HomeMy WebLinkAboutESTIMATED CONSTRUCTION COST i
I'
Orlando Residence
Estimated Construction Costs: � SCANNED
By
If;
Demolition (includes dumpsters): $2,400.00
Spray Attic insulation: $2,460.00 RECEIVED
Structural Steel & Lam Beams: $5,120.00 JUL0 3 2018
Concrete forming & pour: $3,000.00T. Lucie County'Permitting
Windows and Doors: $22,180.00
Electrical: $4,200.00
HVAC: $9,820.00
Plumbing: $1,200.00
Drywall (Frame, Hang & Finish): I $6,500.00
Paint: $4,000.00
Cabinets: I $6,400.00
Plumbing fixtures: $4,000.00
Flooring Allowance: $6,000.00
i
Total: 73,500.00
I
i
i
I
i
U �'� RECEIVED
JUL 0 3 2018
--\ ST. Lucie County, Permitting
c �—
3) rA
L-4)
� GAY .�
62)
t-ee a
W �
i
I
i
I