Loading...
HomeMy WebLinkAboutFIELD DENSITY TESTedal Phone 954-784-2941 et 6h5%VrJJ 800-848-1919 Fax 954-784-7875 & TESTING INC. 91(iihe1nllof, www.fed-eng.com 250 SW 13th Ave Pompano Beach, FL 33069 Field Density Tests of;Compacted Soils Method D-6938 Client: Mel-Ry Construction Address: 10967 S. Ocean Drive, Jensen Beach, FL Project: Proposed Single Family Home Address: 98 Nettles Blvd., Jensen Beach, FL Area Tested: Building Pad Material Type: Pale Brown Sand w/Rock Date: August 22, 2014 Order #: 14-2315 Permit #: Tech: AM Compaction Req.: 950% Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth' Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 N.E. Corner of Pad 12" FL 7.6 11.1.6 114.0 10.2 97.9% Yes 2 1 Center of Pad 12" FL 8.3 113.8 1 114.0 10.2 99.8% Yes 3 S.W. Corner of Pad i 12" FL 8.2 112.6 114.0 10.2 98.8% Yes 4 5 6 I 7 8 9 10 11 12 13 14 15 Remarks: See Reverse For Disclaimer Test Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift SL = Springline FL = Final Lift SG = Subgrade BG = Below Grade BC = Basecourse BOF = Bottom of Footing TOP = Top of Pipe FG = Finished Grade Only On Top 12" Of Pad Not A Verification Of Soil Submitted by: KEITH LFBLANC Professional Engineer #59394 Cert. of Authorization #5471 State of Florida r As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of material only. A density does not replace a soil bearing capacity determination. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test'replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. This testing does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below -the tested -top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. if environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and look forward to do so in the near future. c I I Phone 954-77�8�p4-2941 Ei48 ederal 800-4 919 Fax 954-784,787S �,1<t triNe stir , WWW.fed-eng.com 250 SW 13th Ave Pompano t3ettch, FL 33069 Field Density Tests of Compacted Soils method D4939 I Client: Mel-Ry Construction ' _ Date: August 22, 201 4 Address: 10967 8. Ocean Drive,. ,fensen Beach. FLj 34957 order #: 142315 Project proposed SiQUle Family Home � _ . — --Permit #: L/ 10 6 —0 �J� Address: 98 Nettles Blvd., Jensen Beach, FL Tech: AM Area Tested: Building Pad I Cornpactlon Req.: 950/u Material Type: Palo Brawn Sand w/RockProctor Method: ASTM D-1557 Test TEST LOCATION 1 N.E. Corner of Pad 2 Center of Fad 3 S.W. Cornor of pad 4 5 6 7 8 9 1 iZ 17 Moist —z rrr..an vt.r Murrr Elay. �p Density Value Moisture . Compaction Pass 12" 1 FL 7.6 1 111.6 114.0 10.2 97.9% Yes 12q FL 8-3 113.8 114.0 10.2 99.8% Yes 12" FL 8.2 112.6 114-0 10.2 98.$°/n Yes I 13 I Remarks. See Revaraa For Disclaitr tt Test PetOarmed Ortt On To 12" Of Pad Not A It L�� Legend for Elevation: PR = Proofroil 1,2,3 =1st, Znd, 3rd Lift. Submitted by: ` .�5) � SL = Springtime FL m Final Lift SG = Subgrade 8G T Below Grade K&OHEBLANC 49 P ' sii�oa! �> $ 9394,1 l ,!' BC = Basecourse. SOF = Bottom of Footing TOP = Top of Pipe FG = Finished Gratfa C i�tltortzetion ; C'. C I �f� As s mutual protection to chente, the pubtir; and autseives, au reports ate 66trmitted n the ponAdet)Libi property of cifents, and authprt t rl t4�i of stat9ments. C*ndusigna or ex mom from or eepardtng our raporta is reserved pending our Vwridan approvaL A derotytest detamiine3 tno dagrae of. cqr MUOn of the tested tayar of matadat onty, A dooty does npt replace a suit bearing capacity determination, After layigr dormant for a pertol of so days or after heavy rain(alarms, retftling must twper%omad on ose work, Pursuant to your request. Federal Engineering & Testing, Inc. (TET) has performed a compaction test at the referenced project on The reverse side. The purposes of our test was to determine the degree of compsetioD of the tested layer of material only. in no gray shall a colxtpaction test replace a soil beating capacity deternlinatioti. A soil boning test must be perforraled by the clietxt prior to construction to verify ettbsoil conditions. Our scope of services only included testing the top 12" of added fill .matezial, This testing does not include an analysis of the underlying soil materials to determine if they are capable of, supgotling the proposed structure without settlement. This density compaction test does blot warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed. stluctttte, Nve recommend performing soil borings below all fou:. tdstion areas of the proposed structure to verify the undcrlying soil conditions. Eiwironmental analysis of the soil materials is not span of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing; an environmcntat analysis of the soil materials. The scope of services is for determination of the dcgrele of Compaction of the tested layer of material only. No other analysis is implied or wan -anted. i i Job project specifications AC're not available at tree. time the work was perfbilned. Determination ofthe pass/,fail Compaction results art based on curretxt common iodustry requirements of 95% of the ASTM D-1 557 standard for building foundations and 98% of the AASHTO TA, 80 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findixtgs are relative to the date and areas Of our site work and sbould not be relied upon to represent conditions on outer areas or dates. Any subsequent�site disturbances due to water erosion, rain water$, aonfirraciion activities,. excavations , overgrown, vegetation, traffic and other disturbances will void this. test and the site must be re-CoMpacted and re-tesled prior to construction, As a mutual protection to clients, the public and ot2rselves, all reports are submitted are the confidential properly of clients and authorization for use,. publ;cation ofstaiernerits, conclusions or extracts from or regarding our report$ is reserved pending written approval. It has been, a pleasure working with you and look f6rward to do $o in the near future.