Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTFrom fax5616880909 1.161.688.0909 Fri Feb 22 09:32:16 2019 MST Page 1 of 1 SCANNLb BY St Lucie County Inspections 2300 Virginia Avenue Ft Pierce, FL 34982 (722) 462-2172,j!�- RECEIVED �a FEB 2 2 2019 CERTIFICATE OF TERMITE TREATMENT . ST. Lucie County, Permitting_. CONSTRUCTIONJ SOIL TREATMENT PERMIT # 80(0 --D' k JOB ADDRESS 2701 Bent Pine Dr, Fort Pierce, FL 34951-2905 BUILDER GHO PEST CONTROL CONTRACTOR PEST CONTROL LICENSE # JF0001886 We, the undersigned, hereby certify that we have termites in accordance with the standards of the l Square feet of area treated: 290 Percentage of solution:.50% Date of treatment: 02/21/19 ® Footing ®1st Treatment ❑ Re -treat ❑ Slab ❑ 1 st Treatment ❑ Re -treat ❑ Driveway 111 st Treatment ❑ Re -treat ❑ Pools ❑ 1 st Treatment ❑ Re -treat ❑ Other ❑ 1 st Treatment ❑ Re -treat Inc. ed the above -described construction for subterranean Pest Control Association. Chemicals used: Sentricon Always Active HD Total gallons used: Time of treatment: AM FBC 104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the poermit is fisued to and another copy for the building permit files. The Treatment Cerollcate shall provide the product used, identity ojthe applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and n:ember o'jgallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be' placed on the electrical panel box cover, listing all the treatments and dates of applications. ® Perimeter for Final Inspection Signature of exterminator NOTE: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged