 4 — 8 depict the mechanical mezzanine stair and framing. S-201 Concrete Details • Detail 10 updated per RFI S-205 Framing Details • Roof tie down schedule updated to show proper corrosion protection 5-305 Sections • Section 4 updated per RFI 24. I M-2.1 Partial Mechanical Floor Plan - Northeast • Key IInotes 8 & 9 added to t I e mechanical key notes block. • Added the 4" 0 dryer exhaust duct, dryer box, and wall cap for the dryer located in room 1054. 1 M-2.2 Partial Mechanical Floor Plan - Southeast j • Adjusted the diffusers in rooms 1076, 1008, & 1009 to align with the revised ceiling layout. i • Key notes 8 & 9 added to tI he mechanical key notes block. M-2.3 Partial Mechanical Floor Plan — East Tennis Pro Shop I • Key, notes 8 & 9 added to the mechanical key notes block. I R E C E F.' ? Page 1 of 4 I 4 s a Oi Harbour Ridge Lifestyle Center Rev #4 Narrative August 31st, 2016 RGD CONSULTING ENGINEERS ......gdang(n—mm • Adjusted the diffusers in the pro shop to be aligned with the ceiling change that occurred in a previous revision. • Adjusted the diffusers in rooms 1008, & 1009 to align with the revised ceiling layout. E0.1 Electrical Cover Sheet • Added Fan Control Switch to; the symbol legend. E1.1 Electrical Power Plan Detail 1- Electrical Power Plan • Deleted receptacle and circ • Deleted receptacle and circ • Added receptacle and circu • Relocated circuitry for Stea added keynote #7. • Deleted 4 receptacles and i • Deleted 4 receptacles and i • Deleted 4 receptacles and i • Deleted 4 receptacles and i • Relocated receptacle and c • Revised one duplex receptz • Added 2 recepts and one to • Deleted coordination note Detail 2 - Mezzanine Electrical I • Added 6 light fixtures, 2 sw, Keynotes • Added keynote #7. E1.3 Electrical Site PI • Added 8 speakers. E1.4 Electrical Low Voltage Plan • Revised entire plan. it for amp power in Room 1068. it for amp power in Room 1061. for u/c refrig in Room 1060. I Generator from Room 1078 to Mezzanine on Detail 2 and evised circuitry in Room 1046. evise.d circuitry in Room 1047. wised circuitry in Room 1048. avised circuitry in Room 1049. rcuit for A/V from Room 1004 to Room 1009. cle to quad in Room 1076. le/data outlet in Room 1076. or A/V in Room 1006. Ian (New Detail) tches, 2 receptacles, and corresponding circuitry on Mezzanine. E2.1 Electrical Lighting Plan I Detail 1- Electrical Power Plan • Revised all dimming control zones. • Deleted one Big Ass Fan and its switch in Room 1006. i Page 2 of 4 Harbour Ridge Lifestyle Center Rev #4 Narrative A 31 2016 RGD ugust st, CONSULTING ENGINEERS hi-i—tI tummt tInn\t—vIrncrrnartammIsrma— trsrtrrgdvng(mrnmm • Revised 2 switches for Big Ass Fans from standard switch to fan control switch with keynote 7 in Room 1006. • Revised one standard switch) to Scene Selector switch in Room 1006. • Revised 2 switches for Fans from standard switch to fan control switch and deleted one standard switch in Room 1002. • Revised Fan circuitry and added one fan control switch in Room 1072. • Revised Override switch at front entrance to Scene Selector switch. • Deleted keynote 1 designation from circuits 1-4-18 and 1-4-20 in Hallway. • Revised Override switch at rear entrance to Scene Selector switch. • Added one fan control swit+ in Room 1004. • Deleted keynote 1 designation from circuit 1-4-8 in Room 1008. • Deleted 4 Scene Selector switches and one three-way switch in Room 1008. • Added one wall -mounted occupancy sensor switch in Room 1008. • Revised one switch for Fans ifrom standard switch to fan control switch and deleted one standard switch outside Room 1008. i • Added one Override switch in Room 1063. • Revised lighting and circuitry in Steam Room 1044. • Added one dimmer switch and circuitry in Room 1046. • Added one dimmer switch aind circuitry in Room 1047. • Added one dimmer switch and circuitry in Room 1048. • Added one dimmer switch and circuitry in Room 1049. • Revised lighting circuitry in Rooms 1042, 1057, 1060, 1061, 1077, and 1078. • Revised 6 light fixtures from Type D1 to Type B in Room 1060. • Deleted one Type SX light fixture in Room 1057. • Deleted 2 exterior lights and circuitry from North side of building. • Revised light fixture layout and circuitry in area outside Proshop and in Proshop 1033. • Added one Override switch land 2 Fan Control Switches in Proshop 1033. Keynotes • Deleted keynote #2. • Added keynote #7. E3.1 Electrical Schedules & Riser Switchboard MDP j • Circuit 6 - Revised breaker from 3P-90 to 213-90 and wire from 3#3 to 2#3. Panel L1 • Circuit 31- Revised from Fans to Spare. • Circuit 33 - Revised from Fans to Spare. Panel L2 • Circuit 40 - Revised from Amp Power to Spare. • Circuit 42 - Revised from Amp Power to Spare. Panel L4 • Circuit 24 - Revised from Fan to Spare. Page 3 of 4 Harbour Ridge Lifestyle Center Rev #4 Narrative August 31st, 2016 • Circuit 31- Revised from Fanslto Lighting. Panel L5 I • Circuit 16 - Revised from Space to U/C Refrig. • Circuit 18 Revised from Space to Mezz Ltg/Recept. • Circuit 20 - Revised from Space to 1076 Recepts. • Circuit 22 - Revised from Space to Lighting. • Circuit 24 - Revised from Space to Lighting. E4.1 Electrical Schedules & Details Lighting Control Diagram • Revised entire diagram. Lighting Zone Schedule • Revised entire schedule. Lighting Fixture Schedule • Added D3. • Added BAR RGD CONSULTING ENGINEERS \ft\-\1:f�.Jfntillt[hmlll ♦6�nI IU lllf VU Page 4 of 4