HomeMy WebLinkAboutPERMIT INFORMATIONPage 1 of 3
� w zu
BUILDING &CODE SYS; Q���� �Qa� You are logged in Snuc=ECo\ZaMPet
as. Version 24.13
Property I Valuation I Property Alert I Edit Permit I Search Permit I Review I Inspection I Permit Fee/Pay I Misc Fee I Contractor I Reports I Maint I Fiscal I Flood Log I ERD
To enable scheduling select a -Contractor, OwnerBuilder, Tenant, Applicant ...scheduling is disabled
Enter Permit#: (Press 14asoz5s I DD, EDIT, SCHEDULE INSPECTIONS! Printlnspectio
ENTER)
Input Truel
ERMIT INFORMATION
(Master) Permit
#: 1406-0259
Confirmation #: 872 Job Address: 10751 OCEAN DR B8 , JENSEN BEACH, FL 34957
Parcel #: 4511-311-0037-000/4
RESIDENTIALcel Permit
Status: Issued
Permit Type: (SIR UP TO 2 FLOORS)
Job Description:
NEW SINGLE FAMILY RESIDENCE (REPLACEMENT)2153 SF. 10/13/14 RECEIVED REVISION
TO CHANGE STAIRS
Date Issued: 8/21/2014
Issued By: ingraml Date Finaled: Finaled By:
CONTACT INFORMATION
CONTRACTORS, OWNER BUILDERS, TENANTS, APPLICAN S, AND PERMIT RUNNERS
--.... _......_................................ _..............--.............._...-..-'----..._......._...._.....................-.__......._.....__....---'----------..._...... ....... ---._._......_—.._...... --'---_......... _..-- --
# Type j Cert # I Status
Permit Type I Name
Company Phone Fax Cell Status Message
Contractor
+ 24113 j Active
BUILDING RESIDENTIAL (SFR UP TO ( GREGORY ]
2 FLOORS) - MORA81T0
GM CONSTRUCTION LLC
7727818500
7727818505
—
Contractor
I{ 26164 ; Active
ELECTRIC- RESIDENTIAL
BELLWETHER ELECTRIC
COMPANY
Contractor
? 22570 'Active
MECHANICAL/HVAC RESIDENTIAL- I
A/C MANN INC
1
REPLACEMENTSYSTEM
Contractor
27350 Active
PLUMBING - RESIDENTIAL
SOUTH PARK PLUMBING INC
OF MARTIN COUNTY
Contractor
123018 1 Active
ROOF - METAL
7 A TAYLOR ROOFING INC
I
��
ROPERTY OWNERS �
#
Name Company
Phone
Fax Cell
MARL THYRRING
j
F
j
JULIETHYRRING
tR„��
INSPECTIONS �
Message:
To'Add New Inspection; click ;'Add New'Inspectib on' °tton.
-
- ---
dd New Inspechona�FTaciiige Priorihes . , I
El Override to Schedule AND Edit any Inspection
- I
Pic Ned
Working
Delete
Scheduled E
Scheduled
Inspection Cade
Priority
Status
Inspec[orInspecti
Date On
Inspector Comments !
I�
Day
Ede
1425--SEWER
0..
_
CONNECT
�
Edit
roseberrye
10/14/2014
900 — PLAN
0
Accepted as
21 - ED
10/14/2014
THIS IS FOR FRONT STAIR DETAIL.
10/14/14 REVISION APPROVED FOR FRONT STAIRS.
_
-- _------ ---
..-_.---
_--._
---- __--- _---- , .
REVISION
noted
- --
ROSEBERRY
- --"---'—
,
CANNOT EMEND PAST FRONT GARAGE WALL ERR
" 4 t
EEC
givensd
10/29/2014
187 -- REVISION READY TO PICKUP
1
Approved
pp
GIVENS 109 - DEANNA
10/29/2014
PICKED UP BY GALE ORNELIS.
E it
9/18/2014
427 --
TEMPILEII TEMP
1
Approved
23 - GARYI,
23 - GARY
9/18/2014
CUL
ILI
-
9/18/2014
103 — EUFER
Approved
23 - GARY
9/18/2014
GROUND
11
SCHQGNER
Edit
WEB
9/18/2014
I�1
Approved
AEI ER
9/18/2014
F100TERIFOUNDATIC
NGN
104--
ELI
roseberrye
9/18/2014
COMPACTION TEST
,1
Accepted as
21 - ED
9/18/2014
4
FAXED COPY RECVD. ORIGINAL SIGNED, SEALED i
- ORIGINAL - TURN
noted
ROSEBERRY
COPY TO FOLLOW. ERR k;
INTO OFFICE
i3
122 -- FLOOD ELEV
t�
CERT UNDER
roseberrye 12/1/2014 Approved
CONSTRUCTION
21 - ED
ROSEBERRY
12/1/2014
REINSPECTION. '
--'•-- ------
-OFFICE
--- . _---------- ......2....,.. -------
---
REINSPECTION.
1. LINE A-7 BUILDING DIAGRAM NUMBER IS.
INCORRECT.
122 -- FLOOD ELEV
2. LINE A -BA IS FOR UNDER FLOOR ENCLOSED
Edit roseberrye 10/30/2014 CERT UNDER 2 Disapproved
21- ED
10/30/2014
SQUARE FOOTAGE AREA.
CONSTRUCTION -
ROSEBERRY
3. LINE A-813 REFLECTS TOTAL NUMBER OF FLOOD
OFFICE
OPENINGS COMPLYING WITH R322.2.2:
4. LINE C-2A IS FOR CRAWL SPACE ELEVATION
S. LINE C-213 IS FOR HABITABLE FINISHED FLOOR.
ELEVATION
http://code/(S(ojh3tzv5gohxmeboagll2wiv))/Add EditInspection.aspx
12/22/2014
_
Page 3 of 3
t
- Edit DAY FOR TESTING)
6
OFFICE
-' -
'
Edit
—
12/15/2014
167 — ROOF FINAL 6
Approved
23 - GARY
SCHEIGNER
12/15/2014
Edit
givensd
12/15/2014
I
141-- INSULATIO 6
Approved
23 - GARY
12/15/2014
1
SCHEIGNER
Edit
820 --
7
:....,�------------
--------
DRIVEWAY/CUL
--..---
Edit
,,,.__._....___...___—
----
�-----'-'----------
1 810 — HEALTH 7
---------- '---._
-___..------
--------
—
DEPT - SEPTIC
130 — FLOOD EUFE
.Wit
FINAL CONST
7
CERTIF - OFFICE
Edit
143 — HYDRO
7
—
OPENINGS
Edit
800—ADDRESS
7
—
FINAL
Ede
260 -- 30 DAY FOR
7
TESTNG
153 -- INSULATION
Edit
CERTIFICATION -
7
OFFICE
EdR
BL
8
ANDS(C PING/TRE
B04 -- DRIVEWAYWit
8
BLDG
172 -- HURRICANE
Edit
PANELS
8
(SHUTTERS)
825 --
Edit
LANDSCAPING -
i 8
ERD - SFR IN MHP
821-- SOLID
i
Edit
WASTE (TRASH
J 8
PICKUP) PAY IN
OFFICE
Ed'
�
149 — PROGRESS
8
-
INSPECTION
Edit
999 -- FINAL
8
INSPECTION
996 -- FINAL
-- —
TERMITE
B
TREATMENT-
-
TURN INTO OFFICE
Type in Inspection Notes. Then click'Add Inspection Notes' button=>
!Add Inspection Notes t
4 Max Expiration Date: 2/21/2016
i
http://code/(S(ojh3tzv5gohxmeboagll2wiv))/Add EditInspection.aspx 12/22/2014
Page 2 of 3
—_
Edit
roseberrye
132 -- FLOOR
10/15/2014 i STRAPPING/JOISTS
2
ApprovedSO-IEIGNER
23 - GARY
10/15/2014
'?
Edit
rosebe rye
420 -- PLUMBING
10/15/2014
2
Approved
23 - GARY
10/35/2014
Y�
! ROUGH
SCHEIGNER
t
------
- -
!
-
'----
PLEASE CHECK THAT FINISHED FLOOR ELEVATION
3.,
I
122 -- FLOOD ELEV
IS AT LEAST 7'. LGALBRAITH �..
Edit
roseberrye
10/14/2014
2
Disapproved
10/14/2014
10/14/14 AT THIS TIME, ST LUQE COUNTY
—
CONSTRUCTION'I
R�EB�ERRY
BUILDING DEPARTMENT CANNOT ACCEPT DIGITAL s
OFFICE
SIGNITURES. ERR I F
ENGINEER REPORT CERTIFYING ALL WALL PANELS }
DESIGNED, CONSTRUCTED, AND ERECTED TO MEET
t
106 -- ENGINEERS
21 - ED
WIND LOADS AND ALL REQUIREMENTS OF FBC
i
Edit
roseberrye
10/14/2014 REPORT -ORIGINAL-
2
Disapproved
ROSEBERRY
10/14/2014
2010. ERR
i TURN INTO OFFICE I
10/14/14 NONE OF THE ABOVE REQUIRED
INFORMATION WAS SUBMITTED ON SHOP '
DRAWINGS. ERR
Edit9/30/2014
- 1 121 -- TERMITE
2
Approved
23 - GARY
1/11/2014
t
SPRAY
SCHEIGNER
EEC
WEB
9/30/2014 115 — SLAB
2
Approved —
23 �
SCHEIGNf.,^�
9/3012014
°i
'..
Ede
roseberrye
143 -- HYDRO
9/25/2014
2
Accepted as
23 - GARY
9/25/2014
FINAL HYDRO OPENING INSPECTION REQUIRES I rr.
VENTED
OPENINGS
noted
SCHEIGNER
SQ INCH PER ONE SQ FT OF AREA s
-
-----
--- ---
v
—
23 - GARY
9/24/14 FB APPROVED. LGALBRAITH.:
Edjtt
WEB
9/25/2014 119 -- STEM WALL
2
Approved
SCHEIGNER
9/25/2014
FORM BOARD SURVEY NOT PASSED. PLEASE DO
NOT APPROVE UNTIL FB PASSES. ERR
-
105 —FORM
opted as
91- LYDIA
WOOD FLOOR ON TOP OF STEM WALL WILL BRING
Edit
9/24/2014 ! BOARD SURVEY
2
noted
GALBRAITH
9/24/2014
FLOOR ABOVE 7, DOUBLE CHECK WITH FLOOD
�p
OFFICE
CERT UNDER CONSTR. LGALBRAITH.
z
106 -- ENGINEERS
ENGINEER REPORT CERTIFYING PLACEMENT AND
u
I�
Ede
roseberrye
10/14/2014 REPORT -ORIGINAL-
3
Accepted as
21 - ED
10/14/2014
INSTALLATION OF HELICAL PILES.
E
TURN INTO OFFICE
noted
ROSEBERRY
10/14/14 FIELD REPORT CERTIFIED BY ENGINEER
OF RECORD. ERR
MUST SUBMIT ENGINEER LETTER FOR STRAPPING
904 -- FASTNER$
Accepted as
21 - ED
OF EXTERIOR WALLS TO BLOCK WALL
Edit
roseberrye
12/1/2014 (1ST)
4
noted
ROSEBERRY
12/1/2014
12/1/14 LETTER AND SKETCH FROM ENGINEER OF
RECORD SUBMITTED AND APPROVED USING {
1
i
SIMPSON COIL STRAP. ERR
'
REINSPCCTION. >
i
1. LINE AB (A) SQUARE FOOTAGE IS INCORRECT. l
_
2. LINE A8 (C) MUST SHOW NET AREA OF REQUIRED x
OPENINGS IN SQUARE INCHES. PLEASE DO NOT (E_
122 -- FLOOD EIEV
10ERT 22 UNDER
Disapproved-
21 - ED
ALTER ELEVATION CERTIFICATE FORM.
3. LINE A9 (B) MUST SHOW REQUIRED FLOOD
}
Edit
roseberrye
I
11/19/2014
: CONSTRUCTION
-
4
!
Reinspect Fee
Required
ROSEBERRY
11/19/2014
OPENINGS
OFFICE
4. LINE A9 (C) MUST SHOW NET AREA OF THESE !
i„
OPENINGS
S. LINE C2-A (E) REQUIRE TYPE OF EQUIPMENT TO !
BE DESCRIBED IN COMMENTS SECTION ON BACK OF f
FORM.
Edit
WEB
11 7 2014 136 -- ROOF 10)
/ /
4
Approved
23 - GARY
11/7/2014
—
1INMN TAB
SCHEIGNER
(s
EEC
135 -- WALL
10/30/2014
4
Approved
23 - GARY
10/30/2014
r
i
SHEATHING
SCHEIGNERGARY
!
Ed�l
10/30/2014 ! 137 —STRAPPING
4
Approved
SCHEIGNER
10/30/2014
TRUSS STRAPPING #!
.' a�'.
-
145 -- TRUSS
10/30/2014
4
Accepted as
23 - GARY
10/30/2014
,
.
-------
------
-------
DRWG i
--------------- ---1-
noted
SCHEIGNER
g.
'
§
Edit
roseberrye
10/30/2014 134 -- ROOF
4
Approved
23 - GARYSHEATHING
SOHEIGNER
10/30/2014
1
f y
"
1
106 -- ENGINEERS
RETNSPECTION. `-
ENGINEER REPORT CERTIFYING ALL WALL PANELS
E
roseberrye
10/30/2014 REPORT -ORIGINAL-
4
Approved
ROSEBERRY
10/30/2014
DESIGNED, CONSTRUCTED, AND ERECTED TO MEET
TURN INTO OFFICE
WIND LOADS AND ALL REQUIREMENTS OF FBC
2010. ERR
906 -- BATCH !
Ede
roseberrye
12/15/2014 I �� ) _ CKETS
5
Approved
221 -E D RRY
12/15/2014
3000 PSI } P
TURN INTO OFFICE
Edit
ingraml
12/15/2014 187 -- REVISION
5
Approved
0 -OFFICE
12/12/2014
LETTER FROM ENGINEER CLARIFYING STRAPPING
i READY TO PICKUP
REQUIREMENTS. PICKUP BY THYRRING
1 148 —
z
EEC
12/2/2014 WINDOW/DOOR
5
Approved
23 - GARY:
12/2/2014
----LATTACHMENi�
-- —
— —_—
SCHEIGNER ---
----.—.
--_—....-----
'
1
Edit
12/2/2014 127 -- MULLION
5
Approved
23 - GARY
SCHEIGNER
12/2/2014
r
gg
Edit
WEB
12/2/2014 650 -- FRAME -ALL
5
Approved
2 �
12/2/2014
SCHEIGNS:
L
259 -- POWER
DPI FACF F DM "n
http://code/(S(ojh3tzv5gohxmeboagll2w v))/Add EditInspection.aspx 12/22/2014