HomeMy WebLinkAboutBLOWER DOOR TEST FORMQCANWtu
��-�79G
BY
Planning & DeveloprtIMUrot cCoilrit,
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982 RECEIVED
Phone:772-462-2165 Fax:772-462-6443 1010
au� o e
HoOWER se InfDOORonEST TestOCerMtification peTM01n o Cou v ent
Prescriptive,and Performance Method
Date: 8 / 9 / 2019 Permit #: 1805-0776
Contractor: Paradise Homes
Job Address: 18503 Mach One Dr, Port St. Lucie,
Construction: (><) New Construction — Complete ( ) Existing —After Addition
House Infiltration Test Results
CFM (50) = 1905
Volume = 33450
SLC Climate Zone 2
Test Date: 8 / 8 / 2019
ACH (50) = CFM (50) x 60 / Volume = 3.42 Mechanical Ventilation required less than 3 ACH
Passing results must be & ACH (50) or less X/1 Pass ( ) Fail
FBC, Energy
The building or dwelling unit shall be tested and ' erified as having an air leakage rate of not exceeding 7 air changes per
hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a
blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in
Section 553.993(5) or (7), Florida Statutes or indill iduals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an
approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building
thermal envelope.
►12!
FBC, Residential
Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a
pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation
the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3.
Testing Company
Company Name: Energy House Technology Address: 3341 Pine Hill Trail, Palm Beach Gardens, FL
I hereby certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation
requirements i accordan with tion R402.4.1.2 Climate Zone 2.
Signature:
Printed Name: Bruce Tschosik
License/Certification #: RTIN: 4510152
Duct: Leakage Test Report
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
Jurisdiction:
Builder: Paradise Homes
munity:
Permit #: 1805-0776
Lot: NA
Address: 18503 Mach One Dr
City: Port St. Lucie State: FL Zip: 34987
System 1
12 cfm cfm25
System 2
18 cfm cfm25
System 3
cfm25
Sum of any
cfm25
Total of all
30 cfm cfm25
30 cfm _ 3297 = 0.01 Qn
Total of all Total Conditioned
systems Square Footage
PASS ❑FAIL
Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC380 by either individuals as defined in Section
553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i), Florida Statutes.
Company Name: Energy House Technology Phone: 561-459-0242
1 hereby verify that the above duct lea tind results are in accordance with the Florida Building Code requirements with the
selected compliance papi as state Bove, eit r; the Prescriptive Method or Performance Method.
Signature of Tester: Date of Test: 8 / 9 / 2019
Printed Name of Tester: Bruce Tschosik
License/Certification #: RTIN: 4510152
Issuing Authority: FSEC/RESNET
8/9/2019 11:30:50 AM EnergyGauge@ USA 6.0.03 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software
Page 1 of 1