Loading...
HomeMy WebLinkAbout1107-0046 PROPOSALr-� 15GANN ) BY StLucie COW GENERAL CONTRACTORS SPECIALIZING IN SHELL CONSTRUCTION PHONE (321) 729-0255 smshelicon@gmail.com FAX (321) 729-0454 99 Park Hill Blvd. Suite 101 W. Melbourne, Fl. 32904 May 31, 2011 Sustainable Earth Engineering, Inc 8528 SW Kansas Street Stuart, F134994 Re: Parking Garage Repair Atlantic View Beach Club PROPOSAL Mr. Baber, Please find below our cost estimate to inst 11 the remedial Auger Cast Pile foundation and pile caps consistent with the drawings provided by Sustainable Earth Engineering. Scope of work is as follows: Saw cut and remove from site 4 areas c Provide materials and labor to install tl Excavate and pour new pile caps for cc Remove from site all waste and debris. Perform jacking of the structure with p Install new 14" column and tie to exist: Replace concrete drive at column locat the slab approximately 4' X 6' required auger cast piles to a depth of 20'. Imn placement. ided structural apparatus. according plans and engineering.. Total Price: $43,400. L mpT 6�� o06 g ac�f aP�O c Qc��c� l�a�o Qo�gb �P�a o�g Atlantic View Pg 2 Notes & Exclusions: • Drilling spoil / excavated fill shall be relocated/disposed of by Schopke and Maguire. • Pile and steel elevation will be set to proper height with laser instrument. +/- 2" should be expected. • Schopke and Maguire will obtain locates by Sunshine locating service. • S & M shall not be held responsible fo damage to utilities that may be present at or near pile locations that were not located. • Schopke and Maguire have assumed 8"I �or less in concrete thickness for pricing demolition. Excessive thickness or the presence of footings etc.. may increase the demolition cost. • Pile grout and concrete used for this job will be 5000 PSI. Payment Terms: 60% billed upon completion of the pile and pile cap installation. Balance billed upon completion. Sincerely, Scott Schopke President 321 508 2120