Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT"CANNED BY �4 Lucia CaUvIf ill { planning & ®evelloPM8111$ Services Bull0ding & Code Regulation ®ii ISIGn & 23®o Virginias fee Fowl Pierce, Fa 34982 ~ + 792-4 62-2a72 Fax 717a-46i2-15443 CC!�i�JSTt`?I.1C:TIt�)fJ 5�e��L T(�f.AT �1E:�'��T , tiuT■�flll/-at� a� *^K •� ADDRESS: :I EVICT -A -BUG TERMITE &PEST CONTROL INC. PEST CONTROL CONTRACTOR PEST CONTROL LICENSE: J8175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: Chemicals used: DOMINION 2L gallons used: Total Percentage of solution: •05°�° � g Date of Treatment: /p`/S� Time of Treatment: _ Footing r 15t Treatment Re -Treat Slab J— 1st Treatment Re -Treat Driveway Pools 1st Treatment 1st Treatment Re -Treat Re -Treat Other Perim ter for Final Inspection 1st Treatment Re -Treat �! ure of Exterminator Date Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time, of each inspection or the scheduled Inspection will fall and a re-Inspectlon fee charged. FOC104°2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobslte posting board shall be provided to receive dupllcate Treatment Certificates as each required protective treatment is completed, pro vlding a copy for the person the permit Is Issued to and another copy for the bullding permit flies: The Treatment Certificate shall provide the product used, Identity of the applIcator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number ofgallons used, to establish a verifiable record of protective treatment: if the soli chemical barrier method for termite prevention Is used, final exterior treatment shall be completed prior to Anal building approval. , St Lucie Coup tY r6quiFes for the ff nao inspection for C®, a permanent Stacker to be placed on time electecal panel box cover, halting ell the treatments and dates of aPP11Ce$l0ne° Revtscd 7/24/201A