HomeMy WebLinkAboutRESPONSE TO PLAN EXAMINERJqUO03 Owl is
®INNVOS
Cover Sheet for Response to
ZP
Plan Examiner
Permit # 1806-0111
Includes Response to questions
1 and 3
Question 2 response previously submitted
4
RECEIVED
JUL 10 2918
ST. Lucie County, Permitting
i
�� a
P��
--,
PROPERTY INFORMATION
Address: 320 Se Naranja Ave
City / State / Zip: Port St Lucie, FI 34983
Parcel #: 3419-530-0034-000/0
Zoning: RS-4
APPLICATION INFORMATION
Permit Number: 1806-0111
Permit Type: DOCK
CONTRACTOR INFORMATION
Contractor Name:
Business Name:
Business Addr:
City / State / Zip:
REVIEWS AND COMMENTS
Review Type Status
DOCUMENTS MISSING COMPLETE
REVIEW COMMENTS
Page 1
Owner(s):
Barry Jeneway
Jurisdiction: SAINT LUCIE COUNTY
Lot#: 34 Block: 32
Stories: Automatic Sprinkler System? No
Fax Number:
Email:
Reviewed By Date Started Date Completed Date Released
Audrey Humphrey 6/612018 7/10/2018 7/10/2018
Comment:
ENVIRONMENTAL REVIEW
COMPLETE Lynn Swartzel 6/13/2018 6/13/2018 6M3/2018
Comment:
FRONT COUNTER REVIEW
COMPLETE - Audrey Humphrey 602018 6/612018 616/2018
Comment:
PLANS EXAMINER REVIEW
INCOMPLETE Jpi, Inc 6/28/2018
6/28/2018 Comment:
1) PLEASE PROVIDE CONNECTION DETAILS AT CANTILEVER JOISTS & WALKWAY. ([A] 107.2.1)
6/28/2018 Comment:
2) THE CUT SHEET FOR THE BOAT LIFT IS UNDER THE OLD 2004 FBC, PLEASE UPDATE AND SUBMIT TWO
SIGNED AND SEALED COPIES. (FAC 61G20-1.001(1))
6/28/2018 Comment:
3) PLEASE CLARIFY- DOCUMENTS APPROVED BY FDPEP SHOW APPROVAL OF A 50' SEAWALL AND EXIST.
DOCK. PROPOSED DESIGN DOES NOT MATCH THIS DESCRIPTION. ([A] 107.2.1)
ZONING REVIEW
COMPLETE Lydia Galbraith 6/11/2018 6/11/2018 6/11/2018
Comment:
r-I
LJ
ol@d
dia Galbraith < state.fl.us>
Sovacool, Monica Monica.Sovacoep.
From: Tuesday, July 17, 2018 11:36 AM
Sent: Lydia Galbraith Noncompliantjrf.pdf, permitt 18
To: RE: Report_FL_Review Comments_
Subject:
Hi Lydia the ro ect design
section of the exemption letter should be this
the Department and the statutes and rules in effect when the Information was
Under the Regulatoryised on the conditions
I e �ntineted without furthe
This exemption verification is wb 1 expire after one yation y P Ite rolect destg - on need
ear, and will not be valid at a other time if site conditions matenal?
rovade : ) P
submitted. This verification the exem t activityear amended. rat on:gf thts f Gat t F n Y the event
t�chan e
aitment after the ode y �eW anvltcatton and verification fee will be
is modified, or the statutes or ruff d°e D p f; , ��r nhanHesOrthe statutes ox•rules avexmn the eire faetivt In the even y
to re -verily --
required.
has not changed then it remains exempt,
If the activity and location
Thanks,
Monica Sovacool
acvnarM
pro,,
EnvfronmentalManager
Environmental Resourceing
Protection
aP
o ' °
Florida Department or Environmental
Palm Beach
Southeast District -West
3301 Gun Club Road, MSC 7210 1
33406
West Palm Beach, FL
Monica SOy"ICOOi I Flnridac e{2 EOv
rvsai
0 iice:5�618
F,,_5CIIEDULEY4
I
h[mailto:galbraithl@stlucieco.orgl
From: Lydia Galbrait
Sent: Tuesday, July 17, 2018 a - So AM state.fl.us>
ort_FL_Review_Comments_NoncoMpiiant_jrf.pdf, permit 1806 0111
To: Sovacool, Monica <Monica.Sovacool@dep.
subject: RE: Rep
Hi Monica, o However, I didn't realize that the exemption permit has an expiration date of one
permit before and thought we were all good to g • I including all adjustment or do the online
We have discussed this p 7 or oin to eliminate the permit, should he reapply
fired.
year. This permit has expired 6/ / t Are we totally g g permit had already P
What is required now? Since the project is exert
permit? Sorry, for not asking the question in my or email. Did not realize at that time the p
Please advise.
Thank you,
Lydia Gatfraitfi,
Zoning Specialist
Building and Code Regulation
(772)462-1555
hraith s
zp,a gS1
• .Dl-Mid
From: Sovacool, Monica201814:15 PM a.Sovacool de state.fl.us]
Sent: Monday, June ,�lestlucieco.or >
To: Lydia Galbraith < alb' Iiantjrf.pdf, permit 1806-0111
subject: RE: Report_FL_Review Comments_Noncomp exemption, they would just apply for another
an existing artment. We would only
permit. There is no way to modify
t from needing a p ro erty owner get an exemption letter from the Dep
Hi Lydia- require that any p P
The dock and boatlift activities would also be exempt wired o actual permit.
verification for the a �� it if t was ational tneactivity that requirs; however, we alsoed
do not actual
require they get a p
Thanks,
7/10/2018
Permit # 1806-0111
Response Letter to Plan Examiner
Response to item #3
(3) Please Clarify -Documents approved by FDP,EP show approval of a 50'seawall and Existing dock.
Proposed design does not match this description.
As I worked with the FDEP, it was my understanding that they provided an exemption for jurisdiction in
this canal and were only interested in the overall general concept. They are leaving the detail of the
project for the county permit process. With the assistance of the FDEP agent and some primitive
drawings and sketches, I worked through the process of achieving the exemption permit. (Permit #56-
0351797-001.002-EE)
After receiving the exemption permit, I began to pursue getting all the proper documentation together
for my county permit. At this time, I learned I needed more detailed information and I have been
working with a local engineering firm to achieve this. (Paul Welch Inc.)
The overall concept of my project is basically the same. I am installing approx. 50' of new seawall and
modifying the existing dock to accommodate the width of the area between the seawall and the back
side of the existing dock.
Hopefully I will not be required to go back through the process with FDEP and you will be able to move
forward with the county permitting process. If it helps, when I submitted my application to the county,
this question was brought up at the counter review. We contacted Stacy Cecil with FDEP and she gave
us the go ahead with the project as our modifications had no additional impact/or caused no
environmental concerns. There is also an e-mail from Monica Sovocol that gives us the approval. I
believe my counter review specialist was Andrea. I apologize in advance if I have miss -stated her name.
Thank you for your consideration,
lb ov�
(,Wily
Barry Janeway
7/10/2018
Permit # 1806-0111
Response Letter to Plan Examiner
Response to item #3
(3) Please Clarify -Documents approved by FDPEP show approval of a 50'seawall and Existing dock.
Proposed design does not match this description.
As I worked with the FDEP, it was my understanding that they provided an exemption for jurisdiction in
this canal and were only interested in the overall general concept. They are leaving the detail of the
project for the county permit process. With the assistance of the FDEP agent and some primitive
drawings and sketches, I worked through the process of achieving the exemption permit. (Permit #56-
0351797-001.002-EE)
After receiving the exemption permit, I began to pursue getting all the proper documentation together
for my county permit. At this time, I learned,l needed more detailed information and I have been
working with a local engineering firm to achieve this. (Paul Welch Inc.)
The overall concept of my project is basically the same. I am installing approx. 50' of new seawall and
modifying the existing dock to accommodate the width of the area between the seawall and the back
side of the existing dock. j
I
Hopefully I will not be required to go back through the process with FDEP and you will be able to move
forward with the county permitting process. If it helps, when I submitted my application to the county,
this question was brought up at the counter review. We contacted Stacy Cecil with FDEP and she gave
us the go ahead with the project as our modifications had no additional impact/or caused no
environmental concerns. There is also an e-mail from Monica Sovocol that gives us the approval. I
believe my counter review specialist was Andrea. I apologize in advance if I have miss -stated her name.
Thank you for your consideration,
F
I
tr
Cf%
r.