Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTi Planning & Development Services Building & Code Regulation Division 230,0 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRU PERMIT #: 18U-_ O VZ-3OB BUILDER/CONTRACTOR: PEST CONTROL CONTRACTOR: 1 PEST CONTROL LICENSE #: '�"? We, the undersigned, hereby certify that we h subterranean termites in accordance with the Square feet if area treated: 1� Percentage of solution: Date of Treatment: 1 �6 Footing 15t Treatment Re -Treat Driveway 1st Treatment Re -Treat Other 1st Treatment Re -Treat ON SOIL TREATMENT DRESS: i-foZ0 pretreated the above described construction for ndards of the National Pest Control Association. Chemicals used: ?(Oro-CO—�- Total gallons used: Time of Treatment: Slab 1st Treatment Re -Treat Pools 1st Treatment Re -Treat Perimeter for Final InspectioQ (JU A— ffn,���, �J Signature of Exterminator Date i Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged, FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistantjobsite posting board shall be provided to receive duplicate Treatment �Certilicates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment . Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number ofgaiions used, to establish a ved / bie record of Protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014