Loading...
HomeMy WebLinkAbout23050811 LETTER OF INTENTStructural Engineering Associates, 751 Northlake Blvd., Suite 2C, North Palm Beach, By Joe Cici'sListlecollnfi St. Lucie County Public Works Building and Zone Department- 2300 Virginia Ave Fort Pierce, Florida 34982-5652 Re: Special Inspections Building Structural Repairs and Location: Atlantic View Condominium 5047 North AIA Fort Pierce, Florida 34949 Mr. Cicio: Civil & Structural Engineering Consultants 33408 Phone (561) 844-4060 Fax (561)844-1001 ,,R OF INTENT This letter is to inform you we will be prc structural restoration project at the above project specifications from the'contractor during the project, including shoring, con placements. The inspection plan is as fol May 19, 2003 Project fo. One Association, Inc. iding Special Inspections for the upcoming .ferenced location. You should have received We will be inspecting all the structural work •ete steel reinforcement, forms, and concrete Inspection Plan: • WORK LOCATIONS & DIRECTION: The engineer shall inspect repair areas and direct work, as required, regarding thel location and estimated extent of all repairs. • EXCAVTION LIMITS: The engineer shall inspect and approve, as required, all limits of concrete removal and all steel reinforcement repairs. • APPROVAL TO PLACE CONCRETE: The engineer shall inspect all areas prior to concrete placement and give approval,1 for all concrete placements. The engineer shall inspect all prep work, including forms, shoring, safety, steel bar repairs, and any adjustments to excavation limits. PLACEMENT OF CONCRETE: All engineering and shall be inspected du FINAL: The engineer shall inspect at repairs for each phase of work. of concrete require on -site the placements. approve, as required, the completion of all If there are any forms to complete, please let me know. We will be sending you copies of inspection reports and a final inspection report when the project is completed. If you have any questions or require additional information, please let me know. F OP ILE i5 � h Pavid • • FL • Eng. #555014 Structural Engineering Associates, Civil & Structural Engineering Consultants 751 Northlake Blvd., Suite 2C, North Palm Beach, 33408 Phone (561) 844-4060 Fax (561)844-1001 May 19, 2003 To: Mr. Joe Cicio I St. Lucie County Public Works Building and Zone Department 2300 Virginia Ave Fort Pierce, Florida 34982-5652Building Official � f Re: Correction to Specifications For: Atlantic View Condominium No. One Association, Inc. 5047 North A I A Fort Pierce, Florida 34949 -1W . Mr. Cicio: This letter is to clear up the question on w ich waterproofing membrane is to be used at the above referenced concrete restoration project. The specifications state CRW, when in fact, the waterproofing membrane in which should have been specified is Sonneborne Flextight. We do apologize for any inconvenience his may have caused you or your Department. Please let us know if there is anything else we may be able to do to help.] Sincerely, i . Cols , P.E. FL Reg. Eng. #55501 Cc: Ray Weber, Chase and Weber, Inc. Structural Engineering Associates, Civil & Structural Engineering Consultants 751 Northlake Blvd., Suite 2C, North Palm Beach, To: Building Official City of Fort Pierce Re: Certification and Inspection of Bi Atlantic View Condominium No, 5047 North AlA Fort Pierce, Florida 34949 Dear Sir: 33408 Phone (561) 844-4060 Fax (561)844-1001 ilding Repairs One Association, Inc. May 13, 2003 This letter is to inform you of the upcoming repair project at the above referenced address. The project consists of repairing spalled concrete on balconies around the building, along with waterproofing the e�isting and repaired concrete. We have surveyed the needed repairs and discussed demolition and repair options with the contractor (Chase & Weber, Inc.). This letter is inform you that we would like to proceed with repairs and have presented your office with project specifications prepared for this effort. In addition, I will be inspecting all work during the project, including demolition, limits of excavation, repair procedures in accordance with ACI 318, ICRI guidelines, and FBC code requirements. We will provide your office with copies of inspection reports as they occur and a final inspection report upon completion of the project. Should you have any questions or please contact me. Respectfully, t David Colston FL Reg. Eng. #55501 any additional forms need to be completed, Atlantic View 1 05/13/03