Receipt for Submission
SELF CERTIFICATION FOR
A PROJECT AT A P
05/07/2018
Self Certification File No.: 0364223001 EE
File Name: 1271 Nettles Blvd Jensen Be;
- Self Certification Repair and Replace
ATE, SINGLE-FAMILY RESIDEN
ich, FL 34957
Dock (Aquatic Preserves)
G MIN, SETBACK FIFE0, t
FRONT
SIDS
CNIR S
i; 'CAR-
�, MIG i
`T-C
Dear ROBERT WILLIAMS: On, 05/07/2018, you used the Florida Department of Environmental
Protection's electronic Self Certification P iocess to certify compliance with the terms and conditions
of the Federal State Programmatic General Permit (SPGP) Self Certification Process for a project at
private, single-family residence located at
LAT - Degrees: 27 Minutes: 17 Seconds: 1.7912
LONG - Degrees: -80 Minutes: 13 Seconds: 17.0296
SITE ADDRESS: 1271 Nettles Blvd Jensen Beach, FL 34957
COUNTY: St. Lucie
For:
PATRICIA & WILLIAM RAPER
1271 NETTLES BLVD Jensen BeachJL 34957
You have certified that the project you propose to construct at the above location meets all the
conditions of the Self -Certification Process. A project that is built in conformance to those conditions
(attached for reference) will:
1. Qualify for a regulatory exemption under Section 403.813(1)(b) of the Florida Statutes
(F.S.) and Chapter 62-330, Florida Administrative Code (F.A.C.). As such, it is exempt from
the need to obtain a DEP Environmental Resource Permit.;
2. Qualify for Consent by Rule or Letter of Consent (as applicable) under Chapter 253, F.S.
and Chapter 18-21, F.A.C. (and Chapter 258, F.S. and Chapter 18-20, F.A.C., if applicable),
when the project is located on submerged lands owned by the State of Florida.;
Your Self -Certification is based solely on the information you provided under this process, and
applies only to the statutes and rules in effect when your certification was completed. The
https://mg.mail.yahoo.com/neo/launch?.partner—sbc&.rand=49h4c4boe761j#mail 1/3
5/7/2018 (679 unread) -wilcoinc@bellsouth.net - a++ n?± Mail
certification is effective only�\,,4, the specific project proposed, anL, .__.'lly if the project is constructed,
operated, and maintained in conformance with all the terms, conditions, and limitations stated in the
Self -Certification Process. In addition, any substantial modifications in your plans should be
submitted to the Department for review, as changes may result in a permit being required.
You have acknowledged that this Self Certification will automatically expire if:
1. Construction of the project is not completed within one year from the self -certification
date;
2. site conditions materially change; 1
3. the terms, conditions, and limitations of the Self Certification are not followed; or
4. the governing statutes or rules are amended before construction of the project.
Completion of the Self Certification constitutes your authorization for Department or Corps
personnel to enter the property for purposes of inspecting for compliance.
Receipt of this Self -Certification constitutes authorization to use sovereignty/state-owned
submerged lands, as required by rule 18-21.005, F.A.C.
The authorization must be visibly posted during all construction activities.
In waters that are accessible to manatees,J obtain information on your mandatory Manatee
Protection sign by clicking here.
FEDERAL STATE PROGRAMMATIC GENERAL PERMIT (SPGP)
You have certified that the project you propose to construct at the above location meets all the
conditions of the SPGP Self -Certification Process and will be built in conformance to those
conditions (attached for reference). Your proposed activity as certified is in compliance with the
SPGP program. U.S. Army Corps of Engineers (Corps) Specific conditions apply to your project,
attached. No further permitting for this activity is required by the Corps. In the event of the transfer
of ownership of the property by sale or byI any other means, when the structures or work authorized
by this SPGP Self -Certification are still in existence at the time the property is transferred, the terms
and conditions of this SPGP Self -Certification will continue to be binding on the new owner(s)of the
property. Although the construction period for works authorized by Department of the Army permits
is finite, the permit itself, with its limitations, does not expire. To validate the transfer of this SPGP
Self -Certification and the associated responsibilities associated with compliance with its terms and
conditions, the attached transfer of SPGP Self -Certification request must be completed and
submitted to the Department at the time of transfer of ownership. The address is given below on the
attached transfer form. This SPGP Self -Certification is based solely on the information you provided
under this process, and applies only to the statutes and rules in effect when your certification was
completed. You have recognized that your certification is effective only for the specific project
proposed, and provided the project is constructed, operated, and maintained in conformance with
all the terms, conditions, and limitations stated in the SPGP Self -Certification Process. This Self -
Certification will not apply if any substantial modifications are made to the project. You agree to
contact the Department for review of any plans to construct additional structures or to modify the
project, as changes may result in a permit being required. You have acknowledged that this Self -
Certification will automatically expire if: 1. construction of the project is not completed by midnight,
hftps:Hmg.mail.yahoo.com/neo/launch?.partner—sbc&.rand=4gh4c4boe76]j#mail 2/3
5/7/2018 (679 unread) - wilcoinc@bellsouth.net - a+± gat Mail
July 25, 2021, unless'constr 4^.cron commenced or a contract to ca..__`"uct was executed before July
25, 2021, in which case the time limit for completing the work authorized by the SPGP ends at
midnight, July 25, 2022. However, in no case can construction continue for more than one year
beyond the Self -Certification date; 2. site conditions materially change; 3. the terms, conditions, and
limitations of the Self -Certification are not followed; or 4. the governing statutes or rules are
amended before construction of the project. Completion of the Self -Certification constitutes your
authorization for Department or Corps personnel to enter the property for purposes of inspecting
for compliance. If you have any questions please contact your local Department District Office.
Contact information can be found at: https://floridadep.gov/water/submerged-lands-environmental-
resources-coordination/documents/district-office-contacts. For further information, contact the
Corps directly at: http://www.saj.usace.army.mil/Missions/Regulatory.aspx. When referring to your
project, please use the SPGP. Self -Certification file number listed above. Authority for review - an
agreement with the U.S. Army Corps of Engineers entitled Coordination Agreement between the U.
S. Army Corps of Engineers (Jacksonville District) and the Florida Department of Environmental
Protection State Programmatic General Permit, Section 10 of the Rivers and Harbor Act of 1899 and
Section 404 of the Clean Water Act.
ADDITIONAL INFORMATION
This Self -Certification Process does not relieve you from the responsibility of obtaining other permits
or authorizations from other agencies (federal, state, Water Management District, or local) that may
be required for the project. Failure to obtain all applicable authorizations prior to construction of the
project may result in enforcement.
If you have any problems with the attached documents, please call the ERP Coordinator at (850)
245-8495 or by e-mailing us at ERP eAps@dep.state.fl.us.
Sincerely, Florida Department of Environmental Protection
Attachments:
FDEP Terms and Conditions
Johnson's Seagrass Conditions
Aquatic Vegetation Guidelines
Sea Turtle And Sawfish Conditions
SPGP Terms and Conditions
SPGP Transfer Letter
hftps:Hmg.mail.yahoo.com/neo/launch?.partner—sbc&.rand=49h4c4boe76[j#mail 3/3
0 peParpAh
Florida Department of
e
Environmental Protection
Bob Martinez Center
0� 2600 Blair Stone Road
8ncet 4<�` Tallahassee, Florida 32399-2400
TERMS AND CONDITIONS
Self Certification File No.: 0364223001EE
Construction Conditions:
Rick Scott
Governor
Carlos Lopez-Cantera
Lt. Governor
Noah Valenstein
Secretary
Private residential single family docks are subject to the following criteria in accordance with Section
403.813(1)(d), F.S. The dock to be repaired or replaced:
1. Is a functional dock, which is currently able to provide access to boats moored at the dock, unless the
dock has been rendered nonfunctional by a discrete event such as a storm, flood, accident or fire
within the past year;
i
2. Is in the same location and of the same dimensions and configuration as a previously permitted or
exempt dock;
3. Will be built without adding new surface area to the dock such as walkways, gangplanks, or
catwalks;. i
4. Does not involve filling other than to install the pilings; existing piles may be cut or pulled to remove
them; and.
5. Construction materials may differ from those that currently exist, and minor deviations are allowed
to upgrade the dock to meet current structural and design standards.
General Conditions for Sovereignty/State-Owned Submerged Lands Authorizations:
Any use of sovereignty/state-owned submerged lands is subject to the following general conditions
that are binding upon the applicant and are enforceable under Chapters 253, F.S. or Chapters 258,
F.S.
1. Sovereignty/state-owned submerged lands may be used only for the specified activity or use. Any
unauthorized deviation from the specified activity or use and the conditions for undertaking that
activity or use will constitute a violation. Violation of the authorization will result in suspension or
revocation of the applicant's use of the sovereignty/state-owned submerged lands unless cured to the
satisfaction of the Board of Trustees of the Internal Improvement Trust Fund (Board).
2. Authorization under Rule 18-21.005, F.A.C., conveys no title to sovereignty/state-owned submerged
lands or water column, nor does it constitute recognition or acknowledgment of any other person's
title to such land or water.
3. Authorizations under Rule 18-21.005, F.A.C., may be modified, suspended or revoked in accordance
with its terms or the remedies provided in Sections 253.04, F.S. or Chapter 18-14, F.A.C.
4. Structures or activities will be constructed and used to avoid or minimize adverse impacts to
resources.
5. Construction, use, or operation of the, structure or activity will not adversely affect any species which
is endangered, threatened or of special concern, as listed in Rules 68A-27.003, 68A-27.004, and
68A-27.005, F.A.C.;
6. Structures or activities will not unreasonably interfere with riparian rights. When a court of
competent jurisdiction determines that riparian rights have been unlawfully affected, the structure or
activity will be modified in accordance with the court's decision.
7. Structures or activities will not create. a navigational hazard.
8. Structures will be maintained in a functional condition and will be repaired or removed if they
become dilapidated to such an extent!that they are no longer functional.
9. Structures or activities will be constructed, operated, and maintained solely for water dependent
purposes.
10. The applicant agrees to indemnify, defend and hold harmless the Board and the State of Florida from
all claims, actions, lawsuits and demands in any form arising out of the authorization to use
sovereignty/stateowned submerged lands or the applicant's use and construction of structures on
sovereignty/state-owned submerged lands. This duty to indemnify and hold harmless will include
any and all liabilities that are associated with the structure or activity including special assessments
or taxes that are now or in the future assessed against the structure or activity during the period of the
authorization.
11. Failure by the Board to enforce any violation of the authorization or waiver by the Board of any
provision of the authorization will not invalidate the provision not enforced or waived, nor will the
failure or waiver prevent the Board from enforcing the waived or unenforced provision in the event
of a future violation of that provision.:
12. Applicant binds itself and its successors and assigns to abide by the provisions and conditions set
forth in the authorization. If the applicant or its successors or assigns fails or refuses to comply with
the provisions and conditions of the authorization, the authorization may be terminated by the Board
after written notice to the applicant or its successors or assigns. Upon receipt of such notice, the
applicant or its successors or assigns will have thirty (30) days in which to correct the violations.
Failure to correct the violations within this period will result in the automatic revocation of this
authorization.
13. All costs incurred by the Board in enforcing the terms and conditions of the authorization will be
paid by the applicant. Any notice required by law will be made by certified mail at the address shown
on page one of the authorization. The applicant will notify the Board in writing of any change of
address at least ten days before the change becomes effective.
14. This authorization does not allow any activity prohibited in a conservation easement or restrictive
covenant of record that prohibits the activity.
Manatee Conditions:
The following conditions are intended to protect manatees from direct project effects; THESE
CONDITIONS APPLY ONLY IN WATERS THAT ARE ACCESSIBLE TO MANATEES:
1. All personnel associated with the project will be instructed about the presence of manatees and
manatee speed zones, and the need to! avoid collisions with and injury to manatees. The permittee
will advise all construction personnel; that there are civil and criminal penalties for harming,
harassing, or killing manatees which are protected under the Marine Mammal Protection Act, the
Endangered Species Act, and the Florida Manatee Sanctuary Act.
2. All vessels associated with the construction project will operate at'Idle Speed/No Wake' at all times
while in the immediate area and while in water where the draft of the vessel provides less than a
four -foot clearance from the bottom. All vessels will follow routes of deep water whenever possible.
3. Siltation or turbidity barriers will be made of material in which manatees cannot become entangled,
will be properly secured, and will be 'regularly monitored to avoid manatee entanglement or
entrapment. Barriers must not impede manatee movement.
4. All on -site project personnel are responsible for observing water -related activities for the presence of
manatee(s). All in -water operations, including vessels, must be shutdown if a manatee(s) comes
within 50 feet of the operation. Activities will not resume until the manatee(s) has moved beyond the
50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s) has not
reappeared within 50 feet of the operation. Animals must not be herded away or harassed into
leaving.
5. Any collision with or injury to a manatee will be reported immediately to the FWC Hotline at
1-888-404-FWCC. Collision and/or injury should also be reported to the U.S. Fish and Wildlife
Service in Jacksonville (1-904-731-3336) for north Florida or Vero Beach (1-772-562-3909) for
south Florida.
i
6. Temporary signs concerning manatees will be posted prior to and during all in -water project
activities. All signs are to be removed by the permittee upon completion of the project. Awareness
signs that have already been approved for this use by the Florida Fish and Wildlife Conservation
Commission (FWC) must be used (see MyFWC.com). One sign which reads Caution: Boaters must
be posted. A second sign measuring at least 8 1/2' by 11' explaining the requirements for 'Idle
Speed/No Wake' and the shut down of in -water operations must be posted in a location prominently
visible to all personnel engaged in water -related activities.
Self -Certification Requirements:
The user agrees to the following:
1. The information provided herein is true and accurate.
2. Construction of the project must be completed within one year from the self -certification date. If the
project cannot be completed within that time frame; or the project is to be modified, the Department
must be contacted for authorization requirements.
3. Any substantial modifications in the plans for this project must be submitted to the Department for
review, as changes may result in a permit being required.
4. This self -certification will automatically expire if site conditions materially.change; if the terms,
conditions, and limitations of the self -certification are not followed; or if the governing statutes or
rules are amended before the project is completed.
5. Department personnel will be allowed to enter the property for purposes of inspecting the project for
compliance with the terms and conditions of this self -certification.
I
Depart
b Florida Department of
Environmental Protection
Bob Martinez Center
`G 4 2600 Blair Stone Road
°'h8„�nt 910 Tallahassee, Florida 32399-2400
Rick Scott
Governor
Carlos Lopez-Cantera
Lt. Governor
Noah Valenstein
Secretary
CONDITION FOR THE DEPARTMENT OF THE ARMY SELF -CERTIFIED STATE
PROGRAMMATIC GENERAL PERMIT FOR A PROJECT AT A PRIVATE, SINGLE FAMILY
RESIDENCE
Self Certification File No.: 0364223001EEI
General Conditions:
1. The time limit for completing the work authorized on July 26, 2021.
2. You must maintain the activity authorized by this permit in good condition and in conformance with
the terms and conditions of this permit. You are not relieved of this requirement if you abandon the
permitted activity, although you may make a good faith transfer to a third party in compliance with
General Condition 4 below. Should you wish to cease to maintain the authorized activity or should
you desire to abandon it without a good faith transfer, you must obtain a modification of this permit
from this office, which may require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while accomplishing the
activity authorized by this permit, you must immediately notify this office of what you have found.
We will initiate the Federal and State coordination required to determine if the remains warrant a
recovery effort or if the site is eligible for listing in the National Register of Historic Places.
4. If you sell the property associated with this permit, you must obtain the signature of the new owner
on the enclosed form and forward a copy of the permit to this office to validate the transfer of this
authorization.
5. If a conditioned water quality certification has been issued for your project, you must comply with
the conditions specified in the certification as special conditions to this permit.
6. You must allow representatives from this office to inspect the authorized activity at any time deemed
necessary to ensure that it is being or has been accomplished in accordance with the terms and
conditions of your permit.
Further Information:
1. Limits of this authorization:
a. This permit does not obviate the need to obtain other Federal, State, or local authorizations
required by law.
b. This permit does not grant any property rights or exclusive privileges.
c. This permit does not authorize any injury to the property or rights of others.
d. This permit does not authorize interference with any existing or proposed Federal projects.
2. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any
liability for the following:
a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted
activities or from natural causes.
b. Damages to the permitted project or uses thereof as a result of current or future activities
undertaken by or on behalf of the United States in the public interest.
c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused
by the activity authorized by this permit.
d. Design or Construction deficiencies associated with the permitted work.
e. Damage claims associated with any future modification, suspension, or revocation of this permit.
3. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not
contrary to the public interest was made in reliance on the information you provided.
4. Reevaluation of Permit Decision: This office may reevaluate its decision on this permit at any time
the circumstances warrant. Circumstances that could require a reevaluation include, but are not
limited to, the following:
a. You fail to comply with the terms and conditions of this permit.
b. The information provided by you in support of your permit application proves to have been false,
incomplete, or inaccurate (see 3 above).
c. Significant new information surfaces which this office did not consider in reaching the original
public interest decision.
5. Such a reevaluation may result in a determination that it is appropriate to use the suspension,
modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such
as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for
the issuance of an administrative order requiring you comply with the terms and conditions of your
permit and for the initiation of legal action where appropriate. You will be required to pay for any
corrective measures ordered by this office, and if you fail to comply with such directive, this office
may in certain situations (such as those specified in 33 CER 209.170) accomplish the corrective
measures by contract or otherwise and bill you for the cost.
6. When the structures or work authorized by this permit are still in existence at the time the property is
transferred, the terms and conditions of this permit will continue to be binding on the new owner(s)
of the property. To validate the transfer of this permit and the associated liabilities associated with
compliance with its terms and conditions, have the transferee sign and date the enclosed form.
7. The Permittee understands and agrees that, if future operations by the United States require the
removal, relocation, or other alteration, of the structures or work herein authorized, or if, in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall
cause unreasonable obstruction to the free navigation of the navigable waters, the Permittee will be
required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the
structural work or obstructions caused thereby, without expense to the United States. No claim shall
be made against the United States on account of any such removal, relocation or alteration.
Manatee Conditions:
1. All personnel associated with the project will be instructed about the presence of manatees and
manatee speed zones, and the need to avoid collisions with and injury to manatees. The permittee
will advise all construction personnel that there are civil and criminal penalties for harming,
harassing, or killing manatees which are protected under the Marine Mammal Protection Act, the
Endangered Species Act, and the Florida Manatee Sanctuary Act.
2. All vessels associated with the construction project will operate at "Idle Speed/No Wake" at all times
while in the immediate area and while in water where the draft of the vessel provides less than a
fourfoot clearance from the bottom. All vessels will follow routes of deep water whenever possible.
3. Siltation or turbidity barriers will be made of material in which manatees cannot become entangled,
will be properly secured, and will be regularly monitored to avoid manatee entanglement or
entrapment. Barriers must not impede manatee movement.
4. All on -site project personnel are responsible for observing water -related activities for the presence of
manatee(s). All in -water operations, including vessels, must be shutdown if a manatee(s) comes
within 50 feet of the operation. Activities will not resume until the manatee(s) has moved beyond the
50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s) has not
reappeared within 50 feet of the operation. Animals must not be herded away or harassed into
leaving.
5. Any collision with or injury to a manatee will be reported immediately to the FWC Hotline at
1-888-404-FWCC. Collision and/or injury should also be reported to the U.S. Fish and Wildlife
Service in Jacksonville (1-904-731-3336) for north Florida or Vero Beach (1-772-562-3909) for
south Florida.
6. Temporary signs concerning manatees will be posted prior to and during all in -water project
activities. All signs are to be removed by the permittee upon completion of the project. Awareness
signs that have already been approved for this use by the Florida Fish and Wildlife Conservation
Commission (FWC) must be used (see MyFWC.com). One sign which reads Caution: Boaters must
be posted. A second sign measuring at least 8 1/z" by 11" explaining the requirements for "Idle
Speed/No Wake" and the shut down of in -water operations must be posted in a location prominently
visible to all personnel engaged in water -related activities.
Submerged Aquatic Vegetation Conditions:
1. Avoidance. The piling -supported structure will be aligned so as to minimize the size of the footprint
over SAV beds.
2. The height of piling -supported structure will be a minimum of 5 feet above MHW/OHW as
measured from the top surface of the' decking.
3. The width of the piling -supported structure is limited to a maximum of 4 feet. A turnaround area is
allowed for piling -supported structures greater than 200 feet in length. The turnaround is limited to a
section of the piling -supported structure no more than 10 feet in length and no more than 6 feet in
width. The turnaround will be located at the midpoint of the piling -supported structure.
4. Over-SAV bed portions of the piling -supported structure will be oriented in a north -south orientation
to the maximum extent that is practicable.
5. Terminal Platforms:
a. If possible, terminal platforms wil!1 be placed in deep water, waterward of SAV beds or in an area
devoid of SAV beds..
b. If a terminal platform is placed over SAV areas and constructed of grated decking, the total size of
the platform will be limited to 160 square feet. The grated deck material will conform to the
specifications stipulated below. The configuration of the platform will be a maximum of 8 feet by 20
feet. A minimum of 5 feet by 20 feed will conform to the 5-foot height requirement; a 3 feet by 20
feet section may be placed 3 feet above MHW to facilitate boat access. The long axis of the platform
should be aligned in a north -south direction to the maximum extent that is practicable.
c. If the terminal platform is placed over SAV areas and constructed of planks, the total size of the
platform will be limited to 120 square feet. The configuration of the platform will be a maximum of
6 feet by 20 feet of which a minimum 4-foot wide by 20-foot long section will conform to the 5-foot
height requirement. A section may be placed 3 feet above MHW to facilitate boat access. The 3 feet
above MHW section will be cantilevered. The long axis of the platform should be aligned in a
northsouth direction to the maximum extent that is practicable. If the 3 feet above MHW section is
constructed with grating material, it may be 3 feet wide.
6. Pilings will be installed in a manner which will not result in the formation of sedimentary deposits
("donuts" or "halos") around the newly installed pilings. Pile driving is the preferred method of
installation, but jetting with a low pressure pump may be used.
7. The spacing of pilings through SAV beds will be a minimum of 10 feet on center.
8. The gaps between deckboards will be a minimum of 1/2 inch.
Marsh and Mangroves Conditions:
1. Marsh:
a. The piling -supported structure will be aligned so as to have the smallest over -marsh footprint as
i
practicable.
b. The over -marsh portion of the piling -supported structure will be elevated to at least 4 feet above
the marsh floor.
c. The width of the piling -supported structure is limited to a maximum of 4 feet. Any exceptions to
the width must be accompanied by an equal increase in height requirement.
2. Mangroves:
a. The width of the piling -supported structure is limited to a maximum of 4 feet.
b. Mangrove clearing is restricted to the width of the piling -supported structure.
c. The location and alignment of the piling -supported structure should be through the narrowest area
of the mangrove fringe.
Sea Turtle and Smalltooth Sawfish Construction Conditions:
The permittee will comply with the following protected species construction conditions:
1. The permittee will instruct all personnel associated with the project of the potential presence of these
species and the need to avoid collisions with sea turtles and smalltooth sawfish. All construction
personnel are responsible for observing water -related activities for the presence of these species.
2. The permittee will advise all construction personnel that there are civil and criminal penalties for
harming, harassing, or killing sea turtles or smalltooth sawfish, which are protected under the
Endarigered Species Act of 1973.
3. Siltation barriers will be made of material in which a sea turtle or smalltooth sawfish cannot become
entangled, be properly secured, and be regularly monitored to avoid protected species entrapment.
Barriers may not block sea turtle or smalltooth sawfish entry to or exit from designated critical
habitat without prior agreement from the National Marine Fisheries Service's Protected Resources
Division, St. Petersburg, Florida.
4. All vessels associated with the construction project will operate at "no wake/idle" speeds at all times
while in the construction area and while in water depths where the draft of the vessel provides less
than a four -foot clearance from the bottom. All vessels will preferentially follow deep -water routes
(e. g., marked channels) whenever possible.
5. If a sea turtle or smalltooth sawfish i;s seen within 100 yards of the active daily construction/dredging
operation or vessel movement, all appropriate precautions will be implemented to ensure its
protection. These precautions will include cessation of operation of any moving equipment closer
than 50 feet of a sea turtle or smalltooth sawfish. Operation of any mechanical construction
equipment will cease immediately if a sea turtle or smalltooth sawfish is seen within a 50-ft radius of
the equipment. Activities may not resume until the protected species has departed the project area of
its own volition.
6. Any collision with and/or injury to a sea turtle or smalltooth sawfish will be reported immediately to
the National Marine Fisheries Service's Protected Resources Division (727-824-5312) and the local
authorized sea turtle stranding/rescue organization.
7. Any special construction conditions, required of your specific project, outside these general
conditions, if applicable, will be addressed in the primary consultation.
8. Any collision(s) with and/or injuries to any whale, or sturgeon occurring during the construction of a
project, shall be reported immediately to NMFS's Protected Resources Division (PRD) at
(727-824-5312). .
9. Reports to NMFS's Protected Resources Division (PRD) may be made by email to
takereport.nmfsser@noaa.gov.
10. Sea turtle and marine mammal stranding/rescue organizations' contact information is available by
region at http://www.mnfs.noaa.gov/pr/health/networks.htm.
11. Smalltooth sawfish encounters shall be reported to
http: //www. flmnh.ufl. edu/fish/sharks/sawfish/s awfishencounters.html.
12. All work must occur during daylight hours.
Special Conditions:
i
For concrete piles installed by impact hammer:
a. The piles will be less than or equal to than 24 inches in diameter; and
b. Not more than 10 piles will be installed per day if in open water; or,
c. Not more than 5 piles will be installed per day in a confined space. A confined space is defined as
any area that has a solid object (e.g., shoreline, seawall, jetty) or structure within 150 feet of the pile
installation site that would effectively serve as a barrier or otherwise prevent animals from moving
past it to exit the area. This does not include objects such as docks or other pile -supported structures
that would not stop animal movement or significantly reflect noise.
2. Metal piles will NOT be installed by impact hammer.
3. The Permittee is responsible for obtaining any 'take' permits required under the U.S. Fish and
Wildlife Service's regulations governing compliance with the Migratory Bird Treaty Act or the Bald
and Golden Eagle Protection Act. The Permittee should contact the appropriate local office of the
U.S. Fish and Wildlife Service to determine if such 'take' permits are required for a particular
activity.
4. ' The Permittee is responsible for compliance with 50 CFR 224.103 prohibiting approach within 500
yards of a right whale, with limited exceptions.
5. Special Conditions Related to All Reviews and Authorizations are available at:
http://www.saj.usace.army.mil/Missions/Regulatory/Source-Book/ and must be followed.
Key' for Construction Conditions for Docks or Other Minor Structures Constructed
in or Over Johnson's Seagrass (Halophila johnsonit)
National Marine Fisheries Service/U.S. Army Corps of Engineers
October 2002
Ia. The construction site is within the known range of Johnson's seagrass occurrence (Sebastian Inlet
to central Biscayne Bay in the lagoonal systems on the east coast of Florida). Go to 2.
lb. The construction site is not within the known range of Johnson's seagrass occurrence but
submerged aquatic vegetation (SAV) is present at the site. Use "Dock Construction Guidelines in
Florida for Docks or Other Minor Structures Constructed in or over Submerged Aquatic
Vegetation, Marsh or Mangrove Habitat" - U.S. Army Corps of Engineers/National Marine
Fisheries Service, August 2001.
lc. The construction site is not within the range of Johnson's seagrass and SAV is not present at the
site: No construction conditions for SA are necessary.
2a. Seaa ass survey for Johnson's seagrass is performed at the proposed site during the April 1 —
August 31 growing season. Go ito 3.
2b. No survey for Johnson's seagrass is performed at the proposed site during the growing season, or a
survey is performed at the proposed site but is outside of the growing season. Go to 4.
3a. Johnson's seagrass is present at ;the proposed construction site. Go to 5.
3b. Johnson's seagrass is not present at the proposed construction site. Go to 6.
4a. The construction is in an area designated by the National Marine Fisheries Service - Protected
Resources Division (NMFS-PRD) as critical habitat' for Johnson's seagrass. Use "Dock
Construction Guidelines in Florida for Docks or Other Minor Structures Constructed in or over
Submerged Aquatic Vegetation, I Marsh or Mangrove Habitat" - U.S. Army Corps of
Engineers/National Marine Fisheries Service, August 2001, except that light -transmitting
materials' (LTMs) shall comprise 100% of all pedestrian surfaces waterward of the mean low
water (ML99 line.
4b. The construction is not in an area designated by NMFS-PRD as critical habitat for Johnson's
seagrass. Use. `Dock Construction Guidelines in Florida for Docks or Other Minor Structures
Constructed in or over Submerged Aquatic Vegetation, Marsh or Mangrove Habitat" - U.S. Army
Corps of Engineers/National Marine Fisheries Service, August 2001, except that LTMs shall
comprise at least 75% of all pedestrian surfaces waterward of the MLW line and a minimum I -
inch spacing shall be maintained between all wooden deckboards used waterward of the MLW
line.
5a. The construction is in an area designated by NMFS-PRD as critical habitat for Johnson's seagrass.
Use `Dock Construction Guidelines in Florida for Docks or Other Minor Structures Constructed
in or over Submerged Aquatic Vegetation, Marsh or Mangrove Habitat " - U.S. Army Corps of
Engineers/National Marine Fisheries Service, August 2001, except that LTMs shall comprise at
least 75% of all pedestrian surfaces waterward of the MLW line and a minimum I -inch spacing
shall be maintained between all wooden deckboards used waterward of the MLW line.
5b. The construction is not in an area designated by NMFS-PRD as critical habitat for Johnson's
seagrass. Use `Dock Construction Guidelines in Florida for Docks or Other Minor Structures
Constructed in or over Submerged Aquatic Vegetation, Marsh or Mangrove Habitat" - U.S. Army
Corps of Engineers/National Marine Fisheries Service, August 2001, except that all pedestrian
surfaces directly over Johnson's seagrass areas shall be constructed of LTMs and a minimum
This key was modified in October 2002 to change the percent light transmittance requirement of the grids from
46 to 43 as stipulated in Note #3 .
I -inch spacing shall be maintained between: all wooden deckboards used waterward of the
MLW line.
6a. The construction is in an area designated by NMFS-PRD as critical habitat for Johnson's seagrass.
Use `Dock Construction Guidelines in Florida for Docks or Other Minor Structures Constructed
in or over Submerged Aquatic Vegetation, Marsh or Mangrove Habitat" - U.S. Army Corps of
Engineers/National Marine Fisheries Service, August 2001, except that a minimum 1-inch
spacing shall be maintained between all wooden deckboards used waterward of the MLW line.
6b. The construction is not in an area designated by NMFS as critical habitat for Johnson's seagrass.
Go to 7
7a. SAV other than Johnson's seagrass is present at the site. Use "Dock Construction Guidelines in
Florida for Docks or Other Minor Structures Constructed in or over Submerged Aquatic
Vegetation, Marsh or Mangrove Habitat" - U.S. Army Corps of Engineers/National Marine
Fisheries Service, August 2001.
i
7b. No SAV present. No construction: conditions for SAV are necessary.
Notes:
This key is meant to complement but not,supersede the "Dock Construction Guidelines in Florida for Docks or
Other Minor Structures Constructed in or over Submerged Aquatic Vegetation, Marsh or Mangrove Habitat - U.S.
Anny Corps of Engineers/National Marine Fisheries Service, August 2001. Docks incorporating light -transmitting
materials shall not exceed the dimensions recommended in the Guidelines.
2. Federal Register 65 FR 17786, April 5, 2000, Designation of critical habitat for Johnson's seagrass.
3- Light -transmitting materials are made of various materials shaped in the form of grids, grates, lattices, etc., to allow
the passage of light through the open spaces. All light -transmitting materials used for dock construction in the
known range of Johnson's seagrass shall have a minimum of forty-three (43) percent open space.
This key was modified in October 2002 to change the percent light transmittance requirement of the grids from
46 to 43 as stipulated in Note #3 .
Dock Construction Guidelines in Florida for Docks or Other Minor Structures
Constructed in or over Submerged Aquatic Vegetation (SAV), Marsh or Mangrove Habitat
U.S. Army Corps of Engineers/National Marine Fisheries Service
August 2001
Submerged Aquatic Vegetation:
1. Avoidance. The pier shall be aligned so as to minimize the size of the footprint over SAV beds.
2. The height of pier shall be a minimum of 5 feet above MHW/OHW as measured from the top surface of the decking.
3. The width of the pier is limited to a maximum of 4 feet. A turnaround area is allowed for piers greater than 200 feet
in length. The turnaround is limited to a section of the pier no more than 10 feet in length and no more than 6 feet in
width. The turnaround shall be located at the midpoint of the pier.
4. Over-SAV bed portions of the pier shall be oriented in a north -south orientation to the maximum extent that is
practicable.
5. a. If possible, terminal platforms shall be!placed in deep water, waterward of SAV beds or in an area devoid of SAV
beds.
b. If a terminal platform is placed over SAV areas and constructed of grated decking, the total size of the platform shall
be limited to 160 square feet. The grated! deck material shall conform to the specifications stipulated below. The
configuration of the platform shall be a maximum of 8 feet by 20 feet. A minimum of 5 feet by 20 feet shall conform to
the 5-foot height requirement; a 3 feet by 20 feet section may be placed 3 feet above MHW to facilitate boat access. The
long axis of the platform should be aligned. in a north -south direction to the maximum extent that is practicable.
c. If the terminal platform is placed over SAV areas and constructed of planks, the total size of the platform shall be
limited to 120 square feet. The configuration of the platform shall be a maximum of 6 feet by 20 feet of which a
minimum 4-foot wide by 20-foot long section shall conform to the 5-foot height requirement. A section may be placed 3
feet above MHW to facilitate boat access. .'The 3 feet above MHW section shall be cantilevered. The long axis of the
platform should be aligned in a north -south, direction to the maximum extent that is practicable. If the 3feet above MHW
section is constructed with grating material, it may be 3 feet wide.
6. One uncovered boat lift area is allowed. A narrow catwalk (2 feet wide if planks are used, 3 feet wide if grating is
used) may be added to facilitate boat maintenance along the outboard side of the boat lift and a 4-foot wide walkway
may be added along the stern end of the boat lift, provided all such walkways are elevated 5 feet above MHW. The
catwalk shall be cantilevered from the outboard mooring pilings (spaced no closer than 10 feet apart).
7. Pilings shall be installed in a manner.which will not result in the formation of sedimentary deposits("donuts" or
"halos") around the newly installed pilings. Pile driving is the preferred method of installation, but jetting with a low
pressure pump may be used.
8. The spacing of pilings through SAV beds shall be a minimum of 10 feet on center.
9. The gaps between deckboards shall be a minimum of inch.
Grid Specifications and Suppliers Section modified in October 2002 to add an additional vendor of materials.
February 2003 -Vendor name changed from ChemGrate to FiberGrate
Marsh:
1. The structure shall be aligned so as to have the smallest over -marsh footprint as practicable.
2. The over -marsh portion of the dock shall be elevated to at least 4 feet above the marsh floor.
I. The width of the dock is limited to a maximum of 4 feet. Any exceptions to the width must be accompanied by an
equal increase in height requirement.
Mangroves.
1. The width of the dock is limited to a maximum of 4 feet.
2. Mangrove clearing is restricted to the width of the pier.
3. The location and alignment of the pier should be through the narrowest area of the mangrove fringe.
Grid Specifications and Suppliers
The following information does not constitute a U.S. Army Corps of Engineers endorsement or advertisement for
any particular provider and is provided only as an example for those interested in obtaining these materials for dock
construction. A type of fiberglass grate panel is manufactured by SeaSafe (Lafayette, LA; phone: 1-800-326-8842)
and FiberGrate (1-800-527-4043). Plastic grate panels are also available from Southern Pine Lumber Company
(Stuart, FL; phone: 772-692-2300). Panels are available in a variety of sizes and thicknesses. For safety, the grate
should contain an anti -slip texture which is integrally molded into the top surface. The manufacturer or local
distributor should be consulted to ensure that the load -bearing capacity of the selected product is sufficient to support
the intended purpose. Contact the manufacturer(s) for product specifications and a list of regional distributors.
Grid Specifications and Suppliers Section modified in October 2002 to add an additional vendor of materials.
February 2003 -Vendor name changed from ChemGrate to FiberGrate
Q,e`"EN
`
UNITED STATES DEPARTMENT OF COMMERCE
National Oceanic and Atmospheric Administration
NATIONAL MARINE FISHERIES SERVICE
Southeast Regional Office
263 13th Avenue South
St. Petersburg, FL 33701
SEA TURTLE AND SMALLTOOTH SAWFISH CONSTRUCTION CONDITIONS
The permittee shall comply with the following protected species construction conditions:
a. The permittee shall instruct all personnel associated with the project of the potential presence of
these species and the need to avoid collisions with sea turtles and smalltooth sawfish. All
construction personnel are responsible for observing water -related activities for the presence of
these species.
b. The permittee shall advise all construction personnel that there are civil and criminal penalties for
harming, harassing, or killing sea turtles or smalltooth sawfish, which are protected under the
Endangered Species Act of 1973.
c. Siltation barriers shall be made of material in which a sea turtle or smalltooth sawfish cannot
become entangled, be properly secured, and be regularly monitored to avoid protected species
entrapment. Barriers may not block sea turtle or smalltooth sawfish entry to or exit from
designated critical habitat without prior agreement from the National Marine Fisheries Service's
Protected Resources Division, St. Petersburg, Florida.
d. All vessels associated with the construction project shall operate at "no wake/idle" speeds at all
times while in the construction area and while in water depths where the draft of the vessel
provides less than a four -foot clearance from the bottom. All vessels will preferentially follow
deep -water routes (e.g., marked channels) whenever possible.
e. If a sea turtle or smalltooth sawfish is seen within 100 yards of the active daily
construction/dredging operation or vessel movement, all appropriate precautions shall be
implemented to ensure its protection. These precautions shall include cessation of operation of
any moving equipment closer than 50 feet of a sea turtle or smalltooth sawfish. Operation of any
mechanical construction equipment shall cease immediately if a sea turtle or smalltooth sawfish is
seen within a 50-ft radius of the equipment. Activities may not resume until the protected species
has departed the project area of its own volition.
f. Any collision with and/or injury to a sea turtle or smalltooth sawfish shall be reported
immediately to the National Marine Fisheries Service's Protected Resources Division (727-824-
5312) and the local authorized sea turtle stranding/rescue organization.
g. Any special construction conditions, required of your specific project, outside these general
conditions, if applicable, will be addressed in the primary consultation.
Revised: March 23, 2006
O:\forms\Sea Turtle and Smalltooth Sawfish Construction Conditions.doc
s'"A auosq��
Additions
to the
"Sea Turtle and Smalltooth Sawfish Construction Conditions"
for SPGP V
a. Any collision(s) with an/or injuries to any whale, or sturgeon occurring during the
construction of a project, shall be reported immediately to NMFS's Protected Resources
Division (PRD) at (727-824-5312).
b. Reports to NMFS's Protected Resources Division (PRD) may be made by email to
takereport.nmfsser@noaa.gov.
c. Sea turtle and marine mammal stranding/rescue organizations' contact information
is available by region at http://www.nmfs.noaa.gov/pr/health/networks.htm.
d. Smalltooth sawfish encounters shall be reported to
http://www.flmnh.ufl.edu/fish/sharks/sawfish/sawfishencounters.html.
e. All work must occur during daylight hours.