Loading...
HomeMy WebLinkAbout1006-0186 CONTRACTOR BID WORKSHEETAtlantic Vi W Beach Club Condominium SCANNED By St Lucle Collf1b, Contractor Bid Worksheet, Bid Item 1 -Mobilization Description: Order ma site, accommodate po% work on site including Include action and c conditioning, and any work. Bid Item 2 - Floor Slab, Hi Description: Repair c sand blast degraded cleanliness standard' Unit Cost (Square -Ft Bid Item 3 - Overhead Slal Description: Repair concrete, sand blast painting council cleaj mortar. Install patch., Unit Cost (Square -Ft). (31 March 2010) GENERAL herials, schedule manpower, transport equipment to the job II er and electric utility use. All actions necessary to begin administrative and setup costs, dumpster, site protection. xpense necessary to tarp and protect landscaping, air other fixture or item that could be damaged by coating Total CONCRETE REPAIR !ontal, Partial Depth (V or Less) k spalling by demotion and removal or degraded concrete, !1 to near white (SSPC 7 - Steel structures painting council install steel surface primers and repair mortar. x 580 SF = Total Horizontal, Partial Depth (6" or Less) ferhead- spalling by demotion and removal of degraded legraded steel to near white (SSPC 7 - Steel structures mess standard 7), install steel surface primers and repair pport form with bracing as needed. x 7 SF = Total Bid Item 4 -Floor Slab, Horizontal, Full Depth Repair Description: Repair de k spalling by demotion and removal or degraded concrete, sand blast degraded steel to near white (SSPC 7 - Steel structures painting council cleanliness st dard 7), install steel surface primers and repair mortar. Unit Cost (Square-Ft)an _ x 175 SF = Total Bid Item 5 — Edge Spall Repair Description: Saw cut alcony 12" back from edge to a depth necessary such that underlying steel reinfo cement is not cut, demolish and remove all concrete from cut line to edge, sand blast and prime edge reinforcement, form and brace new edge, pour new edge Iith Y' PVC knockouts for handrail post base. Unit Cost (Linear -Ft) L x 494 LF = Total Bid Item 6 — Waterproof Membrane & Spray Deck Description: Apply final deck waterproofing and spray deck in repaired areas. Unit Cost (Square-Ft)�_ x 2176 SF = Total SUSTAINABLE EARTH ENGINE�R'S ATLANTIC VIEW BEACH CLUB CONDOMINIUM BID WORKSHEET Page 1 of 7 Note-1: The contractor is to inspect the site prior to submittal of the bid. Work to be priced using only materi is listed or described. Substitution shall be considered after award of contract only. 1 Note-2: The Engineer is of responsible for changes in the repair area sizes. The dimensions for restoratio are approximate, and are presented as a guideline for bidding purposes only. Note-3% A Pre -bid confe 1 n'ce will be held April 9 at 9 AM on site, meet in the Lobby. Note-4: Please provide your estimate for the total project as it is described above. Base your estimate on Quality installation as inspected and approved by the,engineer, to be completed betweenlMay and September 2010 Note-5: Owner to pay pe mit fees. Contractor to submit permit to the municipality as assisted by the engineer. Please list the items that wer not included in the above description that you feel are necessary to achieve a suitabIle finished product as it relates to this project. SUSTAINABLE EARTH ENGINEER'S ATLANTIC VIEW BEACH CLUB CONDOMINIUM R BID WORKSHEET Page 6 of 7 List 3 projects of similar sizq1 and ,scope and an owner representative name, address, and phone number for referenced] projects. Additional information. SUSTAINABLE EARTH ENGINIEER'S ATLANTIC VIEW BEACH CLUB CONDOMINIUM CONTRACTOR BID WORKSHEET Page 7 of 7