Loading...
HomeMy WebLinkAboutFIELD DENSITY TEST°set' �'1 �f e eta & TESTING INC. 250 SW 13th Ave Pompano Beach, FL 33069 RECEIVED SEP 2 :0 2010 Permitting Department St. Lucie County Phone 954-784-2941 800-848-1919 Fax 954-784-7875 www.fed-eng.com Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 68, Creekside Date: August 31, 2018 Address: 8616 Cobblestone Drive, Fort Pierce, FL A Area Tested: Building Pad Material Type: Brown Sand with Some Shell Client: D.R. Horton. Inc. Order #: 18DR779 Permit #: &Y- 07rJ Tech: BK Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. 'Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Center of Building Pad 12" FL 8.4 103.1 106.0 13.0 97.3% Yes 2 NW Corner of Building Pad 12" FL i i 8.6 105.8 106.0 13.0 99.8% Yes 3 SE Corner of Building Pad 12" FL 6.4 105.2 106.0 13.0 99.2% Yes 4 5 6 7 I 8 9 i 10 11 I 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verificationzfSoji Bearirjg Capacity. � Legend for Elevation: ' `! PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: '.; . I' �_ SL = Springline FL = Final Lift _ . Keith LeBlanc, F:t:. SG = Subgrade BG = Below Grade `Federal,Englneering & Te"stipg, Inc. BC = Basecourse BOF = Bottom of Footing Florida Reg. N6."59394_ TOP = Top of Pipe FG = Finished Grade Certificate,of;Authorization'#5471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization.fof publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compactigii of the tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the so&rnate'rials' belowpro' posed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify.'th t,he,u6d6dl 09,8611s wf0 supportthe proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed a' val euate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must beipear6 ed on this work. PAGE 1 of 2 i Compacted Soils. Method D-6938 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. - The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing' soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope .of services. If environmental analysis of the soils is required, we can provide a proposal for Performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. Noother analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% .of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication .of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2 edera'­'l & TESTING INC. 250 SW 13th Ave Pompano Beach, FL 33069 S�� a r Phone 954-784-2941 RECEWD 800-848.1919 SEP 0' .��� Fax 954-784-7875 www.fed-eng.com ermitting DspsPtffl@fit Field Density Tests of Compacl4a,1oils Method D-6938 Project: Proposed Residence Lot 68, Creekside Date: August 31, 2018 Address: 8616 Cobblestone Drive, Fort Pierce, FL Order #: 18DR779 #: S s Area Tested: Building Pad Permit Material Type: Brown Sand with Some Shell Tech: K Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE p'n e4•: 95% Rroctor Palm Bay, FL 32907 Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist , �0 I Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Center of Building Pad 12" FL I 8.4 103.1 106.0 13.0 97.3% Yes 2 NW Corner of Building Pad 12" FL 8.6 105.8 106.0 13.0 99.8% Yes 3 SE Corner of Building Pad 12" FL I 6.4 105.2 106.0 13.0 99.2% Yes 4 I 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side Page 2 of 2 for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification of Soil J3,0bKngFd1&I Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: A4 SL = Springline FL = Final Lift Keith LeBlanc, PZ%ml 0 a • "`' °♦ rin inee SG = Subgrade BG =Below Grade Federal En g' � '�&Testing, Inc. BC = Basecourse BOF = Bottom of Footing Florida Reg. No.; §S 4 STATE OF ;°� TOP = Top of Pipe FG = Finished Grade Certificate of Authorization V71 � °� o As mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorizaeo'lor, ` Q�eo% st> eats, conclusions or extracts from or regarding our reports Is reserved pending our written approval. A density test determines the degree of compactidn��;"e",fesCeil 191f�rfia edal only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the prQRbA drj1tivctUrek V1ie results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will support tfie 0roposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rainstorms, retesting must be performed on this work. PAGE 1 of 2