Loading...
HomeMy WebLinkAboutCERTTIFICATE OF TERMITE TREATMENTMOM Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 I I RECEIVED OCT 1.1019 Perrnitti,9 O St LUCie COUepartMenr CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: 06'M JOB ADDRESS: VLZ9 &"(eSne Ar BUILDER/CONTRACTOR:(! PEST•, CONTROL CONTRACTOR: � PEST CONTROL LICENSE #: _�q t3 (9'?s We, the undersigned, hereby certify that we have p subterranean termites in accordance with the stand Square feet if area treated: PZ Q L Percentage of solution: Date of Treatment: )-obs f Footing 1st Treatment Re -Treat Driveway -eated the above described construction for s of the National Pest Control Association. --micals used: &G (icIL Cc. -Pe otal gallons used: Time of Treatment: Slab 1st Treatment Re -Treat Pools 1st Treatment 1st Treatment Re -Treat Re -Treat Other Perimeter for Final Inspection 1st Treatment Re -Treat Krw,_�� hs Signature of Exterminator D to Note; There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. I I FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistantjobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate sha//provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014