Loading...
HomeMy WebLinkAboutLETTER KITCHEN LAYOUTJPI inc From: Jo -Ann Breau <pjbre Sent: Wednesday, June 20, To: JPI inc Subject: Re: FW: Review Comr Attachments: SCAN�itt hen Wire Layout.) BY Hi Andrew, stLueleCourt I Slab repair - Backfill dirt, termite spray, wire quickcrete concrete mix bags 80 Ibs 018 3:09 PM dated 6/12/18, [ Permit Number 1805-0755 ] h & plastic vapor barrier. 4" slab repair - 4000 PSI Bathroom frame - wood frame, PT bottom plate, 2x4 framing 16" apart, pocket door open to right side, bottom sheet green moisture resistant 1/2" drywall on interior of bathroom, top sheet & ceiling 1/2" regular drywall, exterior bathroom 1/2" regular drywall top & bottom Interior finish - the floors, pedestal sink & regular toilet Wire layout for kitchen attached Hope this answers all of your questions. Thanks, Paul Breau On Wednesday, June 20, 2018, 1:40:19 PM EDT, JJPI inc <jpiinc@stlucieco.org> wrote: Paul, Attached are the comments from the first round. Based on our phone conversation, I will revise the description of work in the Permit Application o include: 1) Add half bath- frame & gypsum board walli with 2x4 wood studs. Add one sink, one toilet. Add one light, one exhaust fan, one outlet. 2) Kitchen- Relocate refrigerator to opposite wall, add new 20 amp circuit. 1