ATLANTIC VIEW BEACH CONDOMINIUM
Concrete and Waterproofing
.may,
INC.
Certified State ,d' Florida Licenses. CGCI510734
CGC1518181.
CGC058421
Ferber Intern' tional Concrete Repair Institute
Member -of American Concrete Institute
E-mail info @concretereparing.net ��� 7
Atlantic View ]Beach.Cluh CondaMinlium
—Contr ctor Bid Worksheet
(31 M ch 2010) Revised 04/15/2010
GENERAL
Bid Item 1-Mobilnahon
Descri ty ion: Ozeier materi is, schedule m r►power, stages, transport equipment to
- power -and electric utility use. All actions necessary to
-the j ob-site; -accommodate
begin work on- site iiicl ding administrative and setup costs, dumpster site
protection.
Include action —and expe se necessary to tarp and protect landscaping, air
conditioning, and any oth r fixture or item that could be "damaged by coating
work. .
S 17.280.00 Total
CONCRETE REPAIR
Biel -Items -door Slab, glorizo tal, Partial Depth (6" or Less)
— Description: Repair deck palling by demotion and -removal or degraded concrete,
-—..---. sand blast degraded steel tp near white (SSPC 7 - Steel structures painting council
cleanliness standard 7)2 in�tall steel surface primers and repair. mortar.
Unit Cost (Square -Ft) .h0 x 580 SF = $ 39.440.00 Total
Bid Item 3 - Overhead Slab, H4&ontal, Partial Depth (6" or Less)
Description: Repair over ead spalling by demotion and removal of degraded
concrete, sand blast de aded steel to near white (SSPC 7 - Steel structures
painting council cleanline s standard 7), install steel. surface primers and repair
_..__ ..._ mortdr. install patch supp A form, with bracing as needed.
--- Unit Cost (Square -Ft) 85.00- x 7 SF = $ 595.00 Total
Bid Item 4 - Floor Slab, Horizo6tal, Full Depth Repair
Description: Repair deck palling by demotion and removal or degraded concrete,
sand blast - degraded ste 1 to near white (SSPC 7 -Steel structures painting
- — — council cleanliness stand d 7), install steel surface primers and repair mortar.
I` n-imost (Square -Ft) _� 78.00 x 175 SF = S 13;650.00 Total
Bid Item 5 — Edge Spall Repair such that
Description: Saw cut bal ony 12" back from edge to a depth necessary
underlying -steel reinforce ent is not cut, demolish and remove all concrete from
cut line. to edge, sand bl st and prime edge reinforcement, form and brace new
- -- edge, pour new edge with 3" PVC knockouts for handrail post base.
Unit'Cost (Linear -Ft) 5.00 x 494.LF = $ 46 930.00 Total
Bid Item 6 —waterproof Mein rane & Spray Deck
Description: Apply final deck waterproofing ancTspray deck in repaired areas.
Uui.LCost (Square -Ft) 4.65 x 217G SF = $ 10-119.40 Total.
SUSTAINABLE EARTH ENGINEER' ATLANTIC VIEW BEACH CLUB CONDOMINIUM
BID WORKSHFF,T Pagel of 7
;, Ate- �t�►n' � �� 5 � ;��� � �
p C.t^J
Bid Item 6a — Pressure Wash & Stain deck I 1 coat.
Unit Cost (Square -Ft)
Bid Item 7 — Column and Beam
Description: Repair strut
degraded concrete, sand 1
structures painting count:
and repair mortar. This in
Unit Cost. (Square -Ft) $ 7:
Bid Item .8 — Column .and Beam
Description: Repair strut
degraded. concrete, sand
structures painting counci
and repair mortar. Fabrica
complete. Shoring is not c
case basis if required.
Unit Cost (Cubic -Ft) $ 2
Bid Item 9 — Bleed Thru & R
Description: Clip and
depth of 2 inches. Cut
surface patch.
Unit Cost -(Patch)
Bid Item 10 — Stucco
Description: Apply be
Unit Cost (Square -Ft)
Bid Item 11—Paint
Description: Prime and
Unit Cost (Square -Ft)
Bid Item 12 — Caulk
Description: Remove
Unit Cost (Linear -Ft)
SUSTAINABLE EARTH ENGINEER'
x 10.00OSF = $ 11,000.00 Total
tpair, Surface Patch
Ural concrete spalling by demotion and removal of
asf degraded steeTto""hear white `(SSPC -and 7- - -Steel
cleanliness standard 7), install steel surface primers
udes surface patch only, no forming required.
00 x 80 SF = $ 6,000.00Total
,epair, Forms & Pour
iral concrete spalling by demotion and removal of
last degraded steel to near white (SSPC 7 Steel
cleanliness standard 7), install steel surface primers
forms and bracing as needed, patch tremie area when
asidered necessary, and will be addressed on a case by
x 10 CF = $ 2.150.00Total
Spots
love concrete around bleed thru's and rust spots to a
1 remove tie wire, form nail, or reinforcement. Apply
x 60 Patches = $ 1.500.00Total
WATERPROOFING -
agent and stucco to match existing.
) x 700 SF = $ 6.650.00Total
where. required.
x 200 SF = $ 420.00Total
loose, or cracked caulk, dry surface, install new
x * * .. LF = Total
ATLANTIC VIEW BEACH CLUB CONDOMINIUM
BID WORKSHEET . Page 2 of 7
SLIDING GLASS DO(
Bid Item 13 — Remove, Re-inst
Description: In areas wh
the sliding glass doors),
affect repairs. The slidii
staged on the balcony ,
overhead and floor with
framing is to store the s'
sliding glass door tracks
frames are to be caulked
Unit Cost (Each) $
REMOVE, REFIURBISH, RE-INS'TAL..L
Sliding Glass Door
threshold damage is noted (the concrete slabs framing
will be required to remove the sliding glass doors to
glass doors are to be removed, framed with 2x4, and
3, being worked on. The 2x4 shall be secured to the
e tap con per foot, top and bottom. The purpose of the
ng. glass doors while repairs are being performed. The.
to be re -installed using new.hardware. The tracks and
id sealed the saie as with. a new installation.
).00 x 12 Ea = $ 3,600.00Total
Bid Item 14 _ Refurbish Slidin ! Glass Door (Refurbishment)
Description: Repair and lbricate sliding glass door rollers and latches.
Unit Cost (Each) $ 41 .00 x 20Ea' = $ 840.00Total
Bid Item 15— Replace sliding glass door tracks
Description: Where sliding glass door tracks are unusable, they are to be replaced
and installed with new.
Unit Cost (Ea) $ 300.00 x 6 Ea = $ 1,800.00Total
Bid Item 16— Dust Wall / Interi
Description: Where slidi:
wall shall be installed, se(
be 12" on center, nailed I
shall be weather proofe
carpeting and tile will be
Unit Cost (Ea) $ 518.00
SUSTAINABLE EARTHE.NGIN
3r Protection
ig glass doors .are to be removed, a '/a" plywood dust
,ure with 3" tap -con every foot, top and bottom. Studs to
o plywood and bottom board and header. The dust wall
d with visqueen stapled to the dust wall. Damaged
3n owner expense, not to be included in this bid item.
x 12 Ea = $ 6,216.00 Total
°S ATLANTIC VIEW BEACH CLUB CONDOMINIUM
LCTOR BID WORKSHEET Page 3 of 7
Bid Item 17— Remove, Keturt
-Description:- Handrail --.-
where 2 or more handy
removing a portion of
shop, sandblasting, ref
removal and re -grout pc
Unit Cost (Linear -Ft) g
Bid Item 18= Remove and Rep
Description: Where hanc
to replace), the handrails
nit Cost (Linear -Ft) $ 58
HANDRAILS
h. Re -Install Existing Handrail
noval_ will _be_required-to _perform edge spall repairs
posts are involved. This aspect of the work consists of
e existing handrails, (from post to post) delivery to a
- as . needed, recoating, and re -install. Include cost for
bases.
>.00 x 200 LF = $ 9,0 )0.00 Total
Handrails
are unserviceable (it would cost more to repair than
l be removed and replaced in kind.
x 200 LF = $ 9.000.00Total
Bid Item 19— Post Base Repair
Description: The grouted post bases have degraded in -some areas. The degraded
grout shall be excavated to sound material, and replaced with high strength, low
shrink grout. These areas are located randomly throughout the structure.
Unit Cost (Ea) $ 58.00 x 205 Ea = $ 4,510.00Total
Bid Item 20— Angle & Attachm
Description: Where hanc
broken, or corroded, thes
Unit Cost (Ea) $ 32.00
SUSTAINABLE EARTH ENGINEER
;nt Repair
rail attachment or connection hardware is bent, loose,
components shall be removed and replaced. .
c 40 Ea = $ 1.280..00Total
ATLANTIC VIEW BEACH CLUB CONDOMINIUM
OR BID WORKSHEET Page 4 of 7
Bid -Item 21— Remove,-Re"Iw
Description: Hurricane
deck repairs. The hurri
and re=installed
Unit Cost (Linear -Ft) 9
Bid Item 22— Remove and ReI
Description: Remove an
hardware.
Cost (Linear -Ft) $ 8.00
Bid Item 23— Remove and R,
Description: Remove
attachment hardware.
Unit Cost (Linear -Ft) ..
Bid Item 24— Remove and I
Description: Remove
hardware.
Unit Cost (Ea) $
Total Project
How soon can you start the we
Pemit What is your projection
typical circumstances? 21 w
Please list the name, address,
cell phone as appropriate.
CHASE/DANIELLO &. ASSC
2708 N. Australian Ave.
West Palm Beach, Fl. 33407
561-835-4788 fax 561-833-35
SUSTAINABLE EARTH ENGIN
HURRICANE SHUTTERS
iurricane Shutter -_
:er removal will be required to perform edge spall or
shutter shall be removed, staged or stored carefully,
x 500 LF = $ 19,500.00Total
Lce Top Track
replace top hurricane shutter track with new attachment
2100 LF = $ 16,800.00Tota1
e, Bottom Track Only.
replace bottom hurricane shutter track with new
x 2100 LF = $ 16,800.00Tota1,
ice Starter Strip
replace top hurricane starter strips with new attachment
x .60 Ea = $ 2,100.00Total
timate $ 249,779.40
? As soon as The City of Fort Pierce issue Building
time to complete, including weather delays and other
telephone number of your company, with fax, email,
TES, INC.
'$ ATLANTIC VIEW BEACH CLUB CONDOMINIUM
kCTOR BID WORKSHEET Page 5.of7
ly
Note-1: The contractor is to
priced using only materials
award of contract only.
Note-2: The Engineer is not
dimensions for restoration at
bidding purposes only.
Note-3:. A Pre -bid conferenc
Lobby.
3pect the site prior to submittal of the bid. Work to be
:ed or described. Substitution shall be considered after
-sponsible for changes in the repair area sizes. The
approximate, and are presented as a guideline for
will be held April 9 at 9 AM on site, meet in the
Note-4: Please'provide. your stimate for the total project as it is described above.
Base your estimate on quality installation as inspected and approved by the engineer,
to be completed between May and September 2010
Note-5: Owner to pay.permit fees. Contractor to submit permit to the municipality as
assisted by the engineer.
Please list the items that were no included in the above description that you feel are
necessary to achieve a suitable fi ished product as it relates to this project.
ITEM 13.-
ITEM 15.-
ITEM 16.-
BASED ON $ 25.00/LF (12' OPENING)
BASED ON $ 2 5.00/LF(12' OPENING)
BASED ON $ 3,7.00/LF(14' OPENING)
SUSTAINABLE EARTH ENGINEER'S ATLANTIC VIEW BEACH CLUB CONDOMINIUM
CnNTRACTOR BID WORKSHEET. Page 6 of 7
Additional information.
SUSTAINABLE EARTH ENGINEER'S. ATLANTIC VIEW BEACH CLUB CONDOMINIUM
CONTR CTOR BID WORKSHEET Page" of 7