Loading...
HomeMy WebLinkAboutPROJECT SUMMARYt Florida Building Code; Fifth Edition (2014) - Energy Conservation r EnergyGauge Summit@ Fla/Co 201.5, Effective Date: June 30, 2015 :.; IECC 2012 - Total BuildingRerformance Compliance Option SCANNED i St Lucie COUO2V Check List • 0 9/22/2017 Applications for compliance with the Flo 'ida Building Code, Energy Conservation shall include: This Checklist The full compliance report generated by the software that contains the project summary, compliance summary, ce ifications and detailed component compliance reports. The compliance report must include he full input report generated by the software as .contigous part of the compliance report. El• Boxes appropriately checked in the 1V�Iandatory Section of the complaince report. EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0.Compliant Software. Effective Date: June 30, 2015• Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option Page 1 of 22 z ■ 9/22/2017 Short Desc: Seacoast 2017-22 Owner: Seacoast Addressl: 2601 Industrial Avenue Addressl: Type: Office Jurisdiction: FORT PIERCE, ST Conditioned Area: 3501 SF No of Stories: 1 Permit No: 0 ROJECT SUMMARY Description: Seacoast #2017-22 City: Ft. Pierce State: Enter state here Zip: 0 Class: New Finished building COUNTY, FL (661100) Conditioned & UnConditioned Area: 3501 SF Area entered from Plans 3500 SF Max Tonnage 5 If different, write in: Compliance Summary Component Design Criteria Result Gross Energy Cost (in $) 2,329.0 3,237.0 PASSED LIGHTING CONTROLS PASSES EXTERNAL LIGHTING PASSES HVAC SYSTEM PASSES PLANT No Entry WATER HEATING SYSTEMS PASSES PIPING SYSTEMS PASSES Met all required compliance from Check Li t? Yes/No/NA IMPORTANT MESSAGE Info 5009 -- -- -- An input report of this design building must be submitted along with this Compliance Report EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option Page 2 of 22 I hereby certify that the plans and Florida Energy Code Date: TIFICATIONS by this calculation are in compliance with the Building Official: Date: certify that this building is in compliance with the FLorida Energy Efficiency Code Owner Agent: Jeffrey D. Brasseur Date: W- S - / 7 If Required by Florida law, I hereby certify (") that the system design is in compliance with the Florida Energy Efficiency Code Architect: Jeffrey D. I Electrical Designer: Joseph Lan Lighting Designer: Joseph Lan Mechanical Designer: Michael Gr Plumbing Designer: Michael Gr (*) Signature is required where Florida Law i professionals. Typed names and registration contained on signed/sealed plans. ur Reg No: AR No. 0017698 IV Reg No: P.E. No. 78477 IV Reg No: P.E. No. 78477 P.E. Reg No: P.E. No. 17285 P.E. Reg No: P.E. No. 17285 -es design to be performed by registered design bers may be used where all relevant information is EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 s Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option 9/22/2017 Page 3 of 22 Y , Project: Seacoast 2017-22 Title: Seacoast #2017-22 • Type: Office (WEA File: FL ST LUCIE CO INTL.W) Building End Uses 1) Proposed 2) Baseline Total 149.50 243.30 $2,329 $3,808 ELECTRICITY(MBtu/kWhl$) 149.50 243.30 43855 71310 $2,329 $3,808 AREA LIGHTS 12.50 35.90 3669 10527 $195 $562 DOMHOT WATER 62.30 62.30 18250 18250 $969 $975 MISC EQUIPIVIT 31.70 31.70 9300 9300 $494 $497 PUMPS & MISC 0.10 0.10 40 40 $2 $2 SPACE COOL 33.90 46.60 9944 13639 $528 $728 SPACE HEAT 1.70 2.40 ! 502 716 I $27 $38 VENT FANS 7.30 64.30 2150 18838 $114 $1,006 Credits Applied: None PASSES Passing Criteria = 3237 Design (including any credits) = 2329 Passing requires Proposed Building cost .to be at most 85% of • Baseline cost. This Proposed Building is at 61.2% EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total BVilding Performance Compliance Option 9/22/2017 Page 4 of 22 Project: Seacoast 2017-22 Title: Seacoast #2017-22 Type: Office (WEA File: FL ST LUCIE_CO_INTL.tm3) Ext4nal Lighting Compliance Description Category' Tradable? Allowance Area or Length ELPA CLP (W/Unit) or No. of Units (W) (W) (Sgft or ft) Ext Light 1 Canopies (freestanding, attached Yes 1.25 74.0 93 48 and Overhangs) Tradable Surfaces: 48 (W) Allowance for Tradable: 809.2 (W) PASSES All External Lighting: 48 (W) Complicance check includes a excess/BaSe allowance of 75O.00(W) Project: Seacoast 2017-22 Title: Seacoast #2017-22 Type: Office (WEA File: FL_ST_LUCIE_CO_INTL.tm3) Lighting Controls Compliance 'Acronym Ashrae Description Area Design Min Compli- ID (sq.ft) CP CP ance XrOZo1Sp1 8 Food Service - Leisure Dining 368 1 1 PASSES PrOZo1Sp2 17 Office - Enclosed 253 1 1 PASSES PrOZo1Sp3 1 Electrical Mechanical Equipment 64 1 1 PASSES Room - General PrOZo1Sp4 17 Office - Enclosed 222 1 1 PASSES PrOZo1Sp5 6 Toilet and Washroom PrOZo1Sp6 17 Office -Enclosed 179 191 1 1 1 1 PASSES PASSES PrOZo1Sp7 5 Corridor 350 2 1 PASSES Pr0Zo2Sp1 17 Office -Enclosed 380 1 1 PASSES PrOZo2Sp2 5 Corridor 224 2 1 PASSES PrOZo2Sp3 5 Corridor 498 2 1 PASSES PrOZo2Sp4 16 Office - Open Plan 772 1 1 PASSES PASSES r EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option 9/22/2017 Page 5 of 22 Y Project: Seacoast 2017-22 Title: Seacoast #2017-22 Type: Office (WEA File: FL_ST_LUCIE_CO_INTL.tm3) System Report Compliance PrOSyl System 1 Constant Volume Air Cooled No. of Units Split System < 65000 Btu/hr 1 Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 60000 16.50 13.00 8.00 PASSES Split System < 65000 Btu/h Cooling Capacity Heating System Electric Furnace 19642 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 1950 0.10 0.82 PASSES System -Supply . Constant Volume Air Distribution ADS System (Sup) 8.00 4.20 PASSES System (Sup) Air Distribution ADS System (Ret) 8.00 PASSES System (Ret) Energy Recovery Compliance Not Applicable PASSES Unit PrOSy2 AHU/CU-2 Constant Volume Air Cooled No. of Units Split System < 65000 Btu/hr I Component Category Capacity Design Eff Design IPLV Comp- Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 60000 16.50 13.00 8.00 PASSES Split System < 65000 Btu/h Cooling Capacity Heating System Electric Furnace 19642 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 1720 0.11 0.82 PASSES System -Supply Constant Volume Air Handling Air Handler (Return) - 1720 0.11 0.82 PASSES System - Return Constant Volume Air Distribution ADS System (Sup) 8.00 4.20 PASSES System (Sup) Air Distribution ADS System (Ret) 8.00 PASSES System (Ret) j Energy Recovery Compliance Not Applicable PASSES Unit . PASSES i EnergyGauge. Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option 9/22/2017 Page 6 of 22 Plant Compliance Description Installed Size Design No Min Design Min Category Comp Eff Eff IPLV IPLV liance I None Project: Seacoast 2017-22 Title: Seacoast #2017-22 Type: Office (WEA File: FL ST LUCIE CO INTL.tm3) Water Heater Compliance Description Type Category Design Min Eff Eff Design Max Comp Loss Loss liance Water Heater 1 Electric water heater <= 12 [kW] 1.00 0.90 PASSES PASSES Project: Seacoast 2017-22 Title: Seacoast #2017-22 Type: Office (WEA File: FL ST LUCIE_CO INTL.tm3) Piping System Compliance Category Pipe Dia Is Operating Ins Cond Ins Req Ins Compliance [inches] Runout? Temp [Btu-in/hr Thick [in] Thick [in] [F] SF.F1 Domestic and Service Hot Water 0175 False 105.00 0.28 1.00 0.50 PASSES Systems PASSES I EnergyGauge Summit@ Fla/Com-2014. TAM 2014AGCompliant Software. Effective Date: June 30, 2015 Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option 9/22/2017 Page 7 of 22 • Mandatory Requirements (as applicable) Mandatory requirements compiled by US Department of Energy and Pacific Northwest National Laboratory. Adopted with permission Topic Section Component Description Yes N/A Exempt 1. To be,checked by Designer or Engineer' Fenestration C402.2.7 Envel pe U-factor of opaque doors associated with the ❑ building thermal envelope meets requirements. Insulation C402.2.1.1 Envelope High-albedo roofs satisfy one of the following: 3-year-aged solar reflectance — 0.55 and thermal emittance >= 0.75, 3-year-aged solar reflectance index >= 64.0, initial year solar reflectance >_ 0.70 and thermal emittance >= 0.75, or initial year solar Wattage C405.6 Exterior Lighting Exterior grounds lighting over 100 W provides >60 Im/W unless on motion sensor or fixture is exempt from scope of code or from external LPD. Wattage C405.4 Interior Lighting Exit signs do not exceed 5 watts per face. El ❑ 11 Wattage C405.2.3 Interior Lighting Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. HVAC C403.2.6 Mechanical Exhaust air energy recovery on systems meeting Table C403.2.6 SYSTEM —SPECIFIC C403.3.1,C403.3.1.1 Mech nical Air economizers provided where required, meet the requirements for design capacity, control signal, ventilation controls, high -limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation. SYSTEM —SPECIFIC C403.3.1,C403.4.1 Mechanical Water economizers provided where required, meet the requirements for design capacity, maximum pressure drop and integrated economizer control. SYSTEM_SPECIFIC C403.4.1.4 Mechanical Economizer operation will not increase heating energy use during normal operation. SYSTEM —SPECIFIC C403.2.10.1 Mechanical HVAC fan systems at design conditions do not exceed allowable fan system motor nameplate hp or fan system bhp. SYSTEM —SPECIFIC C403.2.10.2 Mechanical HVAC fan motors not larger than allowable limits. El ❑ El SYSTEM_ SPECIFIC C404.2 Mechanical Service water heating equipment meets efficiency requirements. SYSTEM —SPECIFIC C403.2.3 Mechanical Centrifugal fan open -circuit cooling towers having combined rated capacity >= 1100_gpm meets minimum efficiency requirement: >=38.2 gpm/hp. 2. To,be checked by Plan Reviewer Air Leakage C402.4.7 Envelope Vestibules are installed on all building entrances. Doors have self -closing devices. Insulation C402.2.6 Envelope Slab edge insulation depth/length. Slab insulation extending away from building is covered by pavement or >=10 inches of soil. Plan Review C103.2 Envelope Plans and/or specifications provide all information with which compliance can be determined for the ` building envelope and document where exceptions to the standard are claimed. EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option 9/22/2017 Page 8 of 22 Plan Review C103.2 Exterior Lighting Plans, specifications, and/or calculations provide all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Wattage C405.6.2 Exterior Lighting Exterior lighting power is consistent with what is El 0 El shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Plan Review C103.2 Interior Lighting Plans, specifications, and/or calculations provide El 1:1 all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. HVAC C403.2.5.1 Mechanical Demand control ventilation provided for spaces El E >500 ft2 and >25 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. HVAC C403.2.4.3 Mechanical Each zone equipped with setback controls using automatic time clock or programmable control system. Plan Review C103.2 Mechanical Plans, specifications, and/or calculations provideEl El ❑ all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per " acceptable engineering standards and handbooks. Plan Review C103.2 Mechanical Plans, specifications, and/or calculations provide El ❑ ❑ all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system SYSTEM_ SPECIFIC C403.4.5 Mechanical sized per manufacturer's sizing guide. Zone controls can limit simultaneous heating and cooling and sequence heating and cooling to each SYSTEM_ SPECIFIC C403.4.3.1 Mechanical zone. Three -pipe hydronic systems using a common El El 1:1 return for hot and chilled water are not used. SYSTEM —SPECIFIC C403.4.3.2 Mec I anical Two -pipe hydronic systems using a common El 1:1 ❑ distribution system have controls to allow a deadband > 15 IF, allow operation in one mode for at least 4 hrs before changeover, and have rest controls to limit heating and cooling supply temperature to <=30 OF. SYSTEM —SPECIFIC C403.4.3.3.1 Mechanical Hydronic heat pump systems connected to a El El 1:1 common water loop meet heat rejection and heat addition requirements. SYSTEM —SPECIFIC C408.2.2.2 Mechanical HVAC hydronic heating and cooling coils have rl means to balance and have pressure test connections. SYSTEM C403.4.2 Meclhanical VAV fan motors >=7.5 hp to be driven by variable —SPECIFIC I speed drive, have a vane -axial fan with variable ` pitch blades, or have controls to limit fan motor demand. SYSTEM —SPECIFIC C403.4.2.1 Mechanical VAV fans have static pressure sensors positionedEl El ❑ I so setpoint <=1/3 total design pressure. SYSTEM_ SPECIFIC C403.4.2.2 Mechanical Reset static pressure setpoint for DDC controlled VAV boxes reporting to central controller based j on the zones requiring the most pressure. SYSTEM —SPECIFIC C403.4.5.4 Me hanical Multiple zone HVAC systems have supply air temperature reset controls. SYSTEM —SPECIFIC C403.4.3.4 Mechanical Hydronic systems greater than 300,000 Btu/h D El ❑ I designed for variable fluid flow. EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option 9/22/2017 Page 9 of 22 .•. SYSTEM C403.4.3.4 Mechanical Temperature reset by representative building U U U —SPECIFIC loads in pumping systems for chiller and boiler systems>300,000 Btu/h. SYSTEM —SPECIFIC C403.4.4 Mecha ical Fan systems with motors —7.5 hp associated ❑ ❑ 11 with heat rejection equipment to have capability to operate at 213 of full -speed and auto speed controls to control the leaving fluid temperature or condensing temp/pressure of heat rejection Plan Review C406 Projeci device. Plans, specifications, and/or calculations provide 0 all information with which compliance can be determined for the additional energy efficiency package options. Plan Review C402.3.2.2 Envelope Skylights in office, storage, automotive service, manufacturing, non -refrigerated warehouse, retail store, and distribution/sorting area have a measured haze value > 90 percent unless designed to exclude direct sunlight. �j 3. ,To be checked by Inspector Air Leakage C402.4.1,C402.4.2 Envelope The building envelope contains a continuous air El 0 ❑ barrier that is sealed in an approved manner and either constructed or tested in an approved manner. Air barrier penetrations are sealed in an approved manner. Air Leakage C402.4.3,C402.4.4 Envelope Factory -built fenestration and doors are labeled as meeting air leakage requirements. Air Leakage C402.4.1.1 Envelope All sources of air leakage in the building thermal El envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor -permeable wrapping material to minimize J air leakage. Air Leakage C402.4.6 Envelope Weatherseals installed on all.loading dock cargo ❑ El doors. a Air Leakage C402.4.8 Envelope Recessed luminaires in thermal envelope to limit11 El ❑ R infiltration and be IC rated and labeled. Seal between interior finish and luminaire housing. Fenestration C303.1.3 Envelope Fenestration products rated in accordance with NFRC. Fenestration C303.1.3 Envelope Fenestration products are certified as to performance labels or certificates provided. Insulation C303.2 Envelope Below -grade wall insulation installed per 1:1 El El manufacturer's instructions. Insulation C303.2 Envelope Slab edge insulation installed per manufacturer's ❑ ❑ El instructions. Insulation C403.2.7,C408.2.8,C4, Envelope Exterior insulation protected against damage, ❑ El sunlight, moisture, wind, landscaping and equipment maintenance activities. Insulation C402.4.2.1 Envelope Roof R-value. For some ceiling systems, 11 El verification may need to occur during Framing Insulation C303.2 Envelope Inspection. Roof insulation installed per manufacturer's instructions. Blown or poured loose -fill insulation is installed only where the roof slope is <=3 in 12. Insulation C402.2.1 Envelope Skylight curbs are insulated to the level of roofs with insulation above deck or R-5. insulation C303.2 Envelope Above -grade wall insulation installed per manufacturers instructions. Insulation C303.2 Envelope Floor insulation installed per manufacturers instructions. Insulation C303.1 Envelope Building envelope insulation is labeled with ❑1:1 ❑ R-value or insulation certificate providing R-value and other relevant data. Insulation C303.2.1 Envelope Exterior insulation is protected from damage with ❑ 0 El a protective material. Verification for exposed foundation insulation may need to occur during j Foundation Inspection. EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option 9/22/2017 Page 10 of 22 .�� Insulation, Controls Controls Controls Controls Controls Controls Controls Controls Controls Controls Controls Wattage HVAC HVAC Air Leakage Air Leakage HVAC HVAC HVAC HVAC HVAC HVAC HVAC HVAC HVAC C402.2.1 C405.2.4 C405.2.2.1 C405.2.1.1 C405.2.1.2 C405.2.2.3 C405.2.3 C405.2.2.2 C405.2.2.3 C405.2.2.3 C405.2.3 C405.3 C405.5.2 C403.2.4.5 C403.2.3 C402.4.5.1 C402.4.5.2 C403.2.8.1 C403.2.7 C403.2.8 C403.2.7 C408.2.2.1 C403.2.11 C403.2.4.1 C403.2.4.2 C403.2.4.2 Envelo a Insulation intended to meet the roof insulation U U U requirements cannot be installed on top of a suspended ceiling. Mark this requirement compliant if insulation is installed accordingly. Exterio r Lighting Automatic lighting controls for exterior lighting El 0 El installed. Interior Lighting Automatic controls to shut off all building lighting installed in all buildings. Interio Lighting Independent lighting controls installed per approved lighting plans and all manual controls readily accessible and visible to occupants. Interior Lighting Lighting controls installed to uniformly reduce theEl El ❑ lighting load by at least 50%. Interior Lighting Daylight zones provided with individual controls ❑ that control the lights independent of general area lighting. Interior Lighting Sleeping units have at least one master switch at the main entry door that controls wired luminaires and switched receptacles. Interior Lighting Occupancy sensors installed in required spaces. El ❑ 0 Interio Lighting Primary sidelighted areas are equipped with required lighting controls. Interio Lighting Enclosed spaces with daylight area under skylights and rooftop monitors are equipped with required lighting controls. Inteno� Lighting Separate lighting control devices for specific uses installed per approved lighting plans. Interior Lighting Fluorescent luminaires within odd numbered lamp configurations that are with 10 feet center to center (if recess mounted) or are within 1 foot edge to edge (if pendant or surface mounted) shall be tandem wired. Interio Lighting Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Mechanical Freeze protection and snow/ice melting system sensors for future connection to controls. Mechanical HVAC equipment efficiency verified. ❑ Envelope Stair and elevator shaft vents have motorized dampers that automatically close. Envelope Outdoor air and exhaust systems have motorized ❑ El M dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity Mechanical dampers where allowed. Piping Insulation exposed to weather is protected from damage (due to sun, moisture, wind, etc.). Mechanical HVAC ducts and plenums insulated. Where ducts or plenums are installed in or under a slab, verification may need to occur during Foundation Inspection. Mechanical Thermally ineffective panel surfaces of sensible 1-1 ❑ heating panels have insulation >= R-3.5. Mechanical Ducts and plenums sealed based on static dl f EnergyGauge Summit@ Fla/Com-2014. TAM Florida Building Code, Fifth Edition (2014) - Energy Coi 9/22/2017 pressure an oca ion. tical Air outlets and zone terminal devices have means for air balancing. iical Unenclosed spaces that are heated use only radiant heat. iical Heating and cooling to each zone is controlled by a thermostat control. iical Thermostatic controls have a 5 °F deadband. iical Temperature controls have setpoint overlap restrictions. 114-1.0 Compliant Software. Effective Date: June 30, 2015 irvation IECC 2012 - Total Building Performance Compliance Option Page 11 of 22 . ., HVAC C403.2.4.3 SYSTEM —SPECIFIC C404.3 SYSTEM —SPECIFIC C404.4 SYSTEM —SPECIFIC C404.2 SYSTEM —SPECIFIC C403.2.3 SYSTEM —SPECIFIC C403.4.2 SYSTEM —SPECIFIC C403.2.8 SYSTEM —SPECIFIC C403.2.7.1.3 SYSTEM —SPECIFIC ' C403.4.3.5 SYSTEM —SPECIFIC C403.4.3.3.3 SYSTEM —SPECIFIC C403.4.6 - SYSTEM —SPECIFIC C403.4.7 SYSTEM —SPECIFIC C403.2.4.2 SYSTEM —SPECIFIC C403.2.4.3.3 SYSTEM —SPECIFIC SYSTEM —SPECIFIC SYSTEM —SPECIFIC SYSTEM —SPECIFIC SYSTEM —SPECIFIC SYSTEM —SPECIFIC SYSTEM —SPECIFIC SYSTEM —SPECIFIC SYSTEM —SPECIFIC Testing C403.2.4.1.1 C404.3 C404.5 C404.5 C404.5 C404.6 C404.7.1 C404.7.3 C404.7.2 C408.2.3.2 I Mechanical Mechanical Mechanical Mechanical Mechanical i Automatic Controls: Setback to 55°F (heat) and 85°F (cool); 7-day clock, 2-hour occupant override, 10-hour backup Temperature controls installed on service water heating systems (110 OF for dwelling units and lavatories in public restrooms and 90 OF for other occupancies.) Automatic time switches installed to automatically switch off the recirculating hot-water system or heat trace. Heat traps installed on non -circulating storage water tanks. PTAC and PTHP with sleeves 16 in. by 42 in. labeled for replacement only as per Footnote b to Table C403.2.3(3). VAV fan >= 7.5 hp are driven by mechanical or electrical variable speed drive, or driven by vane -axial with variable speed blades, or operate with motor demand <=30% design kW at 50% design flow - calculations required HVAC piping insulation thickness. Where piping is installed in or under a slab, verification may need to occur during Foundation Inspection. Ductwork operating >3 in. water column requires air leakage testing. Reduce flow in pumping systems >10 hp to multiple chillers or boilers when others are shut down. Two -position automatic valve interlocked to shut off water flow when hydronic heat pump with pumping system >10 hp is off. Condenser heat recovery system that can heat water to 85 OF or provide 60% of peak heat rejection is installed for preheating of service hot water in 2417 facility, water cooled systems reject >6 MMBtu, SHW load >=1 MM13tu. Hot gas bypass limited to: <=240 kBtu/h — 50% >240 kBtu/h — 25% Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Systems include optimum start controls. Heat pump controls prevent supplemental electric resistance heat from coming on when not needed. Public lavatory faucet water temperature < 110°F. All piping in circulating system insulated First 8 ft of outlet piping is insulated All heat traced or externally heated piping insulated Controls are installed that limit the operation of a recirculation pump installed to maintain temperature of a storage tank. Pool heaters are equipped with on/off switch and no continuously burning pilot light. Vapor retardant pool covers are provided for heated pools and permanently installed spas. Time switches are installed on all pool heaters and pumps. HVAC control systems have been tested to ensure proper operation, calibration and adiustment of controls. ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ i ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑. ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option 9/22/2017 j Page 12 of 22 Mandatory Additional Eff C406 C402.2.8 Project Project Efficient HVAC performance, efficient lighting system, or on -site supply of renewable energy consistent with what is shown the approved plans. Bottom surface of floor structures incorporating radiant heating insulated to > 11-3.5. ❑ ❑ El 4. To be checked by Inspector at"Project Completion and Prior to Issuance of Certificate of Occupancy Post Construction C408.3 Exterio Lighting Lighting systems have been tested to ensure v❑� proper calibration, adjustment, programming, and operation. Post Construction C408.2.5.1 Interior Lighting Furnished as -built drawings for electric power El El El systems within 30 days of system acceptance. Post Construction C303.3,C408.2.5.2 Interior Lighting Furnished O&M instructions for systems and ❑ ❑ El equipment to the building owner or designated representative. Post Construction C408.3 Interior Lighting Lighting systems have been tested to ensure proper calibration, adjustment, programming, and operation. Post Construction C408.2.5.1 Mechanical Furnished HVAC as -built drawings submitted within 90 days of system acceptance. Post Construction C303.3,C408.2.5.2 Mechanical Furnished O&M manuals for HVAC systems within 90 days of system acceptance. Post Construction C408.2.5.3 Mechanical An air and/or hydronic system balancing report isEl El ❑ provided for HVAC systems. Post Construction C408.2.1 Mechanical Commissioning plan developed by registered design professional or approved agency. Post Construction C408.2.4 Mech nical Preliminary commissioning report completed and certified by registered design professional or r approved agency. Post Construction C408.2.5.4 Mechanical Final commissioning report due to building owner ❑ ❑ ❑ within 90 days of receipt of certificate of . Post Construction C408.2.3.1 Mechanical occupancy. HVAC equipment has been tested to ensure 1:1 El ❑ proper operation. Post Construction C406.2.3.3 Mechanical Economizers have been tested to ensure proper operation. EnergyGaUge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 Florida Building Code, Fifth Edition (2014) - Energy Corjservation IECC 2012 - Total Building Performance Compliance Option 9/22/2017 Page 13 of 22 InDut Data ReDOrt Project Name: Seacoast 2017-22 Address: 2601 Industrial Avenue 3 Owner: Seacoast Building Type: Office No.of Stories: 1 Bldg. Rotation: None No Acronym Description 1 PrOZol 2 PrOZo2 Zone 1 AHU-2 et Information Project Title: Seacoast#2017-22 State: Enter state here Building Classification: New Finished building GrossArea (SF): 3,501 Zones Zip: 0 Area Multi Total Area rsn Isfl 1626.9 1 1626.9 H 1874.0 1 1874.0 EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 - Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option 9/22/2017 Page 14 of 22 Spaces No Acronym Description Type Depth Width Height Mult Total Total [ft] [ft] [ft] Area Vol[ct] In Zone: PrOZol 1 PrOZo1 Sp Break Room Food Service - Leisure Dining 17.28 21.30 9.00 1 368.0 3311.9 ❑ 2 PrOZo 1 Sp2 Dana's Office Office - Enclosed 16.32 15.50 9.00 1 253.0 2276.6 ❑ 3 PrOZo1Sp3 Zo1Sp3 Electrical Mechanical 8.00 8.00 9.00 1 64.0 576.0 Equipment Room - General 4 PrOZo1Sp4 Engineering 1 Office - Enclosed 14.32 15.50 9.00 1 222.0 1998.0 ( 5 PrOZo1Sp5 MensBathroom Toilet and Washroom 10.23 17.50 9.00 1 179.0 1611.0 6 PrOZo 1 Sp6 Pat & John's Office Office - Enclo led 12.32 15.50 9.00 1 191.0 1718.9 ❑ 7 PrOZo1Sp7 West Corridor Corridor 5.30 66.00 9.00 1 350.0 3150.0 In Zone: PrOZo2 1 Pr0Zo2Sp1 Office - Enclosed 18.72 20.30 9.00 1 380.0 3420.0 Brandon's Office 2 PrOZo2Sp2 East Corridor 1 Corridor 11.98 18.70 9.00 1 224.0 2015.9 3 PrOZo2Sp3 Lobby/Reception 1 Corridor 32.13 15.50 9.00 1 498.0 4482.0 - 4 PrOZ-o2Sp4 Open Office 1 Office - Open Plan 25.65 30.10 9.00 1 772.0 6947.9 EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option 9/22/2017 Page 15 of 22 No Type In Zone: PrOZol In Space: PrOZo1Spl 1 LED In Space: PrOZo1Sp2 1 LED In Space: PrOZo1Sp3 1 LED In Space: Pr0Zo1Sp4 1 LED In Space: Pr0Zo1Sp5 1 LED In Space: Pr0Zo1Sp6 1 LED In Space: Pr0Zo1Sp7 1 LED • 2 LED In Zone: PrOZo2 In Space: PrOZo2Sp1 1 LED In Space: PrOZo2Sp2 1 LED 2 LED In Space: PrOZo2Sp3 1 LED 2 LED In Space: PrOZo2Sp4 1 LED Lighting Category No. of Watts per Power Control Type No.of Luminaires Luminaire [W] Ctrl pts General Lighting 6 19. 111 Manual On/Off 1 ❑ General Lighting 4 20 80 Manual On/Off 1 ❑ General Lighting 2 19 37 Manual On/Off 1 ❑ General Lighting 4 20 80 Manual On/Off 1 ❑ General Lighting 5 12 60 Manual On/Off 1 ❑ General Lighting 4 18 72 Manual On/Off I 1 ❑ General Lighting 1 12 12 Manual On/Off 1 ❑ General Lighting 1 19 19 Manual On/Off 1 ❑ General Lighting 6 20 120 Manual On/Off 1 ❑ General Lighting 3 12 36 Manual On/Off 1 ❑ General Lighting 4 19 74 Manual On/Off 1 ❑ I General Lighting 6 12 72 Manual On/Off 1 ❑ General Lighting 7 19 130 Manual On/Off 1 ❑ General Lighting 16 19 296 Manual On/Off 1 ❑ EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option 9/22/2017 Page 16 of 22 Walls (Walls will be rotated clockwise by building rotation value) No Description Type Width H (Effec) Multi Area Orient Cond- Heat Dens. R-Value [ftl [ft] plier [sf] ation uctance Capacity [lb/cf] [b.sf.FBtu] [Btu/h.sf.Fl [Btu/sf.Fl In Zone: PrOZol 1 East 1 Metal 43.00 12.00 1 516.0 East 0.0920 1.072 19.38 10.9 ❑ siding/2x4@24"+Rl 1Batt/5/8"Gyp 2 East 2 Metal 43.00 6.00 1 258.0 East 0.0920 1.072 19.38 10.9 ❑ siding/2x4@24"+Rl IBatt/5/8"Gyp 3 South I Metal 40. 0 12.00 1 480.0 South 0.0920 1.072 19.38 10.9 ❑ siding/2x4@24"+R1 1Batt/5/8"Gyp 4 South 2 Metal 40.)0 6.00 1 240.0 South 0.0920 1.072 19.38 10.9 ❑ siding/2x4@24"+Rl 1Batt/5/8"Gyp In Zone: PrOZo2 1 East 1 Metal 61.00 12.00 1 732.0 East 0.0920 1.072 19.38 10.9 ❑ siding/2x4@24"+Rl 1Batt/5/8"Gyp 2 East Metal 00 61.00 1 366.0 East 0.0920 1.072 19.38 10.9 ❑ siding/2x4@24"+RI lBatt/5/8"Gyp Windows (Windows will be rotated clockwise by building rotation\value) No Description Orientation Shaded U SHGC Vis.Tra W H (Effec) Multi Total Area [Btu/hr sf F] IN [ft] plier [sq In Zone: PrOZol In Wall: PrOZo1Wal 1 PrOZo1Wa1Wi1 East No 1.2500 0.82 0.76 3.00 5.00 4 60.0 ❑ In Wall: Pr0Zo1Wa3 1 PrOZo1Wa3WH South No 1.2500 0.82 0.76 3.00 5.00 2 30.0 ❑ In Zone: PrOZo2 In Wall: Pr0Zo2Wa1 1 PrOZo2Wa1Wil East No, 1.2500 0.82 0.76 3.00 5.00 4 60.0 2 PrOZo2Wa1Wi2 East No 1.2500 0.82 0.76 6.00 7.00 1 42.0 B EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option 9/22/2017 Page 17 of 22 4- Doors No Description Type Shade? Width H (Effec) Multi Area Cond. Dens. Ht Cap. R [ft] IN plier [sf] [Btu/h.sf.F] [lb/cf] [Btu/sf. [h.sEF/ Fl Btul In Zone: PrOZol In Wall: Pr0Zo1Wa3 1 PrOZolWa3Drl Solid core flush No 3.00 7.00 1 21.0 0.3504 0.00 0.00 2.85 ❑ (2.25) Roofs No Description Type Width H (Effec) Multi Area Tilt Cond. Heat Cap Dens. R-Value IN IN plier [sf] [deg] [Btu/h.Sf. F] [Btu/sE F] [lb/cf] [h.sf.F/Btu In Zone: PrOZol 1 PrOZo1Rfl Mtl Bldg Roof/R- 19 16.26 100.00 1 1626.0 0.00 0.0492 1.34 9.49 20.3 - Batt In Zone: PrOZo2 1 PrOZo2Rfl Mtl Bldg Roof/R-19 18.74 1'00.00 1 1874.0 0.00 0.0492 1.34 9.49 20.3 - Batt Skylights No Description Type U SHGC Vis.Trans W H (Effec) Multi- Area Total Area [Btu/hr A F i [ft] IN plier [Sf] [Sf] In Zone: I In Roof: i I a e I EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option 9/22/2017 Page 18 of 22 Floors No Description Type Width H (Effec) Multi Area Cond. Heat Cap. Dens. R-Value [ft] [ft] plier [sf] [Btu/h.sf.F [Btu/sE F] [lb/cf] [h.sf.F/]Btu i In Zone: PrOZol 1 Pr0Zo1F11 I ft. soil, concrete 16.26 100.00 1 1626.0 0.2681 34.00 113.33 3.73 ❑ floor, carpet and rubber pad In Zone: PrOZo2 1 PrOZo21711 1 ft. soil, concrete 18.74 100.00 1 1874.0 0.2681 34.00 113.33 3.73 ❑ flo f, carpet and rubber pad i Systems PrOSyl s System, 1 Constant Volume Air Cooled No. Of Units Split System < 65000 Btu/hr 1 Component Category Capacity Efficiency IPLV 1 Cooling System 60000.00 16.50 8.00 ❑ 2 Heating System 19642.00 1.00 ❑ 3 Air Handling System -Supply 1950.00 0.10 ❑ 4 Air Distribution System (Sup) 8.00 ❑ 5 Air Distribution System (Ret) 8.00 ❑ 6 Energy Recovery Unit ❑ PrOSy2 AHU/CU-2 Constant Volume Air Cooled No. Of Units Split System < 65000 Btu/hr 1 Component Category Capacity Efficiency H'LV 1 Cooling System 60000.00 16.50 8.00 ❑ 2 Heating System 19642.00 1.00 ❑ 3 Air Handling System -Supply 1720.00 0.11 ❑ 4 Air Handling System - Return 1720.00 0.11 ❑ 5 _ Air Distribution System (Sup) 8.00 ❑ 6 Air Distribution System (Ret) 8.00 ❑ 7 Energy Recovery Unit ❑ 9 EnergyGauge Summit® Fla/Com-2014. TAM 20 4-1.0 Compliant Software. Effective Date: June 30, 2015 • Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option 9/22/2017 Page 19 of 22 Plant Equipment Category Size Inst.NoEff. IPLV Water Heaters W-Heater Description Capacity Cap.Unit I/P Rt. Efficiency Loss 1 Electric water heater 50 [Gal] 6 [kW] 1.0000 [Ef] [Btu/h] ❑ Ext-Lighting Description - Category No. of Watts Lumin- per aires Lumin- Area/Len/No [sVft/No] Control Type Wattage [w] a Ext Light 1 Canopies (freestanding, attached and Overhangs) 4 12 74.00 Astronomical Timer ( 48.00 ❑ -Piping No T e Operating Temp [i] Insulation Conductivity [ Btu-in/h.sf.F] Nomonal pipe Diameter [in] Insulation Thickness [in] Is Runout? 1 Domestic and Service Hot Water �05.00 Systems 0.28 0.75 1.00 No ❑ EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option 9/22/2017 Page 20 of 22 i6 Fenestration Used Name Glass Type No. of Glass SHGC VLT Conductance .Panes , [Btu/h.sf.F] ASHULSg1C1rA11 User Defined 1 1.2500 0.8200 0.7600 Frm Materials Used Only RValue Thick Cond- Density Sp. Heat Mat No Acronym Description R-Value [h.sf.F/Btu] IN uctivity [lb/cf] [Btu/lb.F] Used [Btu/h.ft.F 187 Matl l87 GYP OR PLAS No 0.4533 0.0417 0.0920 50.00 0.2000 ❑ BOARD,1/2IN 178 Mat1178 CARPET W/RUBBER PAD Yes 1.2300 ❑ 265 Mat1265 Soil, 1 ft No 2.0000 1.0000 0.5000 100.00 0.2000 ❑ 48 Mat148 6 in. Heavyweight concrete No 0.5000 0.5000 1.0000 140.00 0.2000 ❑ 23 Mat123 6 in. Insulation No 20.0000 0.5000 0.0250 5.70 0.2000 ❑ 4 Mat14 Steel siding No 0.0002 0.0050 26.0000 480.00 0.1000 ❑ 271 Mat1271 2x4@24" oc + RI 1 Batt No 10.4179 0.2917 0.0280 7.11 0.2000 ❑ 279 Mat1279 Solid core flush (2.25") Yes 2.8537 ❑ 94 Mat194 BUILT-UP ROOFING, No 0.3366 0.0313 0.0930 70.00 0.3500 ❑ 3/81N I EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 • Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option 9/22/2017 Page 21 of 22 ' Constructs Used No Name Simple Massless Conductance Heat Cap Density RValue Construct Construct [Btu/hsf.F] [Btulsf.F] [Ib/cf] [hsf.FBtu] 1055 Metal No I No 0.09 1.07 19.38 10.9 siding/2x4@24"+R11Batt/5/8"Gyp Layer Material Material Thickness Framing No. [ft] Factor 1 4 Steel siding 0.0050 0.000 ❑ 2 271 2x4@24" oc + Rl 1 att 0.2917 0.000 ❑ 3 187 GYP OR PLAS BOARD,1/21N 0.0417 0.000 ❑ No Name SimpiIe Massless Conductance Heat Cap Density RValue Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/cf] [h.sf.FBtu] 1056 Mtl Bldg Roof/R-19 Batt No No 0.05 1.34 9.49 20.3 ❑ , Layer Material Material Thickness Framing No. [ft] Factor 1 94 BUILT-UP ROOF G, 3/81N 0.0313 0.000 ❑ - 2 23 6 in. Insulation 0.5000 0.000 El No Name Simpl a Massless Conductance Heat Cap Density RValue . Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/cl] [h.sf.FBtu] 1057 1 ft. soil, concrete floor, carpet and N i No 0.27 34.00 113.33 3.7 ❑ rubber pad Layer Material. Material Thickness Framing No. [ft] Factor 1 265 Soil, 1 ft 1.0000 0.000 ❑ ❑ 2 48 6 in. Heavyweight ncrete 0.5000 0.000 3 178 CARPET W/RUBBER PAD I 0.000 ❑ Simple Massless Conductance Heat Cap Density RValue No Name Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/ct] [h.sf.F/Btu] 1058 Solid core flush (2.25) No Yes 0.35 2.9 Layer Material Material Thickness Framing No. [ft] Factor 1 279 Solid core flush (2125") I 0.000 ❑ I EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015 Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option 9/22/2017 Page 22 of 22 EnergyGauge Summit® v5.20 11 PUT DATA REPORT Project Name: Seacoast 2017-22 Project Title: Seacoast#2017-22 Address: 2601 Industrial Avenue 3 State: Enter state here Zip: 0 Owner: Seacoast Pro*ect Information Orientation: 0 Deg Clockwise. Walls & Windows will be rotated accordingly Building Tape: Office Building Classification: New Finished building No.of Stories: I GrossArea: 3501 SF Zones No Acronym Description Type I Area Multiplier Total Area fsfl fsfl 1 P:OZol Zane 1 Comm'ONED 1626.9 1 1626.9 El 2 PrOZo2 AHU-2 CONDITIONED 1874.0 1 1874.0El 9/22/2017 EnergyGauge Summit® v5.20 I � I � I I 1 Spaces / multi Total Area Total Volume Depth Width H[f j t er [SA[ctl No Acronym Description / Type [ft] [ft.]❑ 1 368 0 3311.9 1728 . 21.30 9.00 In Zone: Pr0Zo1 I ProZolSp1 Break Room Food Service -Leisure Dining 9.00 1 253.0 2276.E ❑ 16.32 15.50 $76.0 2 1'r0Zo1Sp2 Danas0ffice Office - Enclosed 8.00 8.00 9.00 1 64.0 Electrical Mechanical 1998.0 3 Pr0Zo1Sp3 Zo1Sp3 EquipmentRoom- General 14.32 15.50 9.00 1 222.0 ❑ 4 Pr0ZolSp4 Engineering 1 Office - Enclosed 1023 17.50 9.00 1 179.0 1611.0 ❑ 5 Pr0Zo1Sp5 Mens Bathroom Toilet and Washroom . 9.00 1 191.0 1718.9 Office -Enclosed 12.32 15.50 3150.0 6 PrOZ0ISp6 Pat & John's Office / 5.30 66.00 9.00 1 350.0 7 PrOZ0ISP7 West/Corridor ' Corridor ❑ 1 380.0 3420.0 In Zone: Pr0Zo2 / Office -Enclosed 18,72 20.30 9.00 1 ProZo2Sp1 1 224.0 2015.9 ❑ Brandon's Office East Corridor 1 Corridor 11.98 18.70 9.00 4482.0 2 Pr0Zo2Sp2 Com or 32.13 15.50 9.00 1 498 0 3 Pr0Zo2SP3 Lobby/Reception 1 772.0 6947.9 ❑ 4 Pr0Zo2Sp4 Open Office 1 Office - Open Plan 25.65 30.10 9.00 1 / Lighting No Type Category No. of Watts per Power Control Type No.of Luminaires Luminaire 1W1 Ctrl pts In Zone: ' PrOZol In Space: Pr0Zo1Sp1 1 LED General Lighting 6 19 111 Manual On/Off 1 Q In Space: Pr0Zo1Sp2 1 LED General Lighting 4 20 80 Manual On/Off ] 0 In Space: Pr0ZolSp3 i 9/22/2017 EnergyGauge Summit® v5.20 2 I LED General Lighting 2 19 37 Manual On/Off 1 ❑ In Space: Pr0Zo1Sp4 1 LED General Lighting 4 20 80 Manual On/Off I ❑ In Space: Pr0Zo1Sp5 1 LED General Lighting 5 12 60 Manual On/Off 1 ❑ In Space: PrOZo1Sp6 1 LED General Lighting 4 18 72 Manual On/Off 1 ❑ In Space: PrOZolSp7 1 LED General Lighting 1 12 12 Manual On/Off 1 2 LED General Lighting 1 19 19 Manual On/Off 1 ❑ In Zone: PrOZ02 In Space: Pr0Zo2Sp1 1 LED General Lighting 6 20 120 Manual On/Off 1 ❑ In Space: Pr0Zo2Sp2 1 LED General Lighting 3 12 36 Manual On/Off 1 ❑ _ 2 LED General Lighting 4 19 74 Manual On/Off 1 ❑ In Space: PrOZo2Sp3 I 1 LED General Lighting 6 12 72 Manual On/Off 1 ❑ 2 LED General Lighting 7 19 130 Manual On/Off 1 ❑ In Space: Pr0Zo2Sp4 1 LED General Lighting 16 19 296 Manual On/Off 1 ❑ Walls (Walls will be rotated clockwise by building rotation value) No Description Type Width H(Effec) Multi Area Orientation Conductance Heat Dens. R-Value [ft] im plier ]sf] [Btu/hr. st F] Capacity [Ih/cf] [h.sLF/Btu] [Btu/sf.F] In Zone: PrOZol 1 East 1 Metal 43.00 12.00 1 516.0 East 0.0920 1.072 19.38 10.9 ❑ siding/2x4@24"+Rl 1Batt/5/8"Gyp 2 East 2 Metal 43.00 6.00 1 258.0 East 0.0920 1.072 19.38 10.9 ❑ siding/2x4@24"+Rl 1Batt/5/8"Gyp 9/22/201Y EneruGauge Summit® v5.20 3 3 South 1 Metal 40.00 12.00 1 480.0 South 0.0920 1.072 19.38 10.9 ❑ siding/2x4@24"+Rl 1Batt/5/8"Gyp 4 South 2 Metal 40.00 6.00 1 240.0 South 0.0920 1.072 19.38 10.9 ❑ siding/2x4@24"+Rl lBatt/5/8"Gyp In Zone: PrOZo2 1 East 1 Metal 61.00 12.00 1 732.0 East 0.0920 1.072 19.38 10.9 ❑ siding/2x4@24"+Rl 1Batt/5/8"Gyp 2 East 2 Metal 6.00 61.00 1 366.0 East 0.0920 1.072 19.38 10.9 ❑ siding/2x4@24"+Rl lBatt/5/8"Gyp Windows (Windows will ble rotated clockwise by building rotation value) No Description Orientation Shaded SHGC Vis.Tra W H (Effee) Multi Total Area /hU [Btur sf F1 [ft] [ft] plier [sf] In Zone: PrOZol In Wall: PrOZo1Wal 1 PrUolWalWil East No 1.2500 0.82 0.76 3.00 5.00 4 60.0 El In Wall: Pr0Zo1Wa3 1 PrO&IWa3Wi1 South No 1.2500 0.82 0.76 3.00 5.00 2 30.0 In Zone: PrOZo2 In Wall: Pr0Zo2Wa1 1 PrOZo2WalWil East No 1.2500 0.82 0.76 3.00 5.00 4 60.0 2 PrOZo2WalWi2 East No 1.2500 0.82 0.76 6.00 7.00 1 42.0 HI ' 'Doors No Description Type Shaded? Width H (Effec) Multi Area Cond. Dens. Heat Cap. R-Value IN [ft] plier [sf] [Btu/hr. st F] [Ib/cf] [Btu/st Fl [h.st.F/Btu1 In Zone: PrOZol In Wall: Pr0Zo1Wa3 1 PrOZolWa3Drl Solid core flush No 3.00 7.00 1 21.0 0.3504 0.00 0.00 2.85 (2.25) I 9/22/2017 EnergyGauge Summit® v5.20 i i R' I 4 4 Roofs No Description Type, Width H (Effec) Multi Area Tilt Cond. Heat Cap Dens. R-Value [ft] [ft] plier [sf] [deg] [Btu/hr. Sf. F] [Btu/sf. F] [lb/cf] [b.sEF/Btu] In Zone: PrOZol 1 PrOZolRf1 Mfl Bldg Roof/R-19 16.26 100.00 1 1626.0 0.00 0.0492 1.34 9.49 20.3 ❑ Batt In Zone: PrOZo2 I PrOZo2Rfl Mtl Bldg Roof/R-19 18.74 100.00 1 1874.0 0.00 0.0492 1.34 9.49 20.3 ❑ Batt Skylights No Description Type U SHGC Vis.Trans W H (Effec) Multiplier Area Total Area [Btu/hr sf F] [ft] [ft] 1Sf] [Sf] In Zone: In Roof: Floors No Description Type Width' H (Effec) Multi Area Cond. Heat Cap. Dens. R-Value [ft] [ft] plier [sf] [Btu/hr. sf. F] [Btu/sE F] [Ib/cf] [h.sEF/Btu] In Zone: PrOZol 1 PrOZo1Fl1 1 ft soil, concrete 16.26 100.00 1 1626.0 0.2681 34.00 113.33 3.73 ❑ floor, carpet and rubber pad In Zone: PrOZo2 I PrOZo2Fl1 1 ft soil, concrete 18.74 100.00 1 1874.0 0.2681 34.00 113.33 3.73 ❑ floor, carpet and rubber pad i En rgyGauge Summit® v5.20 5 Systems PrOSyl System 1 Constant Volume Air Cooled Split System < 65000 Btu/hr No. Of Units 1 Component Category Capacity Efficiency IPLV 1 2 3 4 5 6 Cooling System Heating System Air Handling System -Supply Air Distribution System (Sup) Air Distribution System (Ret) Energy Recovery Unit 60000.00 16.50 19642.00 1.00 1950.00 0.10 8.00 8.00 8.00 El ❑ ❑ ❑ El PrOSy2 AHU/CU-2 Constant Volume Air Cooled Split System < 65000 Btu/hr No. Of Units 1 Corponent Category Capacity Efficiency IPLV 1 2 3 4 5 6 7 Cooling System Heating System Air Handling System -Supply Air Handling System - Return Air Distribution System (Sup) Air Distribution System (Ret) Energy Recovery Unit 60000.00 16.50 19642.00 —1.00 1720.00 0.11 1720.00 0.11 8.00 8.00 8.00 ❑ El Plant Equipment Category size InstNo Eff. IPLV El Water Heaters W-Heater Description Capacity Cap.Unit i UP Rt Efficiency Loss 9/22/2017 En IrgyGauge Summit® v5.20 6 S Ext-Lighting Description Category No. of Watts per Area/Len/No. of units Control Type Wattage Luminaires Luminaire [sf/ft/No] [W] I Ext Light I Canopies (freestanding, 4 12 74.00 Astronomical Timer Contra 48.00 ❑ attached and Overhangs) Piping Operating Insulation Nomonal pipe Insulation Is Runout? No Type Temperature Conductivity Diameter Thickness [F] [ Btu-in/b.sf.F) [in] [in] I Domestic and Service Hot Water Systems 105.00 0.28 0.75 1.00 No ❑ I Fenestration Used Name Glass Type No. of Glass SHGC VLT Conductance Panes 111"'sEF) ASHULSg1CIrAll User Defined I 1.2500 0.8200 0.7600 ❑ Frm I Materials Used Only R-Value RValue Thickness Conductivity Density SpecificHeat Mat No Acronym Description Used [h.sEF/Btu] [it] [Btu/h.ft.F] [kb/ct] [Btu/Ib.F) 187 Matl187 GYP OR PLAS No i 0.4533 0.0417 0.0920 50.00 0.2000 Li BOARD,1/2IN 178 Mad178 CARPET W/RUBBER PAD Yes; .1.2300 ❑ 9/22/2017 EuergyGauge Summit® v5.20 7 265 Mat1265 Soil, 1 ft No 2.0000 1.0000 0.5000 100.00 0.2000 0 48 Mat148 6 in. Heavyweight concrete No 0.5000 0.5000 1.0000 140.00 0.2000 ❑ 23 Mat123 6 in. Insulation No 20.0000 0.5000 0.0250 5.70 0.2000 ❑ 4 Mat14 Steel siding No 0.0002 0.0050 26.0000 480.00 0.1000 ❑ 271 Mat1271 2x4@24" oc+RII Batt No 10.4179 0.2917 0.0280 7.11 0.2000 ❑ 279 Mat1279 Solid core flush (2.25") Yes 2.8537 ❑ 94 Mat194 BUILT-UP ROOFING, No 0.3366 0.0313 0.0930 70.00 0.3500 El 3/81N Constructs Used Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/b.sf.F] ]Btu/sf.F] [lb/cfl [h.sf.F/Btul 1055 Metal siding/2x4@24"+R11Batt/5/8"Gyp No No 0.09 1.07 19.38 10.9 ❑ Layer Material Material Thickness Framing • No. [ft] Factor 1 4 Steel siding 0.0050 0.000 ❑ 2 271 2x4@24" oc+Rll Batt 0.2917 0.000 ❑ 3 187 GYP OR PLAS BOARD,1/21N 0.0417 0.000 ❑ Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/cfl [h.sf.F/Btu] 1056 Mtl Bldg Roof/R-19 Batt No No 0.05 1.34 9.49 20.3 ❑ Layer Material Material Thickness Framing No. [ft] Factor 1 94 BUILT-UP ROOFING, 3/81N 0.0313 0.000 ❑ 2 23 6 in. Insulation 0.5000 0.000 ❑ 9/22/2017 4 EnergyGauge Summit® v5.20 8 Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/b.sEF] [Btu/sEF] [lb/cf] [h.sf.F/Btul 1057 i 1 fL soil, concrete floor, carpet and rubber pad No No 0.27 34.00 113.33 3.7 ❑ Layer Material i Material Thickness Framing No. IN Factor 1 265 Soil, 1 ft 1.0000 0.000 ❑ 2 48 6 in. Heavyweight concrete 0.5000 0.000 ❑ 3 178 CARPET W/RUBBER PAD 0.000 ❑ Simple Massless Conductance Heat Capacity Density RValue No Name Construct Construct [Btu/h.sEFl [Btu/sf.Fl [lb/cfj [b.sEF/Btu] 1058 Solid core flush (2.25) No Yes 0.35 2.9 ❑ Layer Material Material Thickness Framing \ No. IN Factor 1 279 Solid core flush (2.25") 0.000 ❑ 9/22/2017 EnergyGauge Summit® v5.20 9 0 Profiles 0 0 No Classification No Classification 201 People 2 Fractional Null Schedule 202 Lighting 2 Fractional Null Schedule 203 Infiltration 2 Fractional Null Schedule 204 Equipment 2 Fractional Null Schedule 205 Sources 2 Fractional Null Schedule 206 HeatTemp 202 Set Point 55 207 CoolTemp 201 Set Point 99 208 Hot Water Schedule 2 Fractional Null Schedule 1,001 Heating Schedule 1 ON -OFF Null Schedule 1,002 Cooling Schedule 1 ON -OFF Null Schedule 1,003 Fan Operation SchedL 1 ON -OFF Null Schedule 501 501 ACM-NonRes ACM Nonres 201 People 519 ACM Nonres People 202 Lighting 507 ACM Nonres Lights 203 Infiltration 616 ACM Nonres Infiltration 204 Equipment 510 ACM Nonres Equipment 205 Sources 2 Fractional Null Schedule 206 HeatTemp 501 ACM Nonres Heating 207 CoolTemp 504 ACM Nonres Cooling 208 Hot Water Schedule 522 ACM Nonres Hot Water 1,001 Heating Schedule 410 Always ON 1,002 Cooling Schedule 410 Always ON 1,003 Fan Operation SchedL 513 ACM Nonres Fans 9f2212017 Summit® v510 10 t I Schedules 1 1 On/Off I ON -OFF Null Schedule Hourly Sch. for: Monday Tuesday Wednesday Thursday Friday Saturday Sunday Holiday 12/31/1989 ShHr1 ShHr1 ShHr1 ShHr1 ShHr1 ShHr1 ShHr1 ShHr1 2 2 Fraction Fractional Null Schedule Hourly Sch. for: Monday Tuesday Wednesday Thursday Friday Saturday Sunday Holiday 12/31/1989 ShHr2 ShHr2 ShHr2 ShHr2 ShHr2 ShHr2 ShHr2 ShHr2 . 4R 44 Absolute SetPt78 Hourly Sch. for: Monday Tuesday Wednesday Thursday Friday Saturday Sunday Holiday 12/31/1989 ShHr179 ShHr179 ShHr179 ShHr179 ShHr179 ShHr179 ShHr179 ShHr179 45 45 Absolute Set Point 70 Hourly Sch. for: Monday Tuesday Wednesday Thursday Friday Saturday Sunday Holiday 12/31/1989 ShHr180 ShHr180 ShHr180 ShHr180 ShHr180 ShHr180 ShHr180 ShHr180 201 201 Absolute Set Point 99 Hourly Sch. for: Monday Tuesday Wednesday Thursday Friday Saturday Sunday Holiday 12131/1989 ShHr201 ShH2O1 ShH2O1 ShH2O1 ShH2O1 ShH2O1 ShH2O1 ShH2O1 202 202 Absolute Set Point 55 Hourly Sch. for: Monday Tuesday Wednesday Thursday Friday Saturday Sunday Holiday 12/31/1989 ShH2O2 ShH2O2 ShH2O2 ShH2O2 ShH2O2 ShH2O2 ShHr202 ShH2O2 9/22/2017 I EnergyGauge Summit@ v5.20 I I1 410 410 On/Off Always ON I Hourly Sch. for. Monday Tuesday Wednesday Thursday Friday Saturday Sunday Holiday 12/31/1989 ShHr410 ShHr410 ShHr410 ShHr410 ShHr410 ShHr410 ShHr410 ShHr410 i Absolute Florida Commercial Electric Rate 412 412 Hourly Sch. for: Monday Tuesday i Wednesday Thursday ' Friday Saturday Sunday Holiday 3/31/1989 ShHr413 ShHr413 ShHr413 ShHr413 ShHr413 ShHr415 ShHr415 ShHr415 10/31/1989 ShHr412 ShHr412 ShHr412 ShHr412 ShHr412 ShHr412 ShHr414 ShHr414 12/31/1989 ShHr413 ShHr413 ShHr413 ShHr413 ShHr413 ShHr415 ShHr415 ShHr415 _ 501 501 Absolute AC Nonres Heating Hourly Sch. for: Monday Tuesday Wednesday Thursday Friday Saturday Sunday Holiday 12/31/1989 ShHr501 ShHr501 ShHr501 ShHr501 ShHr501 ShHr502 ShHr503 ShHr503 504 504 Absolute AC i Nonres Cooling Hourly Sch. for: Monday Tuesday Wednesday Thursday Friday Saturday Sunday Holiday 12/31/1989 ShHr504 ShHr504 ShHr504 ShHr504 ShHr504 ShHr505 ShHr506 ShHr506 507 507 Fraction ACM Nonres Lights Hourly Sch. for: Monday Tuesday Wednesday Thursday Friday Saturday Sunday Holiday 12/31/1989 ShHr507 ShHr507 ShHr507 ShHr507 ShHr507 ShHr508 ShHr509 ShHr509 510 510 Fraction ACM Nonres Equipment Hourly Sch. for: Monday Tuesday Wednesday Thursday Friday Saturday Sunday Holiday 12/31/1989 ShHr510 ShHr510 ShHr510 ShHr510 ShHr510 ShHr511 ShHr512 ShHr512 513 513 On/Off ACM Nonres Fans Hourly Sch. for: Monday Tuesday Wednesday Thursday Friday Saturday Sunday Holiday 12/31/1989 ShHr513 ShHr513 ShHr513 ShHr513 ShHr513 ShHr514 ShHr515 ShHr515 9/22/2019 I EnergyGauge Summit® v5.20 I I I r 12 516 516 Fraction ACM Nonres Infiltration Hourly Sch. for: Monday Tuesday Wednesday Thursday Friday Saturday Sunday Holiday 12/31/1989 ShHr516 ShHr516 ShHr516 ShHr516 I ShHr516 ShHr517 ShHr518 ' ShHr518 519 519 Fraction ACM I Nonres People Hourly Sch. for: Monday Tuesday Wednesday Thursday Friday Saturday Sunday Holiday 12131/1989, ShHr519 ShHr519 ShHr519 ShHr519 ShHr519 ShHr520 ShHr521 ShHr521 522 522 Fraction ACM Nonres Hot Water Hourly Sch. for: Monday Tuesday Wednesday Thursday Friday Saturday Sunday Holiday 12131/1989 ShHr522 ShHr522 ShHr522 ShHr522 ShHr522 ShHr523 ShHr524 ShHr524 1,001 " 1,001 Absolute Absolute null schedule Hourly Sch. for: Monday Tuesday Wednesday Thursday Friday Saturday Sunday Holiday 12/31/1989 ShHr10001 ShHr10001 ShHr10001 I ShHr10001 ShHr10001 ShHr10001 ShHr10001 ShHr10001 1,002 1,002 Absolute Absolute null schedule Hourly Sch. for: Monday Tuesday Wednesday j Thursday Friday Saturday Sunday Holiday 12/31/1989 ShHr10002 ShHr10002 ShHr10002 ShHr10002 ShHr10002 ShHr10002 ShHr10002 ShHr10002 9/22/2017 EnergyGauge Summit® v5.20 I i • I 13 0 m 0 00LLLL LLLL LL LL Op Op m 00 O mm m )n LO NZ Z LLLL ZLLLL LL Om7 Cm0 LL 00 O 00 O co 0 0 0 o n n n n n n m m m v v v 0 0 000 0 0 0 0 0 0 m m Oo , OD LL LL LL m m m 0 O O m m m CO CO)) Z Z Z LL LL LL O O O OO 000 000 onn rlrr rnmm mvv v00 000 Oco 0 o m 0 m Oo m y, LLLL LL - co OD m00 Om m m)nm )n ZZ ZLL LLLL LL00 0 00 000 000 onn nnn rmm mvv V-00 000 Ooo 0 m v v m N O m (D n LLLL LL ZZ ZLLLL LL00 0 � OO 0oo 000 00 00 orr m00 nlnn O m m nmm 0m W) mvv )n v00 000 Ooo c 12 o' 'o 'o oo ro O OD to ^� LLLLLL LLLL Op Op m00 Omm mu))a LOZZ ZLLLL LLLL LLLL 00m 0 OO OOO OOo Onr Innl. nm m mvv v00 000 Ooo 0 y�C LLL LLL mmm LLL LLLL L L co co m00 Om CD mN)a mZZ ZLLLLLL Lo 0 0 00 000 0000 nrr nrna) a)vv v 0 0 000 000 0 0 0 m m m m LL LL LL m m m 0 0 O m a) m LO Cn Cn Z Z Z LL LL LL LL LL O Cl) (0 00 000 000 onn rnn nmm mvv v 0 0 000 0o0 0 00 Do LLLL LL LL LL LL Cl) m m Ca 0 O O a) a) a) Cn )n Lo Z Z Z LL LL 000 0 00 000 000 onn nnn nmm mvv v00 000 0o0 0 w a`) E E NU O N N U) OC OC HOT C dmmmm a T Q Q 0 m 0d dNp, Q❑OCD Ta7 L ❑ ❑ 7 'a Y a)U U m a O a N a o a) < d d CV Q) E <Op m o o U vL v� c 2 2 S�Z 2 2 2 2 2 2 2 rn O L L Z L L n n m O L U co Z c C CA r �, U) C Cn C w, fA C 0) Vi C_ L'n 0 C) 0 COCn Q Q < O N V. - 0 O O m m OLL .O Cl N LL O Ca < Na - ar- N m< N N —ID N N v 3 v 3 v 0 a LL .0 Q co Cn Cn m Q a LL a P7 gO y " m n W ' O N a Y 413 ShHr413 Absolute 0.03804 0.03804 0.03804 0.03804 0.03804 0.0686 0.0686 0.0686 Florida Avg. Week Day Winter Ele 0.0686 0.0686 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.0686 0.0686 0.0686 0.0686 0.0686 0.03804 0.03804 414 ShHr414 Absolute 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 Florida Avg. Week End Summer E 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 415 ShHr415 Absolute 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 Florida Avg. Week End Winter Ele 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 0.03804 501 ShHr501 Absolute 60 60 60 60 60 65 65 70 ACM Nonres Heating Weekday 70 70 70 70 70 70 70 70 70 70 65 60 60 60 60 60 502 ShHr502 Absolute 60 60 60 60 60 65 65 65 ACM Nonres Heating Saturday 65 65 65 65 65 65 65 65 60 60 60 60 60 60 60 60 503 ShHr503 Absolute 60 60 60 60 60 65 65 65 ACM Nonres Heating Sunday 65 65 65 65 65 65 65 65 60 60 60 60 60 60 60 60 504 -ShHr504 Absolute 77 77 77 77 77 73 73 73 ACM Nonres Cooling Weekday 73 73 73 73 73 73 73 73 73 73 77 177 77 77 77 77 505 ShHr505 Absolute 77 77 77 77 77 73 73 73 ACM Nonres Cooling Saturday 73 73 73 73 73 73 73 73 73 73 77 77 77 77 77 77 506 ShHr506 Absolute 77 77 77 77 77 73 73 73 ACM Nonres Cooling Sunday 73 73 73 73 73 73 73 73 73 73 77 I77 77 77 77 77 507 ShHr507 Fraction 0.05 0.05. 0.05 0.05 0.1 0.2 0.4 0.7 ACM Nonres Lights Weekday 0.8 0.85 0.85 , 0.85 0.85 0.85 0.85 0.85 0.85 0.8 0.35 10.1 0.1 0.1 0.1 0.1 508 ShHr508 Fraction 0.05 0.05 0.05 .0.05 0.05 0.1 0.15 0.25 ACM Nonres Lights Saturday 0.25 0.25 0.25 0.25 0.25 0.25 0.2 0.2 0.2 0.15 0.1 0.1 0.1 0.1 0.1 0.1 509 ShHr509 Fraction 0.05 0.05 0.05 10.05 0.05 0.1 0.1 0.15 ACM Nonres Lights Sunday 0.15 0.15 0.15 10.15 0.15 0.15 0.15 0.15 0.16 0.1 0.1 10.1 0.05 0.05 0.05 0.05 510 ShHr510 Fraction 0.15 0.15 0.15 0.15 0.15 0.2 0.35 0.6 ACM Nonres Equipment Weekday 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.65 0.45 0.3 ;0.2 0.2 0.15 0.15 0.15 M2/2017 EnergyGauge Summit® v5.20 is 511 ShHr511 Fraction 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.2 ACM Nonres Equipment Saturday 0.25 0.25 0.25 0.25 0.25 0.25 0.2 0.2 0.2 0.15 0.15 0.15 0.15 0.15 0.15 0.15 512 ShHr512 Fraction 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.2 ACM Nonres Equipment Sunday 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.15 0.15 0.15 0.15 0.15 0.15 0.15 513 ShHr513 .On/Off OFF OFF OFF OFF OFF ON ON ON ACM Nonres Fans Weekday ON ON ON ON ON ON ON ON ON ON ON ON OFF OFF OFF OFF 514 ShHr514 On/Off OFF OFF OFF OFF OFF ON ON ON ACM Nonres Fans Saturday ON ON ON ON ON ON ON OFF OFF OFF OFF OFF OFF OFF OFF OFF 515 ShHr515 On/Off OFF OFF OFF OFF OFF OFF OFF OFF ACM Nonres Fans Sunday OFF OFF OFF I OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF ` OFF OFF OFF 516 ShHr516 Fraction 1 1 1 1 1 0 0 0 ACM Nonres Infiltration Weekday 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 517 'ShHr517 Fraction 1 1 1 1 1 0 0 0 ACM Nonres, Infiltration Saturday 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 518 ShHr518 Fraction 1 1 1 1 1 1 1 1 ACM Nonres Infiltration Sunday 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 519 ShHr519 Fraction 0 0 0 0 0.05 0.1 0.25 0.65 ACM Nonres People Weekday 0.65 0.65 0.65 0.6 0.6 0.65 0.65 0.65 0.65 0.4 0.25 0.1 0.05 0.05 0.05 0 520 ShHr520 Fraction 0 0 0 0 0 0 0.05 0.15 ACM Nonres People Saturday 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.05 0.05 0.05 0 0 0 0 521 ShHr521 Fraction 0 0 0 0 0 0 0 0.05 ACM Nonres People Sunday 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0 0 0 0 522 ShHr522 Fraction 0 0 0 0 0.1 0.1 0.5 0.5 ACM Nonres Hot Water Weekday 0.5 0.5 0.7 0.9 0.9 0.5 0.5 0.7 0.5 0.5 0.5 0.1 0.1 0.1 0.1 0.1 523 ShHr523 Fraction 0 0 0 0 0 0 0.1 0.2 ACM Nonres Hot Water Saturday 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0 0 0 0 % 9/22/200 EnergyGauge Summit® v5.20 I I 16 J i 524 ShHr524 Fraction 0 0 0 0 0 0 0 0.1 ACM Nonres Hot Water Sunday 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0 0 0 0 3,001 ShHr1000' Absolute 0 0 0 0 0 0 0 0 Absolute Null Schedule 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3,002 ShHr1000. Absolute 0 0 0 0 0 0 0 0 Absolute Null Schedule 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9/22/20117 iEnergyGauge Summit® v5.20 17