Loading...
HomeMy WebLinkAboutTERMITE TREATMENT OPTIONNuelle Engineering Donald J. Nuelle P.E. 816 University Boulevard Apt. 301 Jupiter, FL 33458 Cellular 561-629-6975 GHO Homes 590 NW Mercantile Place Port St. Lucie, FL 34986 Attn: Bill Handler Re: Termite Treatment Option Dear Mr. Handler.: Date: 10/17/2015 Per your request, I have inspected the termite treatment requirements in the FBC and find the baiting method (which is used on all GHO homes) should have been specified on the foundlation notes instead of the soil treatment. The soil treatment note is an error and should be omitted. R318.1.7 If a registered lermiticide formulated subterranean termite prevention, Se however, a signed contract assuring baiting system that is in compliance shall be provided to the building offic be installed prior to final building apr nd registered as a bail system is used for ion R3'18.1.1 through Section R318.1.6 do not apply; le installation, maintenance and monitoring of the ilh the requirements of Chapter 482, Florida Statutes, l prior to the pouring of the slab, and the system must aval If you or any other interested party has any questions or requires additional information please feel free to contact me at any time. Donal.,;... Nuelle P.E Vi9O �P. E..# 6