Loading...
HomeMy WebLinkAbout1006-0186 CONCRETE REPAIRS & WATERPRROFING811) DOCUMBNT.S Q ] 0�z !e-, UZ fYIJ J SCANNEu BY Y t A r ATLANTIC VIEW BEACH CONDOMINIUM Concrete and Waterproofing .may, INC. Certified State ,d' Florida Licenses. CGCI510734 CGC1518181. CGC058421 Ferber Intern' tional Concrete Repair Institute Member -of American Concrete Institute E-mail info @concretereparing.net ��� 7 Atlantic View ]Beach.Cluh CondaMinlium —Contr ctor Bid Worksheet (31 M ch 2010) Revised 04/15/2010 GENERAL Bid Item 1-Mobilnahon Descri ty ion: Ozeier materi is, schedule m r►power, stages, transport equipment to - power -and electric utility use. All actions necessary to -the j ob-site; -accommodate begin work on- site iiicl ding administrative and setup costs, dumpster site protection. Include action —and expe se necessary to tarp and protect landscaping, air conditioning, and any oth r fixture or item that could be "damaged by coating work. . S 17.280.00 Total CONCRETE REPAIR Biel -Items -door Slab, glorizo tal, Partial Depth (6" or Less) — Description: Repair deck palling by demotion and -removal or degraded concrete, -—..---. sand blast degraded steel tp near white (SSPC 7 - Steel structures painting council cleanliness standard 7)2 in�tall steel surface primers and repair. mortar. Unit Cost (Square -Ft) .h0 x 580 SF = $ 39.440.00 Total Bid Item 3 - Overhead Slab, H4&ontal, Partial Depth (6" or Less) Description: Repair over ead spalling by demotion and removal of degraded concrete, sand blast de aded steel to near white (SSPC 7 - Steel structures painting council cleanline s standard 7), install steel. surface primers and repair _..__ ..._ mortdr. install patch supp A form, with bracing as needed. --- Unit Cost (Square -Ft) 85.00- x 7 SF = $ 595.00 Total Bid Item 4 - Floor Slab, Horizo6tal, Full Depth Repair Description: Repair deck palling by demotion and removal or degraded concrete, sand blast - degraded ste 1 to near white (SSPC 7 -Steel structures painting - — — council cleanliness stand d 7), install steel surface primers and repair mortar. I` n-imost (Square -Ft) _� 78.00 x 175 SF = S 13;650.00 Total Bid Item 5 — Edge Spall Repair such that Description: Saw cut bal ony 12" back from edge to a depth necessary underlying -steel reinforce ent is not cut, demolish and remove all concrete from cut line. to edge, sand bl st and prime edge reinforcement, form and brace new - -- edge, pour new edge with 3" PVC knockouts for handrail post base. Unit'Cost (Linear -Ft) 5.00 x 494.LF = $ 46 930.00 Total Bid Item 6 —waterproof Mein rane & Spray Deck Description: Apply final deck waterproofing ancTspray deck in repaired areas. Uui.LCost (Square -Ft) 4.65 x 217G SF = $ 10-119.40 Total. SUSTAINABLE EARTH ENGINEER' ATLANTIC VIEW BEACH CLUB CONDOMINIUM BID WORKSHFF,T Pagel of 7 ;, Ate- �t�►n' � �� 5 � ;��� � � p C.t^J Bid Item 6a — Pressure Wash & Stain deck I 1 coat. Unit Cost (Square -Ft) Bid Item 7 — Column and Beam Description: Repair strut degraded concrete, sand 1 structures painting count: and repair mortar. This in Unit Cost. (Square -Ft) $ 7: Bid Item .8 — Column .and Beam Description: Repair strut degraded. concrete, sand structures painting counci and repair mortar. Fabrica complete. Shoring is not c case basis if required. Unit Cost (Cubic -Ft) $ 2 Bid Item 9 — Bleed Thru & R Description: Clip and depth of 2 inches. Cut surface patch. Unit Cost -(Patch) Bid Item 10 — Stucco Description: Apply be Unit Cost (Square -Ft) Bid Item 11—Paint Description: Prime and Unit Cost (Square -Ft) Bid Item 12 — Caulk Description: Remove Unit Cost (Linear -Ft) SUSTAINABLE EARTH ENGINEER' x 10.00OSF = $ 11,000.00 Total tpair, Surface Patch Ural concrete spalling by demotion and removal of asf degraded steeTto""hear white `(SSPC -and 7- - -Steel cleanliness standard 7), install steel surface primers udes surface patch only, no forming required. 00 x 80 SF = $ 6,000.00Total ,epair, Forms & Pour iral concrete spalling by demotion and removal of last degraded steel to near white (SSPC 7 Steel cleanliness standard 7), install steel surface primers forms and bracing as needed, patch tremie area when asidered necessary, and will be addressed on a case by x 10 CF = $ 2.150.00Total Spots love concrete around bleed thru's and rust spots to a 1 remove tie wire, form nail, or reinforcement. Apply x 60 Patches = $ 1.500.00Total WATERPROOFING - agent and stucco to match existing. ) x 700 SF = $ 6.650.00Total where. required. x 200 SF = $ 420.00Total loose, or cracked caulk, dry surface, install new x * * .. LF = Total ATLANTIC VIEW BEACH CLUB CONDOMINIUM BID WORKSHEET . Page 2 of 7 SLIDING GLASS DO( Bid Item 13 — Remove, Re-inst Description: In areas wh the sliding glass doors), affect repairs. The slidii staged on the balcony , overhead and floor with framing is to store the s' sliding glass door tracks frames are to be caulked Unit Cost (Each) $ REMOVE, REFIURBISH, RE-INS'TAL..L Sliding Glass Door threshold damage is noted (the concrete slabs framing will be required to remove the sliding glass doors to glass doors are to be removed, framed with 2x4, and 3, being worked on. The 2x4 shall be secured to the e tap con per foot, top and bottom. The purpose of the ng. glass doors while repairs are being performed. The. to be re -installed using new.hardware. The tracks and id sealed the saie as with. a new installation. ).00 x 12 Ea = $ 3,600.00Total Bid Item 14 _ Refurbish Slidin ! Glass Door (Refurbishment) Description: Repair and lbricate sliding glass door rollers and latches. Unit Cost (Each) $ 41 .00 x 20Ea' = $ 840.00Total Bid Item 15— Replace sliding glass door tracks Description: Where sliding glass door tracks are unusable, they are to be replaced and installed with new. Unit Cost (Ea) $ 300.00 x 6 Ea = $ 1,800.00Total Bid Item 16— Dust Wall / Interi Description: Where slidi: wall shall be installed, se( be 12" on center, nailed I shall be weather proofe carpeting and tile will be Unit Cost (Ea) $ 518.00 SUSTAINABLE EARTHE.NGIN 3r Protection ig glass doors .are to be removed, a '/a" plywood dust ,ure with 3" tap -con every foot, top and bottom. Studs to o plywood and bottom board and header. The dust wall d with visqueen stapled to the dust wall. Damaged 3n owner expense, not to be included in this bid item. x 12 Ea = $ 6,216.00 Total °S ATLANTIC VIEW BEACH CLUB CONDOMINIUM LCTOR BID WORKSHEET Page 3 of 7 Bid Item 17— Remove, Keturt -Description:- Handrail --.- where 2 or more handy removing a portion of shop, sandblasting, ref removal and re -grout pc Unit Cost (Linear -Ft) g Bid Item 18= Remove and Rep Description: Where hanc to replace), the handrails nit Cost (Linear -Ft) $ 58 HANDRAILS h. Re -Install Existing Handrail noval_ will _be_required-to _perform edge spall repairs posts are involved. This aspect of the work consists of e existing handrails, (from post to post) delivery to a - as . needed, recoating, and re -install. Include cost for bases. >.00 x 200 LF = $ 9,0 )0.00 Total Handrails are unserviceable (it would cost more to repair than l be removed and replaced in kind. x 200 LF = $ 9.000.00Total Bid Item 19— Post Base Repair Description: The grouted post bases have degraded in -some areas. The degraded grout shall be excavated to sound material, and replaced with high strength, low shrink grout. These areas are located randomly throughout the structure. Unit Cost (Ea) $ 58.00 x 205 Ea = $ 4,510.00Total Bid Item 20— Angle & Attachm Description: Where hanc broken, or corroded, thes Unit Cost (Ea) $ 32.00 SUSTAINABLE EARTH ENGINEER ;nt Repair rail attachment or connection hardware is bent, loose, components shall be removed and replaced. . c 40 Ea = $ 1.280..00Total ATLANTIC VIEW BEACH CLUB CONDOMINIUM OR BID WORKSHEET Page 4 of 7 Bid -Item 21— Remove,-Re"Iw Description: Hurricane deck repairs. The hurri and re=installed Unit Cost (Linear -Ft) 9 Bid Item 22— Remove and ReI Description: Remove an hardware. Cost (Linear -Ft) $ 8.00 Bid Item 23— Remove and R, Description: Remove attachment hardware. Unit Cost (Linear -Ft) .. Bid Item 24— Remove and I Description: Remove hardware. Unit Cost (Ea) $ Total Project How soon can you start the we Pemit What is your projection typical circumstances? 21 w Please list the name, address, cell phone as appropriate. CHASE/DANIELLO &. ASSC 2708 N. Australian Ave. West Palm Beach, Fl. 33407 561-835-4788 fax 561-833-35 SUSTAINABLE EARTH ENGIN HURRICANE SHUTTERS iurricane Shutter -_ :er removal will be required to perform edge spall or shutter shall be removed, staged or stored carefully, x 500 LF = $ 19,500.00Total Lce Top Track replace top hurricane shutter track with new attachment 2100 LF = $ 16,800.00Tota1 e, Bottom Track Only. replace bottom hurricane shutter track with new x 2100 LF = $ 16,800.00Tota1, ice Starter Strip replace top hurricane starter strips with new attachment x .60 Ea = $ 2,100.00Total timate $ 249,779.40 ? As soon as The City of Fort Pierce issue Building time to complete, including weather delays and other telephone number of your company, with fax, email, TES, INC. '$ ATLANTIC VIEW BEACH CLUB CONDOMINIUM kCTOR BID WORKSHEET Page 5.of7 ly Note-1: The contractor is to priced using only materials award of contract only. Note-2: The Engineer is not dimensions for restoration at bidding purposes only. Note-3:. A Pre -bid conferenc Lobby. 3pect the site prior to submittal of the bid. Work to be :ed or described. Substitution shall be considered after -sponsible for changes in the repair area sizes. The approximate, and are presented as a guideline for will be held April 9 at 9 AM on site, meet in the Note-4: Please'provide. your stimate for the total project as it is described above. Base your estimate on quality installation as inspected and approved by the engineer, to be completed between May and September 2010 Note-5: Owner to pay.permit fees. Contractor to submit permit to the municipality as assisted by the engineer. Please list the items that were no included in the above description that you feel are necessary to achieve a suitable fi ished product as it relates to this project. ITEM 13.- ITEM 15.- ITEM 16.- BASED ON $ 25.00/LF (12' OPENING) BASED ON $ 2 5.00/LF(12' OPENING) BASED ON $ 3,7.00/LF(14' OPENING) SUSTAINABLE EARTH ENGINEER'S ATLANTIC VIEW BEACH CLUB CONDOMINIUM CnNTRACTOR BID WORKSHEET. Page 6 of 7 Additional information. SUSTAINABLE EARTH ENGINEER'S. ATLANTIC VIEW BEACH CLUB CONDOMINIUM CONTR CTOR BID WORKSHEET Page" of 7