HomeMy WebLinkAboutPROJECT SUMMARYt
Florida Building Code; Fifth Edition (2014) - Energy Conservation
r EnergyGauge Summit@ Fla/Co 201.5, Effective Date: June 30, 2015
:.;
IECC 2012 - Total BuildingRerformance Compliance Option
SCANNED i
St Lucie COUO2V
Check List
• 0
9/22/2017
Applications for compliance with the Flo 'ida Building Code, Energy Conservation shall include:
This Checklist
The full compliance report generated by the software that contains the project
summary, compliance summary, ce ifications and detailed component compliance
reports.
The compliance report must include he full input report generated by the software as
.contigous part of the compliance report.
El• Boxes appropriately checked in the 1V�Iandatory Section of the complaince report.
EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0.Compliant Software. Effective Date: June 30, 2015•
Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
Page 1 of 22
z
■
9/22/2017
Short Desc: Seacoast 2017-22
Owner: Seacoast
Addressl: 2601 Industrial Avenue
Addressl:
Type: Office
Jurisdiction: FORT PIERCE, ST
Conditioned Area: 3501 SF
No of Stories: 1
Permit No: 0
ROJECT SUMMARY
Description: Seacoast #2017-22
City:
Ft. Pierce
State:
Enter state here
Zip:
0
Class:
New Finished building
COUNTY, FL (661100)
Conditioned & UnConditioned Area: 3501 SF
Area entered from Plans 3500 SF
Max Tonnage 5
If different, write in:
Compliance
Summary
Component
Design Criteria Result
Gross Energy Cost (in $)
2,329.0 3,237.0 PASSED
LIGHTING CONTROLS
PASSES
EXTERNAL LIGHTING
PASSES
HVAC SYSTEM
PASSES
PLANT
No Entry
WATER HEATING SYSTEMS
PASSES
PIPING SYSTEMS
PASSES
Met all required compliance from Check Li
t? Yes/No/NA
IMPORTANT MESSAGE
Info 5009 -- -- -- An input report of this
design building must be submitted along with this
Compliance Report
EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
Page 2 of 22
I hereby certify that the plans and
Florida Energy Code
Date:
TIFICATIONS
by this calculation are in compliance with the
Building Official:
Date:
certify that this building is in compliance with the FLorida Energy Efficiency Code
Owner Agent: Jeffrey D. Brasseur Date: W- S - / 7
If Required by Florida law, I hereby certify (") that the system design is in compliance with the Florida Energy
Efficiency Code
Architect: Jeffrey D. I
Electrical Designer: Joseph Lan
Lighting Designer: Joseph Lan
Mechanical Designer: Michael Gr
Plumbing Designer: Michael Gr
(*) Signature is required where Florida Law i
professionals. Typed names and registration
contained on signed/sealed plans.
ur Reg No: AR No. 0017698
IV Reg No: P.E. No. 78477
IV Reg No: P.E. No. 78477
P.E. Reg No: P.E. No. 17285
P.E. Reg No: P.E. No. 17285
-es design to be performed by registered design
bers may be used where all relevant information is
EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
s Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
9/22/2017 Page 3 of 22
Y ,
Project: Seacoast 2017-22
Title: Seacoast #2017-22
• Type: Office
(WEA File: FL ST LUCIE CO INTL.W)
Building End Uses
1) Proposed 2) Baseline
Total
149.50
243.30
$2,329
$3,808
ELECTRICITY(MBtu/kWhl$)
149.50
243.30
43855
71310
$2,329
$3,808
AREA LIGHTS
12.50
35.90
3669
10527
$195
$562
DOMHOT WATER
62.30
62.30
18250
18250
$969
$975
MISC EQUIPIVIT
31.70
31.70
9300
9300
$494
$497
PUMPS & MISC
0.10
0.10
40
40
$2
$2
SPACE COOL
33.90
46.60
9944
13639
$528
$728
SPACE HEAT
1.70
2.40
!
502
716
I
$27
$38
VENT FANS
7.30
64.30
2150
18838
$114
$1,006
Credits Applied: None
PASSES
Passing Criteria = 3237
Design (including any credits) = 2329
Passing requires Proposed Building cost .to be at most 85% of
• Baseline cost. This Proposed Building is at 61.2%
EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012
- Total BVilding Performance Compliance Option
9/22/2017
Page 4 of 22
Project: Seacoast 2017-22
Title: Seacoast #2017-22
Type: Office
(WEA File: FL ST LUCIE_CO_INTL.tm3)
Ext4nal Lighting Compliance
Description Category' Tradable? Allowance
Area or Length
ELPA CLP
(W/Unit)
or No. of Units
(W)
(W)
(Sgft or ft)
Ext Light 1 Canopies (freestanding, attached Yes 1.25
74.0
93 48
and Overhangs)
Tradable Surfaces: 48 (W) Allowance for
Tradable: 809.2 (W)
PASSES
All External Lighting: 48 (W)
Complicance check includes a excess/BaSe
allowance of 75O.00(W)
Project: Seacoast 2017-22
Title: Seacoast #2017-22
Type: Office
(WEA File: FL_ST_LUCIE_CO_INTL.tm3)
Lighting
Controls Compliance
'Acronym Ashrae Description
Area
Design
Min
Compli-
ID
(sq.ft)
CP
CP
ance
XrOZo1Sp1 8 Food Service - Leisure
Dining 368
1
1
PASSES
PrOZo1Sp2 17 Office - Enclosed
253
1
1
PASSES
PrOZo1Sp3 1 Electrical Mechanical
Equipment 64
1
1
PASSES
Room - General
PrOZo1Sp4 17 Office - Enclosed
222
1
1
PASSES
PrOZo1Sp5 6 Toilet and Washroom
PrOZo1Sp6 17 Office -Enclosed
179
191
1
1
1
1
PASSES
PASSES
PrOZo1Sp7 5 Corridor
350
2
1
PASSES
Pr0Zo2Sp1 17 Office -Enclosed
380
1
1
PASSES
PrOZo2Sp2 5 Corridor
224
2
1
PASSES
PrOZo2Sp3 5 Corridor
498
2
1
PASSES
PrOZo2Sp4 16 Office - Open Plan
772
1
1
PASSES
PASSES
r EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
9/22/2017 Page 5 of 22
Y
Project: Seacoast 2017-22
Title: Seacoast #2017-22
Type: Office
(WEA File: FL_ST_LUCIE_CO_INTL.tm3)
System
Report Compliance
PrOSyl System 1
Constant Volume Air Cooled
No. of Units
Split System < 65000 Btu/hr
1
Component
Category
Capacity
Design Eff Design
IPLV Comp-
Eff Criteria IPLV
Criteria liance
Cooling System
Air Conditioners Air Cooled
60000
16.50 13.00 8.00
PASSES
Split System < 65000 Btu/h
Cooling Capacity
Heating System
Electric Furnace
19642
1.00 1.00
PASSES
Air Handling
Air Handler (Supply) -
1950
0.10 0.82
PASSES
System -Supply .
Constant Volume
Air Distribution
ADS System (Sup)
8.00 4.20
PASSES
System (Sup)
Air Distribution
ADS System (Ret)
8.00
PASSES
System (Ret)
Energy Recovery
Compliance Not Applicable
PASSES
Unit
PrOSy2 AHU/CU-2
Constant Volume Air Cooled
No. of Units
Split System < 65000 Btu/hr
I
Component
Category
Capacity
Design Eff Design
IPLV Comp-
Eff Criteria IPLV
Criteria liance
Cooling System
Air Conditioners Air Cooled 60000
16.50 13.00 8.00
PASSES
Split System < 65000 Btu/h
Cooling Capacity
Heating System
Electric Furnace
19642
1.00 1.00
PASSES
Air Handling
Air Handler (Supply) -
1720
0.11 0.82
PASSES
System -Supply
Constant Volume
Air Handling
Air Handler (Return) -
1720
0.11 0.82
PASSES
System - Return
Constant Volume
Air Distribution
ADS System (Sup)
8.00 4.20
PASSES
System (Sup)
Air Distribution
ADS System (Ret)
8.00
PASSES
System (Ret)
j
Energy Recovery
Compliance Not Applicable
PASSES
Unit
.
PASSES
i
EnergyGauge. Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
9/22/2017 Page 6 of 22
Plant Compliance
Description Installed Size Design
No
Min Design Min Category Comp
Eff Eff IPLV IPLV liance
I
None
Project: Seacoast 2017-22
Title: Seacoast #2017-22
Type: Office
(WEA File: FL ST LUCIE CO INTL.tm3)
Water
Heater Compliance
Description Type
Category Design Min
Eff Eff
Design Max Comp
Loss Loss liance
Water Heater 1 Electric water heater
<= 12 [kW] 1.00 0.90
PASSES
PASSES
Project: Seacoast 2017-22
Title: Seacoast #2017-22
Type: Office
(WEA File: FL ST LUCIE_CO INTL.tm3)
Piping System Compliance
Category
Pipe
Dia Is Operating Ins Cond
Ins
Req Ins Compliance
[inches]
Runout? Temp [Btu-in/hr
Thick [in] Thick [in]
[F] SF.F1
Domestic and Service Hot Water
0175
False 105.00 0.28
1.00
0.50 PASSES
Systems
PASSES
I
EnergyGauge Summit@ Fla/Com-2014. TAM 2014AGCompliant Software. Effective Date: June 30, 2015
Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
9/22/2017 Page 7 of 22
•
Mandatory Requirements (as applicable) Mandatory requirements compiled by US Department
of Energy and Pacific Northwest National Laboratory.
Adopted with permission
Topic
Section Component
Description
Yes
N/A Exempt
1. To be,checked by Designer or Engineer'
Fenestration
C402.2.7 Envel pe
U-factor of opaque doors associated with the
❑
building thermal envelope meets requirements.
Insulation
C402.2.1.1 Envelope
High-albedo roofs satisfy one of the following:
3-year-aged solar reflectance — 0.55 and thermal
emittance >= 0.75, 3-year-aged solar reflectance
index >= 64.0, initial year solar reflectance >_
0.70 and thermal emittance >= 0.75, or initial year
solar
Wattage
C405.6 Exterior Lighting
Exterior grounds lighting over 100 W provides >60
Im/W unless on motion sensor or fixture is exempt
from scope of code or from external LPD.
Wattage
C405.4 Interior Lighting
Exit signs do not exceed 5 watts per face.
El
❑
11
Wattage
C405.2.3 Interior Lighting
Additional interior lighting power allowed for
special functions per the approved lighting plans
and is automatically controlled and separated
from general lighting.
HVAC
C403.2.6 Mechanical
Exhaust air energy recovery on systems meeting
Table C403.2.6
SYSTEM —SPECIFIC
C403.3.1,C403.3.1.1 Mech nical
Air economizers provided where required, meet
the requirements for design capacity, control
signal, ventilation controls, high -limit shut-off,
integrated economizer control, and provide a
means to relieve excess outside air during
operation.
SYSTEM —SPECIFIC
C403.3.1,C403.4.1 Mechanical
Water economizers provided where required,
meet the requirements for design capacity,
maximum pressure drop and integrated
economizer control.
SYSTEM_SPECIFIC
C403.4.1.4 Mechanical
Economizer operation will not increase heating
energy use during normal operation.
SYSTEM —SPECIFIC
C403.2.10.1 Mechanical
HVAC fan systems at design conditions do not
exceed allowable fan system motor nameplate hp
or fan system bhp.
SYSTEM —SPECIFIC
C403.2.10.2 Mechanical
HVAC fan motors not larger than allowable limits.
El
❑
El
SYSTEM_ SPECIFIC
C404.2 Mechanical
Service water heating equipment meets efficiency
requirements.
SYSTEM —SPECIFIC
C403.2.3 Mechanical
Centrifugal fan open -circuit cooling towers having
combined rated capacity >= 1100_gpm meets
minimum efficiency requirement: >=38.2 gpm/hp.
2. To,be checked by Plan Reviewer
Air Leakage
C402.4.7 Envelope
Vestibules are installed on all building entrances.
Doors have self -closing devices.
Insulation
C402.2.6 Envelope
Slab edge insulation depth/length. Slab insulation
extending away from building is covered by
pavement or >=10 inches of soil.
Plan Review
C103.2 Envelope
Plans and/or specifications provide all information
with which compliance can be determined for the
`
building envelope and document where
exceptions to the standard are claimed.
EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
9/22/2017 Page 8 of 22
Plan Review C103.2 Exterior Lighting
Plans, specifications, and/or calculations provide
all information with which compliance can be
determined for the exterior lighting and electrical
systems and equipment and document where
exceptions to the standard are claimed.
Information provided should include exterior
lighting power calculations, wattage of bulbs and
ballasts, transformers and control devices.
Wattage C405.6.2 Exterior Lighting
Exterior lighting power is consistent with what is
El
0
El
shown on the approved lighting plans,
demonstrating proposed watts are less than or
equal to allowed watts.
Plan Review C103.2 Interior Lighting
Plans, specifications, and/or calculations provide
El
1:1
all information with which compliance can be
determined for the interior lighting and electrical
systems and equipment and document where
exceptions to the standard are claimed.
Information provided should include interior
lighting power calculations, wattage of bulbs and
ballasts, transformers and control devices.
HVAC C403.2.5.1 Mechanical
Demand control ventilation provided for spaces
El
E
>500 ft2 and >25 people/1000 ft2 occupant
density and served by systems with air side
economizer, auto modulating outside air damper
control, or design airflow >3,000 cfm.
HVAC C403.2.4.3 Mechanical
Each zone equipped with setback controls using
automatic time clock or programmable control
system.
Plan Review C103.2 Mechanical
Plans, specifications, and/or calculations provideEl
El
❑
all information with which compliance can be
determined for the mechanical systems and
equipment and document where exceptions to the
standard are claimed. Load calculations per
"
acceptable engineering standards and
handbooks.
Plan Review C103.2 Mechanical
Plans, specifications, and/or calculations provide
El
❑
❑
all information with which compliance can be
determined for the service water heating systems
and equipment and document where exceptions
to the standard are claimed. Hot water system
SYSTEM_ SPECIFIC C403.4.5 Mechanical
sized per manufacturer's sizing guide.
Zone controls can limit simultaneous heating and
cooling and sequence heating and cooling to each
SYSTEM_ SPECIFIC C403.4.3.1 Mechanical
zone.
Three -pipe hydronic systems using a common
El
El
1:1
return for hot and chilled water are not used.
SYSTEM —SPECIFIC C403.4.3.2 Mec I anical
Two -pipe hydronic systems using a common
El
1:1
❑
distribution system have controls to allow a
deadband > 15 IF, allow operation in one mode
for at least 4 hrs before changeover, and have
rest controls to limit heating and cooling supply
temperature to <=30 OF.
SYSTEM —SPECIFIC C403.4.3.3.1 Mechanical
Hydronic heat pump systems connected to a
El
El
1:1
common water loop meet heat rejection and heat
addition requirements.
SYSTEM —SPECIFIC C408.2.2.2 Mechanical
HVAC hydronic heating and cooling coils have
rl
means to balance and have pressure test
connections.
SYSTEM C403.4.2 Meclhanical
VAV fan motors >=7.5 hp to be driven by variable
—SPECIFIC
I
speed drive, have a vane -axial fan with variable
`
pitch blades, or have controls to limit fan motor
demand.
SYSTEM —SPECIFIC C403.4.2.1 Mechanical
VAV fans have static pressure sensors positionedEl
El
❑
I
so setpoint <=1/3 total design pressure.
SYSTEM_ SPECIFIC C403.4.2.2 Mechanical
Reset static pressure setpoint for DDC controlled
VAV boxes reporting to central controller based
j
on the zones requiring the most pressure.
SYSTEM —SPECIFIC C403.4.5.4 Me hanical
Multiple zone HVAC systems have supply air
temperature reset controls.
SYSTEM —SPECIFIC C403.4.3.4 Mechanical
Hydronic systems greater than 300,000 Btu/h
D
El
❑
I
designed for variable fluid flow.
EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
9/22/2017 Page 9 of 22
.•.
SYSTEM C403.4.3.4
Mechanical
Temperature reset by representative building
U
U
U
—SPECIFIC
loads in pumping systems for chiller and boiler
systems>300,000 Btu/h.
SYSTEM —SPECIFIC C403.4.4
Mecha
ical
Fan systems with motors —7.5 hp associated
❑
❑
11
with heat rejection equipment to have capability to
operate at 213 of full -speed and auto speed
controls to control the leaving fluid temperature or
condensing temp/pressure of heat rejection
Plan Review C406
Projeci
device.
Plans, specifications, and/or calculations provide
0
all information with which compliance can be
determined for the additional energy efficiency
package options.
Plan Review C402.3.2.2
Envelope
Skylights in office, storage, automotive service,
manufacturing, non -refrigerated warehouse, retail
store, and distribution/sorting area have a
measured haze value > 90 percent unless
designed to exclude direct sunlight.
�j
3. ,To be checked by Inspector
Air Leakage
C402.4.1,C402.4.2
Envelope
The building envelope contains a continuous air
El
0
❑
barrier that is sealed in an approved manner and
either constructed or tested in an approved
manner. Air barrier penetrations are sealed in an
approved manner.
Air Leakage
C402.4.3,C402.4.4
Envelope
Factory -built fenestration and doors are labeled
as meeting air leakage requirements.
Air Leakage
C402.4.1.1
Envelope
All sources of air leakage in the building thermal
El
envelope are sealed, caulked, gasketed, weather
stripped or wrapped with moisture
vapor -permeable wrapping material to minimize
J
air leakage.
Air Leakage
C402.4.6
Envelope
Weatherseals installed on all.loading dock cargo
❑
El
doors.
a
Air Leakage
C402.4.8
Envelope
Recessed luminaires in thermal envelope to limit11
El
❑
R
infiltration and be IC rated and labeled. Seal
between interior finish and luminaire housing.
Fenestration
C303.1.3
Envelope
Fenestration products rated in accordance with
NFRC.
Fenestration
C303.1.3
Envelope
Fenestration products are certified as to
performance labels or certificates provided.
Insulation
C303.2
Envelope
Below -grade wall insulation installed per
1:1
El
El
manufacturer's instructions.
Insulation
C303.2
Envelope
Slab edge insulation installed per manufacturer's
❑
❑
El
instructions.
Insulation
C403.2.7,C408.2.8,C4, Envelope
Exterior insulation protected against damage,
❑
El
sunlight, moisture, wind, landscaping and
equipment maintenance activities.
Insulation
C402.4.2.1
Envelope
Roof R-value. For some ceiling systems,
11
El
verification may need to occur during Framing
Insulation
C303.2
Envelope
Inspection.
Roof insulation installed per manufacturer's
instructions. Blown or poured loose -fill insulation
is installed only where the roof slope is <=3 in 12.
Insulation
C402.2.1
Envelope
Skylight curbs are insulated to the level of roofs
with insulation above deck or R-5.
insulation
C303.2
Envelope
Above -grade wall insulation installed per
manufacturers instructions.
Insulation
C303.2
Envelope
Floor insulation installed per manufacturers
instructions.
Insulation
C303.1
Envelope
Building envelope insulation is labeled with
❑1:1
❑
R-value or insulation certificate providing R-value
and other relevant data.
Insulation
C303.2.1
Envelope
Exterior insulation is protected from damage with
❑
0
El
a protective material. Verification for exposed
foundation insulation may need to occur during
j
Foundation Inspection.
EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
9/22/2017 Page 10 of 22
.�� Insulation,
Controls
Controls
Controls
Controls
Controls
Controls
Controls
Controls
Controls
Controls
Controls
Wattage
HVAC
HVAC
Air Leakage
Air Leakage
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
C402.2.1
C405.2.4
C405.2.2.1
C405.2.1.1
C405.2.1.2
C405.2.2.3
C405.2.3
C405.2.2.2
C405.2.2.3
C405.2.2.3
C405.2.3
C405.3
C405.5.2
C403.2.4.5
C403.2.3
C402.4.5.1
C402.4.5.2
C403.2.8.1
C403.2.7
C403.2.8
C403.2.7
C408.2.2.1
C403.2.11
C403.2.4.1
C403.2.4.2
C403.2.4.2
Envelo
a
Insulation intended to meet the roof insulation
U
U
U
requirements cannot be installed on top of a
suspended ceiling. Mark this requirement
compliant if insulation is installed accordingly.
Exterio
r Lighting
Automatic lighting controls for exterior lighting
El
0
El
installed.
Interior
Lighting
Automatic controls to shut off all building lighting
installed in all buildings.
Interio
Lighting
Independent lighting controls installed per
approved lighting plans and all manual controls
readily accessible and visible to occupants.
Interior
Lighting
Lighting controls installed to uniformly reduce theEl
El
❑
lighting load by at least 50%.
Interior
Lighting
Daylight zones provided with individual controls
❑
that control the lights independent of general area
lighting.
Interior
Lighting
Sleeping units have at least one master switch at
the main entry door that controls wired luminaires
and switched receptacles.
Interior
Lighting
Occupancy sensors installed in required spaces.
El
❑
0
Interio
Lighting
Primary sidelighted areas are equipped with
required lighting controls.
Interio
Lighting
Enclosed spaces with daylight area under
skylights and rooftop monitors are equipped with
required lighting controls.
Inteno�
Lighting
Separate lighting control devices for specific uses
installed per approved lighting plans.
Interior
Lighting
Fluorescent luminaires within odd numbered lamp
configurations that are with 10 feet center to
center (if recess mounted) or are within 1 foot
edge to edge (if pendant or surface mounted)
shall be tandem wired.
Interio
Lighting
Interior installed lamp and fixture lighting power is
consistent with what is shown on the approved
lighting plans, demonstrating proposed watts are
less than or equal to allowed watts.
Mechanical
Freeze protection and snow/ice melting system
sensors for future connection to controls.
Mechanical
HVAC equipment efficiency verified.
❑
Envelope
Stair and elevator shaft vents have motorized
dampers that automatically close.
Envelope
Outdoor air and exhaust systems have motorized
❑
El
M
dampers that automatically shut when not in use
and meet maximum leakage rates. Check gravity
Mechanical
dampers where allowed.
Piping Insulation exposed to weather is protected
from damage (due to sun, moisture, wind, etc.).
Mechanical
HVAC ducts and plenums insulated. Where
ducts or plenums are installed in or under a slab,
verification may need to occur during Foundation
Inspection.
Mechanical
Thermally ineffective panel surfaces of sensible
1-1
❑
heating panels have insulation >= R-3.5.
Mechanical
Ducts and plenums sealed based on static
dl f
EnergyGauge Summit@ Fla/Com-2014. TAM
Florida Building Code, Fifth Edition (2014) - Energy Coi
9/22/2017
pressure an oca ion.
tical Air outlets and zone terminal devices have means
for air balancing.
iical Unenclosed spaces that are heated use only
radiant heat.
iical Heating and cooling to each zone is controlled by
a thermostat control.
iical Thermostatic controls have a 5 °F deadband.
iical Temperature controls have setpoint overlap
restrictions.
114-1.0 Compliant Software. Effective Date: June 30, 2015
irvation IECC 2012 - Total Building Performance Compliance Option
Page 11
of 22
. .,
HVAC C403.2.4.3
SYSTEM —SPECIFIC C404.3
SYSTEM —SPECIFIC C404.4
SYSTEM —SPECIFIC C404.2
SYSTEM —SPECIFIC C403.2.3
SYSTEM —SPECIFIC C403.4.2
SYSTEM —SPECIFIC C403.2.8
SYSTEM —SPECIFIC C403.2.7.1.3
SYSTEM —SPECIFIC ' C403.4.3.5
SYSTEM —SPECIFIC C403.4.3.3.3
SYSTEM —SPECIFIC C403.4.6
- SYSTEM —SPECIFIC C403.4.7
SYSTEM —SPECIFIC C403.2.4.2
SYSTEM —SPECIFIC C403.2.4.3.3
SYSTEM —SPECIFIC
SYSTEM —SPECIFIC
SYSTEM —SPECIFIC
SYSTEM —SPECIFIC
SYSTEM —SPECIFIC
SYSTEM —SPECIFIC
SYSTEM —SPECIFIC
SYSTEM —SPECIFIC
SYSTEM —SPECIFIC
Testing
C403.2.4.1.1
C404.3
C404.5
C404.5
C404.5
C404.6
C404.7.1
C404.7.3
C404.7.2
C408.2.3.2
I
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
i
Automatic Controls: Setback to 55°F (heat) and
85°F (cool); 7-day clock, 2-hour occupant
override, 10-hour backup
Temperature controls installed on service water
heating systems (110 OF for dwelling units and
lavatories in public restrooms and 90 OF for other
occupancies.)
Automatic time switches installed to automatically
switch off the recirculating hot-water system or
heat trace.
Heat traps installed on non -circulating storage
water tanks.
PTAC and PTHP with sleeves 16 in. by 42 in.
labeled for replacement only as per Footnote b to
Table C403.2.3(3).
VAV fan >= 7.5 hp are driven by mechanical or
electrical variable speed drive, or driven by
vane -axial with variable speed blades, or operate
with motor demand <=30% design kW at 50%
design flow - calculations required
HVAC piping insulation thickness. Where piping
is installed in or under a slab, verification may
need to occur during Foundation Inspection.
Ductwork operating >3 in. water column requires
air leakage testing.
Reduce flow in pumping systems >10 hp to
multiple chillers or boilers when others are shut
down.
Two -position automatic valve interlocked to shut
off water flow when hydronic heat pump with
pumping system >10 hp is off.
Condenser heat recovery system that can heat
water to 85 OF or provide 60% of peak heat
rejection is installed for preheating of service hot
water in 2417 facility, water cooled systems reject
>6 MMBtu, SHW load >=1 MM13tu.
Hot gas bypass limited to:
<=240 kBtu/h — 50%
>240 kBtu/h — 25%
Heating and cooling to each zone is controlled by
a thermostat control. Minimum one humidity
control device per installed
humidification/dehumidification system.
Systems include optimum start controls.
Heat pump controls prevent supplemental electric
resistance heat from coming on when not needed.
Public lavatory faucet water temperature
< 110°F.
All piping in circulating system insulated
First 8 ft of outlet piping is insulated
All heat traced or externally heated piping
insulated
Controls are installed that limit the operation of a
recirculation pump installed to maintain
temperature of a storage tank.
Pool heaters are equipped with on/off switch and
no continuously burning pilot light.
Vapor retardant pool covers are provided for
heated pools and permanently installed spas.
Time switches are installed on all pool heaters
and pumps.
HVAC control systems have been tested to
ensure proper operation, calibration and
adiustment of controls.
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
i
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑. ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
9/22/2017 j Page 12 of 22
Mandatory Additional Eff C406
C402.2.8
Project
Project
Efficient HVAC performance, efficient lighting
system, or on -site supply of renewable energy
consistent with what is shown the approved plans.
Bottom surface of floor structures incorporating
radiant heating insulated to > 11-3.5.
❑
❑
El
4. To be checked by Inspector
at"Project Completion and Prior to Issuance of
Certificate
of Occupancy
Post Construction C408.3
Exterio
Lighting
Lighting systems have been tested to ensure
v❑�
proper calibration, adjustment, programming, and
operation.
Post Construction C408.2.5.1
Interior
Lighting
Furnished as -built drawings for electric power
El
El
El
systems within 30 days of system acceptance.
Post Construction C303.3,C408.2.5.2
Interior
Lighting
Furnished O&M instructions for systems and
❑
❑
El
equipment to the building owner or designated
representative.
Post Construction C408.3
Interior
Lighting
Lighting systems have been tested to ensure
proper calibration, adjustment, programming, and
operation.
Post Construction C408.2.5.1
Mechanical
Furnished HVAC as -built drawings submitted
within 90 days of system acceptance.
Post Construction C303.3,C408.2.5.2
Mechanical
Furnished O&M manuals for HVAC systems
within 90 days of system acceptance.
Post Construction C408.2.5.3
Mechanical
An air and/or hydronic system balancing report isEl
El
❑
provided for HVAC systems.
Post Construction C408.2.1
Mechanical
Commissioning plan developed by registered
design professional or approved agency.
Post Construction C408.2.4
Mech
nical
Preliminary commissioning report completed and
certified by registered design professional or
r
approved agency.
Post Construction C408.2.5.4
Mechanical
Final commissioning report due to building owner
❑
❑
❑
within 90 days of receipt of certificate of
. Post Construction C408.2.3.1
Mechanical
occupancy.
HVAC equipment has been tested to ensure
1:1
El
❑
proper operation.
Post Construction C406.2.3.3
Mechanical
Economizers have been tested to ensure proper
operation.
EnergyGaUge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
Florida Building Code, Fifth Edition (2014) - Energy Corjservation IECC 2012 - Total Building Performance Compliance Option
9/22/2017 Page 13 of 22
InDut Data ReDOrt
Project Name:
Seacoast 2017-22
Address:
2601 Industrial Avenue 3
Owner:
Seacoast
Building Type:
Office
No.of Stories:
1
Bldg. Rotation:
None
No Acronym Description
1 PrOZol
2 PrOZo2
Zone 1
AHU-2
et Information
Project Title: Seacoast#2017-22
State: Enter state here
Building Classification: New Finished building
GrossArea (SF): 3,501
Zones
Zip: 0
Area
Multi Total Area
rsn
Isfl
1626.9
1 1626.9
H
1874.0
1 1874.0
EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
- Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
9/22/2017 Page 14 of 22
Spaces
No Acronym Description Type Depth Width Height Mult Total Total
[ft] [ft] [ft] Area Vol[ct]
In Zone: PrOZol
1
PrOZo1 Sp
Break Room
Food Service -
Leisure Dining
17.28
21.30
9.00
1
368.0
3311.9
❑
2
PrOZo 1 Sp2
Dana's Office
Office - Enclosed
16.32
15.50
9.00
1
253.0
2276.6
❑
3
PrOZo1Sp3
Zo1Sp3
Electrical Mechanical
8.00
8.00
9.00
1
64.0
576.0
Equipment Room
- General
4
PrOZo1Sp4
Engineering 1
Office - Enclosed
14.32
15.50
9.00
1
222.0
1998.0
(
5
PrOZo1Sp5
MensBathroom
Toilet and Washroom
10.23
17.50
9.00
1
179.0
1611.0
6
PrOZo 1 Sp6
Pat & John's Office
Office - Enclo led
12.32
15.50
9.00
1
191.0
1718.9
❑
7
PrOZo1Sp7
West Corridor
Corridor
5.30
66.00
9.00
1
350.0
3150.0
In Zone:
PrOZo2
1
Pr0Zo2Sp1
Office - Enclosed
18.72
20.30
9.00
1
380.0
3420.0
Brandon's Office
2
PrOZo2Sp2
East Corridor 1
Corridor
11.98
18.70
9.00
1
224.0
2015.9
3
PrOZo2Sp3
Lobby/Reception 1
Corridor
32.13
15.50
9.00
1
498.0
4482.0
-
4
PrOZ-o2Sp4
Open Office 1
Office - Open Plan
25.65
30.10
9.00
1
772.0
6947.9
EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
9/22/2017 Page 15 of 22
No Type
In Zone: PrOZol
In Space:
PrOZo1Spl
1
LED
In Space:
PrOZo1Sp2
1
LED
In Space:
PrOZo1Sp3
1
LED
In Space:
Pr0Zo1Sp4
1
LED
In Space:
Pr0Zo1Sp5
1
LED
In Space:
Pr0Zo1Sp6
1
LED
In Space:
Pr0Zo1Sp7
1
LED
•
2
LED
In Zone:
PrOZo2
In Space:
PrOZo2Sp1
1
LED
In Space:
PrOZo2Sp2
1
LED
2
LED
In Space:
PrOZo2Sp3
1
LED
2
LED
In Space:
PrOZo2Sp4
1
LED
Lighting
Category No. of Watts per Power Control Type No.of
Luminaires Luminaire [W] Ctrl pts
General Lighting
6
19.
111
Manual On/Off
1
❑
General Lighting
4
20
80
Manual On/Off
1
❑
General Lighting
2
19
37
Manual On/Off
1
❑
General Lighting
4
20
80
Manual On/Off
1
❑
General Lighting
5
12
60
Manual On/Off
1
❑
General Lighting
4
18
72
Manual On/Off
I
1
❑
General Lighting
1
12
12
Manual On/Off
1
❑
General Lighting
1
19
19
Manual On/Off
1
❑
General Lighting
6
20
120
Manual On/Off
1
❑
General Lighting
3
12
36
Manual On/Off
1
❑
General Lighting
4
19
74
Manual On/Off
1
❑
I
General Lighting
6
12
72
Manual On/Off
1
❑
General Lighting
7
19
130
Manual On/Off
1
❑
General Lighting
16
19
296
Manual On/Off
1
❑
EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
9/22/2017 Page 16 of 22
Walls (Walls will be rotated clockwise by building rotation value)
No
Description
Type
Width
H (Effec) Multi Area Orient Cond- Heat Dens.
R-Value
[ftl
[ft] plier [sf] ation uctance Capacity [lb/cf]
[b.sf.FBtu]
[Btu/h.sf.Fl [Btu/sf.Fl
In Zone: PrOZol
1
East 1
Metal
43.00
12.00 1 516.0 East 0.0920 1.072 19.38
10.9
❑
siding/2x4@24"+Rl
1Batt/5/8"Gyp
2
East 2
Metal
43.00
6.00 1 258.0 East 0.0920 1.072 19.38
10.9
❑
siding/2x4@24"+Rl
IBatt/5/8"Gyp
3
South I
Metal
40.
0 12.00 1 480.0 South 0.0920 1.072 19.38
10.9
❑
siding/2x4@24"+R1
1Batt/5/8"Gyp
4
South 2
Metal
40.)0
6.00 1 240.0 South 0.0920 1.072 19.38
10.9
❑
siding/2x4@24"+Rl
1Batt/5/8"Gyp
In Zone: PrOZo2
1
East 1
Metal
61.00
12.00 1 732.0 East 0.0920 1.072 19.38
10.9
❑
siding/2x4@24"+Rl
1Batt/5/8"Gyp
2
East
Metal
00
61.00 1 366.0 East 0.0920 1.072 19.38
10.9
❑
siding/2x4@24"+RI
lBatt/5/8"Gyp
Windows (Windows will
be rotated clockwise by building rotation\value)
No
Description
Orientation Shaded
U SHGC Vis.Tra W H (Effec) Multi Total Area
[Btu/hr
sf F] IN [ft] plier
[sq
In Zone: PrOZol
In Wall: PrOZo1Wal
1
PrOZo1Wa1Wi1
East No
1.2500 0.82 0.76 3.00 5.00 4
60.0
❑
In Wall: Pr0Zo1Wa3
1
PrOZo1Wa3WH
South No
1.2500 0.82 0.76 3.00 5.00 2
30.0
❑
In Zone: PrOZo2
In Wall: Pr0Zo2Wa1
1
PrOZo2Wa1Wil
East No,
1.2500 0.82 0.76 3.00 5.00 4
60.0
2
PrOZo2Wa1Wi2
East No
1.2500 0.82 0.76 6.00 7.00 1
42.0
B
EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
9/22/2017 Page 17 of 22
4-
Doors
No Description Type Shade? Width H (Effec) Multi Area Cond. Dens. Ht Cap. R
[ft] IN plier [sf] [Btu/h.sf.F] [lb/cf] [Btu/sf. [h.sEF/
Fl Btul
In Zone: PrOZol
In Wall: Pr0Zo1Wa3
1 PrOZolWa3Drl Solid core flush No 3.00 7.00 1 21.0 0.3504 0.00 0.00 2.85 ❑
(2.25)
Roofs
No Description
Type
Width
H (Effec) Multi
Area
Tilt
Cond. Heat Cap Dens. R-Value
IN
IN plier
[sf]
[deg]
[Btu/h.Sf. F] [Btu/sE F] [lb/cf] [h.sf.F/Btu
In Zone: PrOZol
1 PrOZo1Rfl
Mtl Bldg Roof/R- 19
16.26
100.00 1
1626.0
0.00
0.0492 1.34 9.49 20.3
-
Batt
In Zone: PrOZo2
1 PrOZo2Rfl
Mtl Bldg Roof/R-19
18.74
1'00.00 1
1874.0
0.00
0.0492 1.34 9.49 20.3
-
Batt
Skylights
No Description
Type
U
SHGC Vis.Trans W
H (Effec) Multi- Area Total Area
[Btu/hr A F i
[ft]
IN
plier [Sf] [Sf]
In Zone:
I
In Roof:
i
I
a
e
I
EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
9/22/2017 Page 18 of 22
Floors
No Description Type Width H (Effec) Multi Area Cond. Heat Cap. Dens. R-Value
[ft] [ft] plier [sf] [Btu/h.sf.F [Btu/sE F] [lb/cf] [h.sf.F/]Btu
i
In Zone:
PrOZol
1
Pr0Zo1F11
I ft. soil, concrete
16.26
100.00 1 1626.0 0.2681 34.00
113.33 3.73 ❑
floor, carpet and
rubber pad
In Zone:
PrOZo2
1
PrOZo21711 1 ft. soil, concrete
18.74
100.00 1 1874.0 0.2681 34.00
113.33 3.73 ❑
flo f, carpet and
rubber pad
i
Systems
PrOSyl
s
System, 1
Constant Volume Air Cooled
No. Of Units
Split System < 65000 Btu/hr
1
Component
Category
Capacity Efficiency IPLV
1
Cooling System
60000.00 16.50 8.00
❑
2
Heating System
19642.00 1.00
❑
3
Air Handling System -Supply
1950.00 0.10
❑
4
Air Distribution System (Sup)
8.00
❑
5
Air Distribution System (Ret)
8.00
❑
6
Energy Recovery Unit
❑
PrOSy2
AHU/CU-2
Constant Volume Air Cooled
No. Of Units
Split System < 65000 Btu/hr
1
Component
Category
Capacity Efficiency H'LV
1
Cooling System
60000.00 16.50 8.00
❑
2
Heating System
19642.00 1.00
❑
3
Air Handling System -Supply
1720.00 0.11
❑
4
Air Handling System - Return
1720.00 0.11
❑
5 _
Air Distribution System (Sup)
8.00
❑
6
Air Distribution System (Ret)
8.00
❑
7
Energy Recovery Unit
❑
9
EnergyGauge Summit® Fla/Com-2014. TAM 20 4-1.0 Compliant Software. Effective Date: June 30, 2015
• Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
9/22/2017 Page 19 of 22
Plant
Equipment
Category
Size
Inst.NoEff.
IPLV
Water Heaters
W-Heater Description
Capacity
Cap.Unit
I/P Rt.
Efficiency
Loss
1 Electric water heater
50 [Gal]
6 [kW]
1.0000 [Ef]
[Btu/h] ❑
Ext-Lighting
Description
-
Category
No. of Watts
Lumin- per
aires Lumin-
Area/Len/No
[sVft/No]
Control
Type
Wattage
[w]
a Ext Light 1
Canopies (freestanding,
attached and Overhangs)
4 12
74.00 Astronomical Timer ( 48.00 ❑
-Piping
No T e
Operating
Temp
[i]
Insulation
Conductivity
[ Btu-in/h.sf.F]
Nomonal pipe
Diameter
[in]
Insulation
Thickness
[in]
Is
Runout?
1 Domestic and Service Hot Water �05.00
Systems
0.28
0.75
1.00
No ❑
EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
9/22/2017 Page 20 of 22
i6
Fenestration
Used
Name
Glass Type
No. of
Glass
SHGC
VLT
Conductance
.Panes
,
[Btu/h.sf.F]
ASHULSg1C1rA11
User Defined
1
1.2500
0.8200
0.7600
Frm
Materials
Used
Only RValue
Thick
Cond-
Density
Sp. Heat
Mat No
Acronym
Description
R-Value [h.sf.F/Btu]
IN
uctivity
[lb/cf]
[Btu/lb.F]
Used
[Btu/h.ft.F
187
Matl l87
GYP OR PLAS
No 0.4533
0.0417
0.0920
50.00
0.2000
❑
BOARD,1/2IN
178
Mat1178
CARPET W/RUBBER PAD
Yes 1.2300
❑
265
Mat1265
Soil, 1 ft
No 2.0000
1.0000
0.5000
100.00
0.2000
❑
48
Mat148
6 in. Heavyweight concrete
No 0.5000
0.5000
1.0000
140.00
0.2000
❑
23
Mat123
6 in. Insulation
No 20.0000
0.5000
0.0250
5.70
0.2000
❑
4
Mat14
Steel siding
No 0.0002
0.0050
26.0000
480.00
0.1000
❑
271
Mat1271
2x4@24" oc + RI 1 Batt
No 10.4179
0.2917
0.0280
7.11
0.2000
❑
279
Mat1279
Solid core flush (2.25")
Yes 2.8537
❑
94
Mat194
BUILT-UP ROOFING,
No 0.3366
0.0313
0.0930
70.00
0.3500
❑
3/81N
I
EnergyGauge Summit® Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
• Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
9/22/2017 Page 21 of 22
'
Constructs
Used
No
Name
Simple
Massless
Conductance
Heat Cap
Density
RValue
Construct
Construct
[Btu/hsf.F]
[Btulsf.F]
[Ib/cf]
[hsf.FBtu]
1055
Metal
No
I No
0.09
1.07
19.38
10.9
siding/2x4@24"+R11Batt/5/8"Gyp
Layer
Material
Material
Thickness
Framing
No.
[ft]
Factor
1
4
Steel siding
0.0050
0.000
❑
2
271
2x4@24" oc + Rl 1
att
0.2917
0.000
❑
3
187
GYP OR PLAS BOARD,1/21N
0.0417
0.000
❑
No
Name
SimpiIe
Massless
Conductance
Heat Cap
Density
RValue
Construct
Construct
[Btu/h.sf.F]
[Btu/sf.F]
[lb/cf]
[h.sf.FBtu]
1056
Mtl Bldg Roof/R-19 Batt
No
No
0.05
1.34
9.49
20.3
❑ ,
Layer
Material
Material
Thickness
Framing
No.
[ft]
Factor
1
94
BUILT-UP ROOF G, 3/81N
0.0313
0.000
❑
- 2
23
6 in. Insulation
0.5000
0.000
El
No
Name
Simpl a Massless
Conductance
Heat Cap
Density
RValue
.
Construct Construct
[Btu/h.sf.F]
[Btu/sf.F]
[lb/cl]
[h.sf.FBtu]
1057
1 ft. soil, concrete floor, carpet and N i
No
0.27
34.00
113.33
3.7
❑
rubber pad
Layer
Material.
Material
Thickness
Framing
No.
[ft]
Factor
1
265
Soil, 1 ft
1.0000
0.000
❑
❑
2
48
6 in. Heavyweight ncrete
0.5000
0.000
3
178
CARPET W/RUBBER PAD
I
0.000
❑
Simple Massless
Conductance
Heat Cap
Density
RValue
No
Name
Construct Construct
[Btu/h.sf.F]
[Btu/sf.F]
[lb/ct]
[h.sf.F/Btu]
1058
Solid core flush (2.25)
No Yes
0.35
2.9
Layer
Material
Material
Thickness
Framing
No.
[ft]
Factor
1
279
Solid core flush (2125")
I
0.000
❑
I
EnergyGauge Summit@ Fla/Com-2014. TAM 2014-1.0 Compliant Software. Effective Date: June 30, 2015
Florida Building Code, Fifth Edition (2014) - Energy Conservation IECC 2012 - Total Building Performance Compliance Option
9/22/2017 Page 22 of 22
EnergyGauge Summit® v5.20
11 PUT DATA REPORT
Project Name: Seacoast 2017-22
Project Title: Seacoast#2017-22
Address: 2601 Industrial Avenue 3
State: Enter state here
Zip: 0
Owner: Seacoast
Pro*ect Information
Orientation: 0 Deg Clockwise. Walls & Windows will
be rotated accordingly
Building Tape: Office
Building Classification: New Finished building
No.of Stories: I
GrossArea: 3501 SF
Zones
No Acronym Description Type I Area Multiplier Total Area
fsfl fsfl
1 P:OZol Zane 1 Comm'ONED 1626.9 1 1626.9 El
2 PrOZo2 AHU-2 CONDITIONED 1874.0 1 1874.0El
9/22/2017 EnergyGauge Summit® v5.20
I
� I
� I
I
1
Spaces
/
multi
Total Area
Total Volume
Depth
Width
H[f j t
er
[SA[ctl
No Acronym
Description /
Type
[ft]
[ft.]❑
1
368 0
3311.9
1728
.
21.30
9.00
In Zone: Pr0Zo1
I ProZolSp1
Break Room
Food Service -Leisure
Dining
9.00
1
253.0
2276.E
❑
16.32
15.50
$76.0
2 1'r0Zo1Sp2
Danas0ffice
Office - Enclosed
8.00
8.00
9.00
1
64.0
Electrical Mechanical
1998.0
3 Pr0Zo1Sp3
Zo1Sp3
EquipmentRoom- General
14.32
15.50
9.00
1
222.0
❑
4 Pr0ZolSp4
Engineering 1
Office - Enclosed
1023
17.50
9.00
1
179.0
1611.0
❑
5 Pr0Zo1Sp5
Mens Bathroom
Toilet and Washroom
.
9.00
1
191.0
1718.9
Office -Enclosed
12.32
15.50
3150.0
6 PrOZ0ISp6
Pat & John's Office
/
5.30
66.00
9.00
1
350.0
7 PrOZ0ISP7
West/Corridor
'
Corridor
❑
1
380.0
3420.0
In Zone: Pr0Zo2
/
Office -Enclosed
18,72
20.30
9.00
1 ProZo2Sp1
1
224.0
2015.9
❑
Brandon's Office
East Corridor 1
Corridor
11.98
18.70
9.00
4482.0
2 Pr0Zo2Sp2
Com or
32.13
15.50
9.00
1
498 0
3 Pr0Zo2SP3
Lobby/Reception 1
772.0
6947.9
❑
4 Pr0Zo2Sp4
Open Office 1
Office - Open Plan
25.65
30.10
9.00
1
/
Lighting
No
Type
Category
No. of
Watts per
Power
Control Type
No.of
Luminaires
Luminaire
1W1
Ctrl pts
In Zone: ' PrOZol
In Space: Pr0Zo1Sp1
1
LED
General Lighting
6
19
111
Manual On/Off
1
Q
In Space: Pr0Zo1Sp2
1
LED
General Lighting
4
20
80
Manual On/Off
]
0
In Space: Pr0ZolSp3
i
9/22/2017
EnergyGauge Summit® v5.20
2
I LED
General Lighting
2
19
37 Manual On/Off
1 ❑
In Space:
Pr0Zo1Sp4
1 LED
General Lighting
4
20
80 Manual On/Off
I ❑
In Space:
Pr0Zo1Sp5
1 LED
General Lighting
5
12
60 Manual On/Off
1 ❑
In Space:
PrOZo1Sp6
1 LED
General Lighting
4
18
72 Manual On/Off
1 ❑
In Space:
PrOZolSp7
1 LED
General Lighting
1
12
12 Manual On/Off
1
2 LED
General Lighting
1
19
19 Manual On/Off
1 ❑
In Zone: PrOZ02
In Space:
Pr0Zo2Sp1
1 LED
General Lighting
6
20
120 Manual On/Off
1 ❑
In Space:
Pr0Zo2Sp2
1 LED
General Lighting
3
12
36 Manual On/Off
1 ❑
_
2 LED
General Lighting
4
19
74 Manual On/Off
1 ❑
In Space:
PrOZo2Sp3
I
1 LED
General Lighting
6
12
72 Manual On/Off
1 ❑
2 LED
General Lighting
7
19
130 Manual On/Off
1 ❑
In Space:
Pr0Zo2Sp4
1 LED
General Lighting
16
19
296 Manual On/Off
1 ❑
Walls (Walls will be rotated
clockwise by building rotation value)
No Description
Type Width H(Effec)
Multi Area
Orientation
Conductance Heat
Dens.
R-Value
[ft]
im
plier ]sf]
[Btu/hr. st F] Capacity
[Ih/cf]
[h.sLF/Btu]
[Btu/sf.F]
In Zone:
PrOZol
1 East 1
Metal 43.00 12.00
1 516.0
East
0.0920 1.072
19.38
10.9 ❑
siding/2x4@24"+Rl
1Batt/5/8"Gyp
2 East 2
Metal 43.00 6.00
1 258.0
East
0.0920 1.072
19.38
10.9 ❑
siding/2x4@24"+Rl
1Batt/5/8"Gyp
9/22/201Y
EneruGauge Summit® v5.20
3
3 South 1
Metal
40.00
12.00 1 480.0
South 0.0920
1.072
19.38
10.9
❑
siding/2x4@24"+Rl
1Batt/5/8"Gyp
4 South 2
Metal
40.00
6.00 1 240.0
South 0.0920
1.072
19.38
10.9
❑
siding/2x4@24"+Rl
lBatt/5/8"Gyp
In Zone: PrOZo2
1 East 1
Metal
61.00
12.00 1 732.0
East 0.0920
1.072
19.38
10.9
❑
siding/2x4@24"+Rl
1Batt/5/8"Gyp
2 East 2
Metal
6.00
61.00 1 366.0
East 0.0920
1.072
19.38
10.9
❑
siding/2x4@24"+Rl
lBatt/5/8"Gyp
Windows (Windows will ble
rotated clockwise by building rotation value)
No Description
Orientation
Shaded
SHGC
Vis.Tra W H (Effee)
Multi
Total Area
/hU
[Btur sf F1
[ft] [ft]
plier
[sf]
In Zone: PrOZol
In Wall: PrOZo1Wal
1 PrUolWalWil East
No 1.2500 0.82
0.76 3.00 5.00
4
60.0
El
In Wall: Pr0Zo1Wa3
1 PrO&IWa3Wi1 South
No 1.2500 0.82
0.76 3.00 5.00
2
30.0
In Zone: PrOZo2
In Wall: Pr0Zo2Wa1
1 PrOZo2WalWil East
No 1.2500 0.82
0.76 3.00 5.00
4
60.0
2 PrOZo2WalWi2 East
No 1.2500 0.82
0.76 6.00 7.00
1
42.0
HI
'
'Doors
No Description
Type
Shaded?
Width H (Effec)
Multi Area Cond.
Dens.
Heat Cap. R-Value
IN [ft]
plier [sf] [Btu/hr. st F]
[Ib/cf]
[Btu/st Fl [h.st.F/Btu1
In Zone: PrOZol
In Wall: Pr0Zo1Wa3
1 PrOZolWa3Drl
Solid core flush
No 3.00 7.00
1 21.0 0.3504
0.00
0.00
2.85
(2.25)
I
9/22/2017 EnergyGauge Summit® v5.20
i
i
R'
I
4
4
Roofs
No Description
Type,
Width
H (Effec) Multi
Area
Tilt
Cond.
Heat Cap
Dens. R-Value
[ft]
[ft] plier
[sf]
[deg] [Btu/hr. Sf. F]
[Btu/sf. F]
[lb/cf] [b.sEF/Btu]
In Zone:
PrOZol
1 PrOZolRf1
Mfl Bldg Roof/R-19
16.26
100.00 1
1626.0
0.00
0.0492
1.34
9.49 20.3
❑
Batt
In Zone:
PrOZo2
I PrOZo2Rfl
Mtl Bldg Roof/R-19
18.74
100.00 1
1874.0
0.00
0.0492
1.34
9.49 20.3
❑
Batt
Skylights
No Description Type
U SHGC Vis.Trans
W
H (Effec)
Multiplier
Area Total Area
[Btu/hr
sf F]
[ft]
[ft]
1Sf] [Sf]
In Zone:
In
Roof:
Floors
No Description
Type
Width'
H (Effec) Multi
Area
Cond.
Heat Cap. Dens.
R-Value
[ft]
[ft] plier
[sf]
[Btu/hr. sf. F] [Btu/sE F] [Ib/cf]
[h.sEF/Btu]
In Zone:
PrOZol
1 PrOZo1Fl1
1 ft soil, concrete
16.26
100.00 1
1626.0 0.2681
34.00
113.33
3.73
❑
floor, carpet and
rubber pad
In Zone:
PrOZo2
I PrOZo2Fl1
1 ft soil, concrete
18.74
100.00 1
1874.0
0.2681
34.00
113.33
3.73
❑
floor, carpet and
rubber pad
i
En rgyGauge Summit® v5.20
5
Systems
PrOSyl
System 1
Constant Volume Air Cooled Split
System < 65000 Btu/hr
No. Of Units 1
Component
Category
Capacity Efficiency
IPLV
1
2
3
4
5
6
Cooling System
Heating System
Air Handling System -Supply
Air Distribution System (Sup)
Air Distribution System (Ret)
Energy Recovery Unit
60000.00 16.50
19642.00 1.00
1950.00 0.10
8.00
8.00
8.00
El
❑
❑
❑
El
PrOSy2
AHU/CU-2
Constant Volume Air Cooled Split
System < 65000 Btu/hr
No. Of Units 1
Corponent
Category
Capacity Efficiency
IPLV
1
2
3
4
5
6
7
Cooling System
Heating System
Air Handling System -Supply
Air Handling System - Return
Air Distribution System (Sup)
Air Distribution System (Ret)
Energy Recovery Unit
60000.00 16.50
19642.00 —1.00
1720.00 0.11
1720.00 0.11
8.00
8.00
8.00
❑
El
Plant
Equipment
Category
size InstNo
Eff.
IPLV
El
Water Heaters
W-Heater Description
Capacity Cap.Unit
i UP Rt Efficiency
Loss
9/22/2017 En IrgyGauge Summit® v5.20
6
S
Ext-Lighting
Description Category
No. of
Watts per
Area/Len/No. of units
Control Type Wattage
Luminaires
Luminaire
[sf/ft/No]
[W]
I Ext Light I Canopies (freestanding,
4
12
74.00 Astronomical Timer Contra 48.00 ❑
attached and Overhangs)
Piping
Operating
Insulation
Nomonal pipe
Insulation Is Runout?
No Type
Temperature
Conductivity
Diameter
Thickness
[F]
[ Btu-in/b.sf.F)
[in]
[in]
I Domestic and Service Hot Water Systems
105.00
0.28
0.75
1.00 No ❑
I
Fenestration Used
Name
Glass Type No. of
Glass SHGC VLT
Conductance
Panes
111"'sEF)
ASHULSg1CIrAll
User Defined I
1.2500 0.8200 0.7600
❑
Frm
I
Materials Used
Only R-Value RValue Thickness Conductivity
Density SpecificHeat
Mat No Acronym
Description
Used [h.sEF/Btu] [it] [Btu/h.ft.F]
[kb/ct] [Btu/Ib.F)
187 Matl187
GYP OR PLAS
No i 0.4533 0.0417 0.0920
50.00 0.2000 Li
BOARD,1/2IN
178 Mad178
CARPET W/RUBBER PAD
Yes; .1.2300
❑
9/22/2017
EuergyGauge Summit® v5.20
7
265
Mat1265
Soil, 1 ft No
2.0000 1.0000
0.5000
100.00
0.2000
0
48
Mat148
6 in. Heavyweight concrete No
0.5000 0.5000
1.0000
140.00
0.2000
❑
23
Mat123
6 in. Insulation No
20.0000 0.5000
0.0250
5.70
0.2000
❑
4
Mat14
Steel siding No
0.0002 0.0050
26.0000
480.00
0.1000
❑
271
Mat1271
2x4@24" oc+RII Batt No
10.4179 0.2917
0.0280
7.11
0.2000
❑
279
Mat1279
Solid core flush (2.25") Yes
2.8537
❑
94
Mat194
BUILT-UP ROOFING, No
0.3366 0.0313
0.0930
70.00
0.3500
El
3/81N
Constructs
Used
Simple
Massless Conductance
Heat Capacity
Density
RValue
No
Name
Construct
Construct [Btu/b.sf.F]
]Btu/sf.F]
[lb/cfl
[h.sf.F/Btul
1055
Metal siding/2x4@24"+R11Batt/5/8"Gyp No
No 0.09
1.07
19.38
10.9
❑
Layer
Material Material
Thickness
Framing
•
No.
[ft]
Factor
1
4 Steel siding
0.0050
0.000
❑
2
271 2x4@24" oc+Rll Batt
0.2917
0.000
❑
3
187 GYP OR PLAS BOARD,1/21N
0.0417
0.000
❑
Simple
Massless Conductance
Heat Capacity
Density
RValue
No
Name
Construct Construct [Btu/h.sf.F]
[Btu/sf.F]
[lb/cfl
[h.sf.F/Btu]
1056
Mtl Bldg Roof/R-19 Batt No
No 0.05
1.34
9.49
20.3
❑
Layer
Material Material
Thickness
Framing
No.
[ft]
Factor
1
94 BUILT-UP ROOFING, 3/81N
0.0313
0.000
❑
2
23 6 in. Insulation
0.5000
0.000
❑
9/22/2017
4
EnergyGauge Summit® v5.20
8
Simple
Massless
Conductance
Heat Capacity
Density
RValue
No
Name
Construct
Construct
[Btu/b.sEF]
[Btu/sEF]
[lb/cf]
[h.sf.F/Btul
1057
i
1 fL soil, concrete floor, carpet and rubber pad No
No
0.27
34.00
113.33
3.7
❑
Layer Material
i
Material
Thickness
Framing
No.
IN
Factor
1 265
Soil, 1 ft
1.0000
0.000
❑
2 48
6 in. Heavyweight concrete
0.5000
0.000
❑
3 178
CARPET W/RUBBER PAD
0.000
❑
Simple
Massless
Conductance
Heat Capacity
Density
RValue
No
Name
Construct
Construct
[Btu/h.sEFl
[Btu/sf.Fl
[lb/cfj
[b.sEF/Btu]
1058
Solid core flush (2.25)
No
Yes
0.35
2.9
❑
Layer Material
Material
Thickness
Framing \
No.
IN
Factor
1 279
Solid core flush (2.25")
0.000
❑
9/22/2017 EnergyGauge Summit® v5.20
9
0
Profiles
0 0 No Classification No Classification
201
People
2
Fractional Null Schedule
202
Lighting
2
Fractional Null Schedule
203
Infiltration
2
Fractional Null Schedule
204
Equipment
2
Fractional Null Schedule
205
Sources
2
Fractional Null Schedule
206
HeatTemp
202
Set Point 55
207
CoolTemp
201
Set Point 99
208
Hot Water Schedule
2
Fractional Null Schedule
1,001
Heating Schedule
1
ON -OFF Null Schedule
1,002
Cooling Schedule
1
ON -OFF Null Schedule
1,003
Fan Operation SchedL
1
ON -OFF Null Schedule
501 501 ACM-NonRes ACM Nonres
201
People
519
ACM Nonres People
202
Lighting
507
ACM Nonres Lights
203
Infiltration
616
ACM Nonres Infiltration
204
Equipment
510
ACM Nonres Equipment
205
Sources
2
Fractional Null Schedule
206
HeatTemp
501
ACM Nonres Heating
207
CoolTemp
504
ACM Nonres Cooling
208
Hot Water Schedule
522
ACM Nonres Hot Water
1,001
Heating Schedule
410
Always ON
1,002
Cooling Schedule
410
Always ON
1,003
Fan Operation SchedL
513
ACM Nonres Fans
9f2212017
Summit® v510
10
t
I
Schedules
1
1
On/Off
I
ON -OFF Null Schedule
Hourly Sch. for:
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Holiday
12/31/1989
ShHr1
ShHr1
ShHr1
ShHr1
ShHr1
ShHr1
ShHr1
ShHr1
2
2
Fraction
Fractional
Null Schedule
Hourly Sch. for:
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Holiday
12/31/1989
ShHr2
ShHr2
ShHr2
ShHr2
ShHr2
ShHr2
ShHr2
ShHr2
.
4R
44
Absolute SetPt78
Hourly Sch. for:
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Holiday
12/31/1989
ShHr179
ShHr179
ShHr179
ShHr179
ShHr179
ShHr179
ShHr179
ShHr179
45
45
Absolute Set Point
70
Hourly Sch. for:
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Holiday
12/31/1989
ShHr180
ShHr180
ShHr180
ShHr180
ShHr180
ShHr180
ShHr180
ShHr180
201 201
Absolute Set Point 99
Hourly Sch. for:
Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Holiday
12131/1989
ShHr201
ShH2O1
ShH2O1 ShH2O1
ShH2O1
ShH2O1
ShH2O1
ShH2O1
202 202
Absolute Set Point 55
Hourly Sch. for:
Monday
Tuesday
Wednesday Thursday
Friday
Saturday
Sunday
Holiday
12/31/1989
ShH2O2
ShH2O2
ShH2O2 ShH2O2
ShH2O2
ShH2O2
ShHr202
ShH2O2
9/22/2017
I
EnergyGauge Summit@ v5.20
I
I1
410 410
On/Off
Always ON
I
Hourly Sch. for. Monday
Tuesday
Wednesday Thursday
Friday
Saturday
Sunday
Holiday
12/31/1989 ShHr410
ShHr410
ShHr410 ShHr410
ShHr410
ShHr410
ShHr410
ShHr410
i
Absolute Florida Commercial Electric Rate
412 412
Hourly Sch. for: Monday
Tuesday
i
Wednesday Thursday '
Friday
Saturday
Sunday
Holiday
3/31/1989 ShHr413
ShHr413
ShHr413 ShHr413
ShHr413
ShHr415
ShHr415
ShHr415
10/31/1989 ShHr412
ShHr412
ShHr412 ShHr412
ShHr412
ShHr412
ShHr414
ShHr414
12/31/1989 ShHr413
ShHr413
ShHr413 ShHr413
ShHr413
ShHr415
ShHr415
ShHr415
_
501 501
Absolute AC Nonres Heating
Hourly Sch. for: Monday
Tuesday
Wednesday Thursday
Friday
Saturday
Sunday
Holiday
12/31/1989 ShHr501
ShHr501
ShHr501 ShHr501
ShHr501
ShHr502
ShHr503
ShHr503
504 504
Absolute AC i Nonres Cooling
Hourly Sch. for: Monday
Tuesday
Wednesday Thursday
Friday
Saturday
Sunday
Holiday
12/31/1989 ShHr504
ShHr504
ShHr504 ShHr504
ShHr504
ShHr505
ShHr506
ShHr506
507 507
Fraction
ACM Nonres Lights
Hourly Sch. for: Monday
Tuesday
Wednesday Thursday
Friday
Saturday
Sunday
Holiday
12/31/1989 ShHr507
ShHr507
ShHr507 ShHr507
ShHr507
ShHr508
ShHr509
ShHr509
510 510
Fraction
ACM Nonres Equipment
Hourly Sch. for: Monday
Tuesday
Wednesday Thursday
Friday
Saturday
Sunday
Holiday
12/31/1989 ShHr510
ShHr510
ShHr510 ShHr510
ShHr510
ShHr511
ShHr512
ShHr512
513 513
On/Off
ACM Nonres Fans
Hourly Sch. for: Monday
Tuesday
Wednesday Thursday
Friday
Saturday
Sunday
Holiday
12/31/1989 ShHr513
ShHr513
ShHr513 ShHr513
ShHr513
ShHr514
ShHr515
ShHr515
9/22/2019
I
EnergyGauge Summit® v5.20
I
I
I
r
12
516
516
Fraction
ACM
Nonres Infiltration
Hourly Sch.
for: Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Holiday
12/31/1989
ShHr516
ShHr516
ShHr516
ShHr516
I
ShHr516
ShHr517
ShHr518
'
ShHr518
519
519
Fraction
ACM
I
Nonres People
Hourly Sch.
for: Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Holiday
12131/1989,
ShHr519
ShHr519
ShHr519
ShHr519
ShHr519
ShHr520
ShHr521
ShHr521
522
522
Fraction
ACM
Nonres Hot Water
Hourly Sch.
for: Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Holiday
12131/1989
ShHr522
ShHr522
ShHr522
ShHr522
ShHr522
ShHr523
ShHr524
ShHr524
1,001 "
1,001
Absolute Absolute null schedule
Hourly Sch.
for: Monday
Tuesday
Wednesday
Thursday
Friday
Saturday
Sunday
Holiday
12/31/1989
ShHr10001
ShHr10001
ShHr10001
I ShHr10001
ShHr10001
ShHr10001
ShHr10001
ShHr10001
1,002
1,002
Absolute Absolute null schedule
Hourly Sch.
for: Monday
Tuesday
Wednesday
j Thursday
Friday
Saturday
Sunday
Holiday
12/31/1989
ShHr10002
ShHr10002
ShHr10002
ShHr10002
ShHr10002
ShHr10002
ShHr10002
ShHr10002
9/22/2017 EnergyGauge Summit® v5.20
I
i
• I
13
0 m
0
00LLLL
LLLL
LL
LL
Op Op
m 00
O mm
m )n LO
NZ Z
LLLL
ZLLLL
LL Om7 Cm0
LL 00
O
00
O co
0 0 0
o n n
n n n
n m m
m v v
v 0 0
000
0 0 0
0
0
0
m
m Oo , OD
LL LL
LL
m m
m 0 O
O m m
m CO CO))
Z Z
Z LL LL
LL O O
O
OO
000
000
onn
rlrr
rnmm
mvv
v00
000
Oco
0
o m
0
m Oo
m
y,
LLLL
LL
-
co OD
m00
Om m
m)nm
)n ZZ
ZLL LLLL
LL00
0
00
000
000
onn
nnn
rmm
mvv
V-00
000
Ooo
0
m v
v
m N
O m
(D
n
LLLL
LL
ZZ
ZLLLL
LL00
0
�
OO
0oo
000
00 00
orr
m00
nlnn
O m m
nmm
0m W)
mvv
)n
v00
000
Ooo
c
12
o' 'o 'o
oo ro
O
OD
to
^�
LLLLLL
LLLL
Op Op
m00
Omm
mu))a
LOZZ
ZLLLL LLLL
LLLL 00m
0
OO
OOO
OOo
Onr
Innl.
nm m
mvv
v00
000
Ooo
0
y�C
LLL
LLL
mmm
LLL
LLLL L
L
co co
m00
Om CD
mN)a
mZZ
ZLLLLLL
Lo 0
0
00
000
0000
nrr
nrna)
a)vv
v 0 0
000
000
0
0 0
m m
m
m
LL LL
LL
m m
m 0 0
O m a)
m LO Cn
Cn Z Z
Z LL LL LL
LL LL O Cl)
(0
00
000
000
onn
rnn
nmm
mvv
v 0 0
000
0o0
0
00
Do
LLLL
LL
LL LL
LL Cl)
m m
Ca 0 O
O a) a)
a) Cn )n
Lo Z Z
Z LL
LL 000
0
00
000
000
onn
nnn
nmm
mvv
v00
000
0o0
0
w
a`)
E
E
NU
O
N
N
U)
OC
OC
HOT
C
dmmmm
a
T
Q
Q
0 m
0d
dNp,
Q❑OCD Ta7
L
❑
❑
7
'a
Y
a)U
U
m a
O a
N
a
o a)
< d
d
CV Q)
E
<Op
m
o
o
U
vL
v�
c
2
2
S�Z
2
2
2
2
2
2
2 rn
O
L
L Z
L
L n
n
m
O
L
U
co Z
c C
CA r
�,
U) C
Cn C
w,
fA C
0)
Vi C_
L'n 0
C) 0
COCn Q
Q
< O
N V.
-
0 O
O
m m
OLL
.O
Cl
N LL
O Ca
<
Na
-
ar- N
m< N
N —ID
N N
v 3
v 3
v 0
a
LL
.0
Q
co
Cn
Cn
m
Q
a
LL
a
P7
gO
y "
m
n
W
'
O
N
a
Y
413
ShHr413 Absolute
0.03804
0.03804
0.03804
0.03804
0.03804
0.0686
0.0686
0.0686
Florida Avg. Week Day Winter Ele
0.0686
0.0686
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.0686
0.0686
0.0686
0.0686
0.0686
0.03804
0.03804
414
ShHr414 Absolute
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
Florida Avg. Week End Summer E
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
415
ShHr415 Absolute
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
Florida Avg. Week End Winter Ele
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
0.03804
501
ShHr501 Absolute
60
60
60
60
60
65
65
70
ACM
Nonres Heating Weekday
70
70
70
70
70
70
70
70
70
70
65
60
60
60
60
60
502
ShHr502 Absolute
60
60
60
60
60
65
65
65
ACM
Nonres Heating Saturday
65
65
65
65
65
65
65
65
60
60
60
60
60
60
60
60
503
ShHr503 Absolute
60
60
60
60
60
65
65
65
ACM
Nonres Heating Sunday
65
65
65
65
65
65
65
65
60
60
60
60
60
60
60
60
504
-ShHr504 Absolute
77
77
77
77
77
73
73
73
ACM
Nonres Cooling Weekday
73
73
73
73
73
73
73
73
73
73
77
177
77
77
77
77
505
ShHr505 Absolute
77
77
77
77
77
73
73
73
ACM
Nonres Cooling Saturday
73
73
73
73
73
73
73
73
73
73
77
77
77
77
77
77
506
ShHr506 Absolute
77
77
77
77
77
73
73
73
ACM
Nonres Cooling Sunday
73
73
73
73
73
73
73
73
73
73
77
I77
77
77
77
77
507
ShHr507 Fraction
0.05
0.05.
0.05
0.05
0.1
0.2
0.4
0.7
ACM
Nonres Lights Weekday
0.8
0.85
0.85
, 0.85
0.85
0.85
0.85
0.85
0.85
0.8
0.35
10.1
0.1
0.1
0.1
0.1
508
ShHr508 Fraction
0.05
0.05
0.05
.0.05
0.05
0.1
0.15
0.25
ACM
Nonres Lights Saturday
0.25
0.25
0.25
0.25
0.25
0.25
0.2
0.2
0.2
0.15
0.1
0.1
0.1
0.1
0.1
0.1
509
ShHr509 Fraction
0.05
0.05
0.05
10.05
0.05
0.1
0.1
0.15
ACM
Nonres Lights Sunday
0.15
0.15
0.15
10.15
0.15
0.15
0.15
0.15
0.16
0.1
0.1
10.1
0.05
0.05
0.05
0.05
510
ShHr510 Fraction
0.15
0.15
0.15
0.15
0.15
0.2
0.35
0.6
ACM
Nonres Equipment Weekday
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.65
0.45
0.3
;0.2
0.2
0.15
0.15
0.15
M2/2017 EnergyGauge Summit® v5.20
is
511 ShHr511 Fraction
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.2
ACM Nonres Equipment Saturday
0.25
0.25
0.25
0.25
0.25
0.25
0.2
0.2
0.2
0.15
0.15
0.15
0.15
0.15
0.15
0.15
512 ShHr512 Fraction
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.2
ACM Nonres Equipment Sunday
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.15
0.15
0.15
0.15
0.15
0.15
0.15
513 ShHr513 .On/Off
OFF
OFF
OFF
OFF
OFF
ON
ON
ON
ACM Nonres Fans Weekday
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
ON
OFF
OFF
OFF
OFF
514 ShHr514 On/Off
OFF
OFF
OFF
OFF
OFF
ON
ON
ON
ACM Nonres Fans Saturday
ON
ON
ON
ON
ON
ON
ON
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
515 ShHr515 On/Off
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
ACM Nonres Fans Sunday
OFF
OFF
OFF I
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF `
OFF
OFF
OFF
516 ShHr516 Fraction
1
1
1
1
1
0
0
0
ACM Nonres Infiltration Weekday
0
0
0
0
0
0
0
0
0
0
0
0
1
1
1
1
517 'ShHr517 Fraction
1
1
1
1
1
0
0
0
ACM Nonres, Infiltration Saturday
0
0
0
0
0
0
0
1
1
1
1
1
1
1
1
1
518 ShHr518 Fraction
1
1
1
1
1
1
1
1
ACM Nonres Infiltration Sunday
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
519 ShHr519 Fraction
0
0
0
0
0.05
0.1
0.25
0.65
ACM Nonres People Weekday
0.65
0.65
0.65
0.6
0.6
0.65
0.65
0.65
0.65
0.4
0.25
0.1
0.05
0.05
0.05
0
520 ShHr520 Fraction
0
0
0
0
0
0
0.05
0.15
ACM Nonres People Saturday
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.05
0.05
0.05
0
0
0
0
521 ShHr521 Fraction
0
0
0
0
0
0
0
0.05
ACM Nonres People Sunday
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0
0
0
0
522 ShHr522 Fraction
0
0
0
0
0.1
0.1
0.5
0.5
ACM Nonres Hot Water Weekday
0.5
0.5
0.7
0.9
0.9
0.5
0.5
0.7
0.5
0.5
0.5
0.1
0.1
0.1
0.1
0.1
523 ShHr523 Fraction
0
0
0
0
0
0
0.1
0.2
ACM Nonres Hot Water Saturday
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.1
0.1
0.1
0
0
0
0 %
9/22/200 EnergyGauge Summit® v5.20
I
I
16
J
i
524 ShHr524 Fraction
0
0
0
0
0
0
0
0.1
ACM Nonres Hot Water Sunday
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0
0
0
0
3,001 ShHr1000' Absolute
0
0
0
0
0
0
0
0
Absolute Null Schedule
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3,002 ShHr1000. Absolute
0
0
0
0
0
0
0
0
Absolute Null Schedule
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
9/22/20117 iEnergyGauge Summit® v5.20 17